SEE ADDENDUM

(No Collect Calls)

W912UM-17-R-0008 02-Feb-2017

b. TELEPHONE NUMBER

0503-321-6089

8. OFFER DUE DATE/LOCAL TIME

04:00 PM 23 Feb 2017

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912UM9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

UN+KYONG HAN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

WOMEN-OWNED SMALL

BUSINESS (WOSB)

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

CONTRACTING DIVISION

U.S. ARMY CORPS OF ENGINEERS

FAR EAST DISTRICT

UNIT #15546

APO AP 96205-5546

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE WT4KCL 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAR EAST DISTRICT

WILLIAM BILLARD

UNIT #15546

APO AP 96205-5546

TEL: 315-753-4970 FAX:

82-2-2269-3411FAX:

TEL: 82-2-2270-7206 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

SIZE STANDARD:

NAICS:

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912UM-17-R-0008

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

TEMPORARY FENCE REMOVAL

FFP

Services, non-personal; the contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary as defined in this Statement of Work (para 2.a).

Only a warranted Contracting Officer acting within their delegated limits has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.

FOB: Destination

NET AMT

0002 1 Job

REMOVAL AND INSTALLATION OF GUARDRAIL

FFP

Services, non-personal; the contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary as defined in this Statement of Work (para 2.b).

Only a warranted Contracting Officer acting within their delegated limits has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make

0003 1 Job

DISMANTLEMENT OF THE WEST CONSTRUCTION

FFP

GATE

Services, non-personal; the contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary as defined in this Statement of Work (para 2.c).

Only a warranted Contracting Officer acting within their delegated limits has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make

0004 1 Job INSTALLATION of PERMANENT AIRFIELD FENCE

FFP

Services, non-personal; the contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary as defined in this Statement of Work (para 2.d).

Only a warranted Contracting Officer acting within their delegated limits has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make

0005 1 Job

STAGING AREA

FFP

Services, non-personal; the contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary as defined in this Statement of Work (para 2.e).

Only a warranted Contracting Officer acting within their delegated limits has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make

0006 1 Job

LIGHTING REMOVAL

FFP

Services, non-personal; the contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary as defined in this Statement of Work (para 2.f).

Only a warranted Contracting Officer acting within their delegated limits has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make

0007 1 Job

CONTRACT MANPOWER REPORT (CMR)

FFP

Contract Manpower Report (CMR) Requirements must be reported by 31 October of each calendar year during the life of the contract, IAW CMR (para 5) clause in the attached SOW.

Instruction to Offeror - Addendum to FAR 52.212-1

1. Offerors shall submit proposal via the AMRDEC SAFE website at:

https://safe.amrdec.army.mil/SAFE/ When submitting documents via safe please use the following labeling format for your documents:

“solicitation number_company name_document name (technical or price)”. In the description ensure to include the solicitation number, your company name, and the file name and number of documents attaching.

And provide access to the following recipients:

Un-kyong.han@usace.army.mil, Han, Un-Kyong, Contract Specialist pof-ct-proposals@usace.army.mil, Contracting Proposal Inbox

a. Price Proposal: Price shall be in local currency (Korean Won)

Schedule of Services (CLIN 0001 ~ 0006) and breakdown of price proposal.

b. Technical Proposal:

Offerors shall submit a minimum of three (3), but no more than five (5) similar projects performed with a satisfactory or higher rating. All projects submitted must be U.S. Government projects completed within the last five (5) years. For each project, the offeror shall include the contract award number, project description, dollar amount and Agency who awarded the contract. Project similarity includes projects of same scope, dollar value, or type of work (dismantling, demolition, removal and installation).

In the case of an offeror for has no past performance or for whom information on past performance is not available, the offeror will receive a neutral rating.

2. Site Visit

A site visit has been scheduled for 9 Feb 2017, 10:00 AM local time at USAG Humphreys - Parcel 2 Resident Office (P2RO). All offerors planning to attend the site visit should submit a request in writing to the POC below, with the names and number of attendees. The site visit will begin in the second floor conference room at P2RO.

Point of Contact (POC) for site visit:

Name: Jason Allmon Telephone: 010-2089-6508 Email: Jason.E.Allmon@usace.army.mil

3. Offeror’s Questions and Comments

1. Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet.

1.1 To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency https://safe.amrdec.army.mil/SAFE/ http://www.projnet.org/projnet

USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click to continue.

1.2 From this page you may view all bidder inquiries or add inquiry.

1.3 Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

1.4 The Solicitation Number is: W912UM-17-R-0008

1.5 The Bidder Inquiry Key is: J25DA2-939MKW

2. Only one question per submission will be allowed. Any inquiries with multiple questions will have only the first question answered.

3. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

4. The bidder call center operates weekdays from 8am to 5pm U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

5. The Bidder Inquiry System will be closed five (5 days) prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

4. Basis of Award:

Award will be made to the lowest price technically acceptable offer. See the FAR 52.212-2 Evaluation

SOW

SCOPE FOR PARCEL 2A/1/K

TEMPORARY FENCING REMOVAL and INSTALLATION CY2016 31 January 2017

1. PROJECT DESCRIPTION: It is necessary to remove temporary fencing and lighting and install permanent fencing and associated infrastructure such as guardrails. All activities will take place at USAG Humphreys in Parcels 1, 2A, and K. Removal of temporary fencing, temporary lighting, signage, gates, installation of permanent fencing and guardrails.

2. SCOPE: The Contractor shall perform all work necessary to execute those items identified in the project description. The work, in general, consists of conducting a joint site/field investigation(s) with the Government, attending meetings/conferences as necessary, and preparation and submission of all necessary construction work permits and material submittals for review and approval by the Government and execution of the following work items:

All work to be performed in accordance with this scope of work shall be accomplished under the following contract line item numbers (CLINs):

a. CLIN 0001: TEMPORARY FENCE REMOVAL: The Contractor shall remove approximately 3 ,362 meters (11,030 feet) of FE-6 fence, and in two areas (Site ID 11 and Site ID 17) remove 225 meters (738 feet) of only barbed wire (not the whole fence section). See the attached table for details.

Concurrent with the removal of the temporary fencing, the Contractor shall restore the affected areas, and remove all resulting debris (i.e. small pieces of tie wire, barbed wire, concertina wire, straps, bolts, et cetera.) All fenceline and gate posts are to be properly backfilled and compacted to 90 percent density, and brought to the elevation of the adjacent surrounding ground. All fenceline and gate posts holes shall be kept free from debris and trash before backfilling. None of the fence posts are to be cut off at or below grade level and left in place. Any concrete that was used to secure the fence must be removed and disposed of appropriately. Landscaping such as sodding/gravel/mulch shall be provided to match the adjacent landscaping. A subsidiary obligation of the Contractor shall be to remove the manbars that are located where the existing airfield perimeter fence crosses the drainage structure at Site ID 3.

Temporary Fence Removal: The Contractor shall commence work within 14 calendar days after Government approval of all submittals required under this contract, including, but not limited to, the Contractor’s Safety Plan, construction permit(s), request for site release(s), et cetera. The Contractor may retain for his use and/or disposal fencing materials which is to be removed under this contract, to include fence posts, top/bottom rails, metal fence fabric, barbed wire, grounding rods, and light poles.

The Government will retain the gates located at Site ID 4. The gates shall be removed and stored at the Base Storage Yard located at 36°57’54.5” N, 127°00’39.43E” (36.965139,127.010953). The Government will retain the gates located at Site ID 3. The gates will need to be removed from the existing fence and installed on the new adjacent parallel airfield fence. The Government will retain all signs at Site ID 3. The Contractor shall transfer all signs and obstruction lights currently on the existing fence and installed on the new adjacent parallel airfield fence. These signs and lights are spaced approximately 30 meters (100 feet) apart.

b. CLIN 0002: REMOVAL AND INSTALLATION OF GUARDRAIL: The Contractor shall remove approximately 28 meters (92 feet) of guardrail at Site ID 7. See attached table for details. Concurrent with the removal of the guardrail, the Contractor shall restore the affected area, and remove all resulting debris. All posts are to be properly backfilled and compacted to 90 percent density, and brought to the elevation of the adjacent surrounding ground. All post holes shall be kept free from debris and trash before backfilling. None of the posts are to be cut off at or below grade level and left in place. Any concrete that was used to secure the guardrail must be removed and disposed of appropriately.

Landscaping such as sodding/gravel/mulch shall be provided to match the adjacent landscaping. The Contractor shall complete this work concurrent with the timing for CLIN 0001. The Contractor may retain for his use and/or disposal guardrail materials which is to be removed under this contract. At Site ID 6 the Contractor shall install approximately 66 meters (217 feet) of guardrail along the concrete retaining wall adjacent to the Main Post Club. The guardrail will be provided by the Government (USAG-H DPW Office).

c. CLIN 0003: DISMANTLEMENT OF THE WEST CONSTRUCTION GATE: The Contractor shall perform all work necessary to remove the traffic control Nasatka Barriers, Jersey barriers, five Guard Shacks and canopies, security traffic arms, signage, and all associated components to the West Gate, Site ID 22. All components shall be handled and stored in a way to prevent damage. This removal shall include all electrical components and building foundation pads. The Contractor shall be responsible for road cleaning and repair of the asphalt surface if damage occurs during removal. The work includes conducting a joint site/field investigation(s) with the Government, attending meetings/conferences as necessary, and preparation and submission of all necessary construction work permits and material submittals for review and approval by the Government. All equipment that is removed shall be stored at the Base Storage Yard located at 36°57’54.5” N, 127°00’39.43E” (36.965139,127.010953).

Dismantlement of the West Construction Gate shall be permitted beginning 31 May 2017.

d. CLIN 0004: INSTALLATION of PERMANENT AIRFIELD FENCE: Provide permanent, electrically grounded, FE-6 perimeter fence at Site ID 3 following the higher ground elevation adjacent to the sidewalk. Fence Installation must be completed before the existing airline fence may be dismantled and removed. The fencing to be installed shall be based on, for bidding purposes, 44 Meters (144 feet).

INSTALLATION of FENCE ALONG EDGE OF FLOOD GATE AT LAKE NEAR HOSPITAL:

Provide permanent, electrically grounded, FE-6 perimeter fence at Site ID 12. The fencing to be installed shall be based on, for bidding purposes, 25 Meters (82 feet).

All work to be performed under this scope of work shall be in accordance with the current contract specifications, the current Unified Facilities Criteria (UFC) available at http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 and the USAG Humphreys Installation Design Guide available from USAG – Humphreys DPW – Master Planning, Building 2105. All fenceline carriage bolts shall be peened and joints/couplings welded. The fence fabric shall be no greater than two inches (5.08 centimeters) above a solid foundation. All non-destructive fence placement methods must be accepted for construction per the submittal process for subject contract.

General Provisions: The Contractor shall perform the following for all of the above as it is required (per the attached exhibit and details):

a. Storm Water Drainage: Contractor shall provide positive drainage from work areas at all times. Provide positive storm water flow conveyance from temporary roads. Drainage devices shall not direct runoff onto adjacent vertical project sites unless the condition already exists or an agreement with the vertical project site director is executed.

b. Miscellaneous Responsibility: All roads, ditches, signage, and other associated items are the responsibility of the Contractor to oversee and maintain in good working order.

c. Removal of Debris: The Contractor shall restore the areas affected by the fence, lighting, guardrail and manbar removal/installation, to include removal of all resulting debris (i.e.

small pieces of tie wire, barbed wire, concertina wire, straps, bolts, et cetera.)

Additionally regarding man bar removal, any accumulated debris that is present shall be removed by the Contractor.

d. Work Plans: Submit work plan showing locations of regular maintenance, removal, and repair work covering a two week period every Monday morning to the Contracting Officer and their designated representative. Work plan must show where the Contractor will be performing regular maintenance on a daily basis; locations of temporary road removal and duration for work; and locations of removal and repair work (when known) and durations.

e. Temporary Road Closures: Where road closures are required to complete work, Contractor must create detour plan and route, provide all traffic control and/or flagmen, et cetera. Provide to the Government a minimum of 14 calendar days’ notice if a road closure is planned, along with drawing showing location, detour route, and duration of closure. Where a detour route cannot be created or one-lane traffic cannot be maintained through the work area and the road must be closed to all traffic, the Contractor shall give a minimum of two (2) weeks notice to allow the Government to properly coordinate with all affected parties. Request, of partial/full area closures in order to complete any portion of this contract, are subject to Government review and approval.

f. Contractor Coordination: The Contractor shall coordinate all activities with the Far East District (FED). The Contractor has the flexibility to coordinate directly with US and Republic of Korea (ROK) stakeholders, but at any time if he is uncertain of possible conflicts with his work scope, and adjacent vertical contractors, he must report this to the Contracting Officer, so that the matter may be resolved. Only the Contracting Officer has the authority to direct new work to the contractor; other Government personnel do not have the authority to execute contract modifications, bind the Government or direct or encourage the contractor to perform work that should be the subject of a contract modification.

g. Submittals: Contractor shall submit all earthwork material data, lab testing (field lab and test results), in-situ test results, compaction testing for repair areas, et cetera in accordance with Specification SECTION 31 00 00 EARTHWORK. The Contractor shall prepare and submit to the Government, material submittals and all necessary work permit requests in parallel with preparing the quality assurance, health and safety, and

ENG Form 4288 submittals.

h. ANTITERRORISM/OPERATIONS SECURITY

• AT Level I Training. This provision/contract text is for contractor employees with an area of performance within an Army controlled installation, facility or area. Proposed language:

“All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.”

• Access and General Protection/Security Policy and Procedures. This standard language text is for contractor employees with an area of performance within an Army controlled installation, facility or area. Proposed language: “All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.”

• For contractors who do not require CAC, but require access to a DoD facility or installation. Proposed language: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

• Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something). This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. Proposed language:

“The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.”

e. CLIN 0005: STAGING AREA: A limited area will be made available to the Contractor to erect a temporary field office, stockpile of some materials, some equipment storage, et cetera. The tentative location for the staging area will be one of two locations: (1) The first option is on 1st Street near First Team Avenue 36°58’46.97” N, 126°59’17.11”E (36.979715,126.988087). (2) The second option is along Pacific Victors Avenue at the DPW Laydown Yard 36°57’52.08” N, 127°01’59.19”E (36.964469,127.033111).

f.CLIN 0006: LIGHTING REMOVAL: Remove the temporary security lighting along the fence at Site ID 13 and 14. There are a total of seven (7) light poles. The Contractor shall disconnect from existing power source once permission is granted by USAG-Humphreys and provided through the COR. The Contractor shall also remove the redundant power source, and relocate associated equipment to the DPW’s Storage Yard that is located off of Pacific Victors Avenue at 36°57’49.82” N, 127°01’57.54” E (36.963839, 127.032650). The Contractor may retain power poles and lighting fixtures for his use and/or disposal. The Government will retain all LED lights, and the Contractor is to place them at the DPW’s Storage Yard that is located off of Pacific Victors Avenue at 36°57’49.82” N, 127°01’57.54” E (36.963839, 127.032650). Any concrete that was used to secure the power poles must be removed and disposed of appropriately.

3. GOVERNMENT FURNISHED DATA/MATERIAL: The following will be furnished by the Government (FED unless stated otherwise):

a. GUARDRAIL FOR Site ID 4

b. TOPOGRAPHIC SURVEYS/MAPS

c. OTHER PROJECT INFORMATION:

1. Designs for LDUI project (as requested by the Contractor).

2. Site and utility plans of vertical projects adjacent to or in the vicinity of temporary fencing (as requested by Contractor).

4. PERIOD OF SERVICES: All work described in this contract shall be completed within two-hundred-and-fifty (250) days of receipt of Notice of Award.

5. CONTRACT MANPOWER REPORTING APPLICATION (CMRA) REPORTING: The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the U.S. Army Corp of Engineers via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address:

https://cmra.army.mil/default.aspx?ReturnUrl=%2f.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year of contract/task order performance.

Contractors may direct questions to the help desk at help desk at: http://www.ecmra.mil to review user manuals and gain an understanding about the data fields that will be included in the reporting structure that is hosted at http://www.ecmra.mil/.

6. MEETINGS AND SITE VISITS:

(This is NOT an all-inclusive list)

DESCRIPTION DATE/TIME LOCATION

Pre-Construction / Project Kick-off

Within 2 days after contract award Parcel 2 Resident Office

Site Investigation TBD / 10:00 am USAG Humphreys – meet at Parcel 2 Resident Office

Monthly Coordination TBD Parcel 2 Resident Office

7. CONTRACTOR QUALITY CONTROL: The requirements for the CONTRACTOR QUALITY

CONTROL (CQC) organization are composed of a CQC System Manager and a sufficient number of additional qualified personnel to ensure personnel safety and contract compliance.

The Site Safety and Health Manager (SSHM) must receive direction and authority from the CQC System Manager and serve as a member of the CQC staff. The CQC staff must have the specialized skills required to assure the work is being performed properly. The CQC staff must maintain a presence on the job site at all times during progress of the work and have complete authority and responsibility to take any action necessary to ensure contract compliance. The CQC staff shall be maintained at full strength at all times, and will be subject to acceptance by the Contracting Officer. Adequate office space, filing systems and other resources should be available to maintain an effective and fully functional CQC organization. All letters, material submittals, shop drawing submittals, schedules and all other project documentation to the CQC organization shall be completed promptly and furnished to the Government as requested. The CQC organization shall be responsible for maintaining these documents and records at the site at all times, except as otherwise acceptable to the Contracting Officer.

https://cmra.army.mil/default.aspx?ReturnUrl=%2f http://www.ecmra.mil/ http://www.ecmra.mil/

Task Site Information Site ID Site Description Work Type Length

(m)* Point X_Coord(m) Y_Coord(m)

1 DPW laydown yard along Airfield Road Fence Removal 21

1-S 324,860.2 4,092,642.9 1-E 324,875.3 4,092,628.8

2 ROK and Fine Construction Fence Removal 14

2-S 324,983.4 4,092,541.6 2-E 324,994.5 4,092,533.4

3 Airfield Fence from Beacon Hill

Fence Removal 1,125 3A-S 325,175.3 4,092,271.4 3A-E 325,918.8 4,091,499.1

Fence Removal and New 44

3B-S 325,922.7 4,091,509.5 3B-E 325,906.3 4,091,468.5

4 By the Air Control Tower Fence Removal 110

4-S 325,200.2 4,092,528.0 4-E 325,211.5 4,092,628.7

Between new Main post Club and Airfield road

Fence Removal 30

5A-S 325,767.2 4,091,885.4 5A-E 325,772.8 4,091,874.7 5B-S 325,779.4 4,091,861.9 5B-E 325,787.7 4,091,845.9

6 main gate access road

& AMC

Fence Removal and Guardrail Installation

6-S 325,800.5 4,091,864.5

6-E 325,815.7 4,091,928.4

7 guard rail next to #6 Guard Rail Removal 28

7-S 325,798.1 4,091,850.9 7-E 325,806.2 4,091,825.8

8 By HQ050 and Central Fire Station Fence Removal 18

8A-S 325,093.9 4,091,529.5 8A-E 325,102.1 4,091,526.2 8B-S 325,108.3 4,091,496.0 8B-E 325,099.2 4,091,496.8

9 Vet Clinic Fence Removal 58 9-S 324,860.2 4,091,610.3 9-E 324,906.6 4,091,599.3

10 new freedom road by Hangar Fence Removal 64

10-S 324,276.3 4,091,406.9 10-E 324,222.8 4,091,391.7

11 Fire lane West of Med 020

Fence Removal 273

11A-S 324,257.1 4,091,615.4 11A-E 324,233.3 4,091,826.3 11C-S 324,225.4 4,092,010.6 11C-E 324,261.9 4,092,049.9

Barbed Wire Removal 185

11B-S 324,233.3 4,091,826.3 11B-E 324,225.4 4,092,010.6

12 Along C Ave S and lake

Fence Removal 112

12A-S 324,313.3 4,091,631.1 12A-E 324,308.3 4,091,721.4 12B-S 324,307.6 4,091,730.5 12B-E 324,306.5 4,091,751.7

Fence Installation 25 Between 324,313.3 4,091,631.1 these Coordinates 324,306.5 4,091,751.7

13 By the Supergym Fence Removal and Temporary Lighting

13-S 324,028.0 4,091,384.4

13-E 323,981.0 4,091,384.5

14 By the ACP - 21 Fence Removal and Temporary Lighting

14-S 323,887.1 4,091,378.9

14-E 323,792.0 4,091,364.6

15 Behind Education Center Fence Removal 161

15-S 323,748.8 4,091,285.4 15-E 323,591.8 4,091,256.8

16 Between Chapel and Education Center Fence Removal 105

16A-S 323,794.1 4,091,277.3 16A-E 323,820.7 4,091,234.5 16B-S 323,871.6 4,091,102.2 16B-E 323,907.8 4,091,106.8

17 AVIM Hangar Fence Removal 17

17-S 324,278.6 4,092,013.7 17-M 324,295.8 4,092,014.2

Barbed Wire Removal 40 17-E 324,297.0 4,091,973.9

*Horizontal Direct Distance (no surface condition considered); Round Up Site ID Site Description Work Type Length

(m)* Point X_Coord(m) Y_Coord(m)

18 By AVIM Hanger and VMF020 Intersection Fence Removal 118

18A-S 324,223.8 4,091,877.2 18A-E 324,218.6 4,091,991.9 18B-S 324,223.6 4,091,992.2 18B-E 324,225.3 4,091,992.3

19 Along 12th Street Fence Removal 167 19-S 323,027.1 4,092,835.5 19-E 323,094.6 4,092,967.7

20 CDC020 Perimeter Fence Fence Removal 631

20-S 321,920.5 4,092,453.9 20-M 321,919.3 4,092,400.7

C-Ave across from Charlies, Airfield Boundary

Fence Removal 72

21A-S 324,134.3 4,092,343.1 21A-E 324,152.5 4,092,317.5 21B-S 324,151.4 4,092,304.8 21B-E 324,166.8 4,092,269.9

22 West Gate

Removal of Fence, Jersey barriers, Nasatka Barriers, Guard Shacks and canopies, security traffic arms, signage, and associated components

1,500

22-S Work is in the vicity of:

322,598.5 4,092,204.6

22-E 322,601.8 4,092,213.8

*Horizontal Direct Distance (no surface condition considered); Round Up

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 250 days of receipt of

Notice of Award

N/A FAR EAST DISTRICT

WILLIAM BILLARD

UNIT #15546

APO AP 96205-5546

315-753-4970

WT4KCL

0002 Same N/A (SAME AS PREVIOUS LOCATION)

0003 Same N/A (SAME AS PREVIOUS LOCATION)

0004 Same N/A (SAME AS PREVIOUS LOCATION)

0005 Same N/A (SAME AS PREVIOUS LOCATION)

0006 Same N/A (SAME AS PREVIOUS LOCATION)

0007 N/A N/A (SAME AS PREVIOUS LOCATION)

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-6 Alt I Restrictions On Subcontractor Sales To The Government

(Sep 2006) -- Alternate I

OCT 1995

52.203-11 Certification And Disclosure Regarding Payments To Influence Certain Federal Transactions

SEP 2007

52.203-12 Limitation On Payments To Influence Certain Federal Transactions

OCT 2010

52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights

APR 2014

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper

MAY 2011

52.204-7 System for Award Management OCT 2016 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2016 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-17 Ownership or Control of Offeror JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.204-20 Predecessor of Offeror JUL 2016 52.209-2 Prohibition on Contracting with Inverted Domestic

Corporations--Representation

NOV 2015

52.209-5 Certification Regarding Responsibility Matters OCT 2015 52.209-7 Information Regarding Responsibility Matters JUL 2013 52.209-11 Representation by Corporations Regarding Delinquent Tax

Liability or a Felony Conviction under and Federal Law

FEB 2016

52.211-8 Alt I Time of Delivery (Jun 1997) Alternate I APR 1984 52.212-1 Instructions to Offerors--Commercial Items OCT 2016 52.212-2 Evaluation - Commercial Items OCT 2014 52.212-4 Contract Terms and Conditions--Commercial Items MAY 2015 52.222-25 Affirmative Action Compliance APR 1984 52.223-1 Biobased Product Certification MAY 2012 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts

SEP 2013

52.223-4 Recovered Material Certification MAY 2008 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-10 Waste Reduction Program MAY 2011 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

MAY 2008

52.223-19 Compliance with Environmental Management Systems MAY 2011 52.225-25 Prohibition on Contracting with Entities Engaging in Certain

Activities or Transactions Relating to Iran-- Representation and Certifications.

OCT 2015

52.228-3 Worker's Compensation Insurance (Defense Base Act) JUL 2014 52.228-4 Workers' Compensation and War-Hazard Insurance Overseas APR 1984 52.229-6 Taxes--Foreign Fixed-Price Contracts FEB 2013 52.232-1 Payments APR 1984 52.232-8 Discounts For Prompt Payment FEB 2002 52.232-9 Limitation On Withholding Of Payments APR 1984 52.232-11 Extras APR 1984

52.232-18 Availability Of Funds APR 1984 52.232-23 Assignment Of Claims MAY 2014 52.232-23 Alt I Assignment of Claims (May 2014) - Alternate I APR 1984 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-1 Disputes MAY 2014 52.233-1 Alt I Disputes (May 2014) - Alternate I DEC 1991 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-13 Accident Prevention NOV 1991 52.237-2 Protection Of Government Buildings, Equipment, And

Vegetation

APR 1984

52.242-13 Bankruptcy JUL 1995 52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.243-1 Alt I Changes--Fixed Price (Aug 1987) - Alternate I APR 1984 52.245-9 Use And Charges APR 2012 52.246-4 Inspection Of Services--Fixed Price AUG 1996 52.246-25 Limitation Of Liability--Services FEB 1997 52.247-27 Contract Not Affected by Oral Agreement APR 1984 52.247-34 F.O.B. Destination NOV 1991 52.249-2 Termination For Convenience Of The Government (Fixed-

Price)

APR 2012

52.249-8 Default (Fixed-Price Supply & Service) APR 1984 52.252-4 Alterations in Contract APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7000 Disclosure Of Information OCT 2016 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting

OCT 2016

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

MAY 2016

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism

OCT 2015

252.211-7007 Reporting of Government-Furnished Property AUG 2012 252.215-7008 Only One Offer OCT 2013 252.222-7002 Compliance With Local Labor Laws (Overseas) JUN 1997 252.222-7007 Representation Regarding Combating Trafficking in Persons JAN 2015

252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials

SEP 2014

252.225-7005 Identification Of Expenditures In The United States JUN 2005 252.225-7012 Preference For Certain Domestic Commodities AUG 2016 252.225-7041 Correspondence in English JUN 1997 252.225-7048 Export-Controlled Items JUN 2013 252.225-7050 Disclosure of Ownership or Control by the Government of a

Country that is a State Sponsor of Terrorism

OCT 2015

252.225-7993 (Dev) Prohibition on Providing Funds to the Enemy (Deviation 2015-O0016)

SEP 2015

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports

JUN 2012

252.232-7008 Assignment of Claims (Overseas) JUN 1997 252.232-7010 Levies on Contract Payments DEC 2006 252.233-7001 Choice of Law (Overseas) JUN 1997 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.237-7010 Prohibition on Interrogation of Detainees by Contractor

Personnel

JUN 2013

252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012

CLAUSES INCORPORATED BY FULL TEXT

52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (OCT 2016)

The Offeror shall complete only paragraph (b) of this provision if the Offeror has completed the annual representations and certification electronically via the System for Award Management (SAM) Web site located at https://www.sam.gov/portal. If the Offeror has not completed the annual representations and certifications electronically, the Offeror shall complete only paragraphs (c) through (s) of this provision.

(a) Definitions. As used in this provision --

“Economically disadvantaged women-owned small business (EDWOSB) Concern” means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127. It automatically qualifies as a women-owned small business eligible under the WOSB Program.

"Forced or indentured child labor" means all work or service-

(1) Exacted from any person under the age of 18 under the menace of any penalty for its nonperformance and for which the worker does not offer himself voluntarily; or

(2) Performed by any person under the age of 18 pursuant to a contract the enforcement of which can be accomplished by process or penalties.

“Highest-level owner” means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.

https://www.sam.gov/portal

“Immediate owner” means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.

“Inverted domestic corporation” means a foreign incorporated entity that meets the definition of an inverted domestic corporation under 6 U.S.C. 395(b), applied in accordance with the rules and definitions of 6 U.S.C. 395(c).

“Manufactured end product” means any end product in product and service codes (PSCs) 1000-9999, except--

(1) PSC 5510, Lumber and Related Basic Wood Materials;

(2) Product or Service Group (PSG) 87, Agricultural Supplies;

(3) PSG 88, Live Animals;

(4) PSG 89, Subsistence;

(5) PSC 9410, Crude Grades of Plant Materials;

(6) PSC 9430, Miscellaneous Crude Animal Products, Inedible;

(7) PSC 9440, Miscellaneous Crude Agricultural and Forestry Products;

(8) PSC 9610, Ores;

(9) PSC 9620, Minerals, Natural and Synthetic; and

(10) PSC 9630, Additive Metal Materials.

“Place of manufacture” means the place where an end product is assembled out of components, or otherwise made or processed from raw materials into the finished product that is to be provided to the Government. If a product is disassembled and reassembled, the place of reassembly is not the place of manufacture.

“Predecessor” means an entity that is replaced by a successor and includes any predecessors of the predecessor.

“Restricted business operations” means business operations in Sudan that include power production activities, mineral extraction activities, oil-related activities, or the production of military equipment, as those terms are defined in the Sudan Accountability and Divestment Act of 2007 (Pub. L. 110-174). Restricted business operations do not include business operations that the person (as that term is defined in Section 2 of the Sudan Accountability and Divestment Act of 2007) conducting the business can demonstrate--

(1) Are conducted under contract directly and exclusively with the regional government of southern Sudan;

(2) Are conducted pursuant to specific authorization from the Office of Foreign Assets Control in the Department of the Treasury, or are expressly exempted under Federal law from the requirement to be conducted under such authorization;

(3) Consist of providing goods or services to marginalized populations of Sudan;

(4) Consist of providing goods or services to an internationally recognized peacekeeping force or humanitarian organization;

(5) Consist of providing goods or services that are used only to promote health or education; or

(6) Have been voluntarily suspended.

Sensitive technology--

(1) Means hardware, software, telecommunications equipment, or any other technology that is to be used specifically--

(i) To restrict the free flow of unbiased information in Iran; or

(ii) To disrupt, monitor, or otherwise restrict speech of the people of Iran; and

(2) Does not include information or informational materials the export of which the President does not have the authority to regulate or prohibit pursuant to section 203(b)(3) of the International Emergency Economic Powers Act (50 U.S.C. 1702(b)(3)).

Service-disabled veteran-owned small business concern--

(1) Means a small business concern--

(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans; and

(ii) The management and daily business operations of which are controlled by one or more service-disabled veterans or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran.

(2) Service-disabled veteran means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16).

"Small business concern" means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR Part 121 and size standards in this solicitation.

“Small disadvantaged business concern”, consistent with 13 CFR 124.1002, means a small business concern under the size standard applicable to the acquisition, that--

(1) Is at least 51 percent unconditionally and directly owned (as defined at 13 CFR 124.105) by--

(i) One or more socially disadvantaged (as defined at 13 CFR 124.103) and economically disadvantaged (as defined at 13 CFR 124.104) individuals who are citizens of the United States; and

(ii) Each individual claiming economic disadvantage has a net worth not exceeding $750,000 after taking into account the applicable exclusions set forth at 13 CFR 124.104(c)(2); and

(2) The management and daily business operations of which are controlled (as defined at 13.CFR 124.106) by individuals, who meet the criteria in paragraphs (1)(i) and (ii) of this definition.

“Subsidiary” means an entity in which more than 50 percent of the entity is owned--

(1) Directly by a parent corporation; or

(2) Through another subsidiary of a parent corporation.

“Successor” means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger). The term “successor” does not include new offices/divisions of the same company or a company that only changes its name.

The extent of the responsibility of the successor for the liabilities of the predecessor may vary, depending on State law and specific circumstances.

“Veteran-owned small business concern” means a small business concern--

(1) Not less than 51 percent of which is owned by one or more veterans (as defined at 38 U.S.C. 101(2)) or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more veterans; and

(2) The management and daily business operations of which are controlled by one or more veterans.

"Women-owned business concern" means a concern which is at least 51 percent owned by one or more women; or in the case of any publicly owned business, at least 51 percent of the stock of which is owned by one or more women;

and whose management and daily business operations are controlled by one or more women.

"Women-owned small business concern" means a small business concern--

(1) That is at least 51 percent owned by one or more women or, in the case of any publicly owned business, at least 51 percent of its stock is owned by one or more women; or

(2) Whose management and daily business operations are controlled by one or more women.

“Women-owned small business (WOSB) concern eligible under the WOSB Program (in accordance with 13 CFR part 127)”, means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States.

(b) (1) Annual Representations and Certifications. Any changes provided by the offeror in paragraph (b)(2) of this provision do not automatically change the representations and certifications posted electronically on the SAM website.

(2) The offeror has completed the annual representations and certifications electronically via the SAM website accessed through https://www.acquisition.gov.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .