UNION VILLAGE
HEATHER MORSE
2 MAIN STREET
EAST THETFORD VT 05043-9667
TEL: 802-649-1606 FAX:
W13G86016365680001
REQUEST FOR QUOTATIONS
(THIS IS NOT AN ORDER) 1
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED RATING
W912WJ20Q0110 16-Jul-2020 5a. ISSUED BY
8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this
Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State, and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e) (f)
SEE SCHEDULE
AMOUNT
% No. %
NOTE: Additional provisions and representations [ ] are [ ] are not attached.
13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
15. DATE OF
QUOTATION
16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)
TELEPHONE NO.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)
PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)
THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE
6. DELIVER BY (Date)
SEE SCHEDULE
AND/OR DMS REG. 1
UNDER BDSA REG. 2
4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE
REQUEST NO.
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
9. DESTINATION (Consignee and address, including ZIP Code)
7. DELIVERY
[ ]X FOB
DESTINATION
[ ] OTHER
(See Schedule)
29-Jul-2020(Date)
PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.
AMANDA N LANE
(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:
d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS
Section B - Supplies or Services and Prices
INSTRUCTIONS TO OFFERORS
*SITE VISITS ARE HIGHLY RECOMMENDED PRIOR TO PROVIDING A QUOTE. SEE CLAUSE 52.236-27
FOR ADDITIONAL INFORMATION.
*PLEASE DIRECT QUESTIONS TO AMANDA LANE AT (978) 318-8814 or
AMANDA.N.LANE@USACE.ARMY.MIL. ANY INFORMATION RECEIVED AT THE SITE VISIT WHICH
CONFLICTS WITH THIS SOLICITAION SHOULD BE BROUGHT TO THE ATTENTION OF AMANDA
LANE THE SOLICITATION AND RESULTING CONTRACT SHALL BE THE GOVERNING DOCUMENT
IN ALL CASES.
**QUOTES CAN BE E-MAILED TO AMANDA LANE AT AMANDA.N.LANE@USACE.ARMY.MIL.
NOTE 1: In accordance with FAR Part 28.102-1(b), the Contractor will be required to provide the following payment protections for all construction contracts greater than $150,000.00.
(i) Payment Bond or
(ii) Irrevocable Letter of Credit and
(iii) Performance Bond
A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.
A Performance Bond shall be required if the total price of the quote is greater than $150,000.00. The penal amount of the Performance Bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall also be submitted to the Contracting Officer within 10 days after receipt of award.
NOTE 2: In accordance with FAR Part 28.102-1(c), the Contractor will be required to provide one of the following payment protections for all construction contracts greater than $35,000.00 but not greater than $150,000.00.
(i) Payment bond or
(ii) Irrevocable letter of credit
A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.
NOTE 3:
QUOTATION INSTRUCTIONS:
1. If subcontractor will be used for this work, please provide company names:
2. In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.gov) to submit an offer. (Formerly the Central Contractor Registration (CCR) database and the On-Line Representations and Certifications (ORCA).) Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website. Please note that Google and Google Chrome are not supported browsers for SAM registration. Mozilla FireFox, Safari, and Internet Explorer are supported browsers.
NOTE: SAM.gov registration takes approximately 3 weeks (DUNS registration 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor’s responsibility to track SAM.gov registration and follow-up with required tasks.
In addition, if you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator. The Entity Administrator must establish a LOGIN.GOV account using the e-mail address that will be associated with the SAM registration. See https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/sam-update for additional information.
3. Provide business DUNS number: _______________________________ (phone 800-333-0505 for DUNS).
4. Provide business CAGE code: __________________________________
5. Tax Identification Number: ___________________________________
6. Contractors shall provide completed FAR clause 52.204-8 (Annual Representations and Certifications) found in Section K of this solicitation with their quote, if the Contractors have not completed their annual representations and certifications electronically via the SAM website at www.sam.gov. (See Paragraph 2 above).
7. Contractors are not required to submit an Accident Prevention Plan (APP) with their quote. The successful offeror will be required to submit this document at the direction of the Technical Point of Contact. The APP must be accepted by the Government Designated Authority prior to the commencement of work.
POTENTIAL QUOTERS ARE NOTIFIED THAT THE BASIS ON WHICH AWARD WILL BE MADE IS PRICE
ALONE.
ALL RESPONSIBLE SOURCES MAY SUBMIT A RESPONSE WHICH, IF TIMELY RECEIVED, MUST BE
CONSIDERED BY THE AGENCY.
INVOICES SHALL BE SENT TO TECHNICAL POINT OF CONTACT.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job UVD Garage Demolition & Construction
FFP
Contractor shall furnish all equipment, materials and labor to demolish one (1) 3 bay 43' x 17' wooden pole barn and construct one (1) (40'l) x (42'w) x (13'h) 2 bay garage at the Union Village Dam in East Thetford, VT in accordance with the Statement of Work.
FOB: Destination
MILSTRIP: W13G8601636568
PURCHASE REQUEST NUMBER: W13G86016365680001
PSC CD: Y1QA
NET AMT
Section C - Descriptions and Specifications
STATEMENT OF WORK
GARAGE DEMOLITION AND CONSTRUCTION
U.S. ARMY CORPS OF ENGINEERS
UNION VILLAGE DAM
THETFORD, VT
Statement of Work
I. General:
1. Scope – Furnish all equipment, materials, and labor to demolish one 3 bay 43’x17’ wooden pole barn and construct one (40’l) x (42’w) x (13’h) 2 bay garage located at Union Village Dam.
2. Location – The Union Village Dam office is located at 2 Main St. East Thetford, VT 05043.
3. Site Visit – Contact the Technical Point of Contact to arrange a site visit. The Technical Point of Contact for the project is Park Ranger, Andrew White (978-318-8716 or andrew.d.white@usace.army.mil.)
4. Schedule – The work shall be completed no later than 180 days from the Notice to Proceed (NTP). The Contractor shall commence work within 14 calendar days after NTP. Work shall be performed Monday through Friday 7:00 AM to 3:30 PM unless otherwise approved by the Technical Point of Contact. No work shall be done on weekends or Government holidays.
5. Safety Requirements – All work shall be conducted in accordance with the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, most recent edition), and all applicable OSHA, federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed at the project office or electronically at Headquarters USACE website under publications using the following link:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385- 1-1.pdf
Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.
a. Accident Prevention Plan:
The Contractor shall prepare an Accident Prevention Plan (APP) specific to the activities being performed. It shall include Activity Hazard Analyses (AHAs) as described below.
A non-mandatory, fillable APP template is available upon request. However, the contractor is permitted to submit their own plan, at a minimum it must meet the requirements of EM 385-1-1, Appendix A, Section K.
A preparatory meeting shall be conducted by the prime contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing their subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.
Weekly safety meetings shall be held and documented. Records shall be available to the TPOC upon request.
b. Activity Hazard Analysis (AHA):
An AHA shall be submitted for each major phase of work. A major phase of work is defined as an operation involving a type of work presenting hazards not experienced in previous operations or where a new subcontractor or work crew is to perform the work.
The analysis shall define all activities to be performed, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.
c. Emergency Response:
Emergency procedures shall be documented in the Accident Prevention Plan and will include a map with directions to the nearest hospital, emergency contact numbers, and onsite First Aid/CPR responders.
d. Required Personnel:
The Contractor shall employ a minimum of one Competent Person (CP) at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO shall be present at the project site and report to the contractor’s upper management. The SSHO is required to have related construction experience and have at a minimum completed a 10 Hour OSHA training.
In addition, when emergency medical services are not accessible within five (5) minutes of the work location and there are two (2) or more workers onsite, at least two (2) employees shall have (in-person) training in First Aid and CPR. Minimum qualifications are listed in EM 385-1-1, Section 03.A.02.c.
*Note: Other Competent or Qualified Persons may be required per EM 385-1-1 and/or other sections of this Statement of Work, based on the characteristics of the project*
e. Accident Reporting:
All accidents and near misses shall be investigated by the Contractor. All work-related recordable injuries, illnesses and property damage accidents (excluding on-the-road vehicle accidents), in which the property damage exceeds $5,000.00, shall be verbally reported to the TPOC within four (4) hours of the incident. Serious accidents as described in EM 385-1-1 Section 01.D shall be immediately reported to the TPOC. ENG Form 3394 shall be completed and submitted to the TPOC within five (5) working days of the incident.
The Contractor shall compile employee work hours (including subcontractors) and forward the total hours to the TPOC no later than close of business on the 10th calendar day of the following month. The method of transmission by the prime contractor to the TPOC shall be electronically.
6. Specific Safety Section-Fall Protection:
a. General: The requirements of this section are applicable to contractors when their employees are working at heights above 6 feet, exposed to fall hazards, and/or using fall protection equipment. Every Contractor is responsible for establishing, implementing and managing a fall protection program in accordance with EM 385-1-1, Section 21.
b. Submittals: A site-specific Fall Protection and Prevention Plan is required to be submitted and approved by the GDA prior to any work being completed at heights.
USACE will provide a non-mandatory, fillable template plan. However, the contractor is permitted to submit their own plan, at a minimum it must address the items listed in EM 385-1-1, Section 21.D.01:
i. Duties and responsibilities. Identify CPs and QPs and their responsibilities and qualifications;
ii. Description of the project or task performed;
iii. Training requirements to include safe use of fall protection equipment;
iv. Anticipated hazards and fall hazard prevention and control;
v. Location of anticipated anchorages that will be installed during the project;
vi. Rescue plan and procedures;
vii. Design of anchorages/fall arrest and horizontal lifeline systems:
viii. Inspection, maintenance and storage of fall protection equipment;
ix. Incident investigation procedures;
x. Evaluation of program effectiveness;
xi. Inspection and oversight methods employed
c. NOTE: It is realized that means of fall protection for the first person establishing anchorages can be difficult. In this situation, fall protection may not be required while the individual is installing the initial anchorage point. Once this is installed, fall protection is required. These activities need to be addressed in the AHA and Fall Protection and Prevention Plan.
d. Competent Person (CP): The person designated in writing by the employer to be responsible for immediate supervising, implementing and monitoring of the fall protection program, who through training, knowledge and experience in fall protection and rescue systems and equipment, is capable of identifying, evaluating and addressing existing and potential fall hazards and, who has the authority to take prompt corrective measures with regard to such hazards. The CP shall:
i. Be onsite at all times while work at height is being performed;
ii. Be trained in accordance with EM 385-1-1, Section 21.C.04, to include a minimum of 24 hour CP in fall protection training made up of classroom and practical hands-on components.
iii. Prepare, update, review and approve fall protection and prevention plans;
iv. Review procedures as workplace activities change to determine if additional practices, procedures or training need to be implemented;
v. Supervise the selection, installation, use and inspection of non-certified anchorages;
vi. Verify End Users who work at heights are trained and authorized to do so;
vii. Inspect fall protection equipment at the frequency required by the manufacturer and
EM 385-1-1.
e. Qualified Person (QP): A person with a recognized degree, or professional certificate, with extensive knowledge, training and experience in the fall protection and rescue field who is capable of designing, analyzing, evaluating and specifying fall protection and rescue systems. The QP shall:
i. Be trained to the applicable level, as described in EM 385-1-1, Section 21.C.03;
ii. Provide technical support for the fall protection program;
iii. Have advanced understanding and knowledge of the requirements, equipment, systems, physical sciences, and engineering principles that affect fall protection and rescue systems;
iv. Supervise the design, selection, installation and inspection of certified anchorages and horizontal lifelines;
v. Be qualified to select proper fall protection and rescue equipment;
NOTE: CPs may only approve non-certified anchorages that are capable of holding 5000 lbs. All other anchorages and horizontal lifelines must be certified by a QP.
f. End User: A person who has been trained and authorized by the employer on the use of assigned fall protection equipment in a typical fall hazard situation. They must have an understanding of workplace activities and follow the policy, procedures, and instructions of the Competent Person regarding the use of fall protection, rescue systems, and related equipment. They shall:
i. Be trained by a CP in accordance with EM 385-1-1, Section 21.C.05, to include hands-on training and practical demonstrations
ii. Bring all unsafe or hazardous conditions or actions that may cause injury to them or others, to the attention of the CP;
iii. Properly use, inspect, maintain, store and care for their fall protection equipment and systems;
iv. Inspect all fall protection equipment or damage or defects, prior to each use.
v. Understand the nature of fall hazards in the work area and how to properly mitigate them;
vi. Calculate free fall distances and clearance requirements of fall protection systems;
vii. Understand the site-specific rescue procedures;
g. Personal Fall Arrest System Requirements (PFAS): All PFAS shall meet the requirements contained in ANSI Z359, Fall Protection Code, to include fall restrain and positioning systems. A PFAS consist of a full body harness, connecting means, and an anchorage system. General this equipment is certified for users within the capacity range of 130 to 310 lbs, including the weight of the worker, equipment, and tools. A CP shall inspect the equipment at least once semi-annually and whenever the equipment is subject to a fall or impact.
i. Full body harnesses shall meet the requirements of ANSI Z359 and be used in accordance with EM 385-1-1, Section 21.I.06. Body belts and full body harnesses meeting only the requirements of the ANSI A10.14 shall not be used. All full body harnesses shall be equipped with Suspension Trauma Preventers such as stirrups, relief steps, or similar in order to provide short-term relief from the effects of orthostatic intolerance.
ii. All energy free fall energy absorbing lanyards shall meet the requirements of ANSI Z359.13 and be used in accordance with EM 385-1-1, Section 21.I.07.
NOTE: When an anchor point is below the dorsal D-ring, a free fall (FF) distance greater than 6 ft (1.8 m) is created. For these situations, a 12 ft (3.6 m) FF energy absorbing lanyard shall be used in accordance with manufacturer’s instructions and recommendations. A 12 ft (3.6 m) FF energy absorbing lanyard does not refer to the lanyard length. Instead it refers to a FF that is greater than 6 ft (1.8 m) up to 12 ft which is created by the anchor point being located below the dorsal D-ring. The maximum length of the lanyard used shall not exceed 6 ft. (See Figure 21-4 in the EM 385-1-1.
Self-Retracting Devices (SRDs) shall meet the requirements of the ANSI/ASSE Z359.14 standard and be used in accordance with EM 385-1-1, Section 21.I.07.d
All scaffolding, aerial work platforms, scissor lifts, or similar must be used in accordance with EM 385-1-1, Section 22.
7. Cranes/Load Handling Equipment (LHE)
a. General: All load handling and crane operations are required to be completed in accordance with EM 385-1-1, Section 16. These requirements are applicable to load handling equipment (LHE) to include cranes, derricks, hoists and power-operated equipment that can be used to raise, lower and/or horizontally move a suspended load. This includes excavators, forklifts, and other equipment when used with rigging.
b. Submittals: A Standard Lift Plan is required to be submitted and approved by the GDA prior to any lifting operations. USACE can provide a non-mandatory, fillable template plan.
However, the contractor is permitted to submit their own plan, at a minimum it must include the items listed in EM 385-1-1, Section 16.A.03:
i. Personnel: roles, responsibilities, qualification/certifications, operator medical clearances;
ii. Area Preparation: load handling location and path of travel, blocking/cribbing, overhead lines, ground stability; control/restrict personnel access near lift;
iii. LHE Considerations: capacity/ratings, configuration, obstructions, inspection, ground support conditions;
iv. Load parameters: weight, center of gravity, radii, and configuration;
v. Rigging: type, inspection, rating, need for softeners;
vi. Environmental Considerations: wind, storms, precipitation, power lines in area of travel or load swing, counterweight swing area barricaded.
vii. Certificate of Compliance for LHE and Rigging (Form 16-1)
viii. Documentation of operational tests and annual/shift inspections;
ix. Documentation of the wire rope’s working load limit (WLL) from the manufacturer;
x. A copy of the crane’s specification/technical data sheets. (PDF version is acceptable).
c. Critical Lifts: A Critical Lift Plan (Form 16-3, or equivalent, in accordance with 16.H.02.d) is required for lifts involving the characteristics listed in EM 385-1-1, 16.H.01:
i. Lifts involving hazardous materials (e.g., explosives, highly volatile substances);
ii. Hoisting personnel with LHE;
iii. Lifts made with more than one LHE;
iv. Lifts where the center of gravity could change;
v. Lifts made when the load weight is 75% of the rated capacity of the LHE load chart or more (not applicable to gantry, overhead or bridge cranes);
vi. Lifts without the use of outriggers using rubber tire load charts;
vii. Lifts using more than one hoist on the same LHE;
viii. Lifts involving Multiple Lift Rigging (MLR) Assemblies or other non-routine or technically difficult rigging arrangements;
ix. Lifts involving submerged loads;
x. Lifts out of the operator’s view;
xi. Load Tests;
xii. When land-based LHE mounted on barges, pontoons or other means of flotation are required to travel while lifting the load;
xiii. Any lift the operator believes should be considered critical.
d. Crane Operators: Crane Operators must meet the requirements of EM 385-1-1, Section 16.B.
Prior to the start of crane activities, documentation of operator certifications, qualifications and designations must be submitted to the GDA for review.
i. Certification for all crane/hoist operators shall be achieved by successful completion of written and operational testing hosted by a Nationally Accredited Crane Operator Testing Organization (or other option as listed in 16.B.03.)
ii. Crane operators shall have a current medical exam certificate (signed by an M.D. or D.O.) dated within the past 2 years, that states the operator meets the proper physical qualifications listed in EM 385-1-1, Section 16.B.05. (Refer to the Crane Operator Medical Clearance Form included in Crane-LHE Lift Plan template).
e. Qualified Riggers (QRs): Employers must designate in writing which employees are QRs and the specific rigging tasks for which they are qualified. All QR’s must meet the requirements listed in EM 385-1-1, Section 15.B.01:
i. Have extensive knowledge, training & experience to sufficiently calculate loads, load weights, safe capacities and apply other safe rigging principles/procedures;
ii. Demonstrate the ability to utilize rigging materials and principles, and;
iii. Be capable of safely inspecting and performing rigging operations.
iv. Effectively communicate, be over 18 years of age, and have basic knowledge of LHE capabilities and limitations.
v. Have demonstrated knowledge and proficiency in the items listed in EM 385-1-1, Section 15.B.02:
1) Personnel roles and responsibilities;
2) Site preparation (terrain, environment);
3) Rigging equipment and materials;
4) Safe Hoisting Equipment operating procedures;
5) Principles of safe rigging;
6) Environmental hazards (includes overhead interferences);
7) Rigging and handling the load;
8) Identify hoisting-related hazards;
9) The associated hazards when employee is required to be in the fall zone to handle a load;
f. Signal Person: A signal person is required to be utilized onsite when the operator cannot maintain a full view of the load and the load travel paths at all times the load is rigged to the equipment. A signal person must meet the qualifications listed in EM 385-1-1, Section 16.B.06
i. All signal persons must be qualified and trained by Qualified Evaluator (trainer). Documentation must be provided by the Evaluator and must specify each type of signaling (e.g., hand signals, radio signals, etc.)
for which they were trained.
ii. A Signal Person must:
1) Know and understand the type of signals used (radio, cell, hand, etc.) If hand signals are used, the signal person must know and understand the Standard Method for hand signals;
2) Be competent in the application of the type of signals used;
3) Have a basic understanding of crane operation and limitations, including crane dynamics involved in swinging and stopping loads and boom deflection from hoisting loads;
4) Demonstrate that he/she meets the requirements above through a written and practical test;
g. Operational Testing: An operational test is required to be completed in accordance with ANSI/ASME, the manufacture’s recommendations, and 16.F.02 when one of the following criteria is met:
i. Before initial use of a crane after a load bearing/controlling part or component, (brake, travel component, or clutch) has been altered, replaced, or repaired. *Adding/removing counterweights is not considered load controlling/load bearing*
ii. Every time a crane or hoisting equipment(s) is reconfigured or re-assembled after disassembly (to include booms);
iii. Every time a crane and/or hoisting equipment is brought onto a USACE project;
iv. Every year during annual inspection;
Operations testing, at a minimum, shall include the components listed in EM 385-1-1, Section 16.F.02.c:
1) Load lifting and lowering mechanisms;
2) Boom lifting and lowering mechanisms;
3) Boom extension and retraction mechanisms;
4) Swinging mechanisms;
5) Travel mechanisms;
6) Safety devices;
7) Operational aids;
W912WJ20Q0110
h. Shift Inspections: Before every LHE operation (at beginning of each shift or following a change of operator) a Competent Person shall, at a minimum, visually inspect the crane in accordance with EM 385-1-1, Section 16.D, applicable ASME standards, OSHA regulations and the manufacturer’s recommendations. Equipment shall not be used until this inspection demonstrates that no corrective action is required.
i. The shift inspection must be documented and shall include the results of the inspection, name and signature of the CP who conducted the inspection and the date of the inspection;
ii. Documentation shall be maintained for a minimum of 12 months, or the life of the contract, whichever is longer;
i. Load Test: A load test is required to be completed when one of the criteria is met in EM 385- 1-1, Section 16.F.03. They include:
i. Before initial use of crane or hoisting equipment in which a load bearing or load controlling part or component, brake, travel component, or clutch has been altered, replaced, or repaired;
ii. Every time a crane or hoisting equipment(s) is reconfigured or re-assembled after disassembly (to include booms);
iii. When the manufacturer requires load testing;
NOTE: Load Testing shall be performed at 100 to 110% of the ANTICIPATED LOAD for the specified configuration, not to exceed 100% of the manufacturer's load chart at the configuration of the test. The actual anticipated load itself may be used as the test load if approved by the GDA.
7. Pre-Construction Conference – Prior to the start of any work, the Technical Point of Contact will schedule and conduct a “Pre-Construction Conference”. The Contractor’s Project Manager and Quality Control Personnel will attend this meeting. This conference will be held at the time and location agreeable to the government and contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Construction conference the contractor shall provide the name of the project superintendent with a telephone number for project coordination.
The following is a general list of items for discussion during this Pre-Construction Conference:
i. Authority of the Technical Point of Contact and Quality Assurance Inspectors.
ii. Contractor’s Safety Program (including sub-contractors).
iii. Accident Prevention Plan and Activity Hazard Analysis (Submitted & accepted prior to start of work on site)
iv. Fall Protection and Prevention Plan IAW EM 385-1-1, Section 21
v. Safety Meetings (Documented on NED Form 251)
vi. Accident Reporting (ENG Form 3394)
vii. Safety Data Sheet (SDS) requirements
viii. Contractor’s Equipment
ix. Correspondence, Communication, Security and Administrative Procedures.
x. Invoice and payment.
8. Permits – The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.
9. Security – The contractor will comply with all established security policies at the Union Village Dam. Due to periods of heightened security that may affect the access to the areas covered under this contract, the Government reserves the right to close any property or portion of property and reschedule and/or cancel any subsequent service. The Contractor shall be given at least 24 hour notice of any such closure.
10. Contractor Conduct – Alcohol and firearms are prohibited on project grounds. Contractor and employees must comply with CFR 36 Rules and Regulations.
11. Payment – After final inspection and acceptance by the Government, the Contractor must submit an invoice to the Technical Point of Contact. The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, process, and total amount due per line item. The invoice must also include the company letterhead and this must match the data that is registered in the System for Award Management (SAM) registry.
For jobs greater than 30 days the contractor may request progress payment.
All invoices may be mailed to U.S. Army Corps of Engineers North Hartland Lake
P.O. Box 55 North Hartland, VT 05052
Or Emailed to andrew.d.white@usace.army.mil
II. Technical Requirements:
Part 1 General:
1. Summary – Furnish all equipment, materials, and labor to demolish and responsibly dispose of one 3 bay 43’x 17’ wooden pole barn and construct one (40’l) x (42’w) x (13’h) 2 bay garage located at Union Village Dam.
2. Submittals – Although the Government technically reviews submissions required by this Statement of Work, it is emphasized that the Contractor’s work must be completed using proper internal controls and review procedures. The documents identified below must be prepared in accordance with the applicable standards, submitted to the Technical Point of
Contact for review and accepted by the Government prior to the commencement of any field activities.
a. Accident Prevention Plan (APP) including Fall Protection Plan – Prior to the start of field work
b. Activity Hazard Analysis – Prior to the start of field work
c. VT State License/Permits- The contractor shall be responsible for obtaining any necessary licenses, permits, and letters of certification.
d. Preliminary Drawings: The contractor must provide preliminary drawings to include all four (4) sides of the building, window and door location, roof slope, snow/wind load calculations, electrical legend and conduit placement before construction begins. Drawings shall be approved by the Technical Point of Contact.
e. As-built drawings: The contractor must provide the Technical Point of Contact with detailed 11”x17” paper as-built drawings as well as a digital file after construction is complete of the building.
f. Warranties: At the completion of this contract contractor will provide the Technical Point of Contact with any and all warranties associated with this project. To include roofing, siding, paint, doors and windows.
g. Critical Lift Plan: A critical lift plan shall be used anytime there is work being done using Load Handling Equipment (LHE) that falls under Section 16. H of the
EM 385.1.1.
h. Standard lift plan
i. Fall Protection and Prevention Plan: In accordance with ANSI Z359.2 and EM
385-1-1 Sect. 21.D.01
3. Existing Conditions:
a. The Wooden pole barn is located approximately 350 feet from the project office.
Access to the pole barn is via a dirt road across an open field. A leach field and associated septic lines run nearby, so coordination with the Technical Point of Contact is required before moving heavy equipment for the pole barn demolition.
b. Access to the new building location is via a paved access rd.
c. The Union Village Dam access rd. is gated and coordination must be made to ensure site access prior to the start of work.
4. Clean Up and Waste Disposal – The contractor shall practice good housekeeping to maintain a safe job site. The contractor shall keep the work area, including any designated storage areas free from accumulation of waste materials. Upon completing work in an area the contractor shall remove any tools, equipment, and materials that are not the property of the Government. Any and all disturbed areas resulting from contractor activities shall be restored by the contractor to the satisfaction of the Technical Point of Contact. All waste material will be disposed of offsite in accordance with all Federal, State, and Local regulations.
5. Environmental Protection – Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the contractor at the site, and the site will be inspected/ cleaned on a daily basis. No burning is permissible. Water, air and land resources shall not be adversely impacted during the course of the work. Storage, fueling and lubrication of equipment and motor vehicles shall be conducted in a manner that affords the maximum protection against spills and evaporation.
Storage and usage of lubricants and daily fueling of machinery and equipment shall occur at least 50 feet from any drainage inlets, water bodies (rivers, streams, and lakes), environmentally sensitive areas (wetlands, vernal pools). Contractor will take necessary steps to ensure all federal, state, and local environmental regulatory requirements are met. To the maximum extent possible all waste material shall be recycled in accordance with Acquisition, waste reduction and prevention, and recycling programs as described in Executive Order No. 13423 (January 2007), including any such programs adopted prior to the effective date of the Executive Order.
6. Sustainability & Environmentally Preferred Products – All products must be covered by the Energy Efficiency Program set forth by the Department of Energy. Products that fall under this category will be lighting, etc. The list of products is periodically updated, please check the Department of Energy’s website for current accepted products:
https://www.energy.gov/eere/femp/search-energy-efficient-products.
Under the Comprehensive Procurement Guidelines (CPG) program, the Environmental Protection Agency (EPA) designates products that are or can be made with recovered materials, and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. Visit https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for a complete list of designated products and the associated recommended contents levels.
Offerors must be able to demonstrate that each offered products meets minimum content levels upon request.
The United States Department of Agriculture (USDA) designates certain bio-based products for federal procurement and specifies minimum bio based content levels for those products.
Any designated product that is being offered or supplied under this contract shall meet USDA BioPreferred's minimum bio based content level. Visit the BioPreferred web site https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml for the complete list of designated products and the associated minimum bio based content level requirements.
7. Building Protection – Any involved building or structure, and all of its contents shall be protected from the elements during the duration of this contract. The contractor shall keep on site the means to quickly cover and protect all areas open to the elements during an unforeseen weather related event that could cause damage to the building and or any of its contents during all phases of this contract.
8. Personal Protective Equipment - It is the contractor’s responsibility to furnish and supply personnel with the proper personal protective equipment necessary for performing the work.
9. Government Resources – The government will supply any electricity necessary for the project work from points of existing outlets when available. The contractor shall carefully conserve the use of electricity provided. The contractor shall supply his own means of communication (telephone). There is not a restroom available at the contract site, and there is limited access to potable water at the contract site. The contractor would have to provide these resources or have an acceptable alternative plan for these resources.
10. Damage to Government and Private Property – The contractor shall be responsible for restoring all Government facilities or structures damaged as a result of the contractor’s operation. The contractor shall also be responsible for any damage to private property or injury to any person as a result of the contractor’s operation. The contractor shall notify the Project Manager immediately of damage to Government and private property and injury to any person resulting from the contractor’s operation. Also, the Contractor shall notify the Technical Point of Contact of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed. Trucks and/or trailers will be driven on existing roads only and not across or through park areas to facilities. The Contractor shall also restore landscape features (shrubs, flowers, grasses, etc.), which are damaged or destroyed by the contractor’s operation. Damaged or destroyed grass areas shall be re-planted as directed by the Technical Point of Contact, and shrubs and flowers which are damaged or destroyed shall be replaced from nursery stock of like size and kind.
11. Omissions – This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.
12. Quality Assurance – The contractor is responsible for the quality control of the contract work. The contractor shall establish and maintain a quality control system to assure compliance with the contract requirements. The government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.
13. Other Contracts – The Government may undertake or award other contracts for additional work not related to this contract, and the contractor shall fully cooperate with other contractors and Government employees. The contractor shall not commit or permit any act which will interfere with the performance of work by another contractor or by Government employees.
14. Receiving and Storing Materials – The contractor is responsible for protecting any stored material until it is placed in service. The contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive materials or supplies for the contractor and will not be responsible for damage to the contractor’s equipment or materials.
15. Requests for information – Requests concerning the work of this project should be directed to the Technical Point of Contact, Andrew White at 978-318-8716 or andrew.d.white@usace.army.mil.
Part 2 Execution:
Demolition and Construction Requirements
1. Demolish 3 bay 43’ x 17’ Wood and Metal Pole Barn:
a. Contractor shall demolish building and move debris off site using necessary tools and equipment to efficiently complete the job.
b. The existing concrete pad for the pole barn shall be left in place after building demolition. Care should be taken to protect the concrete pad from damage. The area around the concrete pad shall be smoothed and leveled to repair any ruts caused by demolition.
c. Temporary fencing will be installed to meet EM 385-1-1 standards.
d. Construction debris will be taken to an appropriate landfill and all metals, concrete and brick will be taken to a recycle center. All material shall be disposed of in accordance with state and local laws.
e. The site will be clean and clear of all construction debris before departing each day; to be approved by the Technical Point of Contact. If at any time materials cannot be hauled off site by the end of the day, materials will be neatly stored and secured.
f. There is no electrical or plumbing in the pole barn.
2. Construct 2 bay 40’ x 42’ x 13’ Garage:
Contractor will provide a building with the following:
a. Building shall be erected at least 15’ from the adjacent 2 bay garage, on a reinforced 6” concrete slab with 18” X 18” thickened edge around perimeter with expansion joints. Slab shall be reinforced in accordance with 2018 International Building Code, Chapter 19. A 6-mil polyethylene vapor retarder with joints lapped not less than 6 inches shall be placed between the base course or subgrade and the concrete floor slab, or other approved equivalent methods or materials shall be used to retard vapor transmission through the floor slab. Building location shall be approved by the Technical Point of Contact.
b. Slab area shall be excavated to a minimum of 30” and crushed stone brought in to bring concrete level back to existing grade. Stone shall extend 3’ beyond the slab on eve sides of the building and 2’ beyond the back wall of the building. The garage bays shall all have a 3’ concrete apron.
c. Building shall be 40’ wide X 42’ long X 13’ high pre- engineered garage kit.
i. Timber columns shall be 3-2”x6” No. 1 or better southern yellow pine, nail laminated, secured to concrete foundation with steel column sockets.
ii. Factory assembled straight chord wood trusses with a minimum of 18 gauge steel truss plates.
iii. The front of the building shall have (2) 12’ X 12’ garage doors, and (1)
36”metal man door with closer and commercial deadbolt. Garage doors shall be non-insulated with electric door openers and have appropriate safety control devices.
iv. The rear side of the building shall have (1) 10’ x 10’ garage door. And (1) 36” metal man door with closer and commercial deadbolt.
v. The building shall also have (5) 30”x 48” minimum double pane aluminum framed windows. Two on each side, and one on the back of the building. The building shall be designed in compliance with the state of Vermont snow and wind load ratings.
vi. The building shall be sided with one-inch tall major rib, steel siding 0.19” thick commercial grade steel, secured with EPDM galvanized roofing screws that meet manufacturer’s recommendations. The color of the siding shall be Light Gray in color and approved by the technical point of contact.
vii. The roofing shall be one-inch tall major rib type steel roofing 0.19” thick commercial grade steel, secured with EPDM galvanized screws that meet manufacturer’s recommendations. The color of the roofing shall be Dark Gray and approved by the technical point of contact.
viii. The building shall have 24” roof overhangs with 6” fascia with pre painted steel trim with color matched soffit and have a continuous vent at the ridge peak.
NOTE: Building design, door layout, window design and layout as well as color selections shall be approved by the Technical Point of Contact prior to construction of the building.
d. Electrical:
i. Approximately 100’ of conduit and appropriately sized electrical wire for the underground 150 amp electrical service shall be provided and installed by the contractor to include; ground rods, SD panel, (12) GFCI 20 amp outlets, (6) high bay LED, 29,100 lumen, 215 watt light fixtures, (2) switches and (1) LED Wall Pack, 110 watt, 15,531 lumen outside light with photocell. The electrical service for the new building will extend from the existing electrical pole and service that is nearby. (See Informational Photo #3)
ii. All work shall conform to the minimum requirements of the National Electrical Code in service at the time of installation and all electrical work will be performed by a Master licensed electrician. The contractor shall also be responsible for digging the electric trench.
iii. All areas disturbed under this contract shall be returned to original condition or better. Any Government property damage shall be replaced or repaired at the contractor’s expense.
NOTE: A drawing shall be provided by the contractor and approved by the Technical Point of Contact prior to start of construction showing locations of doors, windows, outlets.
ATTACHMENTS
PLEASE REFERENCE ATTACHMENTS FOR ADDITIONAL INFORMATION IN REGARD TO THIS
SOLICITATION.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 180 dys. ANP 1 UNION VILLAGE
HEATHER MORSE
2 MAIN STREET
EAST THETFORD VT 05043-9667
802-649-1606 FOB: Destination
961605
Section H - Special Contract Requirements
SECURITY REQUIREMENTS
The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the Technical Point of Contact (TPOC) NLT 5 calendar days after the completion of the training.
WAGE DETERMINATION
"General Decision Number: VT20200024 01/03/2020
Superseded General Decision Number: VT20190024
State: Vermont
Construction Type: Building
Counties: Essex, Lamoille and Orange Counties in Vermont.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020
CARP0118-008 04/01/2013
Rates Fringes
CARPENTER (Including Acoustical Ceiling Installation and Industrial Only; Excluding Drywall Hanging).........................$ 20.69 17.39
* IRON0007-002 03/16/2019
Rates Fringes
IRONWORKER, REINFORCING..........$ 26.01 22.57
SHEE0063-005 01/01/2016
Rates Fringes
SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 31.57 28.12
SUVT2011-009 02/10/2011
Rates Fringes
CARPENTER (Drywall Hanging Only)............................$ 23.00 5.94
ELECTRICIAN......................$ 20.24 7.27
LABORER: Common or General......$ 13.65 2.46
OPERATOR: Crane.................$ 19.50 6.08
PAINTER: Brush Only.............$ 16.11 4.14
PAINTER: Roller.................$ 16.11 4.14
PLUMBER (HVAC Pipe Installation)....................$ 25.35 5.79
PLUMBER, Excludes HVAC Pipe Installation.....................$ 24.04 8.25
ROOFER...........................$ 17.25 1.71
SPRINKLER FITTER (Fire Sprinklers)......................$ 22.50 6.08
WELDERS…