Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_W912WJ18Q0108-0002.pdf | ||
| PLANS_Amendment_0001.pdf | ||
| Site_Visit_Attendance_List.pdf | ||
| PLANS.pdf | ||
| Solicitation_W912WJ18Q0108.pdf | ||
| SPECS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment is hereby necessary to post submitted Requests for information and the Government responses as w ell as the site visit attendance list. This Amendment also extends the Response Date.
All other aspects remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ18Q0108
X 9B. DATED (SEE ITEM 11)
14-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Sep-2018
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
Sheila.M.Winston@usace.army.milEMAIL:978-318-8159TEL:
SHEILA M WINSTONVINCUILLA / CONTRACT SPECIALIST
W912WJ18Q0108
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
RFIS
REQUESTS FOR INFORMATION & GOVERNMENT RESPONSES
1. Is there a cost for Eversource to do the work? Plan Sheet E-101, Keyed Note 1 states that “Contractor shall pay costs associated with utility work”, yet the Summary of Work states that “The utility will change the transformer bank at no cost to the Government.” If there is a cost, what is it?
Response: There will be no cost to replace the transformers or the pole. Revised Plan Sheet E-101 attached.
2. Please confirm what training the SSHO for this project needs?
Response: As per Subparagraph 4 Site Safety and Health Officer (SSHO), Paragraph C. Safety, of the Specifications, the SSHO shall have a minimum of five years of experience in implementing safety and health programs at similar projects; documented experience in personal protective equipment; working knowledge of construction and electrical safety and health regulations and Completion of the 30-hour OSHA Construction Safety class or as an equivalent, 30 hours of formal construction safety and health training covering the subjects of the 30-hour course.
3. Are we re-using the exhaust stack on the generator?
Response: See Plan Sheet E-102, Keyed Note 2 which states “PROVIDE EXHAUST PIPING PER MANUFACTURER’S
RECOMMENDATIONS. USE EXISTING EXHAUST PENETRATION AND ADJUST SIZE AS REQUIRED”.
4. Who is responsible for filling up the day tank for the new generator?
Response: Refer to subparagraphs e., h., j., k., p., and t. in Subparagraph 3.4.5 Safety Run Tests in Spec Section 26 32 14 DIESEL-GENERATOR SET, STATIONARY 15-300 KW, STANDBY APPLICATIONS, which all require the Contractor to start the engine and then run the generator set in order to test it and record various checks and inspections.
5. What permits are required?
Response: As per Subparagraph B, in Paragraph 18, Environmental Protection, “Obtaining and complying with all environmental permits and commitments, required by Federal, State, Regional, and local environmental laws and regulations is the Contractor’s responsibility.” As a Federal property, there are no building permits required.
6. Are we replacing the hydraulic pump motor switches? Are they both to go on the wall where the existing pump motor switches are?
Response: Yes, Contractors are to replace the hydraulic pump motor switches. See Note 1 on revised Sheet E- 103, attached. Both new switches are to be placed on the wall where the old switches are currently located. This is a change to the project as originally described.
7. Can Contractors use the in-house Gantry Crane to lift the pump motors?
Response: Yes, Contractors can use the in-house Gantry Crane to lift the pump motors.
8. Are Contractors to replace the feeds from the service entrance to Panel P2 in the Gallery level?
Response: Refer to per Plan Sheet E-601, Keyed Note 8, which states: “REPLACE PANEL P2 IN SITU. PROVIDE CONDUIT AND WIRE BACK TO DP-1. DEMOLISH EXISTING FEEDER BACK TO SOURCE INCLUDING ABANDONED
CIRCUIT BREAKERS IN JUNCTION BOX ADJACENT TO PANEL LOCATION.”
9. Are Contractors to replace the feeder to the panel for the sump pump shutoff switch in the gallery tunnel? It is, after all, the first device on the circuit.
Response: As per Detail C-1 on Plan Sheet E-601, Contractors are not required to replace this wiring. This work element should not be included in the quote.
10. Are there any hazardous materials such as lead or asbestos on this project?
Response: No, there are no hazardous materials such as lead or asbestos on this project.
11. Is the gate tower or gallery tunnel a confined space?
Response: No, the gate tower and gallery tunnel are not considered confined spaces. Both have multiple exit points.
12. What material does the diamond plate platform need to be made of?
Response: The diamond plate platform shall be made of stainless steel, ¼-inch thick. See revised Plan Sheet E-102 for additional information. This is an addition to the project as originally described.
13. Is the diamond plate platform to be bolted to the floor?
Response: No. It is to be free-standing so it can be lifted up or moved to get to the floor penetrations underneath.
See revised Plan Sheet E-102 for additional information.
14. Would it be better to drill new penetration holes in the concrete floor slab closer to the wall in order to avoid the need for the diamond plate platform?
Response: No - drilling new penetration holes through the concrete floor slab is not feasible, as the conduits and conductors are embedded horizontally in the concrete slab floor. Trenching is not to be permitted, as it weakens the structural integrity of the slab. Additional information regarding the diamond plate platform are shown on the revised Plan Sheet E-102, attached.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 06-Sep-2018 05:00 PM to 11-Sep-2018 05:00 PM.
(End of Summary of Changes)