Amendment W912WJ21Q0122-0001.pdf
PDF 593 KB Posted
- Solicitation number
- W912WJ21Q0122
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Previous Repairs_South Side.pdf | ||
| FFD Railing Posts Detail_7-14-2021.pdf | ||
| Informational Exhibits 2.pdf | ||
| Solicitation W912WJ21Q0122.pdf | ||
| Informational Exhibits.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to post the Site Visit Attendee list and to provide responses to questions received from industry.
Closing w ill be extended until July 27, 2021 at 5:00 PM Eastern.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Jul-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ21Q0122
X 9B. DATED (SEE ITEM 11)
01-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Jul-2021
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
Sheila.M.Winston@usace.army.milEMAIL:978-318-8159TEL:
SHEILA M WINSTONVINCUILLA / CHIEF, CONTRACTING DIVISION
W912WJ21Q0122
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
REQUESTS FOR INFORMATION
SITE VISIT ATTENDEE LIST:
NAME COMPANY
Kevin Sarana Aulson Tia Mercer USACE Brad Clark USACE Jennifer Samela USACE
1. No deck repairs are included in the work for this solicitation?
a. Response: Correct, work included in this solicitation is for fascia repairs only
2. Will the railing be required to be removed?
a. Response: No, the railing will not be required to be removed. The contractor will need to determine the best method to address the unsound concrete located near the railings.
3. Is the road below the bridge accessible?
a. Response: Yes, the road below the bridge is accessible. The road is accessed from Granite Drive
(entry road to the dam), along a gravel road, and out through the field. Depending on weather, this access can be flooded, wet, or muddy.
4. Can the contractor stage equipment below or on top of the dam?
a. Response: The anticipated staging area is the top of the dam (north side), though passable access must remain on the south side of the top of the dam, as well as a three (3) foot access must remain open to the Gatehouse.
5. How are the railing posts attached?
a. Response: An As Built has been included with this amendment as a separate file.
6. Is there any access to water?
a. Response: The solicitation states that there are no resources provided by the Government. The
Contractor must provide all resources needed for this work.
7. What is the height from the road below the bridge to the service bridge?
a. Response: It is approximately forty (40) feet from the road below the bridge to the deck of the service bridge.
8. Does the work completed on the south side of the bridge meet the specifications as required in this solicitation?
a. Response: Yes
9. Is there any work required on the expansion joints? Does the Contractor have to put expansion joints in on the outside of the fascia to match the expansion joints on the inside of the fascia?
a. Response: No, the Contractor is not required to consider expansion joints on the outside of the fascia.
10. Is a corrosion inhibitor and paint required on the railing posts if the metal of the post is exposed?
a. Response: Painting is not required, however, the corrosion inhibitor/bonding agent should be applied to the contacting surface for corrosion prevention and for bonding. Part 3 paragraph 2a of the SOW identified the corrosion inhibitor specifications.
11. There is notation in red box that says work completed during previous contract, is this referring to the work that was completed in 2018 on the south side of the bridge?
W912WJ21Q0122
a. Response: Yes, the previous work references work completed in accordance with the previous contract for the south side of the bridge.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 23-Jul-2021 05:00 PM to 27-Jul-2021 05:00 PM.
(End of Summary of Changes)