Amendment W912QJ21Q0162-0002.pdf

PDF 591 KB Posted

Attached to
Garage Demolition and Construction, Thomaston Dam, Thomaston, CT
Solicitation number
W912WJ21Q0162
Issued by

View the file

Other files

File Type Posted
Amendment W912QJ21Q0162-0004.pdf PDF
Amendment W912QJ21Q0162-0003.pdf PDF
Amendment W912QJ21Q0162-0001.pdf PDF
Solicitation W912WJ21Q0162.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W13G86120294490001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment is necessary to provide responses to questions from industry. Questions/Answ ers #5-9 are applicable to this amendment.

Deadline for question submission is September 16, 2021 at 5:00 PM.

Closing remains September 20, 2021 at 5:00 PM Eastern.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Sep-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ21Q0162

X 9B. DATED (SEE ITEM 11)

07-Sep-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Sep-2021

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

Sheila.M.Winston@usace.army.milEMAIL:978-318-8159TEL:

SHEILA M WINSTONVINCUILLA / CHIEF, CONTRACTING DIVISION

W912WJ21Q0162

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been modified:

REQUEST FOR INFORMATION

Question 1. I. 4. Schedule Is it possible to extend the period of performance from 120 days? Most suppliers are having trouble with materials, etc.

Answer 1: Period of performance has been revised in the Statement of Work to 240 days after Notice to Proceed.

Question 2. II. Construct new garage: Siding / Roofing panel thickness I believe there is a typo. A standard 26 ga.

panel would be .019 and not .19.

Answer 2: Correct, the siding and roof panel thickness should be 0.019” thick. The Statement of Work has been revised to correct this.

Question 3. Can the rib height be 1 1/4" instead of 1"?

Answer 3: The rib height has been revised in the Statement of Work to between 1” and 1 ½”.

Question 4. The total height of interior plywood is 8'?

Answer 4. The plywood should extend the entire height of the building, 16’.

Question 5. Is the electrical service to be single phase or three phase?

Answer 5. Service is to be single phase 200 amp.

Question 6. How many circuits are there for the outlets?

Answer 6. There are to be 4 circuits for outlets with 4 spares. Lighting will be on separate circuits with one circuit for the interior lighting and one circuit for the outside lighting.

Question 7. What is the location of the outlets?

Answer 7. Outlets should be placed 44” above finish floor and spaced in accorandce with local code (6 feet apart).

Question 8. Are breakers to be stab-in breakers or bolt-on breakers?

Answer 8. Breakers are to be bolt-on.

Question 9. Can fixtures be strictly LED in high bays?

Answer 9. Yes, as per the Statement of Work, LED fixtures are preferred and specified.

W912WJ21Q0162

(End of Summary of Changes)