Amendment_W912WJ19Q0090-0001.pdf

PDF 312 KB Posted

Attached to
Water Intrusion Analysis of Frost Effects Research Laboratory, CRREL, Hanover, NH
Solicitation number
W912WJ19Q0090
Issued by

About this file

Amendment

View the file

Other files

File Type Posted
Image_2.jpg JPG image
Image_4.jpg JPG image
Imagine_5.jpg JPG image
Image_6.jpg JPG image
Imagine_3.jpg JPG image
Image_1.jpg JPG image
Solicitation_W912WJ19Q0090.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W13G86914916890001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment is necessary to provide responses to a Request for Information.

Closing w ill be extended until June 14, 2019 at 2:00 PM.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Jun-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912WJ19Q0090

X 9B. DATED (SEE ITEM 11)

31-May-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Jun-2019

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ19Q0090

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

REQUEST FOR INFORMATION

REQUEST FOR INFORMATION

1. Are there as‐built drawings of the structure, including the roof and wall details?

Answer: Yes, as-builts will be loaded to FBO as separate files so that the user can enlarge for clarity.

2. Have any previous engineering investigations been completed? If yes, can you provide report(s)?

Answer: Yes, a previous investigation has been completed. The results of the investigation have been attached.

3. Have previous repairs been made to mitigate the water intrusion?

Answer: No repairs have been made to mitigate the water intrusion as no definitive source of leakage has been found.

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 10-Jun-2019 02:00 PM to 14-Jun-2019 02:00 PM.

(End of Summary of Changes)

ERINNA CONSTRUCTION SERVICES

583 NORTH BROADWAY

HAVERHILL, MA 01832

PHONE: 978.478.8215 * FAX: 978.374.9130

GENERAL CONTRACTOR * SERVICE DISABLED VETERAN OWNED BUSINESS * 8(a) * MBE * DBE

August 27, 2018

Davita S. Baloue, Contracting Officer Vicksburg Branch U. S. Army Corps of Engineers Engineer Research and Development Center ERDC Contracting Office, CEERD-CT-T

3909 Halls Ferry Road, Building 3000, 2nd Floor South Vicksburg, MS 39180-6199

Subject: W913E518C0007 FERF Roof Assessment – Test Results

On Tuesday August 21, 2018 we conducted a leak test on the lower roof of the FERF building at the Cold regions research center in Hanover New Hampshire. The area in question was right outside the bathrooms just to the left of the center entrance. The results are as follows.

We used a nontoxic biodegradable water tracing dye. This is a highly concentrated dye, one gallon is used to treat 13,000 gallons. We used two 100 gallon water containers and poured approximately a quart of dye into each container. How this dye works is under a UV light the water will show florescent or (glow). We then used a water pump to pump the treated water through a garden onto the roof. The first 100 gallon container took approximately 1.5hrs to empty. During this time I walked over 200 feet of the roof spraying the water along the roof where it meets the side wall. After the container was empty we went inside the building using UV and LED flashlights and checked the roof, beams and mechanical piping for any sign of water penetration. We searched above the ceilings for 2 hrs. and could not find any major signs of water penetration. We did see very small drops on the exterior wall.

At this point, I went to the Engineering Department at the CRREL Building and asked for the assistance of the DPW department to help identify the location of the leak. DPW workers came to the work site and we all looked around to try to identify a possible leak location. All of us concluded that the roof does not appear to be leaking except for the exterior wall. We did notice an 8-inch refrigerant line did have frost on it and was dripping by the side entrance door. This pipe does run across the building and could be a possible source of stained ceiling tiles witch could be confused as a roof leak. This pipe is approx. 15 feet away from the area in question. After the DWP left we repeated the water test and soaked the roof with the other 100 gallon container.

After the second test, we searched above the ceilings for another 2hrs looking for leaks using both UV and LED lighting. We could not see any water penetrations again. This concludes our leak investigation.

The Above report was written on Wednesday August 22, 2018. While I was writing this report I received a phone call and e mail from Lisa DeGeorge a mechanical Engineer at CRREL. She said they received heavy rains that morning and she sent someone down to check the roof. There was a puddle by the mechanical entrance door that was created from the above steel Z channel at the joint that morning. This means that the water is penetrating that roof somewhere filling up a framing member and when the water reaches a certain height it begins to run down the framing member and exit at the joint.

After I talked to Lisa, Ramon and I went to CRREL the next day Thursday 8-23-18 to re investigate this leak.

On Thursday, we did see the staining of a water puddle on the floor and we did see evidence of water staining in the steel channel.

ERINNA CONSTRUCTION SERVICES

583 NORTH BROADWAY

HAVERHILL, MA 01832

PHONE: 978.478.8215 * FAX: 978.374.9130

GENERAL CONTRACTOR * SERVICE DISABLED VETERAN OWNED BUSINESS * 8(a) * MBE * DBE

Here is our summery

1. We feel the roof is leaking with no obvious sign of where it’s leaking. We investigated the roof twice.

The first time with dyes and 200 gallons of water and a second time right after a rain event. This roof poses a secondary problem as well. The roof is a standing metal seem roof with minimal pitch (Flat).

Were this roof meets the side wall is a prime location for ice dams. This roof is the wrong roof for its application

Suggested fixes:

Change roof to rubber or EPDM Add Lightning protection (There is currently none) Add Gutters and down spouts to help with leaking from roof water run off Address water penetration at base of exterior wall from roof run off

Please see attached pictures to help show the procedure

Very respectfully, Alan Synnott Project Manager