Solicitation_W912WJ-16-Q-0105.pdf

PDF 538 KB Posted

Attached to
Lower Connecticut River Basin Minor Construction Blanket Purchase Agreement
Solicitation number
W912WJ-16-Q-0105
Issued by

About this file

Solicitation

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATIONS

(THIS IS NOT AN ORDER) 1

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED RATING

W912WJ-16-Q-0105 17-Mar-2016 5a. ISSUED BY

8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE

SEE SCHEDULE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this

Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State, and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e) (f)

SEE SCHEDULE

AMOUNT

% No. %

NOTE: Additional provisions and representations [ ] are [ ] are not attached.

13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF

QUOTATION

16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)

TELEPHONE NO.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)

PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)

THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE

6. DELIVER BY (Date)

SEE SCHEDULE

AND/OR DMS REG. 1

UNDER BDSA REG. 2

4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE

REQUEST NO.

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

9. DESTINATION (Consignee and address, including ZIP Code)

7. DELIVERY

[ ] FOB

DESTINATION

[ ] OTHER X

(See Schedule)

31-Mar-2016(Date)

PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.

978-318-8324JENNIFER M SAMELA

(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:

d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS

W912WJ-16-Q-0105

Section B - Supplies or Services and Prices

BID SCHEDULE

BLANKET PURCHASE AGREEMENT

U.S. ARMY CORPS OF ENGINEERS

MINOR BUILDING CONSTRUCTION SERVICES

LOWER CONNECTICUT RIVER BASIN

Massachusetts

Unit Price Schedule

DESCRIPTION UNIT

Base Year

PRICE 4

Option Year 1 PRICE

Option Year 2

PRICE 4

1. Administrative – Office Work

HR 1

2. Master Carpenter 5

3. Master Plumber 5

4. Roofer 5 HR 1

5. Painter 5

6. General Laborer 5

7. Building Construction Demolition Debris Disposal 2

8. Construction Materials & Supplies 3

Not to Exceed $3,000/BPA Call

NOTES:

1. The Unit Price (HR) includes the Combined Hourly Rate for the equipment, crew and the supplies/materials/fuel required to support the specified crew or trade.

2. The Percent (%) Mark-Up is for Contractor’s actual disposal cost. The building construction demolition debris will not contain any hazardous materials. The contractor shall provide the Technical Point of Contact with actual disposal waybill as part of the applicable invoice.

3. The Percent (%) Mark-Up is for Contractor Furnish Construction Materials and Supplies Only.

4. A separate Bid Schedule may be provided for each Project Location or County to accommodate potential differences in pricing.

5. The Contractor may utilize separate subcontractors to satisfy the specific trade requirements.

ADDITIONAL INFORMATION

PLEASE DIRECT QUESTIONS TO JENNIFER M. SAMELA AT (978) 318‐8324 OR

jennifer.m.samela@usace.army.mil. THE SOLICITATION AND RESULTING CONTRACT SHALL BE THE

GOVERNING DOCUMENT IN ALL CASES.

QUOTES CAN BE FAXED OR E‐MAILED TO JENNIFER M. SAMELA AT (603) 746‐2593 or jennifer.m.samela@usace.army.mil. E‐MAIL IS THE PREFERRED METHOD OF SUBMISSION.

Contractors must be registered in the System for Awards Management at www.SAM.gov (formerly the Central Contractor Registration (CCR) database and the On‐Line Representations and Certifications (ORCA) (see DFARS clause 252.204‐7004 Alt A). Please note that Google and Google Chrome are not supported browsers for SAM registration. Mozilla FireFox, Safari, and Internet Explorer are supported browsers.

Provide DUNS number: ___________________________ (telephone 866‐705‐5711 for DUNS)

Provide CAGE code: ____________________________

Provide TAX ID: __________________________

Per FAR Clause 52.212‐3 Alt I, the Contractor is required to complete the On‐line Representations and Certifications Application (www.SAM.gov) and paragraph (b) if applicable, OR to complete paragraphs (c) thru (m) of this clause and return with quote.

POTENTIAL QUOTERS ARE NOTIFIED THAT THE BASIS ON WHICH AWARD WILL BE MADE IS

PRICE ALONE.

ALL RESPONSIBLE SOURCES MAY SUBMIT A RESPONSE WHICH, IF TIMELY RECEIVED, MUST

BE CONSIDERED BY THE AGENCY.

INVOICES SHALL BE SENT TO TECHNICAL POINT OF CONTACT.

Section C - Descriptions and Specifications

SCOPE OF WORK

BLANKET PURCHASE AGREEMENT

U.S. ARMY CORPS OF ENGINEERS

MINOR BUILDING CONSTRUCTION SERVICES

I. General

1. Scope of Work

The purpose of this Blanket Purchase Agreement (BPA) is to provide an indefinite quantity of Minor Building Construction Services. The Contractor shall furnish all labor, equipment and materials necessary to execute the Construction Equipment Services for each BPA Call under this agreement. No single BPA Call may exceed $25,000 in total cost. The BPA Master Dollar Limit is $250,000. The intent of this blanket BPA is to provide the government with a cost-effective rapid response way to maintain the U.S. Army Corps of Engineers facilities.

In accordance with FAR 13.303-3(a)(2), the Government is obligated only to the extent of authorized purchases actually made under the BPA.

2. Project Locations The Project Offices are located throughout Massachusetts and include the following locations:

a. Barre Falls Project Office [Including Mt Wachusett Radio Relay Area] 200 Coldbrook Road (off Rt62), Barre, MA 01005 (Worcester County)

b. Birch Hill Dam Project Office 68 Birch Hill Dam Road, Royalston, MA 01368 (Worcester County)

c. Knightville Dam Project Office

49 Knightville Dam Road, Huntington, MA 01050 (Hampshire County)

d. Littleville Lake Project Office 32 Goss Hill Road, Huntington, MA 01050 (Hampshire County)

e. Lower Connecticut River Basin Office (Co-Located with Tully Lake)

3 Athol-Richmond Road, Royalston, MA 01368 (Worcester County)

f. Tully Lake Project Office 2 Athol-Richmond Road, Royalston, MA 01368 (Worcester County)

3. Site Visit Contact the Technical Point of Contact for each location to arrange a site visit. The Technical Point of Contact for each location is as follows:

a. Barre Falls Office Project Manager, Ralph Gendron Phone: 978.318.8256 Email: Ralph.J.Gendron@usace.army.mil

b. Birch Hill Dam

Tully Lake Project Manager, Jeffrey Mangum Phone: 978.318.8282 Email: Jeffrey.C.Mangum@usace.army.mil

c. Knightville Dam Littleville Dam Project Manager, Matthew Coleman Phone: 978.318.8846 Email: Matthew.S.Coleman@usace.army.mil

4. Schedule

a. The BPA Base Year shall have a 12-month period of performance from the date of award. In addition, the Government may exercise two (2) optional years with the same scope of services. Each option year shall have a 12- month period of performance.

b. The Contractor shall provide a quote for each BPA Call request within 14 days of the initial contact by the Technical Point of Contact. The Contractor may receive additional time to provide the quote if it is pre-approved by the Technical Point of Contact.

c. Upon receipt of an executed BPA Call from the Government, the Contractor shall coordinate the start of the work no later than 14 calendar days after notification.

5. Workday Project areas will be open to the contractor Monday through Friday 7:00 AM to 3:30 PM and all work must be completed during those hours unless additional hours are approved by the Technical Point of Contact. No work shall be done on weekends or Government holidays unless approved by the Technical Point of Contact.

6. Safety The Contractor shall comply with all pertinent provisions of the latest edition of the U.S.

Army Corps of Engineers Safety and Health Requirements, COE EM 385-1-1. A copy of COE EM 385-1-1 is available for reference at the project office or may be viewed at the following link:

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385- 1-1.pdf.

The Contractor shall also comply with all OSHA work safety standards. The project staff can and will order the cessation of work at any time should the safety of employees and visitors become jeopardized.

7. Preconstruction Conference

Prior to the start of any work, the Technical Point of Contact will schedule and conduct a “Preconstruction Conference.” The Contractor’s Project Manager and Quality Control Personnel shall attend this meeting. This conference will be held at the time and location agreeable to the Government and Contractor. No work shall be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. At the Preconstruction Conference the Contractor shall provide the name of the project superintendent with a telephone number for project coordination.

The following is a general list of items for discussion during this Preconstruction Conference:

i. Authority of the Technical Point of Contact and Quality Assurance Inspectors

ii. Contractor’s Safety Program (including sub-contractors)

iii. Abbreviated Accident Prevention Plan (Submitted & Accepted Annually)

iv. Activity Hazard Analysis

(Submitted & Accepted prior to start of each BPA Call)

v. Safety Meetings for each BPA Call (Documented on NED Form 251)

vi. Accident Reporting (ENG Form 3394)

vii. Safety Data Sheet (SDS) requirements

viii. Correspondence, Communication and Administrative Procedures

ix. Invoice and payment

NOTE: Work cannot begin until all safety paperwork is submitted and accepted by the Government

8. Permits The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

9. Security

The Contractor shall comply with all established security policies at each Project Office identified. If applicable, Contractor shall comply with Projects Key Control Management Program. Due to periods of heightened security, which may affect access to the areas covered under this contract, areas may be subject to periodic closures, which in turn may reduce or inhibit the Contractor’s ability to access certain areas. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The Contractor shall be given at least a 24-hour notice of any such closure.

10. Contractor Conduct

Alcohol and firearms are prohibited on project grounds. Contractor and employees shall comply with CFR 36 Rules and Regulations.

11. Payment

Payment will be made on a per job basis. After final inspection and acceptance by the Government, the Contractor shall submit an invoice to the Technical Point of Contact. The invoice shall include the following: Invoice Date; Contract Number; Dates of Service;

Description of Work; Quantities; Material/Supply Back-Up, and total amount due per line item. For jobs greater than 30 days the Contractor may request progress payment. The invoices for each project will be sent (via mail, email or fax) to the appropriate Technical Point of Contact:

a. Barre Falls Office

i. Mail: Us Army Corps of Engineers

Barre Falls Dam PO Box 519, Hubbardston, MA 01452 Attn: Ralph Gendron Phone: 978.318.8256

ii. Email: Ralph.J.Gendron@usace.army.mil mailto:Jennifer.J.Rockett@usace.army.mil

iii. FAX: 978.928.4790

b. Birch Hill Dam Tully Lake

i. Mail: 2 Athol-Richmond Road Royalston, MA 01368 Attn: Jeffrey Mangum Phone: 978.318.8282

ii. Email: Jeffrey.C.Mangum@usace.army.mil

iii. FAX: 978.249.0223

c. Knightville Dam

Littleville Dam

i. Mail: 49 Knightville Dam Road

Huntington, MA 01050 Attn:, Matthew Coleman Phone: 978.318.8846

ii. Email: Matthew.S.Coleman@usace.army.mill

iii. FAX: 413-667-5366

12. II. Technical Requirements:

Part 1 General:

1.1. Requests for Information:

Requests concerning the work each individual BPA Call should be directed to the Technical Point of Contact for the specific Project Location.

1.2. References:

1.2.1. National Fire Protection Association (NFPA)

1.2.1.1. NFPA 101 Life Safety Code 2015 Edition

1.2.2. International Code Council

1.2.2.1. International Building Code (IBC) 2012 Edition

1.3. Submittals:

Although the Government technically reviews submissions required by this Scope of Work, it is emphasized that the Contractor’s work must be prosecuted using proper internal controls and review procedures. The documents identified below must be prepared in accordance with the applicable standards, submitted for review and accepted by the Government prior to the commencement of any field activities.

1.3.1. Abbreviated Accident Prevention Plan (APP) for the Base Year and annual for each Option Year.

1.3.2. Activity Hazard Analysis (AHA) for each BPA Call

1.3.3. Material List for each BPA Call: Detail material/parts list identifying the material, parts or supplies to be installed as part of the BPA Call.

1.4. Clean Up:

The Contractor shall practice good housekeeping to maintain a safe job site. The Contractor shall keep the work area, including any storage areas, free from the accumulation of waste materials. Upon completing work in an area, the Contractor shall remove any tools, equipment, and materials that are not the property of the Government.

Upon completion of work, the Contractor shall clean up the job site to the satisfaction of the Government. All debris and waste material shall be disposed off-site in accordance with all Federal, State, and local regulations.

1.5. Government Resources:

The Contractor is responsible for providing all materials to complete the project. Unless specified in the contract, the Government will not provide any equipment, water, electricity, telephone services or other resources.

1.6. Omissions:

This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable and functional product.

1.7. Quality Assurance:

The Contractor is responsible for the quality control of the contract work. The Government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.

1.8. Other Contracts:

The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other contractors and Government employees. The Contractor shall not commit or permit any act, which will interfere with the performance of work by another contractor or by Government employees.

1.9. Receiving and Storing Materials:

The Contractor is responsible for protecting any stored materials until they are placed in service. The Contractor is responsible for receiving and unloading delivered goods.

Government employees will not receive materials or supplies for the Contractor and will not be responsible for damage to Contractor equipment or materials.

Part 2 Products:

2.1. Construction Materials

2.1.1. The intent of this material section is not to specify every product to be used in the execution of the work. Rather, to define the expected standards to be followed and the quality of the product to be used.

2.1.2. All construction material shall be new, un-used and be first quality material or products. In addition, construction material shall and be produced domestically or manufactured domestically in accordance with the Buy American Act.

2.1.3. All construction material shall be in conformance to the applicable sections of the International Building Code (2012).

2.1.4. All construction material shall be in conformance to the applicable sections of the National Fire Protection Association (NFPA) Fire and Life Safety Codes [in place of the International Fire Code (IFC)].

Part 3 Execution:

3.1. Scope of Work:

The Technical Point of Contact will provide a Scope of Work (SOW) to the Contractor to review and determine the level of effort required to complete the project. The Technical Point of Contact and the Contractor will negotiate the final SOW. The Contractor shall furnish the Technical Point of Contact a quote and detailed

Parts/Materials list required to complete the final SOW. The work may likely include the following requirements:

3.1.1. Roof repair (including framing, decking, shingles, membrane or sheeting)

3.1.2. Siding and trim repair & replacement

3.1.3. Insulation installation or replacement

3.1.4. Sheetrock and drywall repair & replacement

3.1.5. Finish carpentry

3.1.6. Flooring repair or replacement (including wood, tile, vinyl & carpet)

3.1.7. Interior, exterior & garage door replacement and repair

3.1.8. Window repair or replacement

3.1.9. Plumbing repairs and upgrades

3.1.10. Interior & exterior painting

3.1.11. Timber or wooden fence repair or replacement.

3.1.12. The above task may be required at the following location:

3.1.12.1. Project Office

3.1.12.2. Gatehouse

3.1.12.3. Recreation Areas

3.1.12.4. Garages & accessory buildings

3.2. Qualifications:

3.2.1. Experience: The Contractor shall have a minimum of five years experience with general building construction, including each applicable trade identified in the BPA.

The Contractor shall have sufficient personnel to adequately service up to three (3) BPA Calls concurrently with fully-qualified personnel to satisfy the requirements of each BPA Call with no degradation in quality or supervision. The contractor may rely in part on the experience and qualification of subcontractors to satisfy the above requirements.

3.2.2. License and/or Certification:

ALL work shall be performed by Qualified Personnel with verifiable credentials who are familiar with applicable code requirements. Verifiable credentials consist of State, National and/or Local Certifications or Licenses that a Master or Journeyman may hold, depending on work being performed under this BPA.

3.2.3. Equipment:

3.2.3.1. ALL equipment shall be in good operating and mechanical condition and comply with EM 385-1-1 Army Corps of Engineers Safety and Health Requirements. ALL equipment shall be operated in accordance with manufacturers recommendations and include

3.2.3.2. The Technical Point of Contact may inspect required equipment at any time when in use on Government property. Any equipment found deficient shall be removed from service immediately until faulty conditions have been corrected. No such removal will reduce the Contractor’s obligation to perform all work required within the time scheduled under this contract.

3.3. Building Construction Trades and Personnel Descriptions:

ALL equipment provided shall include the appropriate qualified operator, personal protection equipment (PPE), and fuel. All labor shall be performed in accordance with all federal, state and local laws.

3.3.1. Administrative – Office Work:

The Administrative or Office Work shall be completed by an individual knowledgeable about the specific trades involved and the contract requirements.

The personnel are not required to be licensed in the specific trades. The tasks may likely include, Project Coordination, Submittal Coordination and other related tasks.

3.3.2. Master Carpenter:

The Master Carpenter shall be capable of independent work, with knowledge and experience related to residential and commercial carpentry work. The Master Carpenter shall have a comprehensive knowledge of the applicable building codes.

3.3.3. Master Plumber:

The Master Plumber shall be licensed and capable of independent work, with knowledge and experience related to residential and commercial plumbing work.

The Master Plumber shall have a comprehensive knowledge of the applicable building codes.

3.3.4. Roofer:

The Roofer shall be capable of independent work, with knowledge and experience related to residential and commercial construction. The Roofer shall have a comprehensive knowledge of the applicable building codes.

3.3.5. Painter:

The Painter shall be capable of independent work, with knowledge and experience related to residential and commercial construction. The Painter shall have a comprehensive knowledge of the applicable building codes.

3.3.6. General Laborer:

The General Laborer shall have knowledge and experience related to residential and commercial building construction. The General Laborer shall have knowledge of the applicable building codes.

3.3.7. Travel Time:

The Contractor may include travel time for each crew member for each day that the personnel are on site executing the BPA Call requirements. The travel time charge may not exceed two (2) hrs per day and may not exceed the travel time from the

Contractor’s Office/base of operation to the Project Location (Route Trip) included in the BPA Call.

3.4. Material and Supply Descriptions:

3.4.1. Contractor Furnished Materials and Supplies:

As part of the Quote, the Contractor shall furnish a detailed material/supply list required to complete the SOW. The parts list shall include the unit price and the extended price. The parts list shall be detailed enough to allow the Technical Point of Contact to confirm compliance with the applicable requirements and price reasonableness. The Contractor-Furnished Materials and Supplies shall not exceed $3,000 for each individual BPA Call. The Contractor will be required to provide the detailed list as part of the invoice backup.

3.4.2 Government Furnished Materials and Supplies:

At times it may be advantageous for the Government to provide the materials and supplies (in whole or part) to the Contractor for installation. The Government will utilize the detailed material/supply list provided by the Contractor to purchase the materials and supplies outside of the BPA Call. Under this circumstance, the Government-Furnished Materials and Supplies will not be included in the BPA Call total.

BLANKET PURCHASE AGREEMENT

U.S. ARMY CORPS OF ENGINEERS

MINOR BUILDING CONSTRUCTION SERVICES

BPA Project Locations in Massachusetts

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

Section H - Special Contract Requirements

SECURITY INFORMATION

The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the Technical Point of Contact NLT 5 calendar days after the completion of the training.

The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the Technical Point of Contact no later than 3 business days after the initial contract award.

WAGE DETERMINATIONS

General Decision Number: MA160002 02/05/2016 MA2

Superseded General Decision Number: MA20150002

State: Massachusetts

Construction Types: Building and Heavy (Heavy and Dredging)

BUILDING CONSTRUCTION PROJECTS (Does not include residential construction consisting of single family homes and apartments up to and including 4 stories); HEAVY CONSTRUCTION PROJECTS;

AND MARINE CONSTRUCTION PROJECTS

County: Worcester County in Massachusetts.

BUILDING CONSTRUCTION PROJECTS (Does not include residential construction consisting of single family homes and apartments up to and including 4 stories); HEAVY CONSTRUCTION PROJECTS;

AND MARINE CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least

$10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016 1 01/15/2016 2 02/05/2016

ASBE0006-005 09/01/2015

Rates Fringes

Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coating, and finishes to all types of mechanical systems..........$ 39.43 25.65

BOIL0029-001 10/01/2009

Rates Fringes

BOILERMAKER......................$ 38.25 17.04

BRMA0001-002 08/31/2015

SPRINGFIELD/PITTSFIELD CHAPTER WORCESTER (Warren County)

Rates Fringes

Bricklayer, Cement Mason, Plasterer & Stonemason...........$ 38.36 27.01

BRMA0001-014 09/01/2015

WORCESTER CHAPTER

WORCESTER (Auburn Barre, Blackstone, Berlin, Bolton, Boylston, the Brookfields, Charlton, Clinton, Douglas, Dudley, Grafton, Hardwick, Holden, Leicester, Mendon, Millbury, Milville, New Braintree, Northboro, Northbridge, Oakham, Oxford, Paxton, Rutland, Shrewbury, Southbridge, Spencer, Sturbridge, Sutton, Upton, Uxbridge, Webster, Westboro, West Boylston, Worcester)

Rates Fringes

Bricklayer, Cement Mason, Plasterer & Stonemason...........$ 47.76 28.25

BRMA0001-015 09/01/2015

LOWELL CHAPTER

WORCESTER (Hopedale, Milford, Southboro)

Rates Fringes

Bricklayer, Cement Mason, Plasterer & Stonemason...........$ 47.76 28.25

BRMA0001-023 09/01/2015

LOWELL CHAPTER

WORCESTER (Ashburhanm, Athol, Fitchburg, Gardner, Harvard, Hubbardston, Lancaster, Leominster, Lunenburg, Petersham, Phillipston, Princeton, Royalston, Sterling, Templeton, Westminster, Winchendon)

Bricklayer, Cement Mason, Plasterer & Stonemason...........$ 47.76 28.25

BRMA0003-001 08/01/2015

Rates Fringes

Marble & Tile Finisher...........$ 38.08 27.55 Marble, Tile & Terrazzo Workers..........................$ 49.90 29.07

TERRAZZO FINISHER................$ 48.80 28.90

CARP0056-004 08/01/2015

DIVER TENDER.....................$ 42.04 29.73

DIVER............................$ 58.86 29.73

CARP0056-008 08/01/2015

Rates Fringes

PILEDRIVERMAN....................$ 42.04 29.73

CARP0107-002 03/01/2015

WORCESTER (Except Gilbertville, Harwick, Warren, West Brookfield)

Carpenter/Lather.................$ 35.75 26.88

CARP0108-001 08/31/2015

WORCESTER (Gilbertville, Hardwick, Warren, West Brookfield)

Rates Fringes

Carpenter/Lather.................$ 32.39 23.43

CARP1121-001 04/01/2015

Rates Fringes

MILLWRIGHT.......................$ 36.64 27.88

CARP2168-002 09/01/2015

Rates Fringes

FLOOR LAYER: Carpet.............$ 39.28 27.95

ELEC0007-001 06/28/2015

WORCESTER (Warren)

ELECTRICIAN......................$ 38.06 19.54

ELEC0096-002 12/01/2015

WORCESTER (Except Warren)

Rates Fringes

ELECTRICIAN......................$ 39.37 11%+18.26

Teledata System Installer........$ 26.83 3%+20.46

ELEC0104-001 08/31/2014

Rates Fringes

Line Construction:

Cableman....................$ 43.51 21.64+A Equipment Operator..........$ 36.98 18.93+A Groundman...................$ 23.93 12.26+A Lineman.....................$ 43.51 21.64+A

A. PAID HOLIDAYS: New Year's Day; Memorial Day;

Independence Day; Labor Day; Thanksgiving Day; Christmas Day and Columbus Day, provided the employee has been employed 5 working days prior to any one of the listed holidays.

ELEV0041-002 01/01/2016

Rates Fringes

ELEVATOR MECHANIC................$ 48.77 29.985+a+b

FOOTNOTE:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ENGI0004-003 12/01/2015

WORCESTER (Except Athol, Barre, Brookfield, East Brookfield, Hardwick, New Braintree, North Brookfield, Oakham, Petersham, Phillipston, Royalston, Strutbridge, Templeton, Warren, West Brookfield, Winchendon)

Power equipment operators:

BUILDING, HEAVY & MARINE

GROUP 1....................$ 43.73 25.80+A

GROUP 2....................$ 43.31 25.80+A

GROUP 3....................$ 30.13 25.80+A

GROUP 4....................$ 36.34 25.80+A

GROUP 5....................$ 22.27 25.80+A

GROUP 6....................$ 26.08 25.80+A

FOOTNOTE FOR POWER EQUIPMENT OPERATORS:

A. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day, Christmas Day

HOURLY PREMIUM FOR BOOM LENGTHS (Including Jib):

Over 150 ft. +2.12 Over 185 ft. +3.72 Over 210 ft. +5.23 Over 250 ft. +7.92 Over 295 ft. +10.97 Over 350 ft. +12.76

POWER EQUIPMENT OPERATORS CLASSIFICATIONS BUILDING AND HEAVY

CONSTRUCTION

GROUP 1: Power shovel; crane; truck crane; derrick; pile driver; trenching machine; mechanical hoist pavement breaker; cement concrete paver; dragline; hoisting engine;

three drum machine; pumpcrete machine; loaders; shovel dozer; front end loader; mucking machine; shaft hoist;

steam engine; backhoe; gradall; cable way; fork lift;

cherry picker; boring machine; rotary drill; post hole hammer; port hole digger; asphalt plant on job site;

concrete batching and/or mixing plant on job site; crusher plant on job site; paving concrete mixer; timber jack GROUP 2: Sonic or vibratory hammer; grader; scraper; tandem scraper; bulldozer; tractor; mechanic - maintenance; York rake; mulching machine; paving screed machine;stationary steam boiler; paving concrete finishing machine; grout pump; portable steam boiler; portable steam generator;

roller; spreader; asphalt paver; locomotives or machines used in place thereof; tamper (self propelled or tractor-draw); cal tracks; ballast regulator;rail anchor machine; switch tamper; tire truck GROUP 3: Pumps (1-3 grouped); compressor; welding machines (1-3 grouped); generator; sighting plant; heaters (power driven, 1- 5); syphon-pulsometer; concrete mixer; valves controlling permanent plant air steam, conveyor, wellpoint system (operating) GROUP 4: Assitant engineer (fireman) GROUP 5: Oiler (other than truck cranes and gradalls) GROUP 6: Oiler (on truck cranes and gradalls)

POWER EQUIPMENT OPERATORS CLASSIFICATIONS MARINE CONSTRUCTION

GROUP 1: Shovel; crane; truck crane; cherry picker; derrick;

pile driver; two or more drum machines; lighters; derrick boats; trenching machines; mechanic hoist pavement breakers; cement concrete pavers; draglines; hoisting engines; pumpcrete machines; elevating graders; shovel dozer; front end loader; backhoe; gradall; cable ways;

boring machine; rotary drill; post hole hammer; post hole digger; fork lift; timber jack; asphalt plant (on site);

concrete batching and/or mixing plant (on site); crusher plant (on site); paving concrete mixer GROUP 2: Portable steam boiler; portable steam generator;

sonic or vibratory hammer; grader; scraper; tandem scraper;

concrete pump; bulldozer; tractor; York rake; mulching machine; roller; spreader; tamper (self-propelled or tractor-drawn); asphalt paver; concrete mixer with side loader; mechanic - maintenance; cal tracks; ballast regulator; switch tamper; rail anchor machine; tire truck GROUP 3: Pumps (1-3 grouped); comressor; welding machines (1-3 grouped); generator; lighting plant; heaters (power driven 1-5); syphon-pulsometer; concrete mixer; valves controlling permanent plant air or steam; conveyor; well point systems; auger (powered by independent engines and attached to pile drivers); hydraulic saws GROUP 4: Fireman GROUP 5: Assistant engineer (other than truck crane and gradall) GROUP 6: Assistant engineer (on truck crane and gradall)

ENGI0004-007 12/01/2015

WORCESTER (Area East of a line formed by the Eastern boundaries of the following townships: Barre, Brookfield, East Brookfield, North Brookfield, Oakham, Sturbridge, Templeton, and Winchendon)

(BUILDING)

GROUP 1.....................$ 43.73 25.80+A

GROUP 2.....................$ 43.31 25.80+A

GROUP 3.....................$ 30.13 25.80+A

HOURLY PREMIUM FOR BOOM LENGTHS (Including Jib):

Over 150 ft. +2.12 Over 185 ft. +3.72 Over 210 ft. +5.23 Over 250 ft. +7.92

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Backhoe, Front End Loader, Crane

GROUP 2: Bulldozer

GROUP 3: Pumps

FOOTNOTE FOR POWER EQUIPMENT OPERATORS:

A. Paid Holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day and Christmas Day

ENGI0098-005 06/01/2014

(HEAVY CONSTRUCTION)

Group 1....................$ 31.17 21.43+A Group 2....................$ 30.86 21.43+A Group 3....................$ 30.64 21.43+A Group 4....................$ 30.03 21.43+A Group 5....................$ 27.41 21.43+A Group 6....................$ 26.29 21.43+A Group 7....................$ 24.35 21.43+A Group 8....................$ 285.87 21.43+A Group 9....................$ 210.61 21.43+A Group 10....................$ 32.66 21.43+A Group 11....................$ 35.67 21.43+A Group 12....................$ 37.17 21.43+A Group 13....................$ 38.17 21.43+A Group 14....................$ 39.17 21.43+A Group 15....................$ 40.67 21.43+A

HAZARDOUS WASTE PREMIUM $2.00

FOOTNOTE FOR POWER EQUIPMENT OPERATORS:

A. Paid Holidays: New year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day and Christmas Day

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

Group 1: Shovels; crawlers and truck cranes including all tower; self-propelled hydraulic cranes 10 tons and over;

draglines; clam shells; cableways; shaft hoists; mucking machines derricks; backhoes; bulldozers; gradalls;

elevating graders; pile drivers; concrete pavers; trenching machines; front end loaders- 5 1/2 cu yds and over; dual drum paver; automatic grader-excavator(C.M.I. or equal);

scrapers towing pan or wagon; tandem dozers or push cats(2 units in tandem); shotcrete machine; tunnel boring machine;

combination backhoe/loader 3/4 cu yd hoe or over; jet engine dryer; tree shredder; post hole digger; post hole hammer; post extractor; truck mounted concrete pump with boom; roto-mill; Grader; Horizontal Drilling Machine; John Henry Rock Drill and similar equipment.

Group 2: Rotary drill with mounted compressor; compressor house (3 to 6 compressors); rock and earth boring machines (excluding McCarthy and similar drills); front end loaders 4 cu yds to 5 1/2 cu yds); forklifts-7 ft lift and over 3 ton capacity; scraper 21 yds and over (struck load); sonic hammer console; reclaimers road planer/milling machine; cal tracks; ballast regulators; rail anchor machines; switch tampers, asphalt pavers; mechanic; welder and transfer machine.

Group 3: Combination backhoe/loader up to 3/4 cu yd;

scrapers up to 21 cu yd (struck load, self propelled or tractor drawn); tireman; front end loaders up to 4 yds;

well drillers; engineer or fireman on high pressure boiler;

self-loading batch plant; well point operators electric pumps used in well point system; pumps, 16 inches and over (total discharge); compressor, one or two 900 cu ft and over; powered grease truck; tunnel locomotives and dingys;

grout pumps; hydraulic jacks; boom truck; hydraulic cranes-up to 10 ton.

Group 4: Asphalt rollers; self-powered rollers and compactors; tractor without blade drawing sheepsfoot roller; rubber tire roller; vibratory roller or other type of compactors including machines for pulverizing and aerating soil; york rake.

Group 5: Hoists; conveyors; power pavement breakers;

self-powered concrete pavement finishing machines; two bag mixers with skip; McCarthy and similar drills; batch plants (not self loading); bulk cement plants; self-propelled material spreaders; three or more 10 KW light plants; 30 KW or more generators; power broom.

Group 6: Compressor (one or two) 315 cu ft to 900 cu ft;

pumps 4 inches to 16 inches (total discharge).

Group 7: Compressors up to 315 cu ft; small mixers with skip; pumps up to 4 inches; power heaters; oiler; A-frame trucks; forklifts-up to 7 ft. lift and up to 3 ton capacity; hydro broom; stud welder.

Group 8: Truck crane crews Group 9: Oiler Group 10: Master Mechanic Group 11: Boom lengths over 150 feet including jib Group 12: Boom lengths over 200 feet including jib Group 13: Boom lengths over 250 feet including jib Group 14: Boom lengths over 300 feet including jib Group 15: Boom lengths over 350 feet including jib

ENGI0098-006 06/01/2014

WORCESTER (Area west of a line formed by the Eastern boundaries of the following Townships: Barre, Brookfield, East Brookfield, North Brookfield, Oakham, Sturbridge, Templeton, and Winchendon)

(BUILDING)

GROUP 1.....................$ 31.17 21.43+A

GROUP 2.....................$ 30.86 21.43+A

GROUP 3.....................$ 30.64 21.43+A

GROUP 4.....................$ 30.03 21.43+A

FOOTNOTE FOR POWER EQUIPMENT OPERATORS:

A. Paid Holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day and Christmas Day

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Backhoe; Bulldozer; Front End Loader, 5 1/2 cu yd and over; Crane GROUP 2: Front End Loader, 4 cu yd to 5 1/2 cu yd GROUP 3: Front End Loader up to 4 cu yd GROUP 4: Roller, all types

IRON0007-012 03/16/2015

Rates Fringes

IRONWORKER.......................$ 41.81 28.67

LABO0022-001 06/01/2015

Rates Fringes

Laborers: (HEAVY CONSTRUCTION)

GROUP 1.....................$ 31.15 20.30

GROUP 2.....................$ 31.40 20.30

GROUP 3.....................$ 31.90 20.30

GROUP 4.....................$ 32.15 20.30

GROUP 5.....................$ 20.50 20.30

GROUP 6.....................$ 33.15 20.30

LABORERS CLASSIFICATIONS

GROUP 1: Laborers; carpenter tenders; cement finisher tenders, plasterer tenders

GROUP 2: Asphalt raker; fence and guard rail erector; laser beam operator; mason tender; pipelayer; pneumatic drill operator; pneumatic tool operator; wagon drill operator, jack hammer operator, pavement breaker, carbide core drilling machine, chain saw operator, barco type jumping tampers, concrete pump, motorized mortar mixer, ride-on-motorized buggy

GROUP 3: Air track operator; block paver; rammer; curb setter, hydraulic and similar self powered drills

GROUP 4: Blaster; powderman

GROUP 5: Flagger

GROUP 6: Asbestos Abatement; Toxic and Hazardous Waste Laborers

LABO0022-013 06/01/2015

Rates Fringes

Laborers:

(FREE AIR OPERATION):

SHIELD DRIVEN AND LINER

PLATE IN FREE AIR)

GROUP 1....................$ 39.40 21.80+a GROUP 2....................$ 39.40 21.80+a

(OPEN AIR CASSONS,

UNDERPINNING AND TEST

BORING INDUSTRIES):

TEST BORING & WELL DRILLING

Driller....................$ 33.70 19.85+A Laborer....................$ 32.30 19.85+A

(OPEN AIR CASSONS,

UNDERPINNING AND TEST

BORING INDUSTRIES):

OPEN AIR CASSON,

UNDERPINNING WORK & BORING

CREW

Bottom man.................$ 33.45 19.85+A Laborers; Top man..........$ 32.30 19.85+A

(TUNNELS, CAISSON &

CYLINDER WORK IN

COMPRESSED AIR)

GROUP 1....................$ 36.85 21.80+a GROUP 2....................$ 47.33 21.80+a GROUP 3....................$ 47.33 21.80+a GROUP 4....................$ 47.33 21.80+a GROUP 5....................$ 47.33 21.80+a GROUP 6....................$ 49.33 21.80+a

CLEANING CONCRETE AND

CAULKING TUNNEL (Both New & Existing) GROUP 1....................$ 39.40 21.80+a GROUP 2....................$ 39.40 21.80+a

ROCK SHAFT, CONCRETE

LINING OF SAME AND TUNNEL

IN FREE AIR

GROUP 1....................$ 36.85 21.80+a GROUP 2....................$ 39.40 21.80+a GROUP 3....................$ 39.40 21.80+a GROUP 4....................$ 39.40 21.80+a GROUP 5....................$ 41.40 21.80+a

LABORERS CLASSIFICATIONS for TUNNELS, CAISSON & CYLINDER WORK

IN COMPRESSED AIR

GROUP 1: Powder watchman; Top man on iron bolt; change house attendant

GROUP 2: Brakeman; trackman; groutman; tunnel laborer;

outside lock tender; lock tender; guage tender

GROUP 3: Motorman, miner

GROUP 4: Blaster

GROUP 5: Mucking machine operator

GROUP 6: Hazardous Waste work within the "HOT" zone. (A premium of two dollars $2.00 per hour over the basic wage rate.

LABORERS CLASSIFICATIONS for (FREE AIR OPERATION): SHIELD

DRIVEN AND LINER PLATE IN FREE AIR

GROUP 1: Miner; miner welder; conveyor operator; motorman;

mucking machine operator; nozzle man; grout man-; pumps, shaft and tunnel steel and rodman; shield and erector arm operators, mole nipper, outside motorman, burner, TBM operator, safety miner; laborer topside; heading motormen;

erecting operators; top signal men

GROUP 2: Brakeman; trackman

LABORERS CLASSIFICATIONS FOR CLEANING CONCRETE AND CAULKING

TUNNEL (Both New & Existing)

GROUP 1: Concrete workers; strippers and form movers (wood & steel), cement finisher

GROUP 2: Form erector (wood & steel and all accessories)

LABORERS CLASSIFICATIONS for ROCK SHAFT, CONCRETE LINING OF

SAME AND TUNNE IN FREE AIR

GROUP 1: Change house attendants

GROUP 2: Laborers, topside, bottom men (when heading is 50

ft. from shaft) and all other laborers

GROUP 3: Brakeman; trackman; tunnel laborers; shaft laborers

GROUP 4: Miner; cage tender; bellman

GROUP 5: Hazardous Waste work within the "HOT" zone. (A premium of two dollars $2.00 per hour over the basic wage rate)

FOOTNOTE FOR LABORERS:

A. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Patriot's Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, and Christmas Day

LABO1421-003 06/01/2015

Rates Fringes

Laborers:

Group 1.....................$ 35.25 21.20 Group 2.....................$ 36.00 21.20 Group 3.....................$ 36.25 21.20 Group 4.....................$ 31.25 21.20 Group 5.....................$ 34.35 21.20 Group 6.....................$ 35.25 21.20

Group 1: Adzeman, Wrecking Laborer.

Group 2: Burners, Jackhammers.

Group 3: Small Backhoes, Loaders on tracks, Bobcat Type Loaders, Hydraulic "Brock" Type Hammer Operators, Concrete Cutting Saws.

Group 4: Yardman (Salvage Yard Only).

Group 5: Yardman, Burners, Sawyers.

Group 6: Asbestos, Lead Paint, Toxic and Hazardous Waste.

PAIN0035-006 01/01/2015

Rates Fringes

Painters:

NEW CONSTRUCTION:

Bridge.....................$ 46.76 25.95 Brush, Taper...............$ 36.26 25.95 Spray, Sandblast...........$ 37.66 25.95

REPAINT

Bridge.....................$ 46.76 25.95 Brush, Taper...............$ 34.32 25.95 Spray, Sandblast...........$ 35.72 25.95

PAIN0035-021 01/01/2015

Rates Fringes

GLAZIER..........................$ 36.26 25.95

PLUM0004-002 09/01/2014

WORCESTER (Except Hopedale and Southboro)

Rates Fringes

Plumbers and Pipefitters.........$ 41.11 24.71

PLUM0012-002 09/01/2013

WORCESTER (Hopedale and Southboro)

Rates Fringes

PLUMBER..........................$ 49.06 24.56

ROOF0033-001 08/01/2014

Rates Fringes

Roofers:

All Tear-off and/or removal of any types of roofing and all spudding, sweeping, vacuuming and/or cleanup of any and all areas of any type where a roof is to be relaid........$ 39.21 22.92

SFMA0669-002 04/01/2015

Rates Fringes

SPRINKLER FITTER.................$ 38.01 20.95

SHEE0017-004 10/01/2015

WORCESTER (Harvard, Lancaster)

Sheet metal worker...............$ 35.60 30.05

* SHEE0063-002 01/01/2016

WORCESTER (Except Harvard & Lancaster)

Rates Fringes

Sheet metal worker...............$ 31.57 28.12

TEAM0379-003 08/01/2015

Rates Fringes

Truck drivers: (EXCEPT

BUILDING CONSTRUCTION)

Group 1.....................$ 31.48 20.65+A+B Group 2.....................$ 31.65 20.65+A+B Group 3.....................$ 31.72 20.65+A+B Group 4.....................$ 31.84 20.65+A+B Group 5.....................$ 31.94 20.65+A+B Group 6.....................$ 32.23 20.65+A+B Group 7.....................$ 32.52 20.65+A+B

TRUCK DRIVERS CLASSIFICATIONS

Group 1: Station wagons; panel trucks; and pickup trucks

Group 2: Two axle equipment; & forklift operator

Group 3: Three axle equipment and tireman

Group 4: Four and Five Axle equipment

Group 5: Specialized earth moving equipment under 35 tons other than conventional type trucks; low bed; vachual;

mechanics, paving restoration equipment

Group 6: Specialized earth moving equipment over 35 tons

Group 7: Trailers for earth moving equipment (double hookup)

POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK

(UNDERGROUND ONLY) $.40 DIFFERENTIAN BY AXLE HAZARDOUS

MATERIALS (In Hot Zone Only) $2.00 premium

FOOTNOTES: A. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day, & Christmas Day

B. PAID VACATION: Employees with 4 months to 1 year of service receive 1/2 day's pay per month; 1 week vacation for 1 - 5 years of service; 2 weeks vacation for 5 - 10 years of service; and 3 weeks vacation for more than 10 years of service

SUMA1989-001 05/01/1989

BUILDING CONSTRUCTION ONLY:

Rates Fringes

Laborers:

Landscape...................$ 8.28 Unskilled...................$ 12.71 3.60

Truck drivers:

2-AXLE......................$ 11.77

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .