Amendment W912WJ21Q0060-0002.pdf
PDF 302 KB Posted
- Solicitation number
- W912WJ21Q0060
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ21Q0060-0003.pdf | ||
| SOW - REVISED.pdf | ||
| Drawings REVISED.pdf | ||
| Amendment W912WJ21Q0060-0001.pdf | ||
| Drawings.pdf | ||
| Solicitation W912WJ21Q0060.pdf | ||
| Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment is necessary to answ er questions posed by industry and to post the Site Visit Attendee List.
Closing has been extended until June 23, 2021 at 5:00 PM Eastern.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Jun-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ21Q0060
X 9B. DATED (SEE ITEM 11)
21-May-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Jun-2021
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912WJ
FACILITY CODECODE
Sheila.M.Winston@usace.army.milEMAIL:978-318-8159TEL:
SHEILA M WINSTONVINCUILLA / CHIEF, CONTRACTING DIVISION
W912WJ21Q0060
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
REQUEST FOR INFORMATION
Site Visit Attendee List:
NAME COMPANY
Bryan Paul USACE Steven Patchkofsky USACE Edward Hunter Capital Restoration Jennifer Samela USACE
Question 1: The existing metal grate section that is to be replaced consists of a top section and a vertical front facing section. In the drawing this looks like an “L” shaped structure. Are these two sections welded together or can they be removed separately.? How are they connected to each other? Bolts or ...?
Answer 1: The top section, with a slight slope but a mostly a horizontal span, is bolted to the support beam and can be removed separately. The vertical front facing section appears to be welded to the support beam and possibly bolted. See attached photo.
Question 2: The drawing for the grate to be attached to the Stop Logs is a bit confusing. Stating its purpose might help. Is the metal grating to be placed on the top of the Stop Logs to make footing more secure?
Answer 2: The grating is not to be attached to the stop logs, it will just fit into the stop log slot with the use of HDPE Lumber to shim it into place. The problem that is trying to be address is that turtles are going over the stop log and getting trapped between the space between the stop logs and the vertical face front facing section of grating. The grating will allow water to continue to flow through but prevent turtles from going through. By placing this section of grating it can be removed with the other stop logs and put back as necessary for the various stop log heights.
Question 3: Because much of the work can only be performed once the “permanent pool” level is lowered can you tell me how long it takes to lower the pool? If a flood raises the water level what would be the estimated delay in resuming work? What are the times of year when no work is possible? Can we expect a good time window for this work in late summer early autumn. ie August/September/ October?
Answer 3: The pool can be lowered below stop logs in 7 to 12 days. The return to normal pool level and the time frame needed is greatly dependent on how much rain causes the event, however in recent flood impoundments the pool has returned to normal level usually within 4 days.
Question 4: Does the USACE have drawings of the interior workings of the sluice gate operator valve to be repacked?
Answer 4: USACE does not have drawings of the interior workings of the sluice gate operator. Sluice gate make and model are included in the information in the solicitation.
Question 5: Are the current gratings galvanized?
Answer 5: Current grating are painted with a vinyl paint.
W912WJ21Q0060
Question 6: Would it be acceptable to the Government if the replacement gratings were made from stainless steel?
Answer 6: Yes a substitution with an appropriate Stainless Steel Grade 316 would be acceptable. Hot dipped galvanized is not a suitable alternative.
Question 7: What happens in case of a flood? What are the expectations from the Contractor?
Answer 7: See Specifications page 2, section 2. Description of Work Question 8: At the site visit, it was indicated that the Government would be supplying the vertical life line at a later date. Page 24 of the specifications still lists the vertical life line as a submittal. Should this be removed?
Answer 8: The Government will post revised specs and/or drawings for the life line system that must be supplied by the Contractor in a follow on amendment. Closing has been extended to accommodate the time required for a Government response.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 18-Jun-2021 05:00 PM to 23-Jun-2021 05:00 PM.
(End of Summary of Changes)