W912WJ22B0015 Amendment 0001.pdf
PDF 582 KB Posted
- Solicitation number
- W912WJ22B0015
About this file
This document provides an amendment to a solicitation for construction services for improvement dredging of the Point Judith Harbor Federal Navigation Project in Rhode Island. The U.S. Army Corps of Engineers, New England District is seeking a mechanical dredge to remove approximately 30,200 cubic yards of mixed sediments from channels at depths of 11 to 15 feet below mean lower low water between October 15, 2022 and January 31, 2023. Material will be transported via scow to a nearshore placement site offshore of Matunuck Beach approximately 2.5 miles west of the Point Judith inlet in waters 15 to 18 feet deep. The solicitation is set aside for small businesses with a North American Industry Classification System code of 237990 and size standard of $30 million. Questions may be directed to the specified Contract Specialist and the solicitation is available through the Procurement Integrated Enterprise Environment and System for Award Management registration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract.pdf | ||
| W912WJ22B0015.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is necessary to provide responses to Requests for Information. All other aspects remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Aug-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ22B0015
X 9B. DATED (SEE ITEM 11)
02-Aug-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Aug-2022
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ22B0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
REQUESTS FOR INFORMATION 8/30
1. The requisite Debris Management Plan centers around the debris targets identified by the pre-bid survey and documented with underwater photographs provided in the bid package, and that the Plan must include photo documentation by the Contractor of these targets as they are removed and stockpiled during the course of work. By the nature of dredging, many smaller items that were photographed and classified as debris often are unable to be retrieved from scows as they become encapsulated by the dredge spoils during loading. It would be impractical (and unsafe) to sift through each and every bucket load in search of each item identified in the bid package and so the best practice would be to remove any debris identified that could be safely removed from the scow for photographing, cataloging, stockpiling and disposal off-site as required.
Is the intent of the contract to remove and catalog every item identified in the bid documents, or is it to document the debris that is able to be removed and identified from the scows during the course of dredging?
Response: The intent is to document the debris that is able to be removed and identified. There are no restrictions to the order of work as specified under Part 1.7 in Section 35 20 23 MECHANICAL DREDGING. The Contractor may either plan to remove all the debris prior to the start of dredging, or clear areas of debris as their dredging progresses.
2. If the former is correct, is the USACE directing the contractor to remove all debris from the dredge area prior to the start of dredging? If so, this could negatively impact the timeline which is already quite short due to the environmental window.
Response: No. The means and methods, and timing of debris removal is solely up to the Contractor as long as the debris removal work is within the allowable dredge season as specified under subpart 1.1.1 in Section 01
11 00 SUMMARY OF WORK.
3. If the USACE intends to direct the Contractor to remove all items of debris identified in the bid package prior to the start of dredging, can the debris removal begin prior to the opening of the environmental window for dredging and disposal work?
Response: No. All debris removal work shall be within the allowable dredge season as specified under subpart
1.1.1 in Section 01 11 00 SUMMARY OF WORK.
4. Does the USACE want previously undisclosed debris that is removed to be photographed and cataloged in the same manner as the debris items identified in the bid package?
Response: Yes, photographed and logged. Payment will be made under Bid Line Item 0004.
(End of Summary of Changes)
W912WJ22B0015