SEE ADDENDUM
(No Collect Calls)
W912UM17R0016 28-Jul-2017
b. TELEPHONE NUMBER
315-721-6088
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 18 Aug 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912UM9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
HYE+KYONG CHON
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
CONTRACTING DIVISION
U.S. ARMY CORPS OF ENGINEERS
FAR EAST DISTRICT
UNIT #15546
APO AP 96205-5546
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
X SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
82-2-2269-3411FAX:
TEL: 82-2-2270-7206
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$15,000,000
NAICS:
541990
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF41
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912UM17R0016
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
PLS
FFP
Natural Resources Planning Level Surveys (PLS), USAG Humphreys, Korea
The contractor shall perform the work in accordance with Performance Work
Statement (PWS).
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Contract Manpower Report (CMR)
FFP
The contractor shall perform the work in accordance with Performance Work
Statement (PWS).
Contractor shall report labor hours required for performance of services provided under this contract no later than October 31 of each calendar year
NET AMT
PERFORMANCE WORK STATEMENT (PWS)
FOR
NATURAL RESOURCES PLANNING LEVEL SURVEYS (PLS)
USAG HUMPHREYS
11 July 2017
1. GENERAL
1.1 SCOPE OF WORK. This project requires to conduct planning level survey (PLS) of natural resources for U.S.
Army Garrison (USAG) Humphreys. “Natural resources” is defined in the United States Forces Korea (USFK)
Regulation 201-1, Environmental Governing Standards as: all living and inanimate materials supplied by nature that are of aesthetic, ecological, educational, historical, recreational, scientific or other value.
1.2 PURPOSE. The purpose of this project is to generate data and characterize essential components of the installation natural resources such as location, landform, soil, water, and biota that will serve as the foundation for preparation of an Integrated Natural Resource Management Plan (INRMP) for USAG Humphreys. The INRMP provides procedures and guidelines to help the USAG Humphreys with their environmental stewardship responsibilities and enhance quality of life for facility personnel.
1.3 REQUIREMENTS. The Contractor shall furnish all necessary skilled labor, equipment, tools, transportation, materials, permits, and other required resources to conduct the PLS. During the prosecution of work, the Contractor shall provide adequate supervision to ensure the accuracy, quality, completeness, and progress of the work. All project scheduling, correspondence, submittals and any required approvals shall be coordinated through the
Contracting Officer Representative (COR).
1.4 PROJECT SITE DESCRIPTION. PLS shall be conducted for USAG Humphreys facilities:
- Camp Humphreys;
- Pyongtaek Command Post Exercise (CPX) Area;
1.5 REFERENCES. The publications listed below form a part of this PWS to the extent referenced. The publications may be referred to in the text of this PWS by their basic designation only.
1.5.1 Department of the Army Publications.
- USFK Regulation 201-1, Environmental Governing Standards, 18 June 2012.
- Army Regulation 200-1, Environmental Protection and Enhancement
- Army Environmental Center, Guidelines to Prepare Integrated Natural Resources Management Plans for Army
Installations and Activities, April 1997
- U.S. Army Corps of Engineers (USACE) CADD/GIS Technology Center, Spatial Data Standard for Facilities, Infrastructure, and Environment (SDSFIE), Release 2.401
- EM 385-1-1 Safety and Health Requirements Manual
1.5.2 Other Publications.
- Federal Geographic Data Committee (FGDC) Content Standard for Digital Geospatial Metadata
- Republic of Korea National Soil Survey Manual Keys to Soil Taxonomy and Geology of Korea.
2 PROJECT PLANNING AND COORDINATION.
2.1 REVIEW EXISTING INFORMATION. The Contractor shall review the Army Environmental Center
Guidelines to prepare INRMP and become familiar with the guidelines. The Contractor shall conduct a search and review of readily available local, national, and international documents for specific information about natural resources on each USAG Humphreys installation, including current and historical topographic maps and aerial photographs.
2.2 INTERVIEW KNOWLEDGEABLE PERSONS. The Contractor shall conduct interviews with installation personnel who may be knowledgeable about local natural resources, including but not limited to plant and animal life, wildlife habitat, bodies of water, seasonal wetlands, recreation areas, current environmental management, pest management, etc.
2.3 PREPARE PROJECT WORK PLAN. The Contractor shall prepare a single project Work Plan (WP) for the installations in USAG Humphreys that describes all of the activities and tasks to be performed to accomplish the objectives of this PWS. The WP shall be submitted in draft form to the Government for review and comment. All
Government comments shall be addressed and any required revisions shall be incorporated into the final WP. No field activity may begin until the WP has been approved by the COR.
2.4 QUALITY ASSURANCE. The Contractor shall develop and implement quality assurance procedures to ensure that the data collected has the accuracy, precision, and completeness that is appropriate based on the overall objective of the project. Quality assurance is the systematic approach to identifying deficiencies or errors and provides guidelines and procedures on how the deficiencies or errors can be corrected. The quality assurance program for the project shall be described in the WP.
2.5 MEETINGS AND COORDINATION. The Contractor shall attend a pre-survey meeting at Camp Humphreys after the draft WP has been submitted. The Contractor shall be prepared to present the general approach, work procedures and schedule for the field surveys and subsequent tasks, and answer any questions the Government may have about the WP. Minutes of the meeting shall be prepared and submitted, and the final WP shall incorporate any pertinent information or changes discussed in the meeting.
3. NATURAL RESOURCES SURVEY.
3.1 MOBILIZATION AND DEMOBILIZATION. The Contractor shall furnish all plans, transportation, labor, equipment, instruments, sampling equipment and supplies required to complete the field surveys. The Contractor shall also provide any other materials or equipment necessary to ensure quality control, environmental protection, and worker safety and health. All labor, material, and equipment shall be made ready and available within seven (7) days after the final WP has been approved.
3.2 SAFETY AND HEALTH REQUIREMENTS. The most important consideration throughout the field survey activities is the safety and health of project personnel. Although the Contractor has not been required to prepare a written Site Safety and Health Plan for the project, the Contractor is still required to conduct all field survey activities in accordance with applicable requirements in EM 385-1-1, “Safety and Health Requirements (November
2014).”
3.3 FIELD SURVEY. The field survey program shall be designed to identify and classify natural resources as well to verify or confirm data obtained through literature, maps and photographs, and personal interviews. The field survey shall account for seasonal variations of certain natural resources. Field surveys shall be conducted during the spring, summer, fall, and winter seasons for those natural resource elements described below that are subject to seasonal influence. The duration of each survey may be adjusted based on data requirements and seasonal conditions. The rational and specific field survey schedule for each natural resource element shall be provided in the
WP.
The Contractor shall conduct four (4) seasonal surveys of two areas listed in section 1.4 of this PWS during the entire year. The survey team shall visit each installation at least two (2) times each season. Each field visit shall be conducted for a minimum of three (3) actual working days in the field except travel hours. Field survey team for
Natural Resource PLS shall consist of at a minimum: one prime Contractor’s Program Manager (PM), Flora
Specialist, Fauna Specialist and GIS Assistant(s)/Mapping coordinator.
The survey team shall be on the field at all times in one group. All survey team member shall be under close supervision of the prime Contractor’s PM while conducting field survey.
3.3.1 Physical Features. The PLS shall describe the physical features of each facility including size, geologic features, climatic conditions, and site improvements such as buildings, roads, landscaped grounds, etc., water wells, and undeveloped land. Significant ecosystems based on size, diversity, and/or sensitivity shall be identified and described. The Contractor is encouraged to use a portable Global Positioning System (GPS) device to locate
(coordinate and elevation) and delineate significant physical features. The data collected shall be suitable for graphical presentation (maps and figures).
3.3.1.1 Surface Water and Wetland. The contractor shall identify and describe surface water features such as lakes, rivers, perennial and ephemeral streams, and perennial and seasonal wetlands. Provide description of surface water hydrology.
3.3.1.2 Topography. The contractor shall describe the general topographic features of the land, including elevation changes, steepness of slope, watersheds, and any others that may be important to managing natural resources.
3.3.1.3 Soils. The contractor shall generally describe installation soils and their properties, including erodibility characteristics. Reference any published soil surveys that may exist. Summarize the status of soil productivity and identify trends in that productivity in recent years. Emphasize the effects of wind and water erosion
3.3.2 Flora Survey. The flora survey shall include an installation-wide vascular plant survey. The plants identified shall be described with their scientific names and English and Korean common names if they are available. Genus and species description for the plants identified shall suffice unless taxonomic division below the rank of species is necessary to distinguish between distinct plant types.
3.3.2.1 Vegetative Community. The contractor shall classify the plants into associations or alliances and determination of species diversity and dominant species shall be conducted if the survey identifies significant vegetation communities on an installation, and the information is determined to be relevant to the overall objective of the project. The criteria for determining what constitute a significant vegetation community and the relevance of vegetation classification shall be defined and provided in the WP.
3.3.3 Fauna Survey. The fauna survey shall include identification of significant animal habitats, especially potential habitats for endangered or threatened species and ROK protected wild fauna and flora listed in Table 13-1 and 13-2 of the EGS. Animals identified shall be described with their scientific names and English and Korean common names if they are available. Genus and species description for the animals identified shall suffice unless taxonomic division below the rank of species is necessary to distinguish between distinct animal types. Determination of species diversity and dominant species should be conducted if the survey identifies significant animal habitats on an installation, and the information is determined to be relevant to the overall objective of the project. The fauna survey shall be organized according to the following animal classes:
- Mammals (class Mammalia);
- Birds (class Aves);
- Fishes (superclass Pieces);
- Reptiles (class Reptilia) and amphibians (class Amphibia)
- Insects (class Insecta) and other invertebrates; and
- Arachnids (class Arachnida).
3.3.4 Threatened And Endangered Species. At a minimum, this survey shall produce a map that shows the kinds and known distribution of endangered, threatened, proposed, and candidate species occurring on the installation.
3.4 The Contractor shall provide out-briefing (3 hours) on flora & fauna species, survey methodologies, recommended protection, and control measures within three weeks after the completion of all surveys at Conference room of Environmental office, USAG Humphreys.
4. REPORT PREPARATION
4.1 FIELD SURVEY LETTER REPORTS. The Contractor shall submit a letter report to the COR after the completion of each set of seasonal field surveys. The letter report shall briefly describe the facilities surveyed, when the survey was conducted, tasks that were performed, and any significant or unusual observations.
4.2 NATURAL RESOURCES PLANNING LEVEL SURVEY REPORT. The contractor shall prepare and submit one (1) Planning Level Survey Report that covers USAG Humphreys installations that are included in this project.
The draft PLS Report shall be submitted not later than 28 days from completion of the last field survey. The PLS
Report shall contain a detailed narrative description of the rationale, technical approach, field survey procedures, and survey results. Figures or maps shall be provided to show the location of significant natural resource, including but not limited to large stands of vegetation, surface water bodies, wetlands, animal habitats, recreational resources, etc.
5. GEOSPATIAL DATA
5.1 GEOSPATIAL DATA GENERATION. All geospatial data gathered during the survey will be incorporated into the Government’s Geographic Information System (GIS).
5.2 The Government will provide 50mx50 grid maps (ANCI D size) in PDF for Natural Resources. The Contractor is required to prepare the survey report including photos. The location information of flora type should be matched with grid code in Government furnished maps. The template of survey report consists of site ID, grid ID, survey date, flora type (Endangered/Invasive), Common name, Scientific name, Korean Name and photo ID in MS Excel format.
6. PROJECT DELIVERABLES AND SCHEDULE
6.1 PAPER DELIVERABLES. All plans and reports shall be printed on 8.5 x 11 inches size white paper and bound along the left hand margin; stapling shall not be acceptable. Figures, maps, and photographs sized up to 11 x 17 inches shall be bound into the report. Maps or figures larger than 11 x 17 inches may be placed in pockets at the end of the report inside the back cover.
6.1.1 Project Work Plan. The Contractor shall provide six (6) copies of the draft and final project WP to the COR.
Draft project plans shall be submitted within 14 calendar days from the time the Contractor receives the notice to award (NTA). The draft WP will be reviewed by the Government and returned to the Contractor after a 21-day review period.
6.1.2 Meeting Minutes/Technical Understanding Memorandum. The Contractor shall prepare and submit meeting minutes and technical understanding memorandum to document discussion with the Government regarding survey scope, technical approach, geospatial data to be provided, and/or other related issues as required over the course of the project. Minutes and memorandum shall be submitted within seven (7) calendar days following each meeting or discussion.
6.1.3 Field Survey Letter Reports. The Field Survey Letter Reports shall be submitted within seven (7) calendars days after completion of each seasonal field survey to the COR.
6.1.4 Draft Planning Level Survey Report. The Contractor shall submit six (6) copies of the draft PLS Report not later than 28 days after the final field survey to the COR for Government review. The draft reports will be returned to the Contractor for revision after a 30-day Government review period. The draft reports shall contain all pictures used to document field observations. Original photographs are not required for the draft report; good quality prints shall suffice.
6.1.5 Final Planning Level Survey Report. The Contractor shall provide a written response to every comment received on the draft report and incorporate any revision required into the final report. Six (6) copies of the final
PLS Report shall be submitted to the COR. The final report shall have color photographs or high resolution (>600 dpi) color prints and be bound along the left hand margin. Stapling of the report shall not be acceptable. Text and line drawings shall be clean, clear, and easily reproducible.
6.2 ELECTRONIC DELIVERABLE. The Contractor shall provide an electronic archive of all final plans, reports, and geospatial data on compact disk or digital versatile disk, read-only memory (CD/DVD-ROM) in International
Organization for Standardization (ISO) 9660 file system. A transmittal letter shall accompany the electronic media.
The transmittal letter shall contain the contract number, date of the report/data, computer operating system format and version, name and version of utility software (if any), brief instructions for transferring files from the media, and certification that all electronic media are free of known computer viruses. The most up to date version of virus scanning software shall be used. The certification shall include the name(s) and release date(s) of virus scanning software used to analyze the delivery media, the date that virus scanning was conducted, and the name of the person who performed the scan.
6.2.1 Plans and Reports. The Contractor shall provide electronic version of final plans and reports only. Text and tables shall be provided in a format readable by Microsoft Word version 2016 or lower, Portable Document Format
(*.pdf), or Hypertext Markup Language (HTML). Spreadsheets shall be provided in a format readable by Microsoft
Excel version 2016 or lower. Photographs shall be provided in *.bmp, *.tif or *.jpg format together with a table of contents and description. Maps and figures shall be provided in *.dgn, *.dwg, or *.jpg format and hyperlinked to the referencing text of the plan or report. Six (6) copies of the CD shall be provided to the COR.
Deliverable Number Type
Draft WP 6 copies Hardcopy
Final WP 6 copies CD
Field Survey Letter Reports 1 copy per survey Via email
Draft PLS Report 6 copies Hardcopy
Final PLS Report 6 copies CD
6.3 PROJECT SCHEDULE. The following schedule shall be followed in performing the tasks described in this
PWS. The final PLS Report shall be submitted no later than 428 calendar days after award date.
Task Duration of Task
Calendar Days
Maximum Days from
NTA
Work Progress
Schedule (%)
Notice to Proceed 0 0 0
Submit draft Project WP 14 14 5
Government Review 21 35 -
Submit final Project WP 7 42 10
Conduct season 1 field survey 1
- 56 -
Conduct season 1 field survey 2
- 96 -
Submit letter report for season 1 field surveys 7 103 25
Task Duration of Task
Calendar Days
Maximum Days from
NTA
Work Progress
Schedule (%)
Conduct season 2 field survey 1
- 146 -
Conduct season 2 field survey 2
- 176 -
Submit letter report for season 2 field surveys 7 183 40
Conduct season 3 field survey 1
- 236 -
Conduct season 3 field survey 2
- 266 -
Submit letter report for season 3 field surveys 7 273 55
Conduct season 4 field survey 1
- 326 -
Conduct season 4 field survey 2
- 356 -
Submit letter report for season 4 field surveys & Out-Briefing 7 363 70
Submit draft Planning Level
Survey Report and Geospatial
Data
21 384 90
Government Review 30 414 -
Submit final Planning Level
Survey Report and Geospatial
Data
14 428 100
7. GENERAL REQUIREMENTS
7.1 CONTRACTOR QUALIFICATIONS. The Contractor shall have the necessary equipment, scientific instruments, supplies, and computer hardware and software to complete the tasks required for this PWS.
7.2 PERSONNEL QUALIFICATIONS. The Contractor shall assign personnel who are qualified to perform the work required under this contract, and who will faithfully follow the environmental laws and regulations of the
USFK and ROK. The following are minimum qualifications of personnel who will work on the project.
7.2.1.1 Authority. The PM shall have full authority to act on behalf of the Contractor on all project and contract matters. The PM shall also be responsible for assigning tasks and supervising project professionals and staff.
7.2.1.2 English Proficiency. The PM shall be an individual who is fluent in speaking and writing English with a minimum Bachelor of Science degree
7.2.2 Fauna Specialist. Fauna Specialist shall have a minimum Bachelor of Science degree in the scientific fields of ecology, environmental studies, biology, or related sciences plus two (2) years’ work experience of the same or simil ar type of work The Contractor shall provide Fauna Specialist with a certificate in Biology Classification Engineer –
Animal (생물분류기사-동물). The Contractor shall submit the names and qualifications of proposed project special ist(s) for concurrence by the Government. If key personnel are changed during the project, the COR shall be notified within 48 hours and replacement personnel shall be proposed and approved by the KO. Changes in personnel during project execution shall not result in delays.
7.2.3 Flora Specialist. Flora Specialist shall have a minimum Bachelor of Science degree in the scientific fields of ec ology, environmental studies, biology, or related sciences plus two (2) years’ work experience of the same or similar type of work . The Contractor shall provide Flora Specialist with a certificate in Biology Classification Engineer –
The Contractor shall submit the names and qualifications of proposed project specialist(s) for concurrence by the Go vernment. If key personnel are changed during the project, the COR shall be notified within 48 hours and replaceme nt personnel shall be proposed and approved by the KO. Changes in personnel during project execution shall not res ult in delays.
7.2.4 GIS Assistant(s)/Mapping Coordinator. GIS Assistant(s)/Mapping Coordinator shall have a minimum Bachelo r of Science degree in the scientific fields of geology, geosciences, geography, topography, surveying, ecology, envi ronmental studies, biology, or related sciences plus two (2) years’ work experience. The Contractor shall submit the names and qualifications of proposed project scientists for concurrence by the Government. If key personnel are cha nged during the project, the COR shall be notified within 48 hours and replacement personnel shall be proposed. Ch anges in personnel during project execution shall not result in delays.
7.3 COMMUNICATION. All activities performed and any problems encountered in the performance of the work shall be reported to the COR. The Contractor shall communicate with the USACE, FED COR at least once during each field survey to provide information regarding work progress.
7.4. LIABILITY. The Government shall not be liable for any damage done to the private property of the Contractor, nor any person or public properties, or for personal injuries, illness, disabilities, or for accidental death of the
Contractor, Contractor’s employees, and any other person under the Contractor’s control, including members of the general public, caused, in whole or in part, by (a) Contractor’s breach of any term or provisions of the contract and this PWS; or, (b) any negligent or willful act or omission of the Contractor, its employees or subcontractors in the performance of this PWS.
7.4.1 Indemnity. The Contractor agrees to indemnify, save and defend the Government from and against any and all liabilities, claims, penalties, forfeitures, suits, and the costs and expenses incident thereto (including the costs of defense, settlement and reasonable attorney’s fees), which it may hereafter incur, therefore become responsible for, and/or in result, may pay back as a result of acts or omissions.
7.5 LICENSING AND CERTIFICATION. The Contractor shall maintain all training, licensing and certification(s) required by ROK local and national laws and regulations, U.S. laws and regulations, and military regulations through the complete performance period(s) of the awarded contract. For the services described in this PWS, the
Contractor shall be responsible to keep a current and an up-to-date copy of all required licensing and certification(s).
The required licenses and certifications shall be provided to the COR.
7.6 PHYSICAL SECURITY AND PASSES. The Contractor’s employees and subcontractors must comply with all security requirements imposed by Area III installation commanders at all times while performing under this contract. It shall be the Contractor’s responsibility to arrange personnel and escort passes required for entry onto the installations.
7.7 HOURS OF OPERATION. The Contractor shall perform the work from 0730 hours to 1730 hours, Monday through Friday, except American National Holidays.
7.8 RESOURCE CONSERVATION. All reasonable quantities of water and electricity shall be furnished at no charge to the Contractor in the process of fulfilling this contract. However, the Contractor shall instruct all employees in utility conservation practices, and the Contractor will be held responsible for excess usage or waste.
7.9 ENVIRONMENTAL CONTROL. All Contractors’ performance shall be achieved in strict accordance with the current environmental laws and regulations. The Contractor shall not use any Class I Ozone Depleting Chemicals
(ODC) identified in the Army’s Policy in the performance of this contract.
7.9.1 Preserving Existing Environment. The Contractor shall preserve and protect all structure, equipment, and vegetation such as trees, shrubs, and grass on Area III installations that do not unreasonably interfere with the work required under this project. If any tree limbs or branches are damaged or broken during this project by project personnel, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound, or replace the entire tree as directed by the COR.
7.10 CONTRACTOR QUALITY CONTROL. The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under this PWS conforms to contract requirements.
Contractor quality control shall include corrective actions when deficiencies are identified during such inspection.
The Contractor shall warrant the accuracy of data and reports, upon which other reports or projects may be based.
The Contractor shall be prepared to defend the findings on behalf of the Government should a claim or dispute arise.
All work performed under this PWS is subject to Government quality assurance inspections and tests at all locations and reasonable times before acceptance to ensure strict compliance with terms of the contract.
7.10.1 Government Observations. The KO or COR may visit the project sites without prior notification.
Government quality assurance inspections are for the sole benefit of the Government and do not relieve the
Contractor of the responsibility for providing adequate quality control measures; do not relieve the Contractor of responsibility for damage to or loss of material before acceptance; and do not constitute or imply acceptance or affect the continuing rights of the Government after acceptance of the completed work. The presence or absence of a Government representative does not relieve the Contractor from any PWS requirement or environmental regulation, nor is the Government representative authorized to change any term or condition of the contract or PWS without written authorization from the KO.
8. NOTICE TO THE GOVERNMENT.
8.1 CONTRACT NOTICE REGARDING LATE DELIVERY. In the event that the Contractor encounters difficulty in meeting performance requirements or completing the work according to the project scheduled, the COR shall be notify immediately and provided with all pertinent information regarding the reason(s) for the delay. However, the notification will be for informational purposes only and shall not be construed as a waiver by the Government of any delivery schedule or date, or any right or remedies provided by law under this contract.
9 OWNERSHIP OF DOCUMENTS AND CONFIDENTIALITY.
9.1 OWNERSHIP. Plans, reports, design, drawings, notes, calculations and other work developed in the performance of this contract shall become the sole property of the Government and may be used on any other design or construction project without additional compensation to the Contractor.
10. PERFORMANCE REQUIREMENT STANDARDS
The following table provides metrics and methods that are designed to determine if the Contractor’s performance exceeds, meets, or does not meet a given standard and acceptable quality level.
Performance
Objective
Performance
Standard
Acceptable
Quality Level
(AQL)
Monitoring
Method Remedy
Paragraph 2, 3, 4 and 5. of PWS - Are the WP, PLS Report, and geospatial data prepared according to the requirements?
The PLS Report and geospatial data must be prepared in accordance with the PWS requirements.
90%
Compliance
100% Review If deficiency found, corrective action will be requested. If corrective action is not satisfied or deficiencies occur repeatedly more than once, the contract discrepancy report will be issued.
Paragraph 6. of
PWS - Did the
Contractor start and complete the project as scheduled?
Work will start and complete within the time period as specified in the
PWS.
90%
Compliance
100% Review and
Inspection
If deficiency found, corrective action will be requested. If corrective action is not satisfied or deficiencies occur repeatedly more than once, the contract discrepancy report will be issued.
11. ANTITERRORISM (AT), SECURITY & INTELLIGENCE and OPERATIONS SECURITY (OPSEC)
REQUIREMENTS.
11.1 AT LEVEL I TRAINING. All contractor employees, to include subcontractor employees, requiring access to
Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website:
http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.
11.2 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided byGovernment representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security
Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-
9, Personal Identity Verification of Contractor Personnel) as directed by
DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes."
11.2.1 For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the
National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database
(TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as
NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
11.3 iWATCH TRAINING. The contractor and all associated sub-contractors shall receive a brief/training (provided by the
RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
11.4 FOR CONTRACTS THAT REQUIRE OPSEC TRAINING. All new contractor employees will complete
Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites: https://www.iad.gov/ioss/ or http://cdsetrain.dtic.mil/opsec/index.htm; or it can be provided by the RA
OPSEC Officer in presentation form which will be documented via memorandum.
12. CONTRACTOR MANPOWER REPORTING (CMR).
“The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year of contract/task order performance.
Contractors may direct questions to the help desk at help desk at: http://www.ecmra.mil to review user manuals and gain an understanding about the data fields that will be included in the reporting structure that is hosted at http://www.ecmra.mil/.”
GENERAL INFORMATION
CONSIDERATION FOR PAYMENT
1. PAYMENT
A proper invoice must be submitted by the contractor upon completion of the delivery to the following personnel.
Payment will be made on the 30th day after invoice is forwarded to the Finance and Accounting Office.
2. INVOICE ADDRESS:
Contractor shall submit its invoice(s), submitting of invoice by e-mail is acceptable at the below stated e-mail addresses:
Please e-mail the original to the below address.
One (1) original to Environmental Office:
U.S Army Engineer District, Far East
ATTN: CEPOF-ED-GE(Mr. Paek, Sung Sik)
APO AP 96205-5546, Unit #: 15546
Phone Number: 011-822-0503-321-6119 http://cdsetrain.dtic.mil/opsec/index.htm http://www.ecmra.mil/ http://www.ecmra.mil/ http://www.ecmra.mil/
E-mail: sung-sik.paek@usace.army.mil
One (1) copy to Contracting office:
ATTN: CEPOF-CTP (Ms. Chon, Hye Kyong)
APO AP 96205-5546, Unit #: 15546
Phone Number: 011-82-503-321-6088
E-mail: hye-kyong.chon@usace.army.mil
One (1) copy to Finance Office:
ATTN: CEPOF-RM-F (Ms. Kim, Hyon Cha)
APO AP 96205-5546, Unit #: 15546
E-mail: hyon-cha.kim@usace.army.mil
Phone Number: 011-822-2270-7284
Fax Number: 011-822-2265-8440(Paying Office)
3. INVOICE:
1. An invoice is a written request for payment under the Contract for supplies delivered or for services rendered. In order to be proper, an invoice must include as applicable the following:
(a) Invoice date;
(b) Name of contractor;
(c) Contract number (including order number, if any), contract line item number, contract description of supplies or services, quantity, contract unit of measure and unit price, and extended total.
(d) Shipment number and date of shipment (bill of lading number and weight of shipment will be shown for shipments on Government bills of lading);
(e) Name and address to which payment is to be sent (which must be the same as that in the contract or on a proper notice of assignment); Remit address of invoice must be same as EFT (Electric Fund Transfer) Form that you provided when the time of award of the contract.
(f) Name (where practicable), title, phone number and mailing address of person to be notified in event of a defective invoice; and
(g) Any other information or documentation required by other provisions of the contract (such as evidence of shipment). Invoice shall be marked "Original".
4. RECEIVING OFFICER
Acceptance of the service provided under this order shall be conducted by the following Contracting Officer’s
Representative (COR).
ATTN: CEPOF-ED-GE(Mr. Paek, Sung Sik)
APO AP 96205-5546, Unit #: 15546
Phone Number: 011-822-0503-321-6119
E-mail: sung-sik.paek@usace.army.mil
General Information
1. Military Installation access pass instructions mailto:sung-sik.paek@usace.army.mil mailto:hye-kyong.chon@usace.army.mil
The contractor shall submit a completed Pass and Decal Roster, the format enclosed in this section for all personnel requiring access to military installation to the Contracting Officer's Representative (COR) within 7 days of contract award. Upon approval of the roster by the COR, the contractor shall submit the approved roster with a copy of the awarded contract, copy of Korean ID card for each personnel identified and approved on roster, a copy of expired/expiring pass (if it is for renewal), and the request form (if it is a new request) to the COR. The request form is enclosed in this section. The COR will coordinate obtaining the pass through the appropriate security office.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 N/A N/A N/A N/A
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
0002 N/A N/A N/A N/A
CLAUSES INCORPORATED BY REFERENCE
52.203-2 Certificate Of Independent Price Determination APR 1985
52.204-7 System for Award Management OCT 2016
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011
52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
OCT 2016
52.204-13 System for Award Management Maintenance OCT 2016
52.204-16 Commercial and Government Entity Code Reporting JUL 2016
52.204-17 Ownership or Control of Offeror JUL 2016
52.204-18 Commercial and Government Entity Code Maintenance JUL 2016
52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-20 Predecessor of Offeror JUL 2016
52.209-2 Prohibition on Contracting with Inverted Domestic
Corporations--Representation
NOV 2015
52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for
Debarment
OCT 2015
52.209-10 Prohibition on Contracting With Inverted Domestic
Corporations
NOV 2015
52.212-1 Instructions to Offerors--Commercial Items JAN 2017
Instructions to Offerors (Addendum to FAR 52.212-1)
1. PROPOSAL SUBMISSION VIA AMRDEC Safe Access File Exchange (SAFE)
In an effort to reduce paperwork and reduce costs, all proposals shall be submitted electronically. All submissions shall be in Adobe PDF format, bookmarked according to the Factors described in the solicitation. The price and technical proposals shall be submitted as “separate” single files. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
a. Submit the price and technical proposals electronically via the AMRDEC SAFE website at https://safe.amrdec.army.mil/safe/. At the AMRDEC SAFE website select the button for Non-CAC Users: For users without a CAC OR if your computer is not configured to read your CAC. Using this option will allow you to access SAFE as a guest. Access the site and submit your proposal.
b. When completing the information for transmittal, provide the following information in each of the relevant fields:
i. Name of person submitting proposal – Use the name of individual signing proposal.
ii. Email address of person submitting proposal – Use the email address of the individual signing the proposal.
iii. File information - Title the file(s) in the following format:
SOLICITATION NUMBER-COMPANY NAME-PRICE
SOLICITATION NUMBER-COMPANY NAME-TECHNICAL
iv. Description of file(s). The description of the file shall include the solicitation number, title of solicitation and company name.
v. Recipient information. Please use the email address of hye-kyong.chon@usace.army.mil, and as well as the
POF CT proposals in-box, pof-ct-proposals@usace.army.mil.
2. Proposal Submission Date and Time
a. In accordance with the Status of Forces Agreement (SOFA), the proposed acquisition will be limited to local contractors only. All required material, labor, transportation, and facilities and these services are available locally.
This solicitation is restricted to local sources only."
b. Offerors are required to submit proposals (Price and Technical Proposal) no later than
10:00 A.M., 18 August 2017. All questions should be emailed to the Contract Specialist, Chon, Hye Kyong at hye-kyong.chon@usace.army.mil.
c. PRICE PROPOSAL: The Offeror shall provide complete price proposal in dollars.
-Schedule of Services (CLIN 0001) and breakdown of price proposal.
-Signed Solicitation and Amendment: Signed first page of the solicitation (SF1449) and each amendment
(SF30) (if any amendment were issued).
https://safe.amrdec.army.mil/safe/ mailto:hye-kyong.chon@usace.army.mil mailto:pof-ct-proposals@usace.army.mil mailto:hye-kyong.chon@usace.army.mil
d. TECHNICAL PROPOSAL: Personnel qualifications. The offeror shall submit documentation (resumes, diplomas, licenses, certificates) that demonstrate the proposed Fauna Specialist and Flora Specialist possess the qualifications listed in Paragraph 7.2.2 and 7.2.3 of Performance Work Statement (PWS) of this project.
3. Site Orientation
A site orientation is schedule on 4 August 2017 at 1:30 P.M., CPX gate, USAG Humphreys, Korea. You are required to coordinate with Mr. Paek, Sung Sik at sung-sik.paek@usace.army.mil for post access in order to attend the site orientation.
4. DUNS and Cage Code Number
A CAGE code and a DUNS number are a requirement to do business with the U.S. Federal Government. For more information regarding obtaining a CAGE code:
FOR NON-U.S. COMPANIES
Non-U.S. companies are issued NATO Cage Codes (NCAGE) by contacting the designated Point of Contact
(POC) at the National Codification Bureau (NCB) of the country where the company is located. For a list of addresses and POCs, go https://www.dapa.go.kr.
Please note: Organizations with an address containing APO, FPO or AE do not need an NCAGE assigned by an Allied Nation or NATO-sponsored NCB. Instead, these companies must register in the CCR to receive a
U.S. Cage Code.
The POC for South Korea is:
Defense Acquisition Program Administration, , Logistics Information Management Team
(Gwacheon-si, Gwanmunro-47)
Gyonggi-Do((138-09)
Republic of Korea
Mr. Oh, Jae Ryong
TEL: +82-2-2079-4638
FAX: +82-2-773-7587
E-MAIL:cagerkr@korea.kr
CLAUSES INCORPORATED BY FULL TEXT
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
Technical
Price
The technical factor is approximately equal to price
(b) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (JAN 2017)
The Offeror shall complete only paragraph (b) of this provision if the Offeror has completed the annual representations and certification electronically via the System for Award Management (SAM) Web site located at https://www.sam.gov/portal. If the Offeror has not completed the annual representations and certifications electronically, the Offeror shall complete only paragraphs (c) through (u) of this provision.
(a) Definitions. As used in this provision --
“Administrative merits determination” means certain notices or findings of labor law violations issued by an enforcement agency following an investigation. An administrative merits determination may be final or be subject to appeal or further review. To determine whether a particular notice or finding is covered by this definition, it is necessary to consult section II.B. in the DOL Guidance.
“Arbitral award or decision” means an arbitrator or arbitral panel determination that a labor law violation occurred, or that enjoined or restrained a violation of labor law. It includes an award or decision that is not final or is subject to being confirmed, modified, or vacated by a court, and includes an award or decision resulting from private or confidential proceedings. To determine whether a particular award or decision is covered by this definition, it is necessary to consult section II.B. in the DOL Guidance.
“Civil judgment” means—
(1) In paragraph (h) of this provision: A judgment or finding of a civil offense by any court of competent jurisdiction.
(2) In paragraph (s) of this provision: Any judgment or order entered by any Federal or State court in which the court determined that a labor law violation occurred, or enjoined or restrained a violation of labor law. It includes a judgment or order that is not final or is subject to appeal. To determine whether a particular judgment or order is covered by this definition, it is necessary to consult section II.B. in the DOL Guidance.
“DOL Guidance” means the Department of Labor (DOL) Guidance entitled: ``Guidance for Executive Order 13673, `Fair Pay and Safe Workplaces' ''. The DOL Guidance, dated August 25, 2016, can be obtained from www.dol.gov/fairpayandsafeworkplaces.
“Economically disadvantaged women-owned small business (EDWOSB) Concern” means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127. It automatically qualifies as a women-owned small business eligible under the WOSB Program.
“E…