Amendment 0004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidAbstract.pdf | ||
| BidSummary.pdf | ||
| GreenHarbor-JettyRepair_NSC_AMND_0004.pdf | ||
| Amendment_0003.pdf | ||
| Amendment_0002.pdf | ||
| Sketch_1.pdf | ||
| Amendment0001.pdf | ||
| W912WJ18B0005_Solicitation.pdf | ||
| Drawings.pdf | ||
| Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is issued to provide reponses for Requests for Information (RFI). All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Feb-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ-18-B-0005
X 9B. DATED (SEE ITEM 11)
22-Jan-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Feb-2018
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ-18-B-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
QUESTION 1: Considering the due date of 27 February and assuming the award and NTP is issued within 30 days of bid opening, the likely timeframe for this project will be approximately 1 April through 31 July. The project documents allow land access to the work area, laydown area on public, land-based construction activities and marine plant within the channel. Considering the above, is it the intent for the project to be completed within this timeframe as many projects of this nature are completed in the early fall to spring timeframe in our experience.
GOVERNMENT RESPONSE: Amendment 0003 issued on 23 Feb 2018 has moved the bid opening to 1 Mar 2018.
With no environmental windows for the subject project, it is the intention of the corps to issue NTP and complete this project as soon as possible. The timeframe presented in this RFI is a reasonable assumption, barring any complications to contract award.
QUESTION 2. Specification section 01 11 00 para 1.1.3.a.(3)a states “Water-based or land based construction methods shall be used for the repair of the East Jetty”. Specification section 01 11 00 para 1.1.3.a.(3)e states “The contractor shall not work from the crest of the jetty.” Additionally, Specification section 35 31 19 para 1.1.C states in part “The Contractor may not work along the side slopes or from the top of the jetty.” Typically, a land- based approach would be from the crest of the Jetty. If the contractor provides protection for the existing armor stone will work from the crest of the jetty be permitted?
GOVERNMENT RESPONSE: The contractor will not be permitted to work from the crest, or from the side slopes, of the structure as stated in the specifications. The crest is 6 feet wide with loosely interlocked armor stone on either end of the repair areas. This is not sufficient enough for the anticipated stone handling equipment to operate safely from the crest. Repair areas may be worked from the beach on either side of the structure (east and west).
QUESTION 3. Specification Section 01 50 00 para 3.2.a states in part “The contractor shall provide a fenced 6’ wide accessway to the two beaches North and South of the Jetty.” Please elaborate on the scope and placement of the accessway.
GOVERNMENT RESPONSE: The intention of this specification section is to allow for passage of pedestrian foot traffic between the beaches east and west of the structure that is shoreward of the MHW/Limits of Work line shown on the contract drawings. 6 (six) feet shall be the minimum width of this accessway.
QUESTION 4. Please verify the Contractor will be required to provide a GPS rover to the Government in addition to the rover the Contractor will be required to have onsite to perform the work in accordance with specification section 01 71 23 para 3.2.
GOVERNMENT RESPONSE: The contractor will not be required to provide a GPS rover for government use in addition to the contractor's own. See the attached "Narrative Changes to Specifications, Amendment 0004" for revisions to Specification section 01 71 23 para 3.2.
(End of Summary of Changes)