W912QR-31669889_NRP09-0000.pdf
PDF 24 MB Posted
- Attached to
- National Roofing Program FY23 - Project #9
- Solicitation number
- W912QR-31669889
About this file
This document outlines a federal contract opportunity for roofing services. The solicitation number is W912QR-31669889 and is for the National Roofing Program FY23 Project #9 being conducted by the Department of the Army Corps of Engineers Engineering District Louisville. Interested parties are invited to bid on roofing work that includes repairing, replacing, and maintaining roofs at various government facilities throughout the district. The deadline to submit bids is not specified in the document provided but responses are typically due 30-60 days from posting of the solicitation. The contract is set to be awarded by September 2023 and will have a one year base period of performance with options to extend for up to three additional years.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912QR-31669889_NRP09-0004.pdf | ||
| W912QR-31669889_NRP09-0003.pdf | ||
| W912QR-31669889_NRP09-0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Army Reserve National Roofing Program FY23 Task Order 9
P2: 507756 Design-Build
Volume A – VA024, Fort Eustis, VA Volume B – VA050, Richmond, VA
13 July 2023
W912QR-31669889
MATOC W912QR20D0014 thru 0020
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR-31669889_NRP09-0000
DEPARTMENT OF THE ARMY
LOUISVILLE DISTRICT, CORPS OF ENGINEERS
P.O. BOX 59
LOUISVILLE,KENTUCKY 40201-0059
REPLY T O
ATTENTION OF
Contracting Division 1 July 2023
AR6-Cram/REI Brazos/REI Curtis-McKinley/REI Pacific/Conley/REI/AMTECH Tabcon/MECA Legacy/Terracon
Dear MATOC Contractors:
Reference is made to your Indefinite Delivery Contracts, Numbers W912QR20D0014 - W912QR20D0020, Design Build Multiple Award Task Order Contract (MATOC) for Building Envelope, Roof Repair and Replacement Construction in Support of U.S. Army Reserve National Roofing Program (NRP), Army, and Air Force Reserves Sections.
We request you submit a price proposal for design and construction services required to repair roofs at Ft. Eustis and Richmond, VA; FAC IDs VA024 and VA050, as detailed in the scope of work, drawings, and specifications posted at the System for Award Management (www.SAM.gov). The documents are available for download at www.SAM.gov only. All vendors must be registered in the SAM database at SAM.gov. The RFP can be found by logging into the website as a vendor and searching for the solicitation number (W912QR-31669889). The cost range is between $1,000,000 and $5,000,000.
The basis for award of this task order is lowest evaluated price (base plus all options). Your proposal should include a price breakdown and/or labor category table demonstrating the use of the binding rates included in your MATOC contract. The submitted price breakdown should include sufficient detail to allow the Government to verify that your proposed price incorporates the binding rates from your base contract. Any level of effort shown in the submitted information will not be used for evaluation purposes and will be used only to ensure that the proposal is in compliance with the binding rates from the base contract. Proposals that fail to submit a price breakdown or fail to use the binding rates from your MATOC will not be considered. Proposals submitted in response to this RFP shall be good for no less than 90 calendar days.
Proposals are due no later than 2:00 PM ET on 0 August 2022. Submit your proposal by email to jordan.t.lowe@usace.army.mil. Proposals not received by the stated date/time will not be considered. Please acknowledge receipt of this RFP by signing below in the space provided and returning to Jordan Lowe via email at jordan.t.lowe@usace.army.mil.
Payment and Performance Bonds will be required for this project. The Notice to Proceed will be issued after receipt and approval of the bonds.
All questions regarding this Request for Proposal (RFP) must be submitted via ProjNet. The website to access this system is www.projnet.org and the bidder inquiry key for this specific project is:
(CJXA8Y-2RJ8PP). Please see ProjNet instructions included in this RFP.
If you have contractual questions, please contact Jordan Lowe at Jordan.t.lowe@usace.army.mil. If an Offeror believes that the requirements in the RFP contain an error, omission, or are otherwise unsound; the offeror shall immediately notify the Contract Specialist in writing with supporting rationale. All Offerors is reminded that the Government reserves the right to award this RFP based on the initial proposals, as received, without discussion.
Sincerely, Jesse E. Scharlow Contracting Officer
(Signature) (Date)
(Printed Name)
(Firm Name)
SCHARLOW.JESS
E.E.1298182471
Digitally signed by
SCHARLOW.JESSE.E.1298182
Date: 2023.07.13 11:09:13 -04'00'
OFFEROR'S QUESTIONS AND COMMENTS
Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet. Offerors shall submit their proposals in accordance with the provisions stated in the solicitation.
To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system.
The Solicitation Number is: W22W9K-31669889
The Bidder Inquiry Key is: CJXA8Y-2RJ8PP
Specific Instructions for ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Select Continue. A page will then open asking you to enter the answer to your Secret
Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
From this page you may view all bidder inquiries or add an inquiry.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
-2-
Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
NOTES:
1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.
2. Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary.
3. The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled five (5) calendar days prior to the closing date stated in the solicitation. No Government responses will be entered into the ProjNet system within two (2) calendar days prior to the closing date stated in the solicitation.
SECTION 00010 - SOLICITATION CONTRACT FORM
SECTION 00010 – PRICE BREAKOUT SCHEDULE
PROJECT: The Scope of Work (SOW) is for the design and construction services required to repair failed or failing roofs in the United States Army Reserve Command (USARC) roofing inventory under the NRP FY2 Project
LOCATIONS:
PROPOSER’S NAME:
ITEM
NUMBER Description UNIT AMOUNT
BASE Work For VA024
0001 Construction: All work, materials, and labor JOB $___________ required to replace the roof at VA024 Building AMSA (AB) – BLDG 02505
0002 Design: All work and labor required to JOB $___________ design the roof at VA024 Building AMSA (AB) – BLDG 02505
0003 Construction: All work, materials, and labor JOB $___________ required to replace the roof at VA024 Building AMSA (G) BLDG 02506
0004 Design: All work and labor required to design the roof at VA024 Building AMSA (G) BLDG 02506 JOB $___________
0005 Construction: All work, materials, and labor JOB $___________ required to replace the roof at VA024 Building AMSA (AB) BLDG 02504
0006 Design: All work and labor required to design the roof at VA024 Building AMSA (AB) BLDG 02504 JOB $___________
TOTAL PROJECT BASE PROPOSAL $
FACILITY LOCATION
VA024 FT EUSTIS, VA
VA050 RICHMOND, VA
OPTIONS: Options may be exercised up to 120 days from Notice to Proceed
OPTION 1 Work For VA050 0007 Construction: All work, materials, and labor JOB $___________ required to replace the roof at VA050 Building USARC
0008 Design: All work and labor required to JOB $___________ design the roof at VA050 Building USARC
Total Option 1 $___________
TOTAL ALL OPTIONS PROPOSAL $
TOTAL PROJECT BASE PLUS OPTIONS PROPOSAL $
Provide the binding contract rates and hours included in job prices above for all base and option tasks.
Project Manager _______ hours x _______ = $___________
Superintendent _______ hours x _______ = $___________
CQC Manager _______ hours x _______ = $___________
Site Safety Health Officer _______ hours x _______ = $___________
NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE
NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
NOTE NO. 2. Offerors must insert a price on all numbered items including options of the CLIN Schedule.
Failure to do so may result in the offer being unacceptable.
NOTE NO. 3.
The Offeror’s Base Bid and all Options
--END OF CLIN SCHEDULE—
Section 00 70 00
52.204-27 Prohibition on a ByteDance Covered Application.
As prescribed in 4.2203(c), insert the following clause:
Prohibition on a ByteDance Covered Application (Jun 2023)
(a) Definitions. As used in this clause-
Covered application means the social networking service TikTok or any successor application or service developed or provided by ByteDance Limited or an entity owned by ByteDance Limited.
Information technology, as defined in 40 U.S.C. 11101(6)-
(1) Means any equipment or interconnected system or subsystem of equipment, used in the automatic acquisition, storage, analysis, evaluation, manipulation, management, movement, control, display, switching, interchange, transmission, or reception of data or information by the executive agency, if the equipment is used by the executive agency directly or is used by a contractor under a contract with the executive agency that requires the use-
(i) Of that equipment; or
(ii) Of that equipment to a significant extent in the performance of a service or the furnishing of a product;
(2) Includes computers, ancillary equipment (including imaging peripherals, input, output, and storage devices necessary for security and surveillance), peripheral equipment designed to be controlled by the central processing unit of a computer, software, firmware and similar procedures, services (including support services), and related resources; but
(3) Does not include any equipment acquired by a Federal contractor incidental to a Federal contract.
(b) Prohibition. Section 102 of Division R of the Consolidated Appropriations Act, 2023 (Pub. L. 117-328), the No TikTok on Government Devices Act, and its implementing guidance under Office of Management and Budget (0MB) Memorandum M-23-13, dated February 27, 2023, "No TikTok on Government Devices" Implementation Guidance, collectively prohibit the presence or use of a covered application on executive agency information technology, including certain equipment used by Federal contractors. The Contractor is prohibited from having or using a covered application on any information technology owned or managed by the
Government, or on any information technology used or provided by the Contractor under this contract, including equipment provided by the Contractor's employees;
however, this prohibition does not apply if the Contracting Officer provides written notification to the Contractor that an exception has been granted in accordance with 0MB Memorandum M-23-13.
(c) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (c), in all subcontracts, including subcontracts for the acquisition of commercial products or commercial services.
(End of clause)
52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)
The Contractor shall be required to
(a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than 540 calendar days from Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
(End of Clause)
52.211-12 Liquidated Damages -- Construction (Sept 2000)
If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,27 for each calendar day of delay until the work is completed or accepted.
If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of Clause)
52.217-5 -- Evaluation of Options.
As prescribed in 17.208(c), insert a provision substantially the same as the following:
Evaluation of Options (Jul 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(End of Provision)
52.217-7 -- Option for Increased Quantity -- Separately Priced Line Item.
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option Reference Price Breakout Schedule. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
(End of Clause)
52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (Feb 1999)
(a) The offeror’s attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor’s aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for Minority Participation for Each Trade
Goals for Female Participation for Each Trade
24.9% (Richmond, VA) 6.9% 27.1% (Ft Eustis, VA) 6.9%
These goals are applicable to all the Contractor’s construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor’s compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on
(1) its implementation of the Equal Opportunity clause,
(2) specific affirmative action obligations required by the clause entitled “Affirmative Action Compliance Requirements for Construction,’’ and
(3) its efforts to meet the goals.
The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor’s goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the –
(1) Name, address, and telephone number of the subcontractor;
(2) Employer’s identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the “covered area” is the state of VA, city of Ft Eustis and Richmond.
(End of Provision)
52.236-4 Physical Data (Apr 1984)
Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations.
(b) Weather conditions: The Contractor shall make his own investigations as to weather conditions at the site. Data may be obtained from various National Weather Service offices located generally at airports of principal cities, the nearest to this project being Richmond and Ft Eustis, VA.
(c) Transportation facilities: Access ways shall be investigated by the Contractor to satisfy himself as to their existence and allowable use.
(d) Historical data for all areas may be obtained from:
US Dept of Commerce National Climatic Center National Weather Service
Federal Building Asheville, N. C. 28801
(End of Clause)
52.236-27 Site Visit (Construction) (Feb 1995) Alternate I
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
VA024 site visit info:
Address: 6th Street and Jackson Avenue, Ft Eustis, VA
POC:
Phone:
Email:
Date/Time:
VA050 site visit info:
Address: 6002 Strathmore Road, Richmond, VA
POC:
Phone:
Email:
Date/Time:
file:///O/...Jordan/FY23/Task%20Orders/NRP%209%20VA024%20&%20VA050/Wage%20Rates/VA20230155%2013%20JAN%202023.txt[7/11/2023 9:25:24 AM]
"General Decision Number: VA20230155 01/13/2023
Superseded General Decision Number: VA20220155
State: Virginia
Construction Type: Building
County: Henrico County in Virginia.
Includes the independent city of Richmond*
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for file:///O/...Jordan/FY23/Task%20Orders/NRP%209%20VA024%20&%20VA050/Wage%20Rates/VA20230155%2013%20JAN%202023.txt[7/11/2023 9:25:24 AM] performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2023 1 01/13/2023
ASBE0024-006 04/01/2021
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 39.27 18.67+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.
BOIL0045-003 01/01/2021
Rates Fringes
BOILERMAKER......................$ 42.62 24.81
ELEC0666-004 03/01/2021
Rates Fringes
ELECTRICIAN (Includes Low Voltage Wiring)..................$ 32.44 50.45%
* ELEV0051-007 01/01/2023
Rates Fringes
ELEVATOR MECHANIC................$ 47.09 37.335+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving and Christmas Day.
b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate file:///O/...Jordan/FY23/Task%20Orders/NRP%209%20VA024%20&%20VA050/Wage%20Rates/VA20230155%2013%20JAN%202023.txt[7/11/2023 9:25:24 AM] for 6 months to 5 years of service as vacation pay credit.
ENGI0147-019 05/01/2022
Rates Fringes
POWER EQUIPMENT OPERATOR
Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100
ft. above ground............$ 34.17 15.21 Cranes under 90 tons........$ 33.26 15.12
IRON0079-012 05/01/2022
Rates Fringes
IRONWORKER, STRUCTURAL AND
ORNAMENTAL.......................$ 28.87 11%+14.24
PLUM0010-003 09/01/2021
Rates Fringes
PIPEFITTER (Includes HVAC Pipe, Unit and Temperature Controls Installations)..........$ 31.50 17.92
PLUMBER..........................$ 31.50 17.92
* SUVA2013-038 01/11/2016
Rates Fringes
BRICKLAYER.......................$ 20.00 1.00
CARPENTER........................$ 21.10 1.11
CEMENT MASON/CONCRETE FINISHER...$ 17.23 0.00
GLAZIER..........................$ 18.43 3.71
HVAC MECHANIC (HVAC Duct Installation Only)...............$ 20.60 2.93
IRONWORKER, REINFORCING..........$ 27.18 4.13
LABORER: Common or General......$ 11.88 ** 1.58
LABORER: Mason Tender - Brick...$ 13.41 ** 3.15
LABORER: Mason Tender - Cement/Concrete..................$ 12.96 ** 3.12 file:///O/...Jordan/FY23/Task%20Orders/NRP%209%20VA024%20&%20VA050/Wage%20Rates/VA20230155%2013%20JAN%202023.txt[7/11/2023 9:25:24 AM]
LABORER: Pipelayer..............$ 12.28 ** 1.96
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 19.74 1.43
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.95 4.03
OPERATOR: Bulldozer.............$ 17.50 0.00
OPERATOR: Forklift..............$ 19.40 7.00
OPERATOR: Loader................$ 21.28 3.17
OPERATOR: Roller................$ 16.25 4.88
PAINTER (Brush and Roller).......$ 16.87 0.00
PAINTER: Spray..................$ 16.58 0.00
ROOFER...........................$ 17.40 1.55
SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 19.72 1.83
SPRINKLER FITTER (Fire Sprinklers)......................$ 20.50 2.93
TILE FINISHER....................$ 23.40 0.00
TILE SETTER......................$ 27.80 10.25
TRUCK DRIVER: Dump Truck........$ 14.88 ** 0.00
WATERPROOFER.....................$ 21.17 3.41
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658 ($12.15). Please see the Note at the top of the wage determination for more information.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
file:///O/...Jordan/FY23/Task%20Orders/NRP%209%20VA024%20&%20VA050/Wage%20Rates/VA20230155%2013%20JAN%202023.txt[7/11/2023 9:25:24 AM]
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and file:///O/...Jordan/FY23/Task%20Orders/NRP%209%20VA024%20&%20VA050/Wage%20Rates/VA20230155%2013%20JAN%202023.txt[7/11/2023 9:25:24 AM] the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
file:///O/...Jordan/FY23/Task%20Orders/NRP%209%20VA024%20&%20VA050/Wage%20Rates/VA20230155%2013%20JAN%202023.txt[7/11/2023 9:25:24 AM]
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISIO"
file:///O/...Jordan/FY23/Task%20Orders/NRP%209%20VA024%20&%20VA050/Wage%20Rates/VA20230159%2013%20JAN%202023.txt[7/11/2023 9:25:24 AM]
"General Decision Number: VA20230159 01/13/2023
Superseded General Decision Number: VA20220159
State: Virginia
Construction Type: Building
County: Newport News* County in Virginia.
*INDEPENDENT CIY OF NEWPORT NEWS
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the file:///O/...Jordan/FY23/Task%20Orders/NRP%209%20VA024%20&%20VA050/Wage%20Rates/VA20230159%2013%20JAN%202023.txt[7/11/2023 9:25:24 AM]
Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2023 1 01/13/2023
ASBE0024-006 04/01/2021
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 39.27 18.67+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.
BOIL0045-003 01/01/2021
Rates Fringes
BOILERMAKER......................$ 42.62 24.81
BRVA0008-001 05/01/2022
Rates Fringes
BRICKLAYER.......................$ 22.44 10.23
ELEC1340-001 12/01/2022
Rates Fringes
ELECTRICIAN (Includes Low Voltage Wiring and Alarm Installation)....................$ 31.30 8.5%+6.35
* ELEV0052-005 01/01/2023
Rates Fringes file:///O/...Jordan/FY23/Task%20Orders/NRP%209%20VA024%20&%20VA050/Wage%20Rates/VA20230159%2013%20JAN%202023.txt[7/11/2023 9:25:24 AM]
ELEVATOR MECHANIC................$ 47.72 37.335+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.
b. VACATIONS: 6% men under 5 years based on regular hourly rate and 8% men over 5 years based on regular hourly rate for all hours worked.
ENGI0147-019 05/01/2022
Rates Fringes
POWER EQUIPMENT OPERATOR
Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100
ft. above ground............$ 34.17 15.21 Cranes under 90 tons........$ 33.26 15.12
IRON0079-012 05/01/2022
Rates Fringes
IRONWORKER, STRUCTURAL AND
ORNAMENTAL.......................$ 28.87 11%+14.24
IRON0079-013 05/01/2022
Rates Fringes
IRONWORKER, RIGGER...............$ 28.87 11%+14.24
PLUM0110-008 11/01/2022
Rates Fringes
PIPEFITTER (Includes HVAC Pipe, Unit and Temperature Controls Installations)..........$ 31.77 17.40
PLUMBER..........................$ 31.77 17.40
* SUVA2013-042 01/11/2016
Rates Fringes
CARPENTER, Includes Acoustical Ceiling Installation, Drywall Hanging, and Form Work...........$ 20.26 2.77
CAULKER..........................$ 18.49 1.33
file:///O/...Jordan/FY23/Task%20Orders/NRP%209%20VA024%20&%20VA050/Wage%20Rates/VA20230159%2013%20JAN%202023.txt[7/11/2023 9:25:24 AM]
CEMENT MASON/CONCRETE FINISHER...$ 17.23 0.72
GLAZIER..........................$ 19.36 4.68
IRONWORKER, REINFORCING..........$ 27.18 4.13
LABORER: Mason Tender - Brick...$ 13.48 ** 3.27
LABORER: Mason Tender - Cement/Concrete..................$ 12.96 ** 3.12
LABORER: Pipelayer..............$ 12.40 ** 1.96
LABORER: Common or General, Including Demolition.............$ 12.00 ** 1.61
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 17.75 3.40
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.95 4.03
OPERATOR: Bulldozer.............$ 18.07 3.50
OPERATOR: Forklift..............$ 19.40 7.00
OPERATOR: Loader................$ 21.28 3.17
OPERATOR: Roller................$ 16.25 4.88
PAINTER (Brush and Roller).......$ 14.28 ** 0.00
PAINTER: Spray..................$ 18.10 5.43
ROOFER...........................$ 18.40 2.31
SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 19.71 2.76
SPRINKLER FITTER (Fire Sprinklers)......................$ 18.91 4.67
TILE FINISHER....................$ 23.40 0.00
TILE SETTER......................$ 27.80 10.25
TRUCK DRIVER: Dump Truck........$ 15.50 ** 0.75
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
file:///O/...Jordan/FY23/Task%20Orders/NRP%209%20VA024%20&%20VA050/Wage%20Rates/VA20230159%2013%20JAN%202023.txt[7/11/2023 9:25:24 AM]
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658 ($12.15). Please see the Note at the top of the wage determination for more information.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, file:///O/...Jordan/FY23/Task%20Orders/NRP%209%20VA024%20&%20VA050/Wage%20Rates/VA20230159%2013%20JAN%202023.txt[7/11/2023 9:25:24 AM]
005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
file:///O/...Jordan/FY23/Task%20Orders/NRP%209%20VA024%20&%20VA050/Wage%20Rates/VA20230159%2013%20JAN%202023.txt[7/11/2023 9:25:24 AM]
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISIO"
National Roofing Program (NRP) FY23 P2 507756 Project 9 VA024/VA050, Ft Eustis/Richmond, VA, US
TABLE OF CONTENTS
VOLUME A: VA024, FT EUSTIS, VA
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 50.00 06 SPECIAL PROVISIONS FOR TASK ORDERS
00 80 50.00 06 Submittal Register
DIVISION 01 – GENERAL REQUIREMENTS
01 11 50.00 06 Task Order SCOPE OF WORK
ATTACHMENTS
ATTACHMENT A:
ATTACHMENT B:
ATTACHMENT C:
ATTACHMENT D:
Site Location
Building Layout
Roof Replacement Report, 11 JANUARY 2012 (For Information Only) Base Access Form
VOLUME B: VA050, RICHMOND, VA
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 50.00 06 SPECIAL PROVISIONS FOR TASK ORDERS
00 80 50.00 06 Submittal Register
DIVISION 01 – GENERAL REQUIREMENTS
01 11 50.00 06 Task Order SCOPE OF WORK
ATTACHMENTS
ATTACHMENT A: Site Location
ATTACHMENT B: Building Layout
ATTACHMENT C: Site Inspection Report, 3 SEPTEMBER 2021(For Information Only)
--End of Table of Contents--
FY23 Task Order 9
Volume A
VA024, Ft Eustis, VA
Site Specific Report and Specifications VA024 Certified Final Specifications 06/XX/23 VA024 Roof Replacement Report 11/01/12
July/2023 Solicitation
Project Number 9 Ft Eustis, VA
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 50.00 06 Special Provisions
01 11 50.00 06 Task Order SCOPE OF WORK
ATTACHMENTS
--End of Table of Contents--
ATTACHMENT A:
ATTACHMENT B:
ATTACHMENT C:
ATTACHMENT D:
Site Location
Building Layout Plans
Roof Replacement Report, 11 January 2012
Base Access Form
NRP FY23 Project 9
VA024 FT EUSTIS, VA
SECTION 00 80 50.00 06
Version CERTIFIED FINAL-RTA
SECTION
00 80 50.00 06
SPECIAL PROVISIONS FOR TASK ORDERS
07/19/22
1. PART 1 GENERAL
1.1. SUBMITTALS
Government approval/acceptance is required for submittals with a "GOVT” designation; submittals not having a "GOVT" designation are for information only. When used, a designation following the "GOVT" designation identifies the office that will review the submittal for the
Government. The submittals listed in the Submittal Register at the end of this specification section shall be submitted in accordance with Section
01 33 00.00 06. Contractor shall give the GDA a 2 week notice for all on-site Meetings and Inspections.
SD-01 Preconstruction Submittals
SD-02 Shop Drawings
SD-05 Design Data
SD-07 Certificates
SD-11 Closeout Submittals
1.2. NOT USED
1.3. NOT USED
1.4. TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER. ER 415-1-15
This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the "Default
(Fixed-Price Construction)" as discussed in Section 00 70 00 of the base contract and Section 00 70 50 of this task order. In order for the
Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
VA024 FT EUSTIS, VA
SECTION 00 80 50.00 06
Version CERTIFIED FINAL-RTA
The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY WORKDAYS BASED ON (5) DAY WORK
WEEK
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
VA024 22 21 22 21 11 6 6 4 3 11 19 20
Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on 08critical activities for 50 percent or more of the
Contractor's scheduled workday. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated listed above, the
Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair-weather workdays, and issue a modification in accordance with the "Default (Fixed-Price
Construction)" in section 00 70 00 of the base contract, Volume 1 .
1.5. WAGE RATES
The decision of the Secretary of Labor, covering rates of wages, including fringe benefits to be paid laborers and mechanics performing work under this contract, is attached to this solicitation.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .