About this file

This document is an Amendment 0001 to a Multiple Award Task Order Contract (MATOC) for the U.S. Army Corps of Engineers National Roofing Program (NRP), specifically covering roof replacement projects at three Army Reserve locations in Pennsylvania: PA060 in Lock Haven, PA176 in Danville, and one other location. The amendment includes updated wage determinations, changes to the proposal due date (now 15 August 2025 at 2:00 PM ET), and detailed specifications for roof replacement work.

The scope of work requires design-build contractors to replace existing roof systems using modified bitumen and shingle roofing. For PA060, this involves replacing 5,798 SF and 1,050 SF of EPDM roofing with modified bitumen systems. For PA176, the project covers roof replacements on the Training Center (60,545 SF of shingle, 1,681 SF of EPDM) and Vehicle Maintenance Facility (10,601 SF and 1,371 SF of shingle). Additional requirements include installing roof access ladders, splash blocks, removing 2-8 inches of existing insulation, and addressing any necessary deck repairs. The contractors must comply with UFC 3-110-03 Roofing standards and have a Registered Roof Consultant (RRC) with at least 10 years of roof repair experience.

View the file

Other files

File Type Posted
W912QR-51604662_NRP10-0002.pdf PDF
W912QR-51604662_NRP10-0000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912QR-51604662_NRP10-0001

FY25 NRP Project 10 PA060, 118 Pine Mountain Road, Lock Haven, PA

P2 565479

18-Jun-25

SECTION 01 11 50.00 06

Amendment 0001 Version CERTIFIED FINAL

SECTION

01 11 50.00 06

Task Order SCOPE OF WORK

6.18.25

Amendment 0001

1. PROJECT INFORMATION

1.1. GENERAL

Design/Build: The Contractor shall provide all labor, equipment, supplies, and consultant services and all site investigations, surveys, analysis, sampling, testing and verification of existing field conditions as required for design and construction of the Roof Replacement Project at

PA060 to result in a complete and useable Facility. Contractor shall provide complete design analysis incorporating all engineering computations, analysis, test, and survey results, building code (including fire protection, life safety, environmental and accessibility) review as it pertains/affects/relates to this project, equipment and material data and documentation of existing conditions.

1.2. SCOPE OF WORK

Unless specifically noted otherwise in this Specification Section or in the base MATOC contract Volume 1 of 2 itself, all requirements of the base

MATOC contract Volume 1 of 2 shall apply to this Task Order. The work includes design and construction to replace the following roof systems located at PA060:

Building RFID (SF) Section(s) Existing Roof System

AMSA (5,798 SF) 1 EPDM

AMSA (1,050 SF) 2 EPDM

Design/Build: Design and construction shall comply with the requirements contained in this Task Order Request for Proposal (RFP). The design and technical criteria contained and cited in this RFP and the Unified

Facilities Guide Specifications (UFGS) establish minimum standards for design and construction quality. The Designers of Record shall use the

Unified Facilities Guide Specifications (UFGS) and the requirements contained in this RFP to fully develop the technical specifications and construction drawings. The objective of this solicitation is to obtain an energy efficient, durable, maintainable, and sustainable space.

Design/Build: The illustrations and exhibits included in this RFP illustrate the conceptual design of the project and are provided to define the scope of work and budget. The concepts provided shall be further developed by the Design/Build Contractor to comply with the customer’s functional needs.

P2 565479

18-Jun-25

SECTION 01 11 50.00 06

Amendment 0001 Version CERTIFIED FINAL

All demolition required to construct the project is included as part of the work of this Contract.

1.3. SITE LOCATION

This project is located at 118 Pine Mountain Road, Lock Haven, PA.

1.4. EXISTING SITE UTILITIES

1.4.1. The contractor shall verify the location of all utilities serving the building. Upgrading the existing utilities, (unless noted otherwise) outside the limits of construction, is not a part of this project.

1.5. BID OPTIONS

1.6. NOT USED

1.7. ATTACHMENTS

Design/Build: Information provided in the Attachments is intended to guide the completion of the design by establishing existing conditions, and the desired character, appearance, and function of the new construction. The following Attachments are included and shall be used and strictly adhered-to in completing the design and construction of the project.

a. ATTACHMENT A: Site Location

b. ATTACHMENT B: Building Layout Plans

c. ATTACHMENT C: Site Inspection Report, 1-Nov-24

1.8. NOT USED

1.9. NOT USED

1.10. NOT USED

1.11. NOT USED

1.12. NOT USED

1.13. NOT USED

1.14. PERSONNEL REQUIREMENTS AND QUALIFICATIONS

1.15. Registered Roof Consultant (RRC) (Designer of Record) shall have a degree in Architecture or Engineering and have at least ten (10) years of experience in roof repairs. The RRC must be currently licensed by the International Institute of Building Envelope Enclosures

(IIBEC).

P2 565479

18-Jun-25

SECTION 01 11 50.00 06

Amendment 0001 Version CERTIFIED FINAL

1.16. NOT USED

1.17. NOT USED

1.18. NOT USED

1.19. NOT USED

2. DESIGN REQUIREMENTS

2.1. GENERAL

The Contractor shall prepare complete construction documents for all work designed as required by the RFP. The construction documents to be prepared shall include, but are not limited to, construction drawings, specifications, submittals, and design analysis as required in Section 01

33 16.00 10 DESIGN DATA (DESIGN AFTER AWARD), Volume 1. Materials and equipment shall be limited to those specified except that where no specific material and equipment is specified or no basis of design is identified, the Contractor shall use materials and equipment accepted within the construction industry and in compliance with Design Criteria.

2.2. DESIGN

2.2.1. The Contractor shall prepare a 100% design for the project in accordance with the RFP using industry standard materials and efficient practices. The design of the materials selected shall be high quality, durable and easily maintained. The Contractor shall be responsible for the professional quality, code compliance, technical accuracy, and coordination of all designs, drawings, specifications, and other documents or publications upon which the design and construction are based. It shall be the responsibility of the Design/

Build Contractor to verify the accuracy of the documents provided.

2.2.2 CAD/BIM Requirement

The contractor will not be required to produce advanced modeling and design drawings will be limited to CAD files.

2.2.3 Design Submittal Requirements

The contractor will not be required to produce charette or interim design submittals. The contractor will submit a final design, a corrected final design, and a certified final design. The independent

Registered Roof Observer (RRO) identified under Section 01 11 00.00 06

Paragraph 3.3.2.3 shall review the final design as part of the contractor design QC review team. The RRO shall attend the final design plan-in-hand review meeting.

2.1.4 Design Professionals

SECTION 01 11 50.00 06

Amendment 0001 Version CERTIFIED FINAL

FY25 NRP Project 10 PA060, 118 Pine Mountain Road, Lock Haven, PA

P2 565479

18-Jun-25

General Scope of work for most task orders will be for roof replacement and exterior water proofing with associated work. Roof replacement design will be certified by a RRC and have a professional engineer or architectural stamp. Structural analysis will only be required if there is a change in the dead load for the structural system or if called out in the task order scope of work. Electrical and mechanical design will be limited to relocating existing systems.

2.2.2. Design Milestone Schedule

Notice to Proceed (NTP) Day 0

Design Quality Control Plan (DQCP) NTP + 28 Days

Charette Report (FIO no review) NTP + 74 Days

Interim Submittal (FIO no review) NTP + 104 Days

Final Submittal NTP + 134 Days

Final Plan in Hand Meeting (on-site) NTP + 152 Days

Corrected Final Submittal NTP + 166 Days

Certified Final Submittal NTP + 174 Days

2.3. REQUEST FOR PROPOSAL (RFP) INTENT

The intent of this RFP section is to describe the requirements for appearance, function, materials, and types of construction in sufficient detail to enable engineering and design to be completed by the Contractor.

2.4. Design Milestone Meetings

2.4.1. Charette / Kickoff Meeting

2.4.1.1. Shall be in person and on-site.

2.4.2. Final Design / Plan-in-hand Review Meeting

2.4.2.1. Shall be in person and on-site.

2.5. NOT USED

2.6. NOT USED

2.7. NOT USED

2.8. NOT USED

2.9. NOT USED

2.10. NOT USED

2.11. Insert any additional REQUIRED DESIGN PROFESSIONALS beyond RRC

2.12. GOVERNMENT FURNISHED MATERIALS

P2 565479

18-Jun-25

SECTION 01 11 50.00 06

Amendment 0001 Version CERTIFIED FINAL

2.12.1. GFM Handover

The GFM has been provided as part of the Solicitation package.

2.12.2. GFM File Formats

GFM are provided only in PDF format.

2.13. (See Paragraph 2.1 Section 01 11 00.00 06 )DESIGN SUBMITTAL

DISTRIBUTION MATRIX

Submittal Reviewers & Mailing Addresses

U.S. Army Corps of Engineers

Ryan Fagan

Ryan.a.fagan@usace.army.mil

LRL-ED-MA Room 414

600 Doctor Martin Luther King Junior Place

Louisville, KY 40202

U.S. Army Corps of Engineers

Timothy M. McClellan, P.E., RRC

Timothy.m.mcclellan@usace.army.mil

LRL-ED-MA Room 414

600 Doctor Martin Luther King Junior Place

Louisville, KY 40202

U.S. Army Corps of Engineers

Michael Brooks

Michael.s.brooks@usace.army.mil

LRL-CDR

600 Doctor Martin Luther King Junior Place

Louisville, KY 40202

U.S. Army Corps of Engineers

Jeffrey E. Bayers, P.E., P.M.P.

Jeffrey.e.bayers@usace.army.mil

LRL-PM-R

600 Doctor Martin Luther King Junior Place

Louisville, KY 40202

Steve Coffey, PE

USARC G 3/5/7 Engineers - Desk 4N-4001-62

4700 Knox Street, Bldg 8-8108

Ft. Bragg, NC 28310

Phone: 910-570-8961

Email: steven.w.coffey3.civ@army.mil

W912QR-51604662_NRP10-0001

mailto:Timothy.m.mcclellan@usace.army.mil mailto:Michael.s.brooks@usace.army.mil mailto:Jeffrey.e.bayers@usace.army.mil mailto:steven.w.coffey3.civ@army.mil

P2 565479

18-Jun-25

SECTION 01 11 50.00 06

Amendment 0001 Version CERTIFIED FINAL

Justin Reeder, PE, RRC, RRO, CDT

USARC-ARIMD Engineering Branch / SAIN Engineering

USAR National Roofing Program REM

Phone: 843.813.2423

Email: justin.reeder@saineng.com

US Army Corps of Engineers – Wright Patterson Resident Office

John Hearn john.p.hearn@usace.army.mil

Supervisory Construction Control Rep, COR

LRL CDSO Chairman OSHA SGE

2475 K Street Bldg. 52

WPAFB OH 45433

Bill Markey

99th RSC RFOS

Phone: 609-997-5271

Email: WILLIAM.F.MARKEY4.COV@ARMY.MIL

Mr Scott W. Kawski

CIV, 99th RD/DPW

Regional Facilities Operations Specialist

Phone: 910.656.0251

Work Mobile: 609.744.1123

Mobile: 814-392-6879

Fax: 910.656.0291

Email: scott.w.kawski.civ@army.mil

3. GENERAL CONSTRUCTION REQUIREMENTS

3.1. SUMMARY

3.1.1. The requirements include:

a. Construction considerations and use of the premises.

b. Protection of personnel and Government property.

c. Construction facilities and job site standards.

d. The requirements of this section apply to the entire project including all amendments or modifications that may be issued to modify the contract documents.

3.2. GENERAL INFORMATION

3.2.1. NOT USED

3.2.2. NOT USED

3.2.3. Coordinate all construction activities with:

a. Contracting Officer’s Representative

b. Base Fire Department

W912QR-51604662_NRP10-0001

mailto:justin.reeder@saineng.com mailto:WILLIAM.F.MARKEY4.COV@ARMY.MIL mailto:scott.w.kawski.civ@army.mil

P2 565479

18-Jun-25

SECTION 01 11 50.00 06

Amendment 0001 Version CERTIFIED FINAL

c. Base Security/Police

d. Base Civil Engineer

e. Building Occupants

3.2.4. NOT USED

3.2.5. NOT USED

3.2.6. NOT USED

3.2.7. NOT USED

3.2.8. NOT USED

3.2.9. Project and Safety Signs. See 01 50 00, Paragraph 2.1.3.

3.3. DOCUMENTATION

3.3.1. NOT USED

3.3.2. NOT USED

3.4. NOT USED

3.5. Work Schedule under Section 01 11 00.00 06 Paragraph 3.9.1.2 is changed to “Work S WORK SCHEDULE: The Contractor shall schedule the work between the hours of 7:00 a.m. and 4:30 p.m. Monday through

Friday. No work on Federal Holidays. No work on drill weekends.

3.5.1. Permission to perform any work outside of these hours must be in writing and submitted five (5) calendar days in advance for approval by the Contracting Officer.

3.5.2. The Government may or may not grant such permission at its discretion.

3.6. Contractor Personal Vehicle Parking under Section 01 11 00.00 06

Paragraph 3.9.1.7 is changed to Contractor Personal Vehicle Parking:

The contractor may use a limited number of parking spaces in the existing lots for the contractor’s employee parking of personal vehicles. The Contractor shall coordinate with the Government on the exact number of available spaces, and shall make provisions to transport employees to the site should inadequate parking spaces be available on site. Parking in these areas is available on a first-come first served basis.

4. NOT USED

5. NOT USED

6. EXTERIOR EQUIPMENT

P2 565479

18-Jun-25

SECTION 01 11 50.00 06

Amendment 0001 Version CERTIFIED FINAL

6.1. NOT USED

Amendment 0001****************************************************************

7. ARCHITECTURAL / BUILDING ENVELOPE

7.1. 600 LF of exterior sealant at the AMSA.

7.2. Masonry chimney to be removed below deck prior to installation of new roof.

*************************************************************** Amendment 0001

8. NOT USED

9. NOT USED

10. NOT USED

11. NOT USED

12. NOT USED

13. NOT USED

14. Roof System

Roof system installed shall comply with UFC 3-110-03 Roofing, with

Change 5, or the latest version available. Where they do not existing contractor shall install roof access ladders from the ground to roof and between roof sections to allow access to all sections.

Contractors shall install new splash blocks at all downspout terminations.

Contractor bids shall include removal of 2-8 inches of insulation.

Existing roof systems may be multi-layered with differing roof system types below the surface membrane. Contractor is responsible for identifying all equipment mounted directly below the deck and to utilize a connection method that either avoids the deck or relocates equipment in a way that complies with current building codes.

Modified Bitumen systems shall be three ply systems

Building RFID (SF) Section(s) New Roof System

AMSA (5,798 SF) 1 MOD BIT

AMSA (1,050 SF) 2 MOD BIT

14.1. BUILDING

P2 565479

18-Jun-25

SECTION 01 11 50.00 06

Amendment 0001 Version CERTIFIED FINAL

14.2 ROOF DECK REPAIR

Inspect the roof deck carefully. If there are roof deck areas which require repair or replacement, notify the Contracting Officer. Do not proceed with repair or replacement until directed by the Contracting

Officer. Assume replacement up to 10% damaged decking and 50% wood nailers.

--End of Section --

PA176, 112 Liberty Ave Danville, PA

P2 565479

18-Jun-25

SECTION 01 11 50.00 06

Amendment 0001 Version CERTIFIED FINAL

SECTION

01 11 50.00 06

Task Order SCOPE OF WORK

6.18.25

Amendment 0001

1. PROJECT INFORMATION

1.1. GENERAL

Design/Build: The Contractor shall provide all labor, equipment, supplies, and consultant services and all site investigations, surveys, analysis, sampling, testing and verification of existing field conditions as required for design and construction of the Roof Replacement Project at

PA176 to result in a complete and useable Facility. Contractor shall provide complete design analysis incorporating all engineering computations, analysis, test, and survey results, building code (including fire protection, life safety, environmental and accessibility) review as it pertains/affects/relates to this project, equipment and material data and documentation of existing conditions.

1.2. SCOPE OF WORK

Unless specifically noted otherwise in this Specification Section or in the base MATOC contract Volume 1 of 2 itself, all requirements of the base

MATOC contract Volume 1 of 2 shall apply to this Task Order. The work includes design and construction to replace the following roof systems located at PA176:

Building RFID (SF) Section(s) Existing Roof System

TRAINING CENTER

(60,545 SF)

1 SHINGLE

TRAINING CENTER

(1,681 SF)

2 EPDM

VMF(10,601 SF) 1 SHINGLE

VMF(1,371 SF) 2 SHINGLE

Design/Build: Design and construction shall comply with the requirements contained in this Task Order Request for Proposal (RFP). The design and technical criteria contained and cited in this RFP and the Unified

Facilities Guide Specifications (UFGS) establish minimum standards for design and construction quality. The Designers of Record shall use the

Unified Facilities Guide Specifications (UFGS) and the requirements contained in this RFP to fully develop the technical specifications and construction drawings. The objective of this solicitation is to obtain an energy efficient, durable, maintainable, and sustainable space.

Design/Build: The illustrations and exhibits included in this RFP illustrate the conceptual design of the project and are provided to define the scope of work and budget. The concepts provided shall be further

P2 565479

18-Jun-25

SECTION 01 11 50.00 06

Amendment 0001 Version CERTIFIED FINAL developed by the Design/Build Contractor to comply with the customer’s functional needs.

All demolition required to construct the project is included as part of the work of this Contract.

1.3. SITE LOCATION

This project is located at 112 Liberty Ave Danville, PA.

1.4. EXISTING SITE UTILITIES

1.4.1. The contractor shall verify the location of all utilities serving the building. Upgrading the existing utilities, (unless noted otherwise) outside the limits of construction, is not a part of this project.

1.5. BID OPTIONS

1.6. NOT USED

1.7. ATTACHMENTS

Design/Build: Information provided in the Attachments is intended to guide the completion of the design by establishing existing conditions, and the desired character, appearance, and function of the new construction. The following Attachments are included and shall be used and strictly adhered-to in completing the design and construction of the project.

a. ATTACHMENT A: Site Location

b. ATTACHMENT B: Building Layout Plans

c. ATTACHMENT C: Site Inspection Report, 1-Nov-24

1.8. NOT USED

1.9. NOT USED

1.10. NOT USED

1.11. NOT USED

1.12. NOT USED

1.13. NOT USED

1.14. PERSONNEL REQUIREMENTS AND QUALIFICATIONS

1.15. Registered Roof Consultant (RRC) (Designer of Record) shall have a degree in Architecture or Engineering and have at least ten (10) years of experience in roof repairs. The RRC must be currently

P2 565479

18-Jun-25

SECTION 01 11 50.00 06

Amendment 0001 Version CERTIFIED FINAL licensed by the International Institute of Building Envelope Enclosures

(IIBEC).

1.16. NOT USED

1.17. NOT USED

1.18. NOT USED

1.19. NOT USED

2. DESIGN REQUIREMENTS

2.1. GENERAL

The Contractor shall prepare complete construction documents for all work designed as required by the RFP. The construction documents to be prepared shall include, but are not limited to, construction drawings, specifications, submittals, and design analysis as required in Section 01

33 16.00 10 DESIGN DATA (DESIGN AFTER AWARD), Volume 1. Materials and equipment shall be limited to those specified except that where no specific material and equipment is specified or no basis of design is identified, the Contractor shall use materials and equipment accepted within the construction industry and in compliance with Design Criteria.

2.2. DESIGN

2.2.1. The Contractor shall prepare a 100% design for the project in accordance with the RFP using industry standard materials and efficient practices. The design of the materials selected shall be high quality, durable and easily maintained. The Contractor shall be responsible for the professional quality, code compliance, technical accuracy, and coordination of all designs, drawings, specifications, and other documents or publications upon which the design and construction are based. It shall be the responsibility of the Design/

Build Contractor to verify the accuracy of the documents provided.

2.2.2 CAD/BIM Requirement

The contractor will not be required to produce advanced modeling and design drawings will be limited to CAD files.

2.2.3 Design Submittal Requirements

The contractor will not be required to produce charette or interim design submittals. The contractor will submit a final design, a corrected final design, and a certified final design. The independent

Registered Roof Observer (RRO) identified under Section 01 11 00.00 06

Paragraph 3.3..2.3 shall review the final design as part of the contractor design QC review team. The RRO shall attend the final design plan-in-hand review meeting.

SECTION 01 11 50.00 06

Amendment 0001 Version CERTIFIED FINAL

FY25 NRP Project 10 PA176, 112 Liberty Ave Danville, PA

P2 565479

18-Jun-25

2.1.4 Design Professionals

General Scope of work for most task orders will be for roof replacement and exterior water proofing with associated work. Roof replacement design will be certified by a RRC and have a professional engineer or architectural stamp. Structural analysis will only be required if there is a change in the dead load for the structural system or if called out in the task order scope of work. Electrical and mechanical design will be limited to relocating existing systems.

2.2.2. Design Milestone Schedule

Notice to Proceed (NTP) Day 0

Design Quality Control Plan (DQCP) NTP + 42 Days

Charette Report (FIO no review) NTP + 88 Days

Interim Submittal (FIO no review) NTP + 118 Days

Final Submittal NTP + 148 Days

Final Plan in Hand Meeting (on-site) NTP + 166 Days

Corrected Final Submittal NTP + 180 Days

Certified Final Submittal NTP + 188 Days

2.3. REQUEST FOR PROPOSAL (RFP) INTENT

The intent of this RFP section is to describe the requirements for appearance, function, materials, and types of construction in sufficient detail to enable engineering and design to be completed by the Contractor.

2.4. Design Milestone Meetings

2.4.1. Charette / Kickoff Meeting

2.4.1.1. Shall be in person and on-site.

2.4.2. Final Design / Plan-in-hand Review Meeting

2.4.2.1. Shall be in person and on-site.

2.5. NOT USED

2.6. NOT USED

2.7. NOT USED

2.8. NOT USED

2.9. NOT USED

2.10. NOT USED

2.11. NOT USED

P2 565479

18-Jun-25

SECTION 01 11 50.00 06

Amendment 0001 Version CERTIFIED FINAL

2.12. GOVERNMENT FURNISHED MATERIALS

2.12.1. GFM Handover

The GFM has been provided as part of the Solicitation package.

2.12.2. GFM File Formats

GFM are provided only in PDF format.

2.13. (See Paragraph 2.1 Section 01 11 00.00 06 )DESIGN SUBMITTAL

DISTRIBUTION MATRIX

Submittal Reviewers & Mailing Addresses

U.S. Army Corps of Engineers

Ryan Fagan

Ryan.a.fagan@usace.army.mil

LRL-ED-MA Room 414

600 Doctor Martin Luther King Junior Place

Louisville, KY 40202

U.S. Army Corps of Engineers

Timothy M. McClellan, P.E., RRC

Timothy.m.mcclellan@usace.army.mil

LRL-ED-MA Room 414

600 Doctor Martin Luther King Junior Place

Louisville, KY 40202

U.S. Army Corps of Engineers

Michael Brooks

Michael.s.brooks@usace.army.mil

LRL-CDR

600 Doctor Martin Luther King Junior Place

Louisville, KY 40202

U.S. Army Corps of Engineers

Jeffrey E. Bayers, P.E., P.M.P.

Jeffrey.e.bayers@usace.army.mil

LRL-PM-R

600 Doctor Martin Luther King Junior Place

Louisville, KY 40202

Steve Coffey, PE

USARC G 3/5/7 Engineers - Desk 4N-4001-62

4700 Knox Street, Bldg 8-8108

Ft. Bragg, NC 28310

Phone: 910-570-8961

W912QR-51604662_NRP10-0001

mailto:Timothy.m.mcclellan@usace.army.mil mailto:Michael.s.brooks@usace.army.mil mailto:Jeffrey.e.bayers@usace.army.mil

P2 565479

18-Jun-25

SECTION 01 11 50.00 06

Amendment 0001 Version CERTIFIED FINAL

Email: steven.w.coffey3.civ@army.mil

Justin Reeder, PE, RRC, RRO, CDT

USARC-ARIMD Engineering Branch / SAIN Engineering

USAR National Roofing Program REM

Phone: 843.813.2423

Email: justin.reeder@saineng.com

US Army Corps of Engineers – Wright Patterson Resident Office

John Hearn john.p.hearn@usace.army.mil

Supervisory Construction Control Rep, COR

LRL CDSO Chairman OSHA SGE

2475 K Street Bldg. 52

WPAFB OH 45433

Bill Markey

99th RSC RFOS

Phone: 609-997-5271

Email: WILLIAM.F.MARKEY4.COV@ARMY.MIL

Mr Scott W. Kawski

CIV, 99th RD/DPW

Regional Facilities Operations Specialist

Phone: 910.656.0251

Work Mobile: 609.744.1123

Mobile: 814-392-6879

Fax: 910.656.0291

Email: scott.w.kawski.civ@army.mil

3. GENERAL CONSTRUCTION REQUIREMENTS

3.1. SUMMARY

3.1.1. The requirements include:

a. Construction considerations and use of the premises.

b. Protection of personnel and Government property.

c. Construction facilities and job site standards.

d. The requirements of this section apply to the entire project including all amendments or modifications that may be issued to modify the contract documents.

3.2. GENERAL INFORMATION

3.2.1. NOT USED

W912QR-51604662_NRP10-0001

mailto:steven.w.coffey3.civ@army.mil mailto:justin.reeder@saineng.com mailto:WILLIAM.F.MARKEY4.COV@ARMY.MIL

P2 565479

18-Jun-25

SECTION 01 11 50.00 06

Amendment 0001 Version CERTIFIED FINAL

3.2.2. NOT USED

3.2.3. Coordinate all construction activities with:

a. Contracting Officer’s Representative

b. Base Fire Department

c. Base Security/Police

d. Base Civil Engineer

e. Building Occupants

3.2.4. NOT USED

3.2.5. NOT USED

3.2.6. NOT USED

3.2.7. NOT USED

3.2.8. NOT USED

3.2.9. Project and Safety Signs. See 01 50 00, Paragraph 2.1.3.

3.3. DOCUMENTATION

3.3.1. NOT USED

3.3.2. NOT USED

3.4. NOT USED

3.5. Work Schedule under Section 01 11 00.00 06 Paragraph 3.9.1.2 is changed to “Work S WORK SCHEDULE: The Contractor shall schedule the work between the hours of 7:00 a.m. and 4:30 p.m. Monday through

Friday. No work on Federal Holidays. No work on drill weekends.

3.5.1. Permission to perform any work outside of these hours must be in writing and submitted five (5) calendar days in advance for approval by the Contracting Officer.

3.5.2. The Government may or may not grant such permission at its discretion.

3.6. Contractor Personal Vehicle Parking under Section 01 11 00.00 06

Paragraph 3.9.1.7 is changed to Contractor Personal Vehicle Parking:

The contractor may use a limited number of parking spaces in the existing lots for the contractor’s employee parking of personal vehicles. The Contractor shall coordinate with the Government on the exact number of available spaces, and shall make provisions to transport employees to the site should inadequate parking spaces be available on site. Parking in these areas is available on a first-come first served basis.

P2 565479

18-Jun-25

SECTION 01 11 50.00 06

Amendment 0001 Version CERTIFIED FINAL

4. NOT USED

5. NOT USED

6. EXTERIOR EQUIPMENT

6.1. NOT USED

7. ARCHITECTURAL / BUILDING ENVELOPE

7.1. 2500 LF of exterior sealant at the Training Center.

7.2. Contractor to provide a 20 year NDL metal panel wall system covering for walls that transition from a lower roof section to a higher roof section. Approximately 220 SF.

7.3. Hand nail all shingles. No pneumatic, battery and/or power actuated tools shall be used for shingle installation.

8. NOT USED

9. NOT USED

10. NOT USED

11. NOT USED

12. NOT USED

13. NOT USED

14. Roof System

Roof system installed shall comply with UFC 3-110-03 Roofing, with

Change 5, or the latest version available. Where they do not existing contractor shall install roof access ladders from the ground to roof and between roof sections to allow access to all sections.

Contractors shall install new splash blocks at all downspout terminations.

Contractor bids shall include removal of 2-8 inches of insulation.

Existing roof systems may be multi-layered with differing roof system types below the surface membrane. Contractor is responsible for identifying all equipment mounted directly below the deck and to utilize a connection method that either avoids the deck or relocates equipment in a way that complies with current building codes.

Modified Bitumen systems shall be three ply systems

Building RFID (SF) Section(s) New Roof System

TRAINING CENTER

(60,545 SF)

1 SHINGLE

P2 565479

18-Jun-25

SECTION 01 11 50.00 06

Amendment 0001 Version CERTIFIED FINAL

TRAINING CENTER

(1,681 SF)

2 MOD BIT

VMF(10,601 SF) 1 SHINGLE

VMF(1,371 SF) 2 SHINGLE

Amendment 0001****************************************************************

14.1. BUILDING

14.1.1. Clean soffit around the entire USARC (Training Center) to remove stains on soffit. Soffit is to remain in place, and restored/painted to like new condition as necessary. Replace pieces of soffit only as needed.

14.1.2. Add snow guards to shingle roof around the entire USARC

(training Center) and VMF.

14.1.3. LP System needs reinstalled. – check base MATOC

****************************************************************Amendment 0001

14.2 ROOF DECK REPAIR

Inspect the roof deck carefully. If there are roof deck areas which require repair or replacement, notify the Contracting Officer. Do not proceed with repair or replacement until directed by the Contracting

Officer. Assume replacement up to 10% damaged decking and 50% wood nailers.

--End of Section --

MATOC Letter
Summary of Changes
General Decision Number: PA20250076 08/01/2025
General Decision Number: PA20250100 08/01/2025