Solicitation_W912WJ19Q0067.pdf

PDF 4 MB Posted

Attached to
Grounds Maintenance Services Buffumville Lake and Hodges Village Dam
Solicitation number
W912WJ19Q0067
Issued by

About this file

Solicitation

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912WJ19Q0067 15-Mar-2019

b. TELEPHONE NUMBER

978-318-8324

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 29 Mar 2019

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912WJ9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

JENNIFER M SAMELA

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

978-318-8207FAX:

TEL: 9783188084 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$7,500,000

NAICS:

561730

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF58

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912WJ19Q0067

Section SF 1449 - CONTINUATION SHEET

BID SCHEDULE

GROUNDS MAINTENANCE

U.S. ARMY CORPS OF ENGINEERS

BUFFUMVILLE LAKE AND HODGES VILLAGE DAM

CHARLTON AND OXFORD, MA

Performance Work Statement

Bid Schedule Base Year

TASK / ITEM NUMBER UNIT QTY

UNIT

PRICE

TOTAL

1. Buffumville Lake- Weekly Mowing

EA

2. Buffumville Lake- Bi-Weekly EA 14

3. Buffumville Lake- Monthly

4. Buffumville Lake- Annual

5. Buffumville Lake- Spring Clean- Up

LS

6. Buffumville Lake- Spring Fertilizer

LS 1

7. Buffumville Lake- Fall Clean-Up LS

8. Hodges Village Dam- Weekly

EA 28

9. Hodges Village Dam- Monthly Mowing

EA 6

10. Hodges Village Dam- Spring Clean-Up

LS 1

11. Hodges Village Dam- Spring Fertilizer

LS 1

12. Hodges Village Dam- Planting Maintenance

LS 1

13. Hodges Village Dam- Fall Clean-

Total

GROUNDS MAINTENANCE

U.S. ARMY CORPS OF ENGINEERS

BUFFUMVILLE LAKE AND HODGES VILLAGE DAM

Option Year 1

PRICE

TOTAL

1. Buffumville Lake- Weekly

3. Buffumville Lake- Monthly

Fertilizer

7. Buffumville Lake- Fall Clean-Up LS

EA 28

9. Hodges Village Dam- Monthly Mowing

EA 6

10. Hodges Village Dam- Spring Clean-Up

LS 1

11. Hodges Village Dam- Spring Fertilizer

LS 1

12. Hodges Village Dam- Planting Maintenance

LS 1

13. Hodges Village Dam- Fall Clean-

U.S. ARMY CORPS OF ENGINEERS

BUFFUMVILLE LAKE AND HODGES VILLAGE DAM

Option Year 2

PRICE

TOTAL

1. Buffumville Lake- Weekly

3. Buffumville Lake- Monthly

Fertilizer

7. Buffumville Lake- Fall Clean-Up LS 1

EA 28

9. Hodges Village Dam- Monthly Mowing

EA 6

10. Hodges Village Dam- Spring Clean-Up

LS 1

11. Hodges Village Dam- Spring Fertilizer

LS 1

12. Hodges Village Dam- Planting Maintenance

LS 1

13. Hodges Village Dam- Fall Clean-

INSTRUCTIONS TO OFFERORS

PLEASE DIRECT QUESTIONS TO JENNIFER M. SAMELA AT (978) 318-8324 OR

JENNIFER.M.SAMELA@USACE.ARMY.MIL. THE SOLICITATION AND RESULTING CONTRACT

SHALL BE THE GOVERNING DOCUMENT IN ALL CASES.

** QUOTES CAN BE E-MAILED TO JENNIFER M. SAMELA AT

JENNIFER.M.SAMELA@USACE.ARMY.MIL.

THE BID SCHEDULE MUST BE COMPLETED AND SUBMITTED FOR A QUOTE TO BE

CONSIDERED COMPLETE.

In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.gov) to submit an offer. (Formerly the Central Contractor Registration (CCR) database and the On-Line Representations and Certifications (ORCA).) Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website. Please note that Google and Google Chrome are not supported browsers for SAM registration. Mozilla FireFox, Safari, and Internet Explorer are supported browsers.

NOTE: SAM.gov registration takes approximately 3 weeks (DUNS registration 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor’s responsibility to track SAM.gov registration and follow-up with required tasks.

In addition, if you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator. The Entity Administrator must establish a LOGIN.GOV account using the e-mail address that will be associated with the SAM registration. See https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/sam-update for additional information.

Provide DUNS number: ___________________________ (telephone 866-705-5711 for DUNS) Provide CAGE code: ____________________________ Provide TAX ID: __________________________ Per FAR Part 52.212-3 Alt I, the Contractor is required to complete the On-line Representations and Certifications Application (www.SAM.gov) and paragraph (b) if applicable, OR to complete paragraphs (c) thru (m) of this clause and return with quote.

POTENTIAL QUOTERS ARE NOTIFIED THAT THE BASIS ON WHICH AWARD WILL BE MADE IS

PRICE ALONE.

ALL RESPONSIBLE SOURCES MAY SUBMIT A RESPONSE WHICH, IF TIMELY RECEIVED, MUST

BE CONSIDERED BY THE AGENCY.

INVOICES SHALL BE SENT TO TECHNICAL POINT OF CONTACT.

SECURITY REQUIREMENTS

The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the Technical Point of Contact NLT 5 calendar days after the completion of the training.

The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the Technical Point of Contact no later than 3 business days after the initial contract award.

PERFORMANCE WORK STATEMENT

U.S. ARMY CORPS OF ENGINEERS

BUFFUMVILLE LAKE AND HODGES VILLAGE DAM

A. GENERAL

1. Scope – Furnish all equipment, materials, transportation and labor to perform the grounds maintenance services at both the Buffumville Lake and Hodges Village Dam Project areas. The Buffumville Lake area includes approximately 4.6 acres of weekly maintenance area, approximately 4.4 acres of bi-weekly maintenance area, approximately

8.2 acres of monthly maintenance area, and an additional 0.35 acres (approximate) of annual mowing area. The Hodges Village Dam area includes approximately 2.3 acres of weekly maintenance area, and approximately 2.8 acres of monthly maintenance area. In addition, both projects include a spring clean-up, a fall clean-up, an annual fertilizer application, and Hodges Village Dam has approximately 0.2 acres of an annual planting maintenance (flower bed mulch and weed removal). The Contractor will supply approximately 10 cubic yards of Brown Mulch for the flower beds. Services are to be provided in accordance with the following performance work statement and schedule.

Work shall be performed in a timely manner and to the satisfaction of the Technical Point of Contact, the Park Manager or their representatives.

2. Location- The Buffumville Lake area is located in Charlton, Massachusetts. The project office is located at 48 Old Oxford Road in Charlton, Massachusetts. The Hodges Village Dam is located in Oxford, Massachusetts. The project office is located at 30 Howarth Road in Oxford, Massachusetts.

3. Site Visit- Contact the Technical Point of Contact, Park Ranger Jason Robinson at (978- 318-8290 or Jason.S.Robinson@usace.army.mil) to arrange a site visit.

4. Schedule- The period of performance is from on or about 15 April 2019 through 30 November 2019. In addition, the Government may exercise two (2) optional years with the same scope of services. Optional year one (1) would include a period of performance from 15 April 2020 through 30 November 2020 and option year two (2) would include a period of performance from 15 April 2021 through 30 November 2021.

Mowing and trimming will not be permitted before 7:00am or after 5:00pm within park areas or facilities at each dam, unless approved in advance by the Technical Point of Contact. No mowing or trimming will be done on Saturdays, Sundays, and holidays unless approved in advanced by the Technical Point of Contact. The following table identifies the line item number, description, and frequency.

NOTE: Refer to attached maps for mowing areas.

5. Pre-Work Conference –Prior to the start of any work, the Technical Point of Contact will schedule and conduct a “Pre-work Conference”. The Contractor’s Project Manager and Quality Control Personnel will attend this meeting. This conference will be held at the time and location agreeable to the Government and Contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-work conference the Contractor shall provide to the name of the project superintendent with a telephone number for project coordination.

The following is a general list of items for discussion during this Pre-work Conference:

i. Authority of the Technical Point of Contact and Quality Assurance Inspectors.

ii. Contractor’s Safety Program.

iii. Accident Prevention Plan (Submitted & accepted prior to start of work on site)

iv. Weekly Safety Meetings (Documented on NED Form 251)

v. Accident Reporting (ENG Form 3394)

vi. Contractor’s Quality Control Plan.

vii. Contractor’s Equipment (including a current written safety inspection)

Item # Description Quantity Frequency

1 Buffumville Lake – Weekly

28 Weekly (April – October)

2 Buffumville Lake – Monthly

6 Monthly (May – October)

3 Buffumville Lake – Annually 1 Annual (NLT August)

4 Buffumville Lake – Spring Clean-Up 1 Annual (May)

5 Buffumville Lake – Spring Fertilizer 1 Annual (May)

6 Buffumville Lake – Fall Clean-Up 1 Annual (November)

7 Hodges Village Dam – Weekly 28 Weekly (April – October)

8 Hodges Village Dam – Monthly 6 Monthly (May – October)

9 Hodges Village Dam – Spring Clean-Up 1 Annual (May)

10 Hodges Village Dam – Spring Fertilizer 1 Annual (May)

11 Hodges Village Dam – Planting Maintenance 1 Annual (June)

12 Hodges Village Dam – Fall Clean-Up 1 Annual (November)

viii. Correspondence Procedure.

ix. Communications.

x. Administrative Procedures.

xi. Contractor Utilities.

xii. Invoice and payment.

6. Permits – The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

7. Security – The Contractor will comply with all established security policies at Buffumville Lake and Hodges Village Dam. Due to periods of heightened security that may affect the access to the areas covered under this contract, areas may be subject to periodic closures, which in turn may reduce or inhibit the Contractor’s ability to access certain areas. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The Contractor shall be given at least 24 hour notice of any such closure. The Contractor will be issued keys to gain access to areas behind locked gates. These keys will be accounted for at all times and turned in at the time of the last mowing service or at a time approved by the Technical Point of Contact.

8. Flooding – Buffumville Lake and Hodges Village Dam are flood control projects.

Occasional retention of floodwaters may inundate portions of the mowing and maintenance areas or access roads to these areas. Therefore, it may become necessary to decrease or increase mowing frequencies in any or all portions of the property, and/or to close any portion of a property and delete any subsequent service for the closed property or area. Payment for the decreased service will be adjusted in accordance with the contract unit prices.

9. Contractor Conduct – The Contractor and Employees shall not use or be under the influence of drugs or alcohol at any time while performing the obligations under this contract or giving the public the appearance of same. Firearms are prohibited on project grounds. Contractor and Employees must comply with CFR 36 Rules and Regulations.

10. Payment – The Contractor will furnish the Technical Point of Contact with one monthly invoice, stating the service line item performed and the amount to be paid (See Table on Pg. 2.). Invoices will be clearly labeled with the same business name as on the contract, have the contract number in the heading of the invoice. Payment shall be made monthly for the actual services performed at the applicable contract unit price.

All invoices may be mailed to:

U.S. Army Corps of Engineers, Buffumville Dam 48 Old Oxford Rd.

Charlton, MA 01507 Or emailed to Jason.S.Robinson@usace.army.mil

B. SAFETY

1. General – All work shall be conducted in accordance with the U.S. Army Corps of

Engineers Safety and Health Requirements Manual (EM 385-1-1, most recent edition), and all applicable OSHA, federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed at the project office or electronically at Headquarters USACE website under publications using the following link:

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_3 85-1-1.pdf

2. Accident Prevention Plan – The Contractor shall prepare an Accident Prevention Plan

(APP) specific to the activities being performed. It shall include Activity Hazard Analyses (AHAs) as described in Section 3 below. Special attention shall focus on the requirements of EM 385-1-1, specifically Section 01.A.12 through 01.A.17 and Appendix A, (Minimum Basic Outline for Accident Prevention Plan). Work shall not proceed until the APP has been reviewed by the Technical Point of Contact and deemed acceptable for use on the project. USACE will provide a non-mandatory, fillable template APP. However, the Contractor is permitted to submit their own plan, at a minimum it must meet the requirements listed in EM 385-1-1 and this Scope of Work.

The APP shall interface with the Contractor's overall safety and health program. Any portions of the Contractor's safety and health program referenced in the APP shall be included and made site-specific. The Government considers the Contractor to be the "controlling authority" for safety and health of the subcontractors. Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

The Contractor shall conduct a safety meeting at the project site on the first day of work, whenever a new activity or phase of work begins, or at least weekly during the progress of work. All safety meetings shall be documented. The attached safety meeting form or a similar contractor-prepared form shall be used. Records of the safety briefings shall be submitted to the Technical Point of Contact weekly.

3. AHA – An AHA shall be submitted for each major phase of work. A major phase of work is defined as an operation involving a type of work presenting hazards not experienced in previous operations or where a new subcontractor or work crew is to perform the work. The analysis shall define all activities to be performed, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. Work shall not proceed on a phase of work until the AHAs have been accepted by the Technical Point of Contact. A preparatory meeting shall be conducted by the Contractor to discuss the AHAs contents with all effected onsite employees. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.

4. Required Personnel – The Contractor shall employ a minimum of one Competent

Person (CP) at each project site to function as the Site Safety and Health Officer (SSHO).

The SSHO shall be present at the project site and report to the Contractor’s upper management. The SSHO is required to have related construction experience and have completed a 10 Hour OSHA training (or more). In addition, when emergency medical services are not accessible within 5 minutes of the work location and there are 2 or more workers onsite, at least 2 employees shall have (in-person) training in First Aid and CPR.

Minimum qualifications are listed in EM 385-1-1, Section 03.A.02.c.

*Note: Other Competent or Qualified Persons may be required per EM 385-1-1 and other sections of this Scope of Work, based on the characteristics of the project*

5. Accident Reporting – All accidents and near misses shall be investigated by the

Contractor. All work-related recordable injuries, illnesses and property damage accidents (excluding on-the-road vehicle accidents), in which the property damage exceeds $5,000.00, shall be verbally reported to the Technical Point of Contact within 4 hours of the incident. Serious accidents as described in EM 385-1-1 Section 01.D shall be immediately reported to the Technical Point of Contact or other project staff member.

ENG Form 3394 shall be completed and submitted to the Technical Point of Contact within five working days of an incident.

The Contractor shall complete the attached “USACE Contractor Monthly Summary Record of Injuries/Illness and Work Hour Exposure” (for prime and its subcontractors) and forward the completed form to the GDA no later than close of business on the 5th calendar day of the following month. The method of transmission by the Contractor to the Technical Point of Contact shall be electronically.

6. Project staff reserve the right to cease work at any time should the safety of Federal employees, contractors, and/or public visitors become jeopardized.

7. Templates for the Accident Prevention Plan, Weekly Safety Meeting, Activity Hazard Analysis, Contractor Monthly Record of Accidents and the Accident Investigation ENG Form 3394 are all available upon request from the Technical Point of Contact.

C. TECHNICAL REQUIREMENTS

1. Summary – Furnish all equipment, materials, transportation and labor to perform the grounds maintenance services at both the Buffumville Lake and Hodges Village Dam Project areas. The Buffumville Lake area includes approximately 4.6 acres of weekly maintenance area, approximately 4.4 acres of bi-weekly maintenance area, approximately

8.2 acres of monthly maintenance area and an additional 0.35 acres (approximate) of annual mowing area. The Hodges Village Dam area includes approximately 2.3 acres of weekly maintenance area and approximately 2.8 acres of monthly maintenance area. In addition, both projects include a spring clean-up, a fall clean-up, an annual fertilizer application and Hodges Village Dam has approximately 0.2 acres of an annual planting maintenance (flower bed mulch and weed removal). The contractor will supply approximately 10 cubic yards of Brown Mulch for the flower beds. Services are to be provided in accordance with the following performance work statement and schedule.

2. Submittals – Although the Government technically reviews submissions required by this scope of work, it is emphasized that the Contractor’s work must be prosecuted using proper internal controls and review procedures. The documents identified below must be prepared in accordance with the applicable standards, submitted for review and accepted by the Government prior to the commencement of any field activities. Templates for the Accident Prevention Plan and Activity Hazard Analysis may be provided upon request.

i. Accident Prevention Plan (APP) – Prior to the Start of Field Work

ii. Activity Hazard Analysis (AHA) – Prior to the Start of Field Work

iii. Security Verification for each employee from E-Verify.gov – Prior to the

Start of Field Work

iv. ENG Form 3394 - Contractor Monthly Record of Accidents and the Accident

Investigation

3. Other Contracts – The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other Contractors and Government employees. The Contractor shall not commit or permit any act, which will interfere with the performance of work by another contractor, or by Government employees.

4. Preferred Sequence for Work Schedules – The Technical Point of Contact shall provide the Contractor with a preferred sequence, or order, of work. (Note: The Contractor must provide sufficient personnel and equipment to accomplish services stated in the contract). The Contractor will then be required to submit a work schedule for each service, and approximate times for beginning and ending of each required service listed.

Any proposed change to an approved schedule must be submitted in writing, coordinated and approved by the Technical Point of Contact in advance of actual schedule changes.

5. Damage to Government and Private Property – The Contractor shall be responsible for restoring any Government facilities or structures damaged as a result of the Contractor’s actions. The Contractor shall also be responsible for any damage to private property or injury to any person as a result of the firm’s operations. The Contractor shall notify the Technical Point of Contact immediately of damage to Government and private property and injury to any person resulting from the Contractors’ operation. Also, the Contractor shall notify the Technical Point of Contact of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed. Trucks and/or trailers will be driven on existing roads only and not across or through park areas to facilities. The Contractor shall also restore landscape features (shrubs, flowers, grasses, etc.), which are damaged or destroyed by the firm’s operation. Damaged or destroyed grass areas shall be re-planted as directed by the Technical Point of Contact, and shrubs and flowers which are damaged or destroyed shall be replaced from nursery stock of like size and kind.

6. Contractor’s Personnel:

a. Employee Conduct – Employees will wear proper Personal Protection Equipment at all times with no exceptions. The Contractor shall be responsible for seeing that the firm’s employees strictly comply withal Federal, State, and Municipal laws. Any personnel activity, which, in the opinion of the Government, is deemed detrimental to the performance of the contract may result in the removal of Contractor employee/employees and/or termination of the contract.

7. Inspections:

a. Contractor Quality Control – The Contractor is responsible for establishing and maintaining an adequate quality control system to satisfactorily inspect and ensure that all work performed by the Contractor’s organization in each separate service is in full compliance with this contract and the instructions, provisions, specifications, drawings, and maps herein.

b. General Inspection – Upon the completion of each mowing cycle, the Contractor will perform an inspection of all areas under this contract to insure compliance with the scope of work. The Contractor or his representative must be able to commit personnel, equipment, and resources to correct deficiencies. The Services Inspection Form (form to be provided to the Contractor at the pre-work conference) will be submitted to the Technical Point of Contact to allow verification of results for payment. A Government representative may accompany the Contractor on an inspection of completed work and will identify any contract deficiencies. Any deficiencies noted will be corrected within original contract time frames or appropriate deductions in payment will be made.

c. Equipment/Supplies Inspections – The Technical Point of Contact may inspect required equipment and supplies and Personal Protection Equipment at any time when in use on Government property. Any equipment found deficient shall be removed from service immediately until faulty conditions have been corrected and passed by the Technical Point of Contact. No such removal will reduce the Contractor’s obligation to perform all work required within the time scheduled under this contract. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.

d. Government Inspections – The Government will monitor the Contractor’s service performance and make deductions accordingly.

D. EQUIPMENT

1. Condition of Equipment – All equipment used to perform work under this contract must be in good operating and mechanical condition and comply with EM 385-1-1, Army Corps of Engineers Safety and Health Requirements.

2. Type of Equipment

a. Mowers shall be equipped with suitable protective devices to prevent flying objects from injuring people or damaging property. Mowers must have slides or wheels, which will prevent tearing or plowing into the turf. The Contractor will be held accountable for re-turfing if equipment causes gouging or plowing. In areas where it is not possible to use a tractor-mounted mower the Contractor shall use small mowing equipment such as lawn and garden tractors; push mowers, weed eaters, and other small power-mowing equipment, and/or manual mowing tools.

b. The use of steel or other type of cord in string trimmers that will cause damage to trees, shrubs, fences, posts, etc., will not be allowed. Powered string trimmers will not be used to trim around saplings that are less than three (3) inches diameter at 4-1/2 feet above ground level. Trimming around said saplings shall be accomplished using hand-operated trimmers. Contractor will be required to replace any saplings/trees/shrubs damaged by the firm’s operation.

3. Equipment Storage – No Government space or facilities shall be provided under this contract.

E. SERVICE REQUIREMENTS

1. Pre-mowing Inspection – The Contractor shall survey the park or area and report all damage or vandalism to the Technical Point of Contact prior to commencement of mowing in each area. Any damage found thereafter by the Government’s inspector that has not been previously reported by the Contractor and appears to be caused during grounds maintenance operations shall be assumed to be damage caused by the Contractor’s operation, and shall be repaired, replaced, or deducted from the invoice, as determined by the Technical Point of Contact, at no cost to the Government.

2. Grounds Cleaning – Grounds cleaning will be performed before/during and in conjunction with scheduled mowing services, in order to leave the mowing area with an overall neat and clean appearance. The grounds cleaning shall remove all obvious and noticeable trash and litter from the mowing limits which are designated as the mowing boundaries on the location maps attached to these specifications. All trash and litter including cups, fast food debris, dog waste bags, cans and bottles, etc. shall be removed and properly disposed of in bulk refuse receptacles.

3. Fine Lawn Mowing Requirements – Cut and power mow grass to a height of not more than three (3) inches or less than two and one-half ( 2 ½) inches in each area around each facility. Mowing shall be uniform with no uncut or uneven areas resulting from mowing, overlap, wheel rollover, etc. Mowing shall be conducted in such a manner so there is no wheel damage to the turf or any damage to concrete edges, signs, fences, or trees.

Mowing shall not take place close enough to facilities to cause damage. Remove grass clippings from pavement and ensure grass if not blown onto building siding. Mowing with heavy equipment will not be permitted when the ground is so wet or boggy that the mowing operations will cause wheel rutting. Mowing under these conditions shall be accomplished by use of smaller mowing equipment as mentioned above.

4. Trimming Requirements – Trim grass to a height of not more than three (3”) inches or less than two and one-half (2 ½”) inches in the area around each facility. Trimming and edging shall be conducted in such a manner so there is no damage to the turf or any damage to concrete edges, signs, fences, or trees. Areas adjacent to facilities must be trimmed using other types of equipment such as string trimmers. Trimming shall be accomplished around all vertical objects such as against buildings, guard posts, fences, tables, trash receptacles, electrical pedestals, water fountains, hose bibs, cookers/grills, etc. Trimming shall also be done around the perimeter of a mowing area if the adjacent area is not to be mowed such as where a field abuts a tree line leaving tall grass under the trees branches before the ground cover turns to forest type or pine needles. Trimming shall be done at a minimum each time mowing is performed. The Technical Point of Contact may determine that area/facility trimming is required in conjunction with maintenance work and that mowing services are not required.

5. Spring Clean Up – The Contractor shall remove all leaves, logs, debris, litter, etc. from all lawn areas, roadsides, and parking areas. Damaged turf from winter activities shall be repaired as directed by the Technical Point of Contact. All biodegradable material removed from these locations will be deposited in a designated location for composting.

All litter and garbage will be either deposited in an appropriate waste container at the project or removed from the site at the discretion of the Technical Point of Contact.

6. Fertilizing – Fertilizer will be provided by the Government at the time of cleanup. The Contractor shall fertilize the identified areas with the required quantity and ratio as per manufacturer’s recommendations. Any fertilizer that falls on surfaces not designated for fertilization, e.g., walkways, sidewalks, roadways, parking areas, kiosk pads, etc. during the fertilizing shall be cleaned. Fertilizer will be applied in May or June, if the Contractor fails to apply the fertilizer in this time period without making other arrangements with the Technical Point of Contact prior to June 30th this line item’s payment will be closed and forfeited.

7. Spring Planting Maintenance – The plantings are located at Hodges Village Dam.

There is one planting area located in front of the Hodges Village Utility Building (Green Building), there is one located in front of the Thames River Basin Office (Blue Building), and there is one located on the entrance ramp to Hodges Village Dam to the left of the Utility Building. The Contractor will weed the plantings removing weeds by the root.

The Contractor will remove excess old mulch from the beds and spread new mulch provided by the Contractor to a minimum thickness of 2 inches. All plant material and excess old mulch shall be deposited in a location designated by the Technical Point of Contact. Approximately 10 cubic yards of Brown Mulch, supplied by the Contractor, will be needed to complete this task.

8. Fall Clean Up – The Contractor shall remove all leaves, debris, litter, etc. from all lawn areas, roadsides, and parking areas maintained under this contract. Contractor shall remove all material off-site and properly dispose of all material. All non-biodegradable materials will be recycled per all applicable laws/regulations. All litter and garbage will be either deposited in an appropriate waste container at the project or removed from the site at the discretion of the Technical Point of Contact. Remove all leaves and debris from gutters and downspouts. Gutters are to be cleaned out and downspouts cleared on the utility building and adjacent garage, dam quarters and adjacent garage.

9. Restrictions – All mowing and trimming required in a park or area shall be completed and inspected by the Contractor’s Quality Control Inspector prior to beginning work in another park or area. The Contractor shall notify Technical Point of Contact immediately upon completion of services, so that the Army Corps of Engineers may inspect the work.

The Contractor shall be responsible for correction of any and all deficiencies discovered by the Quality Assurance inspection within twenty-four (24) hours at no additional cost to the Government.

10. Changes to Frequency and/or Quantities – The Government reserves the option, should it become necessary, to decrease or reschedule service frequencies and/or facility quantities in any or all project areas. The Government may also, at any time during the duration of this contract, close any property or portion of the property and delete any subsequent service in the closed property or area. The Contractor shall be given adequate notification to prepare for either contingency. This decrease will be deducted in accordance with the bidding schedule or a negotiated cost. In addition, the Technical Point of Contact may, on special occasions decide to reschedule a service frequency in order to avoid conflict with visitation or unnecessary expense. A minimum of twenty-four hours notification shall be given to the Contractor in such cases.

F. SERVICE LOCATIONS

The services for this contract are located at the Buffumville Lake and Hodges Village Dam Project areas, which are located in Charlton and Oxford, Massachusetts.

The Contractor shall furnish all labor, materials and equipment necessary to perform the following tasks:

1. Buffumville Lake– Weekly Mowing

a. Service Requirement:

i. Map Areas 2A-2R

ii. Fine Lawn Mowing

iii. Trimming

iv. Grounds Cleaning

b. Service Area: 4.6 acres – See weekly mowing on maps attached

c. Service Schedule:

i. Weekly over a 28 week period

ii. Start in the third week of April for approximately 28 weeks

iii. Specific date to be coordinated with the Technical Point of Contact

2. Buffumville Lake– Bi-Weekly Mowing

i. Map Areas 3A-3D

ii. Fine Lawn Mowing

iii. Trimming

iv. Grounds Cleaning

b. Service Area: 4.4 acres – See weekly mowing on maps attached

c. Service Schedule:

i. Bi-Weekly (Every two weeks) over a 28 week period

Specific date to be coordinated with the Technical Point of Contact

3. Buffumville Lake – Monthly Mowing

i. Map Areas 4A-4K

ii. Fine Lawn Mowing

iii. Trimming

iv. Grounds Cleaning

b. Service Area: 8.2 acres – See monthly mowing on maps attached Service Schedule:

i. Once per month

ii. Start in the third week of April for approximately 6 mowing cycles

iii. Specific start date to be coordinated with the Technical Point of Contact

4. Buffumville Lake – Annual Mowing

i. Map Areas 5A & 5B

ii. Fine Lawn Mowing

iii. Trimming

iv. Grounds Cleaning

b. Service Area: 0.35 acres – See annual mowing on map #4 Service Schedule:

i. Once Annually No Later Than August 31st

ii. Specific start date to be coordinated with the Technical Point of Contact

5. Buffumville Lake – Spring Clean-Up

i. Spring Clean-Up

b. Service Area: 17.6 acres (all areas)

c. Service Schedule:

i. Before first weekly mowing, no later than 3rd weekend in May

ii. Specific start date to be coordinated with the Technical Point of Contact

(Note: This area is part of a flood control facility. As such the amount of debris can vary greatly from one year to the next, and can be severe due to prolonged inundations or storms. USACE personnel will be responsible for removing flood debris from service areas.)

6. Buffumville Lake – Spring Fertilizer

i. Fertilizing

ii. Fertilizer to be supplied by USACE.

b. Service Area: 6.2 acres

i. Map #1- areas 2A, 2B, 2K, 2L, 2M

ii. Map #2- areas 2C, 2D, 2E, 3A, 3B, 3C

c. Service Schedule:

i. No later than June 30th without making arrangements with Technical Point of Contact

7. Buffumville Lake – Fall Clean-Up

i. Fall Clean-Up

ii. Gutter clean out- all buildings

b. Service Area: 17.6 acres (all areas)

c. Service Schedule:

i. After final leaf drop in the month of November

ii. Specific date to be coordinated with the Technical Point of Contact

8. Hodges Village Dam – Weekly Mowing

i. Areas 2S-2Y

ii. Fine Lawn Mowing

iii. Trimming

iv. Grounds Cleaning

b. Service Area: 2.3 acres – See weekly mowing on map #5

c. Service Schedule:

i. Weekly over a 28 week period

iii. Specific date to be coordinated with the Technical Point of Contact

9. Hodges Village Dam – Monthly Mowing

i. Areas 4L-4Q

ii. Fine Lawn Mowing

iii. Trimming

iv. Grounds Cleaning

b. Service Area: 2.8 acres – See monthly mowing on map #5 Service Schedule:

i. Once per month

ii. Start in the third week of April for approximately 6 mowing cycles

iii. Specific start date to be coordinated with the Technical Point of Contact

10. Hodges Village Dam – Spring Clean-Up

i. Spring Clean-Up

b. Service Area: 5.1 acres (all areas)

c. Service Schedule:

i. Before first weekly mowing, no later than 3rd weekend in May

ii. Specific start date to be coordinated with the Technical Point of Contact

(Note: This area is part of a flood control facility. As such the amount of debris can vary greatly from one year to the next, and can be severe due to prolonged inundations or storms. USACE personnel will be responsible for removing flood debris in service areas. )

11. Hodges Village Dam- Spring Fertilizer

i. Fertilizing

ii. Fertilizer to be supplied by USACE.

b. Service Area: 2.3 Acres

i. Map #5- areas 2S, 2T, 2U, 2V, 2W, 2X, 2Y

c. Service Schedule:

i. No later than June 30th without making arrangements with Technical Point

12. Hodges Village Dam – Planting Maintenance

i. Brown Mulch, approximately 10 cubic yards – Provided by the Contractor

ii. Weeding planting areas

b. Service Area: 0.2 Acres

i. Map #6 – areas 1A, 1B, 1C, 1D

c. Service Schedule:

i. No later than June 30th without making arrangements with Technical Point

13. Hodges Village Dam – Fall Clean-Up

i. Fall Clean-Up

ii. Gutter clean out- all buildings

b. Service Area: 5.1 acres (all areas)

c. Service Schedule:

i. After final leaf drop in the month of November

ii. Specific date to be coordinated with the Technical Point of Contact

ATTACHMENTS

PLEASE REFER TO THE ATTACHMENTS INCLUDED AT THE END OF THIS SOLICITATION FOR

ADDITIONAL INFORMATION.

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

OCT 2018

52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.212-1 (Dev) Instructions to Offerors - Commercial Items. (DEVIATION 2018-O0018)

OCT 2018

52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018 52.217-5 Evaluation Of Options JUL 1990 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.222-3 Convict Labor JUN 2003

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

AUG 2011

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.242-15 Stop-Work Order AUG 1989 52.252-5 Authorized Deviations In Provisions APR 1984 52.252-6 Authorized Deviations In Clauses APR 1984 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7003 Agency Office of the Inspector General DEC 2012 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting

OCT 2016

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

MAY 2016

252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials

SEP 2014

252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Items JUN 2013

CLAUSES INCORPORATED BY FULL TEXT

52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (OCT 2018)

ALTERNATE I (OCT 2014)

The Offeror shall complete only paragraph (b) of this provision if the Offeror has completed the annual representations and certification electronically in the System for Award Management (SAM) accessed through https://www.sam.gov. If the Offeror has not completed the annual representations and certifications electronically, the Offeror shall complete only paragraphs (c) through (u)) of this provision.

(a) Definitions. As used in this provision--

“Economically disadvantaged women-owned small business (EDWOSB) concern” means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127. It automatically qualifies as a women-owned small business eligible under the WOSB Program.

“Forced or indentured child labor” means all work or service—

(1) Exacted from any person under the age of 18 under the menace of any penalty for its nonperformance and for which the worker does not offer himself voluntarily; or

(2) Performed by any person under the age of 18 pursuant to a contract the enforcement of which can be accomplished by process or penalties.

“Highest-level owner” means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.

“Immediate owner” means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.

“Inverted domestic corporation,” means a foreign incorporated entity that meets the definition of an inverted domestic corporation under 6 U.S.C. 395(b), applied in accordance with the rules and definitions of 6 U.S.C. 395(c).

“Manufactured end product” means any end product in product and service codes (PSCs) 1000-9999, except—

(1) PSC 5510, Lumber and Related Basic Wood Materials;

(2) Product or Service Group (PSG) 87, Agricultural Supplies;

(3) PSG 88, Live Animals;

(4) PSG 89, Subsistence;

(5) PSC 9410, Crude Grades of Plant Materials;

(6) PSC 9430, Miscellaneous Crude Animal Products, Inedible;

(7) PSC 9440, Miscellaneous Crude Agricultural and Forestry Products;

(8) PSC 9610, Ores;

(9) PSC 9620, Minerals, Natural and Synthetic; and

(10) PSC 9630, Additive Metal Materials.

“Place of manufacture” means the place where an end product is assembled out of components, or otherwise made or processed from raw materials into the finished product that is to be provided to the Government. If a product is disassembled and reassembled, the place of reassembly is not the place of manufacture.

“Restricted business operations” means business operations in Sudan that include power production activities, mineral extraction activities, oil-related activities, or the production of military equipment, as those terms are defined in the Sudan Accountability and Divestment Act of 2007 (Pub. L. 110-174). Restricted business operations do not include business operations that the person (as that term is defined in Section 2 of the Sudan Accountability and Divestment Act of 2007) conducting the business can demonstrate—

(1) Are conducted under contract directly and exclusively with the regional government of southern Sudan;

(2) Are conducted pursuant to specific authorization from the Office of Foreign Assets Control in the Department of the Treasury, or are expressly exempted under Federal law from the requirement to be conducted under such authorization;

(3) Consist of providing goods or services to marginalized populations of Sudan;

(4) Consist of providing goods or services to an internationally recognized peacekeeping force or humanitarian organization;

(5) Consist of providing goods or services that are used only to promote health or education; or

(6) Have been voluntarily suspended.

“Sensitive technology”—

(1) Means hardware, software, telecommunications equipment, or any other technology that is to be used specifically—

(i) To restrict the free flow of unbiased information in Iran; or

(ii) To disrupt, monitor, or otherwise restrict speech of the people of Iran; and

(2) Does not include information or informational materials the export of which the President does not have the authority to regulate or prohibit pursuant to section 203(b)(3) of the International Emergency Economic Powers Act (50 U.S.C. 1702(b)(3)).

“Service-disabled veteran-owned small business concern”—

(1) Means a small business concern—

(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans; and

(ii) The management and daily business operations of which are controlled by one or more service-disabled veterans or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran.

(2) Service-disabled veteran means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16).

“Small business concern” means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR Part 121 and size standards in this solicitation.

“Small disadvantaged business concern, consistent with 13 CFR 124.1002,” means a small business concern under the size standard applicable to the acquisition, that--

(1) Is at least 51 percent unconditionally and directly owned (as defined at 13 CFR 124.105) by--

(i) One or more socially disadvantaged (as defined at 13 CFR 124.103) and economically disadvantaged (as defined at 13 CFR 124.104)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.