Amendment0002.pdf

PDF 83 KB Posted

Attached to
Barnes Building Roof Repair
Solicitation number
W912WJ-15-b-0006
Issued by

About this file

Amendment 0002 was erroneously posted under cancelled number W912WJ-15-B-0006 (as opposed to W912WJ-15-b-0006) on May 12 2015. It is the Government's intent to open bids on May 19 2015. However if potential bidders did not see amendment 0002 as posted to W912WJ-15-B-0006 and require more time to prepare bids please contact Doug Raney 978-318-8671 by 1 00PM on Monday May 18 2015.

View the file

Other files

File Type Posted
Amendment0002_SpecChanges.pdf PDF
SiteVisitSignin.pdf PDF
Amendment_1.pdf PDF
Plans.pdf PDF
Solicitation.pdf PDF
Specification.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912WJ-15-B-0006

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment provides answ ers to questions from project site visit as w ell as a list of site visit attendees. There are also 35 pages of changes to the Specifications.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-May-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912WJ-15-B-0006

X 9B. DATED (SEE ITEM 11)

17-Apr-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-May-2015

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

BARNES BUILDING ROOF REPAIR – SITE VISIT QUESTIONS

1.) Q: What does “adjacent staging area” mean?

A: See revised specification section 01 11 00.

2.) Q: When is work anticipated to begin?

A: Early summer 2015

3.) Q: Has any testing been done for hazardous material?

A: No. Roof replacement had been done in the mid 1990s; it is not anticipated that there is any asbestos or PCBs.

4.) Q: In the drawings and specifications, is there a cross-section for roof assembly/showing composition of existing roof?

A: No. Two core samples from 5 November 2013 were taken in November 2013; see spec section 01 11 00, 1.1.3. The cores are not guaranteed to be representative of conditions throughout the entire roof.

5.) Q: Is there an infrared scan?

A: Yes; see spec section 01 11 00, 1.1.3.

6.) Q: Is parking lot 1 available for staging area?

A: See Q&A for 1) and specification section 01 50 00.

7.) Q: Is the alleyway between buildings available for staging area?

A: See 01 11 00, par. 1.5 and 01 50 00, par. 3.8.

8.) Q: What is the expected warranty for work done on the roof under this project?

A: See specification section 00 80 00, par. 1.10, specification section 07 53 23, par. 1.9.1 and 1.9.2.

9.) Q: Will the mechanical units/AC units (near the door) need to be removed and reinstalled?

A: See revised specification section 01 11 00.

10.) Q: Will a building elevator operator be required for the freight elevator?

A: No.

11.) Q: What is the timeframe for bringing a truck into the alley between the buildings?

A: Unclear on the question. See specification section 01 11 00, par 1.5 and par. 1.6.

12.) Q: Can a dumpster be brought and left in the alleyway between the buildings during the construction?

A: Dumpster cannot be placed in the alley for the entire construction duration. See spec section 01 11 00, 1.5.2.4 and 01 50 00, par. 1.4.

13.) Q: Is the alleyway Government property?

A: Yes.

14.) Q: Is parking lot 1 Government property?

A: Yes 15.) Q: Is the existing insulation on the roof tapered or flat?

A: Details of the insulation are unknown.

16.) Q: Is recaulking provided for on the bid schedule?

A: Yes; see specification section 01 22 00, par. 1.4.

17.) Q: What is the capacity of the freight elevator?

A: 6,000 lbs.

18.) Q: What floors of the building will the contractor have access to?

A: See spec section 01 11 00, par. 1.5.2.1 and par 1.5.2.2.

19.) Q: Can a crane be put in the alleyway?

A: See spec section 01 11 00, 1.5.2.4.

20.) Q: What if the ‘wet’ area extends between time of bid and time of award?

A: If there are differing site conditions, Contractor should immediately notify the Contracting Officer. If it is deemed appropriate to do additional work, the Government will negotiate a modification pursuant to "FAR 52.243-4, Changes" and "FAR 52.236-2, Differing Site Conditions”.

21.) Q: Is there any light weight fill on the roof?

A: It is unknown.

22.) Q: Are there any hazardous materials on the roof?

A: See Q&A 3.).

23.) Q: Can the screws be broken off at the concrete or do they need to be taken out completely?

A: Screws can be broken off at the top of the concrete deck.

24.) Q: Sheet A-104 Detail B. Shows drain being raised. Wouldn’t we want to sump the drain to allow water to flow into it? Also are we supposed to create a valley tapered to the drain? Or build up drain and create hip with insulation to allow water to flow away?

A: The intent is to allow water to flow to the re-installed drain by creating a tapered valley as shown on the contract drawings. However, the existing drain has been installed too low and lacks the proper substrate materials under the membrane, resulting in an unsafe area to walk and improper tapering of the insulation. Raising the drain and installing the proper substrate will improve the existing condition.

25.) Q: Bidding schedule 0001-0006 Part of bid documents dated Feb, 2015. Should our pricing be based off of these quantities?

A: Yes; see Section 00 80 00, par. 1.5.

26.) Q: Caulking is listed in the bid docs but there is no line item on the bid form.

A: See Q&A 16.)

27.) Q: How thick is the proposed insulation?

A: See Q&A 4.)

28.) Q: A105/ A106 show ballast description. Three different weights are needed at different locations, 40 PSF, 60 PSF and 90 PSF which we need to engineer. Detail indicates "continuous ballast using sand bags wrapped into continuous banks(100' roll length minimum) of polyester net and connected together". How are we expected to handle a 9,000 LB sandbag? I believe Note 2 clarifies that we are to use many multiply sandbags that get wrapped in netting to keep them all together. Please confirm.

A: The specified ballast load is to be constructed by stacking multiple 50-pound sand bags.

Reference Contract Drawing A-105, Note 2 and Specification Section 07 53 23, subpart 2.1.14.