REHABILITATION OF SANDWICH COMFORT STATION
U.S. ARMY CORPS OF ENGINEERS
CAPE COD CANAL
SANDWICH, MA
January 2016
Informational Photos
Informational Photo Number 1 – East side of Building (looking west).
CAPE COD CANAL
Informational Photo Number 2 – South side of Building (looking north).
CAPE COD CANAL
SANDWICH, MA
Informational Photo Number 3 – West side of Building (looking east).
CAPE COD CANAL
SANDWICH, MA
Informational Photo Number 4 –North side of the building (looking south).
CAPE COD CANAL
SANDWICH, MA
Informational Photo Number 5 – Shows wood boards under existing barn board siding.
Typical all sides of building. Remove existing siding. Install new ¾” plywood. Install new pre-stained cedar shingles.
Informational Photo Number 6 – Shows existing brick area on east side of building. Install new shingles to edge of brick to match existing. Install new PVC trim at corners, termination next to brick and fascia board.
Informational Photo Number 7 – Shows existing window panels on south side of building.
Remove and replace the wood sill of all existing windows. Install new laminated glass panels at all eight existing window locations. Install new PVC trim around all windows. Clean and paint the existing wood soffit area above the windows.
Informational Photo Number 8 – Shows interior of existing window panels on south side of building. Remove and replace the wood sill of all existing windows. Install new laminated glass panels for all eight existing window locations. Install new PVC trim around all windows (casing, jamb, window stops). Clean and paint any existing wood framing to remain on gable ends.
Informational Photo Number 9 – Shows existing metal dormer on west side of building. Clean and paint metal dormer to match new paint on doors.
Informational Photo Number 10 – Shows interior of existing metal door on north side of building. Typical conditions at all three doors. Clean and paint doors including frames at all three door locations.