BIdAbstractForPostingOnInternet.pdf

PDF 27 KB Posted

Attached to
Maintenance Dredging of the 8 ft Federal Navigation Channel into Clinton Harbor, in the town of Clinton, CT
Solicitation number
W912WJ12B0010
Issued by

About this file

Bid Abstract

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID OPENING ABSTRACT

SOLICITATION NO. PROJECT DESCRIPTION

W912WJ-08-B-0004 Maintenance Dredging, North Cove, Old Saybrook, CT

BIDS OPENED BY: Rachael Raposa

RECORDED BY: Tina Krawczyk

BID OPENING OFFICER: Rachael Raposa

DATE: GOVERNMENT ESTIMATE:

22-Aug-08 $4,235,000.00

2:00 PM

APPARENT LOW CONTRACTOR: BID AMOUNT:

BIDDER: 2 Burnham Associates, Inc.

14 Franklin Street $4,058,338.00 Salem, MA 01970

BID NO. CONTRACTOR NAME BID AMOUNT

1 Newborn Construction $9,546,378.00 2 Burnham Associates $4,058,338.00 3 Cashman Dredging $5,480,650.00

Sheet1

SOLICITATION NO. W912WJ-08-B-0004: W912WJ-12-B-0010
SOLICITATION NO. W912WJ-08-B-0004: Clinton Harbor,Dredging, Hammonasset Beach, Madison, Connecticut
SOLICITATION NO. W912WJ-08-B-0004: Sheila Winston-Vincuilla

Elandria M. Cameron

Sheila Winston-Vincuilla

SOLICITATION NO. W912WJ-08-B-0004: 9-5-2012
SOLICITATION NO. W912WJ-08-B-0004: $1,324,131.00
CONTRACTOR: Burnham Associates, Inc. 14 Franklin Street Salem, MA 01970:

Select Transportation, Inc.

BID AMOUNT: $4,058,338.00: $1,011,042.00
(3, <Row 1>): 3
(3, <Row 1>): 2
(3, <Row 1>): 1
(3, <Row 1>):
(3, <Row 1>): $1,132,109.32
(3, <Row 1>): $2,353,558.00
($5,480,650.00, <Row 1>): $1,011,042.00
(3, <Row 2>): 4
(Cashman Dredging, <Row 2>): Village Dock Inc.
($5,480,650.00, <Row 2>): $1,685,740.00
(3, <Row 3>):
(Cashman Dredging, <Row 3>):
($5,480,650.00, <Row 3>):
(3, <Row 4>):
(Cashman Dredging, <Row 4>):
($5,480,650.00, <Row 4>):
(3, <Row 5>):
(Cashman Dredging, <Row 5>):
($5,480,650.00, <Row 5>):
(3, <Row 6>):
(Cashman Dredging, <Row 6>): Select Transportation, Inc.
(Cashman Dredging, <Row 6>): Southwind
(Cashman Dredging, <Row 6>): Cauch Inc
(Cashman Dredging, <Row 6>):
($5,480,650.00, <Row 6>):
(3, <Row 7>):
(Cashman Dredging, <Row 7>):
($5,480,650.00, <Row 7>):
(3, <Row 8>):
(Cashman Dredging, <Row 8>):
($5,480,650.00, <Row 8>):
(3, <Row 9>):
(Cashman Dredging, <Row 9>):
($5,480,650.00, <Row 9>):
(3, <Row 10>):
(Cashman Dredging, <Row 10>):
($5,480,650.00, <Row 10>):
(3, <Row 11>):
(Cashman Dredging, <Row 11>):
($5,480,650.00, <Row 11>):
(3, <Row 12>):
(Cashman Dredging, <Row 12>):
($5,480,650.00, <Row 12>):
(3, <Row 13>):
(Cashman Dredging, <Row 13>):
($5,480,650.00, <Row 13>):
(3, <Row 14>):
(Cashman Dredging, <Row 14>):
($5,480,650.00, <Row 14>):
(3, <Row 15>):
(Cashman Dredging, <Row 15>):
($5,480,650.00, <Row 15>):
(3, <Row 16>):
(Cashman Dredging, <Row 16>):
($5,480,650.00, <Row 16>):
(3, <Row 17>):
(Cashman Dredging, <Row 17>):
($5,480,650.00, <Row 17>):
(3, <Row 18>):
(Cashman Dredging, <Row 18>):
($5,480,650.00, <Row 18>):
(3, <Row 19>):
(Cashman Dredging, <Row 19>):
($5,480,650.00, <Row 19>):
(3, <Row 20>):
(Cashman Dredging, <Row 20>):
($5,480,650.00, <Row 20>):
(3, <Row 21>):
(Cashman Dredging, <Row 21>):
($5,480,650.00, <Row 21>):
(3, <Row 22>):
(Cashman Dredging, <Row 22>):
($5,480,650.00, <Row 22>):
Burnham Associates: 3

File details come from the government source that posted it. Updated .