REPLACE PARK EQUIPMENT AT BULKHEAD

Figure 1

Figure 1 – Shows the general location of areas at the east end of the Cape Cod Canal. Work areas are located in the town of Sandwich Ma.

Figure 2

Figure 2 – Shows work in Area A. Area A has existing benches and receptacles to be replaced.

Benches shall have a new 8’ x 5’ concrete pad. Receptacle locations shall have a new 6' x 4' concrete pad. Work includes six new benches and four trash receptacles in this area.

Bench

Trash

Bench

Bench

Benches

Trash

Trash

Trash

North

Figure 3

Figure 3 - Shows work in Area B. Area B gets four new bench locations. Benches shall have a new 8’ x 5’ concrete pads and the benches shall face the water when installed.

Figure 4

Figure 4 - Shows work in Area C. Area C gets two new bench locations. Benches shall have a new 8’ x 5’ concrete pads and the benches shall face the water when installed.

Informational Photo 1

Informational Photo 1 – Shows typical existing bench in Area A, anchored in a concrete base surrounded by concrete paving stones. Work includes complete removal and installation of new bench with new concrete pad.

Informational Photo 2

Informational Photo 2 – Shows typical existing trash and recycling receptacles in Area A.

Work includes complete removal and installation of new double container receptacles with concrete pad.

Informational Photo 3

Informational Photo 3 – Shows two existing benches located in Area A (west end of the parking lot looking north). Existing concrete pavers sit below grade and are not pitched to provide adequate drainage. Work includes complete removal and installation of new benches with concrete pad.

Informational Photo 4

Informational Photo 4 – Shows typical conditions at location of new bench in Area B. Work includes excavation, installation 6” gravel base, concrete pad and new bench fastened to concrete pad.

Informational Photo 5

Informational Photo 5 – Shows typical conditions at location of new bench in Area C. Work includes excavation, installation 6” gravel base, concrete pad and new bench fastened to concrete pad.