W912WJ-16-Q-0223_Solicitation.pdf
PDF 300 KB Posted
- Solicitation number
- W912WJ-16-Q-0223
About this file
Solicitation Attached
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOONSOCKET FLOOD CONTROL PROJECT
JOSEPH ZANCA
121 SOUTH MAIN STREET
WOONSOCKET RI 02895
TEL: 978-318-8419 FAX: 508-347-8732
REQUEST FOR QUOTATIONS
(THIS IS NOT AN ORDER) 1
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED RATING
W912WJ-16-Q-0223 15-Sep-2016 5a. ISSUED BY
8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this
Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State, and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e) (f)
SEE SCHEDULE
AMOUNT
% No. %
NOTE: Additional provisions and representations [ ] are [ ] are not attached.
13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
15. DATE OF
QUOTATION
16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)
TELEPHONE NO.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)
PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)
THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE
6. DELIVER BY (Date)
SEE SCHEDULE
AND/OR DMS REG. 1
UNDER BDSA REG. 2
4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE
REQUEST NO.
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
9. DESTINATION (Consignee and address, including ZIP Code)
7. DELIVERY
[ ]X FOB
DESTINATION
[ ] OTHER
(See Schedule)
23-Sep-2016(Date)
PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.
9783188478SARA J TORRES
(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:
d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS
W912WJ-16-Q-0223
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
WOONSOCKET FLOOD REDUCTION PROJECT
FFP
Contractor shall furnish all equipment, materials and labor for motor cooling vent insulated electric roll up door installation, in two pumping stations in Woonsocket, RI. For the purpose of facility maintenance, in accordance with attached Statement of Work.
FOB: Destination
NET AMT
Section C - Descriptions and Specifications
ADDITIONAL INFORMATION
-SITE VISITS ARE HIGHLY RECOMMENDED PRIOR TO PROVIDING A QUOTE. SEE CLAUSE 52.236‐27
FOR ADDITIONAL INFORMATION.
-PLEASE DIRECT QUESTIONS TO SARA J. TORRES AT (978) 318‐8478 OR Sara.J.Torres@usace.army.mil .
ANY INFORMATION RECEIVED AT THE SITE VISIT WHICH CONFLICTS WITH THIS SOLICITAION
SHOULD BE BROUGHT TO THE ATTENTION OF MRS. TORRES. THE SOLICITATION AND RESULTING
CONTRACT SHALL BE THE GOVERNING DOCUMENT IN ALL CASES. OFFERORS ARE NOTIFIED
THAT THE BASIS FOR AWARD IS PRICE ALONE.
-QUOTES CAN BE FAXED OR E‐MAILED TO SARA J. TORRES AT (978) 318‐8478 or EMAILED AT Sara.J.Torres@usace@army.mil . E‐MAIL IS THE PREFERRED METHOD OF
SUBMISSION.
-NOTE: QUOTATION INSTRUCTIONS
1. If subcontractor will be used for this work, please provide company name and credentials/qualifications:
2. IMPORTANT NOTE: Contractors must be REGISTERED AND ACTIVE in the System for Awards Management (SAM) database (www.SAM.gov) BY 23-SEPTEMBER-2016 to be eligible for award.
(Formerly the Central Contractor Registration (CCR) database and the On‐Line Representations and Certifications (ORCA).) Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website.
Please note that Google and Google Chrome are not supported browsers for SAM registration. Mozilla Firefox, Safari, and Internet Explorer are supported browsers.
3. Provide business DUNS number: _______________________________ (phone 800‐ 333‐0505 for DUNS).
4. Provide business CAGE code: __________________________________
5. Tax Identification Number: ___________________________________
6. Contractors shall provide completed FAR clause 52.204‐8 (Annual Representations and Certifications) found in Section K of this solicitation with their quote, if the Contractors have not completed their annual representations and certifications electronically via the SAM website at www.sam.gov . (See Paragraph 2 above)
7. Contractors are not required to submit an Accident Prevention Plan (APP) with their quote. The successful offeror will be required to submit this document upon award. The APP must be accepted by the Government Designated Authority prior to the preconstruction conference
STATEMENT OF WORK
SOCIAL AND HAMLET PUMPING STATION
MOTOR COOLING VENT INSULATED ROLL UP DOOR INSTALLATION
U.S. ARMY CORPS OF ENGINEERS
WOONSOCKET FLOOD REDUCTION PROJECT
WOONSOCKET, RI
SCOPE OF WORK
MAY 2016
I. GENERAL
1. Scope
Furnish all equipment, materials and labor for motor cooling vent insulated electric roll up door installation, in two pumping stations in Woonsocket, RI. For the purpose of facility maintenance.
2. Location The required services shall be performed at the following project locations:
1. Social District Pumping Station - 593 Clinton Street, Woonsocket, RI.
2. Hamlet District Pumping Station - 195 Davidson Avenue, Woonsocket, RI.
3. Site Visits and Requests for Information
Contact the Technical Point of Contact, Joe Zanca (978-318-8419 or joseph.l.zanca@usace.army.mil) to arrange a site visit.
4. Schedule The period of performance shall be 120 days from contract award. The project area will be open to the contractor Monday through Friday 7:00 AM to 3:30 PM and all work must be done during those hours unless additional hours are approved by the Technical Point of Contact. No work shall be done on weekends or Government holidays.
5. Safety
The contractor will comply with all pertinent provisions of the latest edition of the U.S. Army Corps of Engineers Safety and Health Requirements COE EM 385-1-1. A copy of COE EM 385-1-1 is available for reference at the project office or the manual may be viewed at the following link http://www.usace.army.mil/SafetyandOccupationalHealth/EM38511,2008BeingRevised.aspx The contractor shall also comply with all OSHA work safety standards. The project staff can and will order the cessation of work at any time should the safety of employees and visitors become jeopardized.
6. Preconstruction Conference
Prior to the start of any work, the Technical Point of Contact will schedule and conduct a “Preconstruction Conference”. The Contractor’s Project Manager and Quality Control Personnel will attend this meeting. This conference will be held at the time and location agreeable to the government and contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. At the Preconstruction conference the contractor shall provide to the name of the project superintendent with a telephone number for project coordination.
The following is a general list of items for discussion during this Preconstruction Conference:
i. Authority of the Technical Point of Contact.
ii. Contractor’s Safety Program (including sub-contractors).
iii. Activity Hazard Analysis (Submitted & accepted prior to start of work on site)
iv. Weekly Safety Meetings (Documented on NED Form 251)
v. Accident Reporting (ENG Form 3394)
vi. Safety Data Sheet (SDS) requirements
vii. Correspondence, Communication and Administrative Procedures.
viii. Invoice and payment.
7. Permits
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.
8. Security The contractor will comply with all established security policies at Woonsocket Flood Reduction Project. Due to periods of heightened security that may affect the access to the areas covered under this contract, areas may be subject to periodic closures, which in turn may reduce or inhibit the Contractor’s ability to access certain areas. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The Contractor shall be given at least 24 hour notice of any such closure.
9. Contractor Conduct
Alcohol and firearms are prohibited on project grounds. Contractor and employees must comply with CFR 36 Rules and Regulations.
10. Payment Payment shall be made on a per job basis. After final inspection and acceptance by the Government, the Contractor must submit an invoice to the Technical Point of Contact.
The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, process, and total amount due per line item. For jobs greater than 30 days the contractor may request progress payment.
This invoice may be mailed to:
US Army Corps of Engineers 518 East Hartford Ave., Uxbridge, MA 01569-1209 or emailed to joseph.l.zanca@usace.army.mil or faxed to the office at (508) 278-4234.
11. Damage to Government and Private Property The Contractor shall be responsible for restoring any Government facilities or structures damaged as a result of the firm’s operation. The Contractor shall also be responsible for any damage to private property or injury to any person as a result of the firm’s operations. The Contractor shall notify the Technical Point of Contact immediately of damage to Government and private property and injury to any person resulting from the firms’ operation.
12. Point of Contact Requirements The Contractor shall provide to the Technical Point of Contact a telephone number and a point of contact for discussion of any contractual matters.
II. TECHNICAL
Part 1 General:
Existing Conditions:
The existing vents are shown in Informational Photo Numbers 1 and 2. Social and Hamlet Pumping Stations are a single floor structure with easy access to all vents from the outside, and limited access from the inside of the Stations.
Existing Vent Schedule:
a. Social District Pumping Station – three (3) approximately five (5) feet wide and ten (10) feet tall
b. Hamlet District Pumping Station – three (3) approximately four (4) feet wide and seven (7) feet tall
Requests for Information:
Requests concerning the work of this project should be directed to the Technical Point of Contact at (978) 318-8419 or joseph.l.zanca@usace.army.mil
Submittals:
Although the Government technically reviews submissions required by this scope of work, it is emphasized that the Contractor’s work must be prosecuted using proper internal controls and review procedures. The documents identified below must be prepared in accordance with the applicable standards, submitted to the Technical Point of Contact for review and accepted by the government prior to the commencement of any field activities.
Product specification sheets for insulated roll up door system (prior to ordering) Manufacturer Warranty for insulated roll up door systems Modified Activity Hazard Analysis (AHA) (Prior to start of field work)
Clean Up:
The Contractor shall practice good housekeeping to maintain a safe job site. The contractor shall keep the work area, including any storage areas, free from the accumulation of waste materials.
Upon completing work in an area the contractor shall remove any tools, equipment, and materials that are not the property of the government. Upon completion of work, the Contractor shall clean up the job site to the satisfaction of the Government.
Government Resources:
The contractor is responsible for providing all materials to complete the project. Unless specified in the contract, the Government will not provide any equipment, telephone services or other resources.
Omissions:
This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.
Quality Assurance:
The contractor is responsible for the quality control of the contract work. The government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.
Other Contracts:
The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other Contractors and Government employees. The contractor shall not commit or permit any act, which will interfere with the performance of work by another contractor, or by Government employees.
Environmental Protection:
Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the contractor at the site, and the site will be inspected/ cleaned on a daily basis. No burning is permissible.
Water, air and land resources shall not be adversely impacted during the course of the work.
Contractor will take necessary steps to ensure all federal, state, and local environmental regulatory requirements are met.
Receiving and Storing Materials:
The contractor is responsible for protecting any stored material until it is placed in service. The contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive material or supplies for the contractor and will not be responsible for damage to contractor equipment or material.
Part 2 Products:
Insulated Roll up Door systems will meet or exceed the following:
1. Insulated Roll Up Doors
a. Door
a. Curtain shall be 24 gauge galvanized steel on front and back and finish shall be baked on grey polyester paint.
b. Galvanized steel double angle bottom bar with weather seal.
c. Galvanized steel angle guides water stop on 1 side.
d. Face of wall OR between jambs mounted door guides as approved by
Technical Point of contact.
e. 24 gauge galvanized steel with primed grey steel hood.
f. Exterior lintel baffle.
g. 3”x3” Galvanized steel angle sills.
h. Insulated slats shall be at a minimum thermal efficiency of a R9 value.
b. Open/Close Control Mechanism
a. Electric with a Hand-crank type mechanical by-pass chain operator.
b. Shall be able to operate all doors from a standing position on the interior of the building with no obstructions of movement.
c. Lock
a. Shall be able to lock/secure door from a standing position on the interior of the building, unable to open from outside.
(Note: Series 625 Rolling Stormtite Insulated Door Systems meets these specifications.)
2. Fasteners and Sealant
a. Fasteners
a. Fasteners, where exposed, will be stainless steel.
b. Fasteners, where concealed, may be stainless or zinc-plated steel in accordance with ASTM Specifications A165-55 or A164-55.
c. Bolts, anchors and other fastening devices shall be as required for the strength of the connections and shall be suitable for conditions encountered. Washers shall be of the same metals as fasteners.
b. Elastomeric Caulking
a. Product will be approved by window manufacture.
b. Color to match door framing.
Part 3 Execution:
General:
The building and all of its contents shall be protected from the elements and unauthorized access during the duration of this contract. The contractor shall keep on site the means to quickly cover and protect all areas open to the elements during an unforeseen weather related event that could cause damage to the building, and or any of its contents during all phases of this contract. The window openings will not be left open and unattended beyond the end of the scheduled work day. The contractor will secure the site by locking all doors and gates whenever any site is unattended.
Demolition:
1. The Contractor shall remove and properly dispose of any exterior plywood and or foam board on existing motor vents at the Social District Pumping Station and at the Hamlet District Pumping Station.
Installation:
The Contractor shall furnish all equipment, materials and labor to install 3 insulated roll up door systems in front of the 3 existing motor cooling vents at the Social District Pumping Station and 3 insulated roll up door systems in front of the 3 existing motor cooling vents at Hamlet District Pumping Station. The insulated roll up door schedule shall be as follows:
Insulated Roll Up Door Schedule:
a. Social District Pumping Station – three (3) approximately five (5) feet wide and ten (10) feet tall
b. Hamlet District Pumping Station – three (3) approximately four (4) feet wide and seven (7) feet tall
The contractor is responsible for all measurements for fabrication of new roll up doors to be installed.
1. Social District Pumping Station
a. Clean and prep area for new installation.
b. Install new, insulated roll up door System.
i. The units shall be set plumb, level, and true to line without warp or rack of frame.
ii. Units shall be securely anchored in place to substrate allowing for expansion and contraction.
iii. Units shall be caulked and sealed per the door manufacturer’s instructions for a weather tight installation.
iv. Installation of doors shall include sub sill and flashing.
v. Install electric service and electric operators.
vi. The contractor shall protect all Government Property from damage from any staging or equipment used to access the area.
vii. Upon completion of installation, contractor must clean up after themselves.
2. Hamlet District Pumping Station
a. Clean and prep area for new installation.
b. Install new, insulated roll up door System.
i. The units shall be set plumb, level, and true to line without warp or rack of frame.
ii. Units shall be securely anchored in place to substrate allowing for expansion and contraction.
iii. Units shall be caulked and sealed per the door manufacturer’s instructions for a weather tight installation.
iv. Installation of doors shall include sub sill and flashing.
v. Install electric service and electric operators.
vi. The contractor shall protect all Government Property from damage from any staging or equipment used to access the area.
vii. Upon completion of installation, contractor must clean up after themselves.
Informational Photo
Informational Photo No. 1: View of exterior of Social District Pump Station motor vents.
Informational Photo No.2: Exterior view of Hamlet District Pumping Station motor vents.
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 120 dys. ADC 1 WOONSOCKET FLOOD CONTROL
PROJECT
JOSEPH ZANCA
121 SOUTH MAIN STREET
WOONSOCKET RI 02895
978-318-8419 FOB: Destination
961314
Section H - Special Contract Requirements
SECURITY INFORMATION
The contractor and all associated sub‐contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the Technical Point of Contact not later than 5 calendar days after the completion of the training.
The Contractor must pre‐screen Candidates using the E‐verify Program (http://www.uscis.gov/e‐verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E verify system. An initial list of verified/eligible Candidates must be provided to the Technical Point of Contact no later than 3 business days after the initial award.
WAGE DETERMINATION
General Decision Number: RI160001 09/02/2016 RI1 Superseded General Decision Number: RI20150001 State: Rhode Island Construction Types: Building, Heavy (Heavy and Marine) and Highway Counties: Rhode Island Statewide.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories) HEAVY, HIGHWAY AND MARINE
CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016 1 01/15/2016 2 01/29/2016 3 02/12/2016 4 02/19/2016 5 03/04/2016 6 03/11/2016 7 04/01/2016 8 05/06/2016 9 06/03/2016 10 06/10/2016 11 06/17/2016 12 06/24/2016 13 08/12/2016 14 09/02/2016
ASBE0006-006 06/01/2015
Rates Fringes
HAZARDOUS MATERIAL HANDLER
(Includes preparation, wetting, stripping, removal scrapping, vacuuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 31.63 18.30
ASBE0006-008 09/01/2015
Rates Fringes
Asbestos Worker/Insulator Includes application of all insulating materials, protective coverings, coatings & finishes to all types of mechanical systems.$ 39.43 25.65
BOIL0029-001 01/01/2016
Rates Fringes
BOILERMAKER......................$ 41.62 24.42
BRRI0003-001 06/01/2016
Rates Fringes
Bricklayer, Stonemason, Pointer, Caulker & Cleaner.......$ 37.38 24.73
* BRRI0003-002 09/01/2016
Rates Fringes
Marble Setter, Terrazzo Worker & Tile Setter.............$ 37.16 25.80
* BRRI0003-003 09/01/2016
Rates Fringes
Marble, Tile & Terrazzo Finisher.........................$ 31.32 24.65
CARP0094-001 06/06/2016
Rates Fringes
CARPENTER (Includes Soft Floor Layer).....................$ 34.91 25.85 Diver Tender.....................$ 35.91 25.85
DIVER............................$ 46.71 25.85
Piledriver.......................$ 34.91 25.85
WELDER...........................$ 35.91 25.85
FOOTNOTES:
When not diving or tending the diver, the diver and diver tender shall receive the piledriver rate. Diver tenders shall receive $1.00 per hour above the pile driver rate when tending the diver.
Work on free-standing stacks, concrete silos & public utility electrical power houses, which are over 35 ft. in height when constructed: $.50 per hour additional.
Work on exterior concrete shear wall gang forms, 45 ft. or more above ground elevation or on setback: $.50 per hour additional.
The designated piledriver, known as the "monkey": $1.00 per hour additional.
CARP1121-002 04/01/2016
Rates Fringes
MILLWRIGHT.......................$ 34.95 26.77
ELEC0099-002 06/01/2016
Rates Fringes
ELECTRICIAN......................$ 36.83 58.39%
Teledata System Installer........$ 27.62 13.42%+13.57
FOOTNOTES:
Work of a hazardous nature, or where the work height is 30
ft. or more from the floor, except when working OSHA-approved lifts: 20% per hour additional.
Work in tunnels below ground level in combined sewer outfall:
20% per hour additional.
ELEV0039-001 01/01/2016
Rates Fringes
ELEVATOR MECHANIC................$ 47.37 29.985+A+B
FOOTNOTES:
A. PAID HOLIDAYS: New Years Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.
B. Employer contributes 8% basic hourly rate for 5 years or more of service of 6% basic hourly rate for 6 months to 5 years of service as vacation pay credit.
ENGI0057-001 05/31/2016
Rates Fringes
Operating Engineer: (power plants, sewer treatment plants, pumping stations, tunnels, caissons, piers, docks, bridges, wind turbines, subterranean & other marine and heavy construction work) GROUP 1.....................$ 36.15 24.85+a GROUP 2.....................$ 31.77 24.85+a
GROUP 3.....................$ 28.92 24.85+a GROUP 4.....................$ 35.20 24.85+a GROUP 5.....................$ 26.00 24.85+a GROUP 6.....................$ 20.00 24.85+a GROUP 7.....................$ 31.85 24.85+a GROUP 8.....................$ 35.77 24.85+a
a. BOOM LENGTHS, INCLUDING JIBS:
150 feet and over + $ 2.00 180 feet and over + $ 3.00 210 feet and over + $ 4.00 240 feet and over + $ 5.00 270 feet and over + $ 7.00 300 feet and over + $ 8.00 350 feet and over + $ 9.00 400 feet and over + $10.00
a. PAID HOLIDAYS:
New Year's Day, President's Day, Memorial Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day. a: Any employee who works 3 days in the week in which a holiday falls shall be paid for the holiday.
a. FOOTNOTES:
Hazmat work: $2.00 per hour additional.
Tunnel/Shaft work: $5.00 per hour additional.
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Digging machine, Ross Carrier, crane, lighter, locomotive, derrick, hoist, elevator, bidwell-type machine, shot & water blasting machine, paver, spreader, graders, front end loader (3 yds. and over), vibratory hammer & vacuum truck, roadheaders, forklifts, economobile type equipment, tunnel boring machines, concrete pump and on site concrete plants.
GROUP 2: Fireman & oiler.
GROUP 3: Oiler on crawler backhoe.
GROUP 4: Bulldozer, bobcats, skid steer loader, tractor, scraper, combination loader backhoe, roller, front end loader (less than 3 yds.), street and mobile-powered sweeper (3-yd. capacity), 8-ft. sweeper minimum 65 HP).
GROUP 5: Well-point installation crew.
GROUP 6: Utility Engineers and Signal Persons
GROUP 7: Heater, concrete mixer, stone crusher, welding machine, generator and light plant, gas and electric driven pump and air compressor.
GROUP 8: Boat & tug operator.
ENGI0057-002 05/02/2016
Rates Fringes
Power Equipment Operator (highway construction projects; water and sewerline projects which are incidental to highway construction projects; and bridge projects that do not span water) GROUP 1....................$ 31.30 24.85+a GROUP 2....................$ 26.00 24.85+a GROUP 3....................$ 20.00 24.85+a GROUP 4....................$ 26.58 24.85+a GROUP 5....................$ 30.28 24.85+a GROUP 6....................$ 29.90 24.85+a GROUP 7....................$ 25.55 24.85+a GROUP 8....................$ 26.93 24.85+a GROUP 9....................$ 28.88 24.85+a
a. FOOTNOTE: a. Any employee who works three days in the week in which a holiday falls shall be paid for the holiday.
a. PAID HOLIDAYS: New Year's Day, President's Day, Memorial Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day & Christmas Day.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Digging machine, crane, piledriver, lighter, locomotive, derrick, hoist, boom truck, John Henry's, directional drilling machine, cold planer, reclaimer, paver, spreader, grader, front end loader (3 yds. and over), vacuum truck, test boring machine operator, veemere saw, water blaster, hydro-demolition robot, forklift, economobile, Ross Carrier, concrete pump operator and boats
GROUP 2: Well point installation crew
GROUP 3: Utlity engineers and signal persons
GROUP 4: Oiler on cranes
GROUP 5: Combination loader backhoe, front end loader (less than 3 yds.), forklift, bulldozers & scrapers and boats
GROUP 6: Roller,skid steer loaders, street sweeper
GROUP 7: Gas and electric drive heater, concrete mixer, light plant, welding machine, pump & compressor
GROUP 8: Stone crusher
GROUP 9: Mechanic & welder
ENGI0057-003 05/31/2016
BUILDING CONSTRUCTION
Rates Fringes
Power Equipment Operator GROUP 1....................$ 35.42 24.85+a GROUP 2....................$ 35.20 24.85+a GROUP 3....................$ 31.20 24.85+a GROUP 4....................$ 28.35 24.85+a GROUP 5....................$ 34.50 24.85+a GROUP 6....................$ 34.07 24.85+a GROUP 7....................$ 31.39 24.85+a a.BOOM LENTHS, INCLUDING JIBS:
150 ft. and over: + $ 2.00 180 ft. and over: + $ 3.00 210 ft. and over: + $ 4.00 240 ft. and over: + $ 5.00 270 ft. and over: + $ 7.00 300 ft. and over: + $ 8.00 350 ft. and over: + $ 9.00 400 ft. and over: + $10.00
a. PAID HOLIDAYS: New Year's Day, President's Day, Memorial Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day & Christmas Day. a: Any employee who works 3 days in the week in which a holiday falls shall be paid for the holiday.
a. FOOTNOTE: Hazmat work: $2.00 per hour additional.
Tunnel/Shaft work: $5.00 per hour additional.
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Digging machine, Ross carrier, crane, boomtrucks, lighter, locomotive, derrick, hoist, elevator, bidwell-type machine, shot & water blasting machine, paver, spreader, front end loader (3 yds. and over), vibratory hammer and vacuum truck
GROUP 2: Telehandler equipment, forklift, concrete pump & on-site concrete plant
GROUP 3: Fireman & oiler
GROUP 4: Oiler on crawler backhoe
GROUP 5: Bulldozer,skid steer loaders,bobcats, tractor, grader, scraper,combination loader backhoe, roller, front end loader (less than 3 yds.), street and mobile powered sweeper (3 yds. capacity), 8-ft. sweeper (minimum 65 hp)
GROUP 6: Well point installation crew
GROUP 7: Heater, concrete mixer, stone crusher, welding machine, generator for light plant, gas and electric driven pump & air compressor
IRON0037-001 03/16/2016
Rates Fringes
IRONWORKER.......................$ 34.01 25.22
LABO0271-001 06/05/2016
BUILDING CONSTRUCTION
Rates Fringes
LABORER
GROUP 1.....................$ 29.20 23.80
GROUP 2.....................$ 29.45 23.80
GROUP 3.....................$ 29.95 23.80
GROUP 4.....................$ 30.20 23.80
GROUP 5.....................$ 31.20 23.80
LABORERS CLASSIFICATIONS
GROUP 1: Laborer, Carpenter Tender, Mason Tender, Cement Finisher Tender, Scaffold Erector, Wrecking Laborer, Asbestos Removal [Non-Mechanical Systems]
GROUP 2: Asphalt Raker, Adzemen, Pipe Trench Bracer, Demolition Burner, Chain Saw Operator, Fence & Guard Rail Erector, Setter of Metal Forms for Roadways, Mortar Mixer, Pipelayer, Riprap & Dry Stonewall Builder, Highway Stone Spreader, Pneumatic Tool Operator, Wagon Drill Operator, Tree Trimmer, Barco-Type Jumping Tamper, Mechanical Grinder Operator
GROUP 3: Pre-Cast Floor & Roof Plank Erectors
GROUP 4: Air Track Operator, Hydraulic & Similar Self-Powered Drill, Block Paver, Rammer, Curb Setter, Powderman & Blaster
GROUP 5: Toxic Waste Remover
LABO0271-002 06/05/2016
HEAVY AND HIGHWAY CONSTRUCTION
Rates Fringes
LABORER
COMPRESSED AIR
Group 1....................$ 46.63 21.80 Group 2....................$ 36.15 21.80 Group 3....................$ 48.63 21.80
FREE AIR
Group 1....................$ 38.70 21.80 Group 2....................$ 36.15 21.80 Group 3....................$ 40.70 21.80
LABORER
Group 1....................$ 29.20 21.80 Group 2....................$ 29.45 21.80 Group 3....................$ 30.20 21.80 Group 4....................$ 22.70 21.80 Group 5....................$ 31.20 21.80
OPEN AIR CAISSON,
UNDERPINNING WORK AND
BORING CREW
Bottom Man.................$ 35.20 21.80 Top Man & Laborer..........$ 34.25 21.80
TEST BORING
Driller....................$ 35.65 21.80 Laborer....................$ 34.25 21.80
LABORER CLASSIFICATIONS
GROUP 1: Laborer; Carpenter tender; Cement finisher tender;
Wrecking laborer; Asbestos removers [non-mechanical systems]; Plant laborer; Driller in quarries
GROUP 2: Adzeperson; Asphalt raker; Barcotype jumping tamper; Chain saw operators; Concrete and power buggy operator; Concrete saw operator; Demolition burner; Fence and guard rail erector; Highway stone spreader; Laser beam operator; Mechanical grinder operator; Mason tender; Mortar mixer; Pneumatic tool operator; Riprap and dry stonewall builder; Scaffold erector; Setter of metal forms for roadways; Wagon drill operator; Wood chipper operator;
Pipelayer; Pipe trench bracer
GROUP 3: Air track drill operator; Hydraulic and similar powered drills; Brick paver; Block paver; Rammer and curb setter; Powderperson and blaster
GROUP 4: Flagger & signaler
GROUP 5: Toxic waste remover
LABORER - COMPRESSED AIR CLASSIFICATIONS
GROUP 1: Mucking machine operator, tunnel laborer, brake person, track person, miner, grout person, lock tender, gauge tender, miner: motor person & all others in compressed air
GROUP 2: Change house attendant, powder watchperson, top person on iron
GROUP 3: Hazardous waste work within the "HOT" zone
LABORER - FREE AIR CLASSIFICATIONS
GROUP 1: Grout person - pumps, brake person, track person, form mover & stripper (wood & steel), shaft laborer, laborer topside, outside motorperson, miner, conveyor operator, miner welder, heading motorperson, erecting operator, mucking machine operator, nozzle person, rodperson, safety miner, shaft & tunnel, steel & rodperson, mole nipper, concrete worker, form erector (wood, steel and all accessories), cement finisher (this type of work only), top signal person, bottom person (when heading is 50' from shaft), burner, shield operator and TBM operator
GROUP 2: Change house attendant, powder watchperson
GROUP 3: Hazardous waste work within the "HOT" zone
PAIN0011-005 06/01/2015
Rates Fringes
PAINTER
Brush, Roller, Taper, Wall Coverer.....................$ 31.52 19.35 Epoxy, Tanks, Towers, Swing Stage & Structural Steel.......................$ 33.52 19.35 Spray, Sand & Water Blasting....................$ 32.52 19.35
PAIN0011-006 06/01/2016
Rates Fringes
GLAZIER..........................$ 35.58 20.15
FOOTNOTES:
SWING STAGE: $1.00 per hour additional.
PAID HOLIDAYS: Labor Day & Christmas Day.
PAIN0011-011 06/01/2016
Rates Fringes
Painter (Bridge Work)...........$ 46.95 20.15
PAIN0035-008 06/01/2011
Rates Fringes
Sign Painter.....................$ 24.79 13.72
PLAS0040-001 12/01/2015
BUILDING CONSTRUCTION
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 32.30 26.20
PLASTERER........................$ 33.00 25.50
FOOTNOTE: Cement Mason: Work on free swinging scaffolds under 3 planks width and which is 20 or more feet above ground and any offset structure: $.30 per hour additional.
PLAS0040-002 07/19/2015
HEAVY AND HIGHWAY CONSTRUCTION
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 29.10 20.95
PLUM0051-002 03/01/2016
Rates Fringes
Plumbers and Pipefitters.........$ 37.38 28.20
ROOF0033-004 06/01/2016
Rates Fringes
ROOFER...........................$ 34.03 22.34
SFRI0669-001 04/01/2016
Rates Fringes
SPRINKLER FITTER.................$ 42.62 20.77
SHEE0017-002 06/01/2016
Rates Fringes
Sheet Metal Worker...............$ 34.46 33.53
TEAM0251-001 08/01/2015
HEAVY AND HIGHWAY CONSTRUCTION
Rates Fringes
TRUCK DRIVER
GROUP 1....................$ 26.71 21.3225+A+B+C
GROUP 2....................$ 26.86 21.3225+A+B+C
GROUP 3....................$ 26.91 21.3225+A+B+C
GROUP 4....................$ 26.96 21.3225+A+B+C
GROUP 5....................$ 27.06 21.3225+A+B+C
GROUP 6....................$ 27.46 21.3225+A+B+C
GROUP 7....................$ 27.66 21.3225+A+B+C
GROUP 8....................$ 27.16 21.3225+A+B+C
GROUP 9....................$ 27.41 21.3225+A+B+C
GROUP 10....................$ 27.21 21.3225+A+B+C
FOOTNOTES:
A. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, plus Presidents' Day, Columbus Day, Veteran's Day & V-J Day, providing the employee has worked at least one day in the calendar week in which the holiday falls.
B. Employee who has been on the payroll for 1 year or more but less than 5 years and has worked 150 Days during the last year of employment shall receive 1 week's paid vacation; 5 to 10 years - 2 weeks' paid vacation; 10 or more years - 3 week's paid vacation.
C. Employees on the seniority list shall be paid a one hundred dollar ($100.00) bonus for every four hundred (400) hours worked, up to a maximum of five hundred dollars ($500.00)
All drivers working on a defined hazard material job site shall be paid a premium of $2.00 per hour over applicable rate.
TRUCK DRIVER CLASSIFICATIONS
GROUP 1: Pick-up trucks, station wagons, & panel trucks
GROUP 2: Two-axle on low beds
GROUP 3: Two-axle dump truck
GROUP 4: Three-axle dump truck
GROUP 5: Four- and five-axle equipment
GROUP 6: Low-bed or boom trailer.
GROUP 7: Trailers when used on a double hook up (pulling 2 trailers)
GROUP 8: Special earth-moving equipment, under 35 tons
GROUP 9: Special earth-moving equipment, 35 tons or over
GROUP 10: Tractor trailer
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
CLAUSES INCORPORATED BY FULL TEXT
52.231-5000 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE (MAR 1995) – UAI
(a) This special contract requirement does not apply to terminations. See 52.249-5000, Basis for Settlement of Proposals, and FAR Part 49.
(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region I. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.
(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36, Rental Costs. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.
(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the SAT, the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.
(End of special contract requirement)
Section I - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.222-6 Construction Wage Rate Requirements MAY 2014 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records MAY 2014 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and
Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment
Exceeding $15,000
MAY 2014
52.222-27 Affirmative Action Compliance Requirements for Construction
APR 2015
52.222-55 Minimum Wages Under Executive Order 13658 DEC 2015 52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
AUG 2011
52.228-11 Pledges Of Assets JAN 2012 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-27 Prompt Payment for Construction Contracts MAY 2014 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-17 Layout of Work APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.242-14 Suspension of Work APR 1984 52.243-5 Changes and Changed Conditions APR 1984 52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.249-1 Termination For Convenience Of The Government (Fixed
Price) (Short Form)
APR 1984
52.249-10 Default (Fixed-Price Construction) APR 1984 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013
252.203-7997 (Dev) Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements (Deviation 2016-O0003)
OCT 2015
252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting.
DEC 2015
252.227-7033 Rights in Shop Drawings APR 1966 252.232-7004 DOD Progress Payment Rates OCT 2014 252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Items JUN 2013
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 days . The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.213-4 TERMS AND CONDITIONS--SIMPLIFIED ACQUISITIONS (OTHER THAN COMMERCIAL
ITEMS) (JUN 2016).
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are ncorporated by reference:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).
(ii) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
(iii) 52.222-26, Equal Opportunity (APR 2015) (E.O. 11246).
(iv) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
(v) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(vi) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78 (19 U.S.C. 3805 note).
(2) Listed below are additional clauses that apply:
(i) 52.232-1, Payments (APR 1984).
(ii) 52.232-8, Discounts for Prompt Payment (FEB 2002).
(iii) 52.232-11, Extras (APR 1984).
(iv) 52.232-25, Prompt Payment (JUL 2013).
(v) 52.232-39, Unenforceability of Unauthorized Obligations (JUN 2013).
(vi) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (DEC 2013).
(vii) 52.233-1, Disputes (MAY 2014).
(viii) 52.244-6, Subcontracts for Commercial Items (JUN 2016).
(ix) 52.222-55, Minimum Wages Under Executive Order 13658 (MAR 2016) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia)).
(b) The Contractor shall comply with the following FAR clauses,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .