Amendment_W912WJ18Q0132-0001.pdf
PDF 130 KB Posted
- Solicitation number
- W912WJ18Q0132
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPECS.pdf | ||
| Solicitation_W912WJ18Q0132.pdf | ||
| Plans...pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment is necessary to revise the Bid Schedule for clarity. Optional Line Item 0003 w ill be separated into Optional Line Items 0003-0009.
Each Optional Line Item now refers to one relief w ell rather than Optional Line Item 0003 referring to the relief w ell system as a w hole.
Each Optional Line Item may only be exercised once.
All other terms and conditions remain unchanged. Closing w ill be extended until September 14, 2018 at 5:00 PM.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912WJ18Q0132
X 9B. DATED (SEE ITEM 11)
14-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Sep-2018
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
Sheila.M.Winston@usace.army.milEMAIL:978-318-8159TEL:
SHEILA M WINSTONVINCUILLA / CONTRACT SPECIALIST
W912WJ18Q0132
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 31-Aug-2018 05:00 PM to 14-Sep-2018 05:00 PM.
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been modified:
BID SCHEDULE
BIDDING SCHEDULE
Item Estimated Unit Estimated No. Description Quantity Unit Price Amount
BASE BID
0001 Townshend Relief Well Valve Removal 1 Job Job $_______
0002 Townshend Outlet Structure with V-Notch Weir 1 Job Job $_______
TOTAL ESTIMATED AMOUNT, BASE BID ITEM $___________
Optional BID
0003 Reseal connection between steel pipe and Collector pipe at RW-1 1 EA $_______ $_______
0004 Reseal connection between pipe at RW-2 1 EA $_______ $_______
0005 Reseal connection between pipe at RW-3 1 EA $_______ $_______
0006 Reseal connection between pipe at RW-4 1 EA $_______ $_______
0007 Reseal connection between pipe at RW-5 1 EA $_______ $_______
0008 Reseal connection between
W912WJ18Q0132
pipe at RW-6 1 EA $_______ $_______
0009 Reseal connection between pipe at RW-7 1 EA $_______ $_______
0010 Excavate Pond and Perform Sediment Analysis Testing 1 Job $_______ $_______
TOTAL ESTIMATED AMOUNT, OPTIONAL BID ITEMS $___________
TOTAL ESTIMATED AMOUNT, BASE AND OPTIONS $___________
Note 1: “EA” = Each
Note 2: Bidders must bid all items. The work will be awarded as a whole to one bidder. Offers will be evaluated and the low bidder determined by the Total Estimated Amount for Line Items 0001 through 0010, including the Base Bid Items and the Optional Items. The minimum work awarded will be the Base Bid work.
Note 3: In the event there is price difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the bidder shows only the total price but fails to enter the unit price, the total divided by the estimated quantity will be held to be the intended unit price.
Note 4: Item Numbers 0003 through 0010 above are Optional Items that may, at the option of the Government, be exercised within 120 calendar day of the Notice to Proceed. If any of the Optional Items are awarded, no additional time will be added to the contract duration.
-- End of Bidding Schedule --
-- End of Document --
(End of Summary of Changes)
File details come from the government source that posted it.