Performance Work Statement Summary

This Performance Work Statement (PWS) outlines requirements for DC Army National Guard (DC ARNG) Advanced Helicopter Hoist Operation Training Services. The contractor shall provide comprehensive, safety-oriented training for Initial, Intermediate, and Advanced Helicopter Hoist techniques over a single five-day concentrated training period (December 7-11, 2026) at the DC ARNG aviation facility. The training shall deliver 24+ flight hours and 14+ classroom/hangar instruction hours to prepare 12-14 total students—comprising 3 Instructor Pilots/Pilots in Command, 3 Pilots, 4 Hoist Operators, and 10 Rescue Specialists—for precision insertion and extraction maneuvers during inland rescue missions. Unlimited auditors are permitted during didactic and static phases. Services shall be performed on-site between 0730-1630 daily (adjusted for night operations as approved by the Contracting Officer Representative), with no telework authorized. The contractor must maintain a strict 6:1 student-to-instructor ratio during all practical instruction and comply with all installation security, safety, and regulatory requirements.

The contractor shall provide two certified Advanced Hoist Operations Instructors, all training equipment and courseware (including 3 dual-person hoist systems and 3 air rescue vests to be left with the unit post-training), training materials, and quality control measures. Training modules include Module 1 (Didactic—8+ hours covering helicopter operations safety, crew coordination, hazard identification, and hoist procedures), Module 2 (Static Skills—6+ hangar hours and 6+ flight briefing hours for equipment operation and emergency procedures), and Module 3 (Flight Operations—6+ hours daily across days 3-5 for live hoist training execution). The Government shall furnish mission-ready H-60 Blackhawk and H-72 Lakota helicopters, all fuel and maintenance, classroom and hangar space, and student personal protective equipment. The contractor shall submit a Quality Control Plan within 10 days post-award, issue course completion certificates to qualified students within 5 days of course end, and maintain daily flight/training logs. All travel-related costs are included in the firm-fixed-price training delivery cost with no separate travel reimbursement authorized.

View the file

Other files

File Type Posted
B8 Solicitation - W912R127QA008.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR DC ARNG ADVANCED HELICOPTER HOIST OPERATION TRAINING

SERVICES

1.0 General:

1.1 Scope:

The contractor shall provide all personnel, training materials, operational equipment, tools, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform advanced helicopter hoist operations training services as defined in this Performance Work Statement

(PWS).

1.1.1 Objectives:

The primary objective of this contract is to deliver detailed, safety-oriented training for the District of Columbia Army National Guard (DC ARNG) in support of Initial, Intermediate, and Advanced Helicopter Hoist techniques. This training shall prepare aircrew and rescue personnel for safe, precision insertion and extraction maneuvers during rescue missions of trauma victims (inland).

The class size shall consist of:

• Three (3) IP’s/PC’s

• Three (3) Pilots

• Four (4) HO/Hoist Operators

• Ten (10) HR/Rescue Specialists

• An unlimited number of "auditors" permitted during the Didactic and Static phases of the training program.

1.2 Background:

The DC ARNG requires specialized, high-intensity hoist operations training to maintain operational readiness, safety, and mission capabilities for domestic rescue operations and trauma victim extractions. The Hoist technique minimizes transition times and improves load control, which is critical for inland rescue operations in challenging terrain. This training ensures that aircrews are compliant with Army Aviation standards and are fully certified in basic, intermediate, and advanced hoist maneuvers.

1.3 Period of Performance (PoP):

The Period of Performance shall be a single, concentrated training period consisting of five (5) consecutive training days, delivering a total of twenty-four

(24+) or more flight hours and fourteen (14+) hours of classroom and hangar instruction. Proposed training dates shall be 7 December – 11 December 2026.

1.4 General Information:

1.4.1 Place and Performance of Services:

The contractor shall provide training services at the designated DC ARNG aviation facility/hangar and designated training areas. Services shall typically be performed between the hours of 0730 and 1630 daily, except when night-flying operations or specific flight profiles require adjusted hours as approved by the

COR. The contractor shall maintain an adequate workforce of qualified instructors for the uninterrupted performance of all training tasks. Teleworking is not authorized for this requirement.

1.4.1.1 Telework:

The Government does not permit the contractor to telework in support of this requirement, as all instruction (didactic, static, and flight) requires on-site, hands-on, and physical participation.

1.4.1.2 Delays and Security Checks:

Unscheduled gate closures by the Security Police may occur at any time, causing delays. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of motor vehicle regulations may result in the loss of installation driving privileges.

1.4.1.3 Base Regulations:

The contractor’s employees shall become familiar with and obey all installation regulations (fire, traffic, safety, and security) while on site. All contractor personnel shall always carry proper identification. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or overt evidence of communicable disease.

1.4.2 Recognized Holidays:

The contractor shall not perform training services on recognized United States

(US) federal holidays unless explicitly coordinated and agreed upon in writing by the KO and COR. The recognized holidays are:

• New Year’s Day: January 1st

• Martin Luther King, Jr.’s Birthday

• President’s Day

• Memorial Day

• Juneteenth National Independence Day: June 19th

• Independence Day: July 4th

• Labor Day

• Columbus Day

• Veteran’s Day: November 11th

• Thanksgiving Day

• Christmas Day: December 25th

1.4.3 Quality Control (QC):

The contractor shall develop and maintain an effective Quality Control Plan

(QCP) to ensure training safety and curriculum delivery standards are maintained. At a minimum, a 6:1 student-to-instructor ratio must be maintained during all practical instruction to ensure training safety. A final QCP shall be submitted to the COR NLT 10 days after contract award.

1.4.4 Quality Assurance (QA):

The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (AQL).

1.4.5 Installation Access and Security Requirements:

The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR.

The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by

Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy (see PWS 6.0). Should the Force Protection Condition

(FPCON) change, the Government may require changes in contractor security matters or processes.

1.4.5.1 For Contractors Requiring Common Access Card (CAC):

[Reserved. Given the short-term 5-day duration of this training event, CAC cards are not anticipated to be issued; contractor personnel shall be vetted and issued local visitor/base access passes for the duration of the performance period. If the

COR determines logical/physical network access is required, standard CAC procedures in the template shall apply.]

1.4.5.2 For Contractors That Do Not Require a CAC, but Require Access to a

DoD Facility or Installation:

The Contractor and all associated subcontractor employees shall comply with adjudication standards and procedures using the National Crime Information

Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database

(TSDB) (Army Directive 2014-05), and applicable installation, facility, and area commander installation/facility access, and local security policies and procedures

(provided by a Government representative).

1.4.5.3 Awareness Training (AT) Level 1:

All contractor employees, including subcontractor employees, requiring access to

Army installations, facilities, and controlled access areas shall complete AT Level

1 training within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 calendar days after completion of training by each employee or subcontractor personnel. AT Level 1 awareness training is available at: https://jko.jten.mil/courses/atl1/launch.html.

1.4.5.4 iWATCH Training:

The contractor and all associated subcontractors with an area of performance within an Army-controlled installation, facilities, or area shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Antiterrorism Officer (ATO)). This training shall be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or the KO. This training shall be completed within

30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each contractor employee and subcontractor employee to the COR within 15 calendar days after completion of training.

https://jko.jten.mil/courses/atl1/launch.html

1.4.5.5 Communications Security/Information Technology (COMSEC/IT)

Security:

All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. The contractor shall ensure wide and frequent dissemination of this information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network.

1.4.5.10 Protection of Personally Identifiable Information (PII):

The contractor shall protect all PII encountered in the performance of services in accordance with Defense Federal Acquisition Regulation Supplement (DFARS)

224.103 Personally Identifiable Information and Department of Defense Directive

(DoDD) 5400.11, Department of Defense Privacy Program, and DoD 5400.11-R.

1.4.5.11 OPSEC Training:

In accordance with AR 530-1, Operations Security, new contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each contractor employee to the COR within 15 calendar days after completion of training. Level 1 OPSEC training is available at https://securityawareness.usalearning.gov/opsec/index.htm.

1.4.5.12 OPSEC SOP/Plan:

[Reserved. A separate OPSEC plan is not required due to the non-sensitive, execution-focused nature of the flight training unless otherwise directed by the

Wing OPSEC manager.]

1.4.5.14 Threat Awareness and Reporting Program (TARP):

Per AR 381-12, Threat Awareness and Reporting Program (TARP), contractor employees with security clearances must receive annual TARP training by a counterintelligence (CI) agent or other trainer as specified in Chapter 2 Threat

Awareness and Education, Section II, paragraph 2-4b. The contractor shall identify annual TARP training, personnel trained, and date of training within 15 days of training completion.

1.4.6 Physical Security:

The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.

https://securityawareness.usalearning.gov/opsec/index.htm

1.4.7 Special Qualifications:

The contractor shall ensure that all instructors are certified Advanced Hoist

Operations Instructors with demonstrated expertise in military helicopter hoist operations. Instructors must have comprehensive knowledge of the Army

Aviation Rescue Hoist SOP, Army H-60 Rescue Hoist Training Support Package

(TSP), and relevant Airworthiness Releases (AWRs), including AWR 980 and

AWR 9.

1.4.8 Post Award Conference/Periodic Progress Meetings:

The contractor agrees to attend any post-award conference convened by the KO in accordance with FAR 42.5. The KO, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review performance.

Contractor attendance at these meetings shall be at no additional cost to the

Government.

1.4.9 Contract Manager (CM):

The contractor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The

CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation.

1.4.10 Identification of Contractor Employees:

All contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. Contractor personnel shall wear identification badges distinguishing themselves as such, displaying the company name, employee name, and the word “contractor”.

1.4.11 Combating Trafficking in Persons:

The United States Government has adopted a zero-tolerance policy regarding trafficking in persons. The contractor shall comply with FAR 22.17 and notify its employees of the actions that will be taken against them for violations.

1.4.12 Contractor Travel:

All travel-related costs (including lodging, meals, transport, and per diem) are included in the firm-fixed-price training course delivery cost. No separate travel reimbursement or travel CLIN is authorized under this contract.

1.4.13 Data Rights:

The Government has unlimited rights to all customized training plans, safety SOP checklists, and training evaluation reports produced under this contract. Standard proprietary contractor training methodologies and courseware remain the intellectual property of the contractor.

1.4.14 Organizational Conflicts of Interest (OCI):

The contractor shall notify the KO immediately if any actual or potential OCI is identified under FAR Subpart 9.5.

2.0 Definitions and Acronyms:

2.1 Definitions:

• Contractor: A supplier or vendor awarded a contract to provide specific supplies or services to the Government

• Defective Service: A service output that does not meet the standard of performance associated with the PWS.

• Deliverable: Anything that can be physically or electronically delivered, including certificates, reports, or logs.

• Hoist Operations: Hoist operations conducted while the aircraft is maneuvering or repositioning to facilitate insertion, extraction, load control, obstacle avoidance, or reduced hover exposure.

• Key Personnel: Contractor personnel evaluated in the source selection process (e.g., the Advanced Hoist Instructors).

• Physical Security: Actions that prevent the loss or damage of Government property.

• Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

• Quality Control: All necessary measures taken by the Contractor to ensure that the quality of service meets contract requirements.

2.2 Acronyms:

• ARNG: Army National Guard

• AT/OPSEC: Antiterrorism/Operations Security

• AWR: Airworthiness Release

• BI: Background Investigation

• CM: Contract Manager

• COR: Contracting Officer Representative

• CRM: Crew Resource Management

• DC ARNG: District of Columbia Army National Guard

• DEERS: Defense Enrollment Eligibility Reporting System

• EASA: European Union Aviation Safety Agency

• FAA: Federal Aviation Administration

• FPCON: Force Protection Condition

• GFE: Government Furnished Equipment

• GFP: Government Furnished Property

• HHO: Helicopter Hoist Operations

• HO: Hoist Operator

• HR: Helicopter Rescuer / Rescue Specialist

• KO: Contracting Officer

• PC: Pilot in Command / Pilot

• PPE: Personal Protective Equipment

• PRS: Performance Requirements Summary

• PWS: Performance Work Statement

• QA/QC: Quality Assurance / Quality Control

• RAPIDS: Real-Time Automated Personnel ID System

• SOP: Standard Operating Procedure

• TARP: Threat Awareness and Reporting Program

• TSP: Training Support Package

3.0 Government Furnished Property, Material, Equipment and Services

(GFP/M/E/S):

The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Aircraft and Support:

The DC ARNG shall provide fully airworthy, mission-ready helicopters equipped for hoist operations:

• H-60 Blackhawk (as scheduled for training modules).

• H-72 Lakota (as scheduled for training modules).

3.2 Fuel and Maintenance:

The Government shall provide all fuel, ground support, and routine/unscheduled aircraft maintenance required to execute the 24 + flight training hours.

3.3 Hangar and Classroom Space:

The Government shall furnish classroom workspace for the didactic portion of the training and hangar space for static skills instruction and dry-run training.

3.4 Student Personal Protective Equipment (PPE):

The Government/students shall provide all personal flight-certified gear, including:

• Flight Helmets

• Flight Suits

• Flight Gloves

• Communications Systems (compatible with the aircraft interphone system)

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General:

Except for those items specifically stated to be Government-Furnished in

Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

4.2 Training Instructors:

The Contractor shall provide two (2) certified Advanced Hoist Operations

Instructors to facilitate all classroom, hangar, and flight instruction.

4.3 Training Equipment and Courseware:

The contractor shall provide and transport all required training aids and specialized hoist operations equipment for the duration of the training at no additional cost. All operational equipment must comply with applicable Army Airworthiness Releases

(including AWR 980 and AWR 9) and the Army Aviation Rescue Hoist SOP.

Equipment includes but is not limited to:

Note: The stated equipment, 3 x 2 ups and 3 ARV-QC-M Air rescue vests will be left with the unit to assist the unit with continued readiness and continuity of training with AWR devices.

• 3 X 2 up dual person hoist system. * 3 - 2-ups will be left with the unit when training is complete.

• 3 X Air Rescue Vest (ARV QC). * 3 - ARV-QC-M will be left with the unit when training is complete.

• ARS Insertion / Extraction Harness

• 2 UP equalizer bars

• Hoist safety lanyards

• Hoist Gloves

• Cable Buddy System

• Back Anchor Redirect Tagline kits

• Hoist Hangar weights

5.0 Requirements:

The contractor shall deliver a comprehensive 5-day training program structured in sequential instructional modules to ensure safe task progression and mastery:

5.1 Training Modules:

5.1.1 Module 1: Didactic Training (Day 1 — 8+ Class Hours)

The contractor shall conduct classroom-based instruction covering theoretical concepts, safety guidelines, and operational dynamics. The curriculum must include:

• Helicopter Operations Safety

• Crew coordination concepts and application of CRM

• Crew duties and responsibilities

• Communications protocols and systems

• Hazard Identification (ID) and Risk Management

• Awareness of specific dangers relating to the operating environment

• On-Scene Checklists

• Aircraft Cabin management during hoist operations

• Physics of Hoist Load Control, including Acceleration of Gravity and Reaction

• Rotor Downwash and its impact on hoist operations

• Communications techniques for helicopter maneuvering during dynamic hoist operations

• Normal and Emergency Hoist procedures

• Hoist Operations Flight Profiles

5.1.2 Module 2: Static Skills Training & Initial Briefing (Day 2 — 6+ Hangar Hours

/ 6+ Flight/Briefing Hours)

The contractor shall deliver practical, hands-on hangar training utilizing stationary aircraft and hoist simulators. This module must cover:

• Operation of hoist equipment, pendant, and cable control

• Inspection of Fall Protection System & PPE for Aircrew

• Preparing the helicopter and equipment for hoist operations

• Standard and emergency static procedures

• Pilot/Crew cabin coordination concepts specific to hoist operations (open door and/or skid transition)

• Checklist execution and integration

• Operation of inter-communication and radio equipment

• Knowledge and use of emergency hoist equipment

• Rescuer-hook riding positions and techniques

• Rescuer cabin exit and entry (with and without simulated victims)

• Techniques for handling victims on the cable

• Tagline control procedures"

• Techniques for victim transition into the cabin

• Use of Fall Protection PPE for cabin transitions

• Hoist Cable Management

• Rescue equipment preflight and operational checks

5.1.3 Module 3: Flight Operations (Days 3-5 — 6+ Flight/Operational Hours per day)

The contractor shall conduct live flight training to implement and evaluate real-time hoist procedures. The live-flight training must complete 24 + total flight hours across the course and must instruct and test students on:

• Operations flight training for hoist/winch including normal and emergency procedures

• Aircraft movement, crew communications, and conning techniques

• Moving the aircraft to target and transitioning to and from hover at the target

• Live pendant and cable/load control

• Transitioning to live loads

• Basic and Intermediate Insertion/Extraction via Hoist

• Executing the Hoist Flight Profiles

• Ascending/Descending, "Fading and Circular", and "Backing-Reversal" Hoist

Profiles

• Techniques for expeditious recovery of rescuers and victims from the hoist cable into the aircraft cabin

• Single Person Hoist Extraction

• Dual Person Hoist Extraction maneuvers

• Tag line

• Confined area hoisting and rescue operations (victim extraction)

• Steep Slope and Canopy insertion/extraction (as required/applicable)

5.2 Student Certification:

Upon successful completion of the course curriculum and practical testing, the contractor shall issue certificates of training to each qualifying student. The certifications must verify that students have met the applicable requirements set forth in:

• EASA SPA 100 Human Hoist Operations (HHO)

• FAA 133D Human External Cargo (HEC)

• Transport Canada (CARS 722)

• Australian Civil Aviation Safety Authority (CAO 29.11)

• Compliance with the Army Aviation Rescue Hoist SOP and Army H-60

Rescue Hoist TSP.

5.3 Safety Management and Student-to-Instructor Ratio:

The contractor shall strictly maintain a maximum 6:1 student-to-instructor ratio during all static and flight phases to ensure optimal supervision and safety.

Instructors shall have the final authority to halt any training evolution if safety tolerances are exceeded or unsafe aircrew actions are observed.

5.4 Operational Coordination:

The contractor shall assist the DC ARNG in developing, updating, or reviewing local Standard Operating Procedures (SOPs), Standard Operating Guidelines

(SOGs), and checklist procedures for hoist operations to align with Hoist training.

6.0 Applicable Publications:

Publications applicable to this PWS are listed below:

Publication (Chapter/Page)

Date of Publication

Mandatory or Advisory

Website

Federal Acquisition Regulation

(FAR)

Current Mandatory https://www.acquisition.gov

Army Aviation Rescue Hoist

SOP

Current Mandatory Provided by Unit

Army H-60 & H72 Rescue Hoist Training Support Package (TSP)

Current Mandatory Provided by Unit https://www.acquisition.gov/

Airworthiness Release (AWR) 980 / 9

Current Mandatory Provided by Unit

Defense Federal Acquisition Regulation Supplement

(DFARS)

Current Mandatory https://www.acquisition.gov/dfars

Joint Travel Regulation

(JTR)

Current Advisory https://www.defensetravel.dod.mil

Army Directive 2014-05 (Common Access Card Credentialing)

03/07/2014 Mandatory https://armypubs.army.mil

AR 25-2

(Information Assurance)

04/04/2019 Mandatory https://armypubs.army.mil

AR 530-1

(Operations Security)

09/26/2014 Mandatory https://armypubs.army.mil

AR 381-12

(Threat Awareness and Reporting Program)

06/01/2016 Mandatory https://armypubs.army.mil

6.1 Applicable Forms:

Form Date Website

I-9 Employment Eligibility Verification

10/21/2019 https://www.uscis.gov https://www.acquisition.gov/dfars https://www.defensetravel.dod.mil/ https://armypubs.army.mil/ https://armypubs.army.mil/ https://armypubs.army.mil/ https://armypubs.army.mil/ https://www.uscis.gov/

DD 250 Material Inspection and Receiving Report

Aug 2000 https://www.esd.whs.mil/Directives/forms/ https://www.esd.whs.mil/Directives/forms/

TECHNICAL EXHIBIT 1 - Performance Requirements Summary (PRS)

Performance Objective

Performance Standard

Acceptable Quality Levels

(AQL)

Surveillance Method / By Whom

PWS 5.1:

Training Delivery & Safety Ratio

Contractor delivers the 5-day curriculum (Didactic, Static, Flight) maintaining a 6:1 student-to-instructor ratio.

100% compliance with safety ratios and module completion.

Direct Observation /

COR

PWS 5.1.3: Flight Training Execution

Contractor facilitates flight phases totaling 24+ flight hours of direct hoist instruction.

Minimum of 24 flight hours logged during the 5-day cycle.

Daily Flight Logs Review / COR

PWS 5.2:

Student Certification

Contractor issues standardized, compliant training certifications to students who pass performance checks.

100% of successful students certified within 5 days of course completion.

Documentation Audit / COR

PWS 1.4.3:

Quality Control Plan Submission

Contractor submits a final Quality Control Plan to the COR.

Submitted NLT 10 calendar days after contract award.

Direct Inspection /

COR & KO

TECHNICAL EXHIBIT 2 - Deliverables Schedule

PWS

Reference / Deliverable Title

Frequency Number of Copies

Medium/Format Submit To

1.4.3: Quality Control Plan

(QCP)

Once, NLT 10 days post-award

1 Electronic COR / KO

1.4.5.3: AT

Level 1 Training Certificates

Within 15 days of training completion

1 Electronic COR

1.4.5.4:

iWATCH Training Verification

Within 15 days of briefing completion

1 Electronic COR

1.4.5.11:

OPSEC

Training Certificates

Within 15 days of training completion

1 Electronic COR

5.1: Daily Flight/Training Log

Daily during training execution

1 Electronic/Paper COR

5.2: Course Completion Certificates

Within 5 calendar days of course end

1 Electronic / Hardcopy

COR &

Students

TECHNICAL EXHIBIT 3 - Estimated Workload Data

Item Description Estimated Quantity (Per Course)

1 Total Students Trained (Pilots, Hoist Operators, Rescuers)

12 - 14 Students

2 Class/Hangar Instructional Hours (Didactic + Static)

14+ Hours

3 Logged Flight Training Hours (H-60 and H-72)

24+ Hours

4 Training Course Duration

5 Consecutive Days

PERFORMANCE WORK STATEMENT (PWS)
FOR DC ARNG ADVANCED HELICOPTER HOIST OPERATION TRAINING SERVICES
1.0 General:
1.1 Scope:
1.1.1 Objectives:
1.2 Background:
1.3 Period of Performance (PoP):
1.4 General Information:
1.4.1 Place and Performance of Services:
1.4.1.1 Telework:
1.4.1.2 Delays and Security Checks:
1.4.1.3 Base Regulations:
1.4.2 Recognized Holidays:
1.4.3 Quality Control (QC):
1.4.4 Quality Assurance (QA):
1.4.5 Installation Access and Security Requirements:
1.4.5.1 For Contractors Requiring Common Access Card (CAC):
1.4.5.2 For Contractors That Do Not Require a CAC, but Require Access to a DoD Facility or Installation:
1.4.5.3 Awareness Training (AT) Level 1:
1.4.5.4 iWATCH Training:
1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security:
1.4.5.10 Protection of Personally Identifiable Information (PII):
1.4.5.11 OPSEC Training:
1.4.5.12 OPSEC SOP/Plan:
1.4.5.14 Threat Awareness and Reporting Program (TARP):
1.4.6 Physical Security:
1.4.7 Special Qualifications:
1.4.8 Post Award Conference/Periodic Progress Meetings:
1.4.9 Contract Manager (CM):
1.4.10 Identification of Contractor Employees:
1.4.11 Combating Trafficking in Persons:
1.4.12 Contractor Travel:
1.4.13 Data Rights:
1.4.14 Organizational Conflicts of Interest (OCI):
2.0 Definitions and Acronyms:
2.1 Definitions:
2.2 Acronyms:
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):
3.1 Aircraft and Support:
3.2 Fuel and Maintenance:
3.3 Hangar and Classroom Space:
3.4 Student Personal Protective Equipment (PPE):
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):
4.1 General:
4.2 Training Instructors:
4.3 Training Equipment and Courseware:
5.0 Requirements:
5.1 Training Modules:
5.1.1 Module 1: Didactic Training (Day 1 — 8+ Class Hours)
5.1.2 Module 2: Static Skills Training & Initial Briefing (Day 2 — 6+ Hangar Hours / 6+ Flight/Briefing Hours)
5.1.3 Module 3: Flight Operations (Days 3-5 — 6+ Flight/Operational Hours per day)
5.2 Student Certification:
5.3 Safety Management and Student-to-Instructor Ratio:
5.4 Operational Coordination:
6.0 Applicable Publications:
6.1 Applicable Forms:
TECHNICAL EXHIBIT 1 - Performance Requirements Summary (PRS)
TECHNICAL EXHIBIT 2 - Deliverables Schedule
TECHNICAL EXHIBIT 3 - Estimated Workload Data