SEE SCHEDULE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment is necessary to provide responses to questions received from industry.

The Statement of Work is also revised.

Closing remains July 28, 2021 at 5:00 PM Eastern.

1. CONTRACT ID CODE PAGE OF PAGES

1 17

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Jul-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ21Q0125

X 9B. DATED (SEE ITEM 11)

12-Jul-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Jul-2021

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

Sheila.M.Winston@usace.army.milEMAIL:978-318-8159TEL:

SHEILA M WINSTONVINCUILLA / CHIEF, CONTRACTING DIVISION

W912WJ21Q0125

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

REQUEST FOR INFORMATION

Question 1: Please provide As Builts for locations included in this solicitation.

Answer 1: Available As Builts are included as separate attachments with this amendment. As Builts are not available for all locations. Interested vendors are encouraged to conduct a site visit.

Question 2: Please advise on the make and model of the existing Fire Alarm Control Panel that Fire Alarm components (manual fire alarm pulls and smoke detectors) will need to be tied into.

Answer 2: All manual fire alarm pulls and detectors will be integrated into the new alarm system panel provided by the awarded Contractor. The existing fire alarm control panel shall be removed and disposed of.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

STATEMENT OF WORK

SECURITY ALARM SYSTEM

U.S. ARMY CORPS OF ENGINEERS

Tully Lake & Birch Hill Dam Royalston, MA

STATEMENT OF WORK

I. General

1. Scope Provide all equipment, materials, and labor necessary to remove existing security alarm system and install a new security alarm system in nine (9) buildings at two (2) sites for Tully Lake and Birch Hill Dam. The contractor shall install the new security system in compliance with the Unified Facilities Guide Specifications (UFGS), National Electrical Code, Massachusetts Building code and applicable Fire Codes. All work will be completed to the satisfaction of the Technical Point of Contact.

The Contractor will remove all existing alarm system components, including but not limited to sensors, control panels, alarm panels, wiring and sirens, where applicable.

Contractor is responsible for removal and proper disposal of all existing equipment and associated components.

All products, software, and miscellaneous supplies shall adhere to the Buy American Act and be in compliance with the requirements for covered telecommunications equipment and services, see Federal Acquisition Regulation (FAR) clause 52.204-24 for information. Any items submitted for approval that do not meet these requirements shall be disapproved and it will be the Contractor’s responsibility to provide suitable replacements at no additional cost to the Government.

2. Location Tully Lake is located at 2 Athol Richmond Road, Royalston, MA 01368.

Birch Hill Dam is located at 68 Birch Hill Dam Road, Royalston, MA 01368.

3. Technical Point of Contact The Technical Point of Contact for this contract will be Park Ranger William Mehr. Park Ranger Mehr can be reached by phone at 978-318-8262 or by email at:

William.C.Mehr@usace.army.mil

4. Site Visit and Request for Information An appointment can be made by contacting the Technical Point of Contact, Park Ranger William Mehr. Site visits are generally scheduled between 7:00am and 3:30 PM Monday thru Friday. A site visit is highly encouraged for all interested vendors.

5. Schedule The work shall commence within 14 days after the issuance of the Notice to Proceed and be completed within 120 days from Notice to Proceed. The project area will be open to the contractor Monday through Friday 7:00 AM to 3:30 PM and all work must be done during those hours unless additional hours are approved by the Technical Point of Contact. No work shall be done on weekends or Government holidays.

6. Safety

a) General:

All work shall be conducted in accordance with the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed at the project office or electronically at the following link:

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.

b) Abbreviated Accident Prevention Plan:

The Contractor shall prepare an Abbreviated Accident Prevention Plan (AAPP) specific to the activities being performed. It shall include Activity Hazard Analyses (AHAs) as described below in paragraph C. A non-mandatory, fillable APP template is available upon request. However, the contractor is permitted to submit their own plan, at a minimum it must meet the requirements of EM 385-1-1, Appendix A, Section K.

A preparatory meeting shall be conducted by the prime contractor to discuss the Abbreviated Action Plan contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

Weekly safety meetings shall be held and documented. Records shall be available to the Technical Point of Contact upon request.

c) Activity Hazard Analysis:

An AHA shall be submitted for each major phase of work. A major phase of work is defined as an operation involving a type of work presenting hazards not experienced in previous operations or where a new subcontractor or work crew is to perform the work. The analysis shall define all activities to be performed, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.

Note: As part of the APP and AHAs include site specific COVID-19 monitoring procedures which address, at a minimum, the following elements:

Procedures for periodic sanitation inspections Procedures for disinfecting project sites in accordance with the Center for

Disease Control and Prevention (CDC) guidelines Site Specific measures to practice social distancing while working on the project Employee training on the signs, symptoms, and protection measures in accordance with CDC guidelines A list of Personal Protective Equipment (PPE) to be used in accordance with

Center for Disease Control and state guidelines

d) Emergency Response:

Emergency procedures shall be documented in the Accident Prevention Plan and will include a map with directions to the nearest hospital, emergency contact numbers, and onsite First Aid/CPR responders.

e) Required Personnel:

The Contractor shall employ a minimum of one Competent Person (CP) at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO shall be present at the project site and report to the contractor’s upper management. The SSHO is required to have related construction experience and have at a minimum completed a 10 Hour OSHA training.

In addition, when emergency medical services are not accessible within 5 minutes of the work location and there are 2 or more workers onsite, at least 2 employees shall have (in-person) training in First Aid and CPR. Minimum qualifications are listed in EM 385-1-1, Section 03.A.02.c.

*Note: Other Competent or Qualified Persons may be required per EM 385-1-1 and/or other sections of this Scope of Work, based on the characteristics of the project*

f) Accident Reporting:

All accidents and near misses shall be investigated by the Contractor. All work-related recordable injuries, illnesses and property damage accidents (excluding on-the-road vehicle accidents), in which the property damage exceeds $5,000.00, shall be verbally reported to the Technical Point of Contact within four (4) hours of the incident. Serious accidents as described in EM 385-1-1 Section 01.D shall be immediately reported to the Technical Point of Contact. ENG Form 3394 shall be completed and submitted to the Technical Point of Contact within five (5) working days of the incident.

The Contractor shall compile employee work hours (including subcontractors) and forward the total hours to the Technical Point of Contact no later than close of business on the 10th calendar day of the following month. The method of transmission by the prime contractor to the Technical Point of Contact shall be electronically.

7. Electrical

a. General:

All electrical work shall comply with EM 385-1-1 (Sections 11 &12) and applicable Unified Facilities Guide Specifications (Section 28 10 05), National Electrical Safety Code (NESC), National Electric Code (NEC), National Fire Protection Association (NFPA), and OSHA regulations. In the circumstance there is a discrepancy between the codes and regulations listed above, the most stringent shall apply.

b. Qualified Person:

Electrical work shall be performed by a Qualified Person (QP) with verifiable credentials who are familiar with applicable code requirements. Verifiable credentials consist of State, National and/or Local Certifications or Licenses that a Master or Journeyman Electrician may hold, depending on the work being performed, and should be identified in the appropriate AHA. Journeyman/Apprentice ratio shall be in accordance with State, Local and Federal requirements applicable to where the work is being performed.

c. Permits:

Contractor shall be responsible for obtaining all applicable State, Local or Federal permits.

d. Wiring and Equipment:

All electrical wiring and equipment shall be a type listed by a nationally recognized testing laboratory for the specific application for which it is to be used. Appropriate PPE will be worn and/or utilized at all times and adequately match the level of associated risk. All materials shall adhere to the Buy American Act.

e. Emergency Procedures and Training:

Employees exposed to shock hazard and those employees responsible for taking action in case of emergency shall be trained in accordance with EM 385-1-1 Section 03.A, OSHA 29 CFR 1910.151, and NEPA 70E 110.2c. The training shall include methods to release of victims from contact with exposed energized electrical conductors or circuit parts. Employees shall be regularly instructed in methods of first aid and emergency procedures, such as approved methods of resuscitation.

f. Lock-out Tag-Out All equipment and circuits to be worked on shall be de-energized before work is started. Personnel shall be protected by a Hazardous Energy Control Program (HECP) and procedures in accordance with EM 385-1-1, Section 12. Positive means shall be provided for rendering controls or devices inoperative while repairs or adjustments are being made to the machines they control.

If work MUST be performed on an energized system, then the employer must first demonstrate that de-energizing introduces additional or increased hazards or is infeasible due to equipment design or operational limitations (i.e., testing, troubleshooting, etc.).

Energized work may never be performed without prior authorization. Once it has been determined that equipment must be worked on in an energized condition, an energized work permit shall be submitted to the Technical Point of Contact for acceptance. > See NFPA 70E and EM 385-1-1, Section 11.A.02.c for permit requirements.

8. Preconstruction Conference The Contractor, upon award of this contract, shall contact the Technical Point of Contact to arrange a preconstruction conference. The Contractor’s Project Manager and Quality Control Personnel will attend this meeting. This conference will be held at the time and location agreeable to the government and contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. At the pre-construction conference the contractor shall provide the name of the project superintendent with a telephone number for project coordination.

The following is a general list of items for discussion during this preconstruction conference:

i. Authority of the Technical Point of Contact and Quality Assurance Inspectors.

ii. Contractor’s Safety Program (including sub-contractors).

iii. COVID-19

iv. Abbreviated Accident Prevention Plan (AAPP) and Activity Hazard Analysis.

v. Safety Meetings (Documented on NED Form 251).

vi. Accident Reporting (ENG Form 3394).

vii. Correspondence, Communication and Administrative Procedures.

viii. Invoice and payment.

ix. Security Requirements.

9. Submittals

Although the Government reviews submissions for technical data/information required by this scope of work, it is emphasized that the Contractor’s work must be executed using proper internal controls and review procedures. The documents identified below must be prepared in accordance with the applicable standards, submitted to the Technical Point of Contact for review and accepted by the government prior to the commencement of any field activities. Templates for the Accident Prevention Plan and Activity Hazard Analysis may be provided upon request.

i. Manufacturer Data specification sheets for alarm system components.

ii. Manufacturer Warranty for alarm system components.

iii. Abbreviated Accident Prevention Plan (AAPP) (Prior to start of field work).

iv. Activity Hazard Analysis (AHA) (Prior to start of field work).

v. Manuals on new equipment installed.

10. Security

The contractor will comply with all established security policies at Tully Lake and Birch Hill Dam. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The contractor shall be given at least 24-hour notice of any such closure. Alarm security equipment requirements are listed in sections below.

11. Clean up The Contractor shall practice good housekeeping to maintain a safe job site. The contractor shall keep the work area, including any storage areas, free from the accumulation of waste materials. Upon completing work in an area, the contractor shall remove any tools, equipment, and materials that are not the property of the government.

Upon completion of work, the Contractor shall clean up the job site to the satisfaction of the Government.

12. Government Resources The contractor is responsible for providing all materials to complete the project. Unless specified in the contract, the Government will not provide any equipment, telephone services or other resources.

13. Omissions This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.

14. Quality Assurance The contractor is responsible for the quality control of the contract work. The government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.

15. Other Contracts The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other Contractors and Government employees. The contractor shall not commit or permit any act, which will interfere with the performance of work by another contractor, or by Government employees.

16. Environmental Protection Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the contractor at the site, and the site will be inspected/ cleaned on a daily basis. No burning is permissible. Water, air and land resources shall not be adversely impacted during the work. Contractor will take necessary steps to ensure all federal, state, and local environmental regulatory requirements are met.

17. Sustainability

All products provided by the contractor must meet the recycled content requirements set forth by the Environmental Protection Agency. Under the Comprehensive Procurement Guidelines (CPG) program, the Environmental Protection Agency (EPA) designates products that are or can be made with recovered materials and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. Visit https://www.epa.gov/smm/comprehensive-procurement-guideline cpgprogram for a complete list of designated products and the associated recommended contents levels. Offerors must be able to demonstrate that each offered products meets minimum content levels upon request.

18. Receiving and Storing Materials The contractor is responsible for protecting any stored material until it is placed in service. The contractor is responsible for receiving and unloading of delivered goods.

Government employees will not receive material or supplies for the contractor and will not be responsible for damage to contractor equipment or material.

19. Contractor’s Personnel

a. Minimum Personnel Requirements

The Contractor shall provide an adequate number of fully qualified personnel to perform the specified service properly and efficiently within the time limits specified.

The Contractor shall provide a list of the names and contact phone numbers for all employees prior to them working on Government Property.

b. Employee Conduct The Contractor shall be responsible for seeing that the firm’s employees strictly comply with all CFR 36 Rules and Regulations, Federal, State, and Municipal laws.

Any personnel activity, which, in the opinion of the Government, is deemed detrimental to the performance of the contract may result in the removal of Contractor employee/employees.

Examples of unbecoming actions or conduct include but are not limited to the following:

i. Cursing, harassment, or discrimination of and/or unwarranted physical contact with visitors, US Army Corps of Engineers personnel, or other contractors

ii. Recurring written and/or verbal complaints from visitors, US Army Corps of Engineers personnel, or other contractors.

iii. Unsafe operation of vehicles while on US Army Corps of Engineers property.

c. Removal of Contractor’s Employees

The Technical Point of Contact may require the Contractor to immediately remove from the work site any employee of the Contractor or subcontractor, who, in the opinion of the Technical Point of Contact, is incompetent, who endangers persons or property, or whose physical or mental condition is such that it would impair the employee’s ability to satisfactorily perform assigned work. Notification to the Contractor shall be promptly made in writing if time and circumstances permit.

Otherwise, notification shall be verbal or by telephone, and shall be confirmed in writing as soon as possible. No such removal, however, will reduce the Contractor’s obligation to perform all work required under this contract, and immediate replacement will be made as required. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.

20. Damage to Government and Private Property

The Contractor shall be responsible for restoring any Government facilities or structures damaged as a result of the Contractor’s actions. The Contractor shall also be responsible for any damage to private property or injury to any person as a result of the firm’s operations. The Contractor shall notify the Technical Point of Contact immediately of damage to Government and private property and injury to any person resulting from the Contractors’ operation. Also, the Contractor shall notify the Technical Point of Contact of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed. Trucks and/or trailers will be driven on existing roads only and not across or through park areas to facilities.

21. Payment Payment shall be made on a per job basis. After final inspection and acceptance by the

Government, the contractor must submit an invoice to the Technical Point of Contact.

The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, process, and total amount due per line item. For jobs greater than 30 days the contractor may request progress payment.

The invoices will be directed via postal mail, fax, or email as identified below:

Attn: William Mehr Tully Lake/Birch Hill Dam 2 Athol Richmond Road Royalston, MA 01368 Email: William.c.mehr@usace.army.mil

21. Changes to Quantities The Government reserves the option, should it become necessary, to decrease or increase quantities in any or all designated contract areas. The Government may also, at any time during the duration of this contract, remove any portion of the contract responsibility and delete any subsequent work in the selected area. The Contractor shall be given adequate notification to prepare for either contingency. This decrease or increase will be deducted from or paid for in accordance of a negotiated cost. Any increase in quantity must be negotiated with the Contracting Officer. The Contractor shall not perform any additional work until the issuance of a formal modification signed by the Contracting Officer. In addition, the Technical Point of Contact may, on special occasions decide to reschedule work in order to avoid conflict with visitation or unnecessary expense. The Contractor shall be given at least 24 hours’ notice.

II. Technical

1. Existing Conditions The current alarm system is outdated and not functioning. The alarm system is divided into two (2) separate projects:

a) Tully Lake (TUL)

Tully Lake Gate House E.N.E. System Existing security cameras shall not be removed.

Smoke detector on ceiling above entrance door inside of gatehouse Keypad.

Door alarm on the main door.

Motion detector on the main floor.

One (1) manual fire alarm pull station next to entrance door All wires for existing system are in a conduit, surface mounted to walls

Project Office Seven (7) Motion detectors

Five (5) CO/Smoke detectors in garage and office rooms One (1) Keypad in workshop Three (3) Door sensors One (1) Garage door - sensors are still intact or next to the door but not in use Three (3) Manual fire alarm pull stations next to entrance doors One (1) External siren/alarm

Sign Shop Five (5) Motion detectors Four (4) CO/Smoke detectors, one in each garage area Two (2) Keypads Door sensor on the main entrance door.

Five (5) Garage doors - sensors are still intact or next to the door but not in use One (1) Manual fire alarm pull station next to entrance door

Basin Office with Attached Garage Seven (7) Motion detectors Five (5) CO/Smoke detectors in garage and office rooms One (1) Keypad Four (4) Door sensors One (1) Garage door - sensors are still intact or next to the door but not in use Three (3) Manual fire alarm pull stations next to entrance doors

Basin Office Detached Garage Not currently on any existing system, will be included in new system

b) Birch Hill Dam (BHD) Birch Hill Dam Gatehouse E.N.E. System Existing security cameras shall not be removed Three (3) CO/Smoke detectors One (1) Keypad Door alarm on the main door and back door Two (2) Motion detectors on the main floor All wires for existing system are in a conduit, surface mounted to walls

Utility Building Existing security cameras shall not be removed Four (4) Motion detectors Four (4) CO/Smoke detectors in garage and office rooms

Two (2) Keypads Four (4) Door sensors Three (3) Garage doors - sensors are still intact or next to the door but not in use Sprinkler system (one head) in back room over wood furnace Two (2) External siren/alarm

Detached Garage One (1) Door sensor Two (2) Garage doors - sensors are still intact or next to the door but not in use

Project Office Seven (7) motion detectors Seven (7) CO/Smoke detectors in office rooms One (1) Keypad Three (3) Door sensors Note, this office was recently renovated and has new components that may be incorporated in new system

2. Execution

a) The Contractor shall install new alarm components in the nine (9) buildings at the two (2) project locations to industry standards that provide intrusion detection for the buildings. Monitoring of the Security System will be the subject of a separate contract.

b) The Contractor will remove old alarm system sensors, control panels, external sirens and all wiring for disposal.

Existing wiring may not be used under any circumstances.

All wiring is to be installed either inside of the wall or ceiling in the project office buildings. If unable to install inside of wall or ceiling, must be concealed in a conduit.

EMT (Electrical Metallic Tubing) shall be used in Gate Houses to match previous installs.

Wiremold may be permitted in finished areas where necessary; locations to be approved by Technical Point of Contact prior to install.

All electrical work shall comply with EM 385-1-1 (Sections 11 &12) and Unified Facilities Guide Specifications (UFGS 28 10 05), applicable National Electrical Safety Code (NESC), National Electric Code (NEC), National Fire Protection Association (NFPA), and OSHA regulations. In the circumstance there is a discrepancy between the codes and regulations listed above, the most stringent shall apply.

The use of window sensors will be limited to areas where motion sensors will not be effective at detecting intrusion.

(24 total) Manual fire alarm pull stations will be installed. Location to be approved by Technical Point of Contact prior to installation. Some areas share garage bay/exterior door and need only one manual fire pull in certain areas.

One (1) in each gatehouse by the entrance for a total of two (2) One (1) in each applicable garage bay, location to be determined by Technical Point of Contact for a total of seven (7) One (1) in each office near applicable exterior door, location to be determined by Technical Point of Contact for a total of twelve (12) One (1) in each office hallway by boiler rooms for a total of five

(5) New photoelectric or ion smoke detectors, heat detectors and carbon monoxide detectors will be installed in locations according to local fire code and incorporated into the alarm system. Either photoelectric or ion smoke detectors are acceptable so long as they are used in the proper locations as recommended by the manufacturer.

New external sirens/alarms will be installed in prior locations.

3. Security Requirements

a) Premise Control Unit (PCU)

Install the PCU command processor in a tamper resistant enclosure that is specified in paragraph "Component Enclosure". Package the following with the PCU:

i. Power transformer

ii. Battery(s)

iii. Network connection cable

iv. Keypad(s)

v. Keypad connection cable(s)

vi. Additional components as required for full functionality

b) Motion Sensors Dual Technology Passive Infrared Sensors and Microwave Sensors UL 639.

Provide sensor combining passive infrared (PIR) and microwave sensors configured and manufactured specifically to be mounted in a single tamper alarmed enclosure.

The sensor must provide ["AND" logic for alarm indication] [selectable "AND" logic or "OR" logic for alarm indication configured in the "OR" logic state]. Provide sensors that have a local means of indicating detection for use during installation and calibration with a means of disabling the indication. The sensor is to have an LED walk test indicator which is not visible during normal operations. When visible, the walk test indicator will light when the sensor detects an intruder. Provide a sensor equipped with a manual control, located within the sensor's housing, to enable and disable the test indicator or with the test indicator located within the sensor housing so that it can only be seen when the housing is open or removed.

c) Exterior Door Sensors High Security Balanced Magnetic Switch (BMS):

Mount the BMS inside the secure location and on the opening side of the door. BMS sensors do not have the capability to incorporate an end-of-line (EOL) resistor. Level 1 Switch. UL 634, Level 1 High Security.

d) Component Enclosures

Alarm enclosures with a tamper switch(es). Refer to Tamper Switches below.

Enclosures are to be formed and assembled to be sturdy and rigid. These include:

i. Consoles

ii. Annunciator housings

iii. Power supply enclosures

iv. Sensor control and terminal cabinets

v. Control units

vi. Wiring gutters

vii. Other component housings

e) Tamper Switches

Corrosion-resistant tamper switches are required for the following intrusion detection system equipment with hinged doors or removable covers that contain open circuits:

Enclosures Cabinets Housings Boxes Raceways Fittings Sensors

Tamper switches are to initiate an alarm signal when the door or cover is moved as little as 6 mm from the normally closed position. Mechanically mount tamper switches to maximize defeat time when enclosure covers are opened or removed.

One second is the minimum amount of time required to depress or defeat the tamper switch after opening or removing the cover. Enclosure and tamper switch must prevent direct line of sight to internal components and prevent switch or circuit tampering. Conceal mounting hardware so switch cannot be observed from enclosure exterior. Tamper switches on doors which are opened to make normal maintenance adjustments to the system and to service power supplies must [not] have a maintenance position. [Provide two position tamper switches].

Tamper Switch Performance Requirements

Tamper switches are to be:

i. Inaccessible until switch is activated.

ii. Under electrical supervision at all times, irrespective of the protection mode in which the circuit is operating.

iii. Annunciated to be clearly distinguishable from intrusion detection alarms and exempt from being disarmed, shunted, or silenced.

iv. Spring-loaded and held in the closed position by the door, or cover protected.

v. Wired to break the circuit when the door or cover is disturbed.

vi. Wired so that each sensor and device is annunciated [individually] [by zone] at the central reporting processor.

4. Products

a) Premise Control Unit (PCU) – The Premise Control Unit is the main connection point of the Intrusion Detection System where all the components come together to control the system. Nine (9) Premise Control Units will be installed:

i. TUL Flood Control Gate House

ii. TUL Project Office

iii. TUL Sign Shop

iv. TUL Basin Office

v. TUL Detached Garage

vi. BHD Flood Control Gate House

vii. BHD Utility Building

viii. BHD Project Office

ix. BHD Detached Garage

Within the enclosures for the Premise Control Unit will also be housed the power supply, battery backups, and any other components that are needed to make the system function correctly. The enclosures will be fitted with a tamper switch that will sound the alarm if opened while armed. In some cases, multiple enclosures may be used to fit all of the needed components

b) Keypad Control Panels Ten (10) Keypad Control panels will be installed at the combined projects, location to be determined by Technical Point of Contact:

i. TUL Flood Control Gate House

ii. TUL Project Office

iii. TUL Sign Shop (2)

iv. TUL Basin Office

v. TUL Detached Garage

vi. BHD Flood Control Gate House

vii. BHD Utility Building

viii. BHD Project Office

ix. BHD Detached Garage

Each Keypad Control panel will have the following: user changeable passcodes, burglar alarm and commercial fire features, digital keypad, low temperature sensor and hard-wired system with emergency backup battery (at least 12 hours). Keypad Control panels should also include features that can notify personnel of power outages. The new keypad control panels may be installed in similar locations to the existing panels.

c) Wiring

New wire will be used at all times. Utilizing old wiring is unacceptable and all old wiring shall be removed and disposed of in accordance with all applicable regulations by the Contractor. All wiring will be either: Inside of the wall or above the drop ceiling suspended from the actual ceiling. All exposed wiring will be inside flexible metal conduit (FMC) or inside electrical metallic tubing (EMT), conduit shall meet applicable electrical code standards.

d) Sensors A minimum of forty-one (41) motion sensors will be placed to maximize their effectiveness and coverage of the buildings. Door sensors will be placed at each building entry point to include the garage doors (sensor placement and number of sensors will be approved prior to installation by the Technical Point of Contact). The following breakdown is the approximate tally of sensors potentially needed.

TUL Gatehouse: 1 motion, 1 double door TUL Project Office: 7 motion, 3 doors, 1 garage door TUL Sign Shop: 6 motion, 2 doors, 5 garage doors TUL Basin Office: 7 motion, 4 doors, 1 garage door TUL Detached Garage: 2 motion, 1 door, 2 garage doors BHD Gatehouse: 2 motion, 1 double door, 1 door BHD Utility Building: 7 motion, 4 doors, 3 garage doors BHD Project Office: 7 motion, 3 doors BHD Detached Garage: 2 motion, 1 door, 2 garage doors

e) Fire Detection

A minimum of forty (40) commercial grade photoelectric and/or ion smoke detectors will be installed in accordance with fire code standards. Install a minimum of eight

(8) commercial grade carbon monoxide detectors placed and installed in accordance with fire code standards. Install hard wired smoke detectors and carbon monoxide units in all nine (9) buildings. Detectors will be integrated into the alarm system.

Detector placement and number of detectors will be approved prior to installation by the Technical Point of Contact.

i. Photoelectric Smoke Detectors:

1) TUL: 21 (11 in offices, 8 in garage bays, 2 in gatehouse)

2) BHD: 19 (11 in office, 5 in garage bays, 3 in gatehouse)

3) Total: 40

ii. Carbon Monoxide detectors:

1) Two (2) in each office building

2) Total: 8

f) Manual Fire Alarm Pull Stations

A minimum of 24 commercial grade manual fire alarm pull stations shall be installed in accordance with building codes. Fourteen will be installed at Tully Lake Project and ten will be installed at the Birch Hill Dam Project. All manual fire alarm pull stations will be integrated into the new alarm system control panel.

i. TUL Project Office: 4

ii. TUL Gatehouse: 1

iii. TUL Sign Shop: 4

iv. TUL Basin Office: 4

v. TUL Detached Garage: 1

vi. BHD Project Office: 3

vii. BHD Gatehouse: 2

viii. BHD Utility Building: 4

ix. BHD Detached Garage: 1

g) Siren

Alarm sirens will be placed in conjunction with keypads on buildings (installed on the exterior of office buildings when possible and installed on the exterior of both Gatehouses) in such a way to draw attention to unauthorized intruder detection within a building.

NOTE: Alarm security system, components and hardware must be compatible with multiple monitoring companies for future monitoring and servicing and must not be proprietary to one alarm security company. Alarm System Monitoring will be the subject of another contracting action once the system has been installed.

(End of Summary of Changes)