This is an Industry Day presentation for the Homestead Air Reserve Base Aircraft Arresting System (AAS) project held on May 14, 2026. The U.S. Army Corps of Engineers Louisville District is planning to issue a single Design-Bid-Build construction contract solicitation (W912QR26RA050) with a 30-calendar-day advertisement period and a bid due date of June 23, 2026. The solicitation will be posted to SAM.gov on May 18, 2026, with construction contract award anticipated on September 8, 2026, and Notice to Proceed on September 23, 2026. The project completion date is November 17, 2027.

The project scope involves replacing deteriorated BAK-12 shelters with new frangible shelters, replacing BAK-12 and fairlead beam foundations, replacing tape tubes and emergency generators, installing new BAK-14M cable retraction systems, installing MB100.10.C bidirectional textile brake and hook cable arresting systems with foundations and anchors at the overruns, performing concrete tape sweeps and bypass pavement work, paving existing road surfaces, and conducting runway restriping. All work must conform to AFI 32-1043 and applicable Technical Orders. The solicitation will use a "Best Value Trade-off" source selection process evaluated on four factors: Past Performance, Risk Management Plan (six mandatory requirements), Schedule Narrative (eight mandatory requirements), and Small Business Participation Plan. Proposals will be submitted electronically through PIEE, with Volume I containing technical factors and Volume II containing pro-forma pricing, bonding, and subcontracting plan information. Interested vendors should register in SAM.gov and follow the designated naming conventions. RFIs must be submitted through ProjNet using Bidder's Key 7QH5BH-UJ9KBB. The eligible NAICS code is 236220 (Commercial and Institutional Building Construction), and both large and small businesses must submit a Small Business Participation Plan; large businesses must also submit a Small Business Subcontracting Plan per FAR 52.219-9.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Industry Day Homestead, ARB FL

Presenters:

Branden Jones– Project Manager Glady Simpson– Project Engineer Jessica Frehse- ACO Lindsay Lawrence – Contract Specialist Crystal Harbin – Deputy for Small Business Pond– Designer of Record

Date: 14 May 2026

Administrative Announcements Please ensure that you have signed in Remote participants provide the following via chat:

Company Name, POC Name, Email, Phone Prime Contractor or Subcontractor If subcontractor, state the type of work you are interested in (Electrical, Mechanical, Roofing, etc.)

Please turn off all mobile devices

No recording

This presentation and the attendee roster will be posted to SAM.gov by EOW

Please be advised that none of the information discussed today is contractually binding and is subject to change prior to solicitation.

Agenda Introduction of Team Members

Project History & Industry Support

USACE Procurement Process Overview

Small Business Briefing

Overview of Homestead Projects Aircraft Arresting System (AAS) Solicitation will be posted to SAM 18 May 2026.

Bomb Assembly Facility

TBD

Q&A Session

AAS Team Members

Mike CoatsProgram Manager (Air Force Reserve Command)
Jonathan PowellProject Manager (Air Force Reserve Command)
Mark Braxton482 BCE/CEC (Engineering Flight Chief - Homestead Air Reserve Base)
Branden JonesProject Manager (Louisville District Office)
Glady SimpsonProject Engineer (Louisville District Office)
Adam WantlandContracting Officer, Contracting Division (Louisville District Office)
Lindsay LawrenceContract Specialist, Contracting Division (Louisville District Office)
Crystal HarbinDeputy for Small Business (Louisville District Office)
Kennith WardArea Engineer / ACO, Construction (Mobile District Office)
Michael LesinskiResident Engineer, Construction (Mobile District Office)
Kurt HairProject Engineer/COR, Construction (Mobile District Office)
Jessica FrehseACO, Construction (Louisville District Office)
Stephanie KenettCOR, Construction (Louisville District Office)

Market Research is a continuous process throughout the project life cycle, and we want to track unusual factors that are impacting the Homestead area.

Potential offerors, we would like to know unique challenges for this project.

Examples:

Low subcontractor interest (any specific reasons) Above average sub pricing on specific disciplines (asphalt, paving etc.)

8(a) Sole Source procurement in Dec. 2025

New market factors have led to a competitive procurement.

Previously awarded in FY22

Design change led to termination

BAK 12/14 systems are already purchased and stored on site

Procurement History

USACE Procurement Process Overview Lindsay Lawrence Contracting Officer/ Sr. Contract Specialist US Army Corps of Engineers Louisville District

How to Obtain the Solicitation SAM – www.sam.gov – all RFP technical information is be posted here Please note it can take time for it to process from PIEE to SAM.

Solicitation Numbers will begin with “W912QR” Homestead AAS - W912QR26RA050

Sign up on the Interested vendors list (Contracting does not track potential Prime Contractors)

“Follow” the Notice on SAM to receive emails regarding updates/ amendments

Obtaining the Issue Documents Requirements to download Technical Data Package:

Need to be registered in System for Award Management (SAM) database. You must sign-in to your account to use many features of SAM.gov (save searches, viewing solicitations, etc.)

You must register your business entity (you as an individual or your organization) to be able to propose on contracts or apply for federal assistance (grants, loans, etc.) from the federal government.

Any amendments issued to the RFP will also be posted on www.sam.gov You will most likely receive a notification from PIEE first. Documents will be available on SAM to download by COB.

Advertisement Period –30 calendar days.

This procurement is not expected to be extended. Late proposals will not be accepted.

The Procurement Process The March ARB Aircraft Arresting System project will be Design-Bid-Build (D-B-B) Request for Proposal (RFP)

Project award will be made on a “Best Value Trade-off” basis as described in the evaluation criteria.

Proposals must be submitted on time.

The Louisville District is in the Eastern time zone.*

The Source Selection Evaluation Board (SSEB) will evaluate contractors’ proposals based on specific factors which are defined in the RFP Package.

Submit your best proposal the 1st time. Discussions are only opened as necessary.

Proposal Requirements Source Selection Criteria for a “Best Value Trade-Off” consists of four factors:

Volume I:

Factor I - Past Performance Evaluation Recent projects, similar in scope

Factor II – Risk Management Plan

- There are six (6) requirements; failure to address all six results in a deficiency and your proposal is un-awardable.

Factor III - Schedule Narrative

- There are eight (8) requirements; failure to address all eight results in a deficiency and your proposal is un-awardable.

Factor IV - Small Business Participation Plan

Volume II:

Pro-Forma Evaluation (Price, JV agreements, Bonding, Pre-Award Information, and Subcontracting Plan)

Proposal Requirements (cont.)

Instructions for submitting a Request for Information (RFI) have been included in the Solicitation.

RFIs for this project will be received and answered through the ProjNet system only.

Any RFIs submitted directly to the project delivery team will not receive a response and will be directed to the ProjNet system.

This project’s Projnet Bidder’s Key is 7QH5BH-UJ9KBB, which is used to post your RFIs to the proper project.

Proposal Submission We will utilize the Electronic Receipt of Proposal process – Instructions are located in Section 00 10 00 of the solicitation package.

Proposals uploaded to Procurement Integrated Enterprise Environment (PIEE) Solicitation Module.

You must be registered in PIEE to submit a proposal.

Follow the naming conventions provided in the solicitation W912QR26RA050-FIRM NAME-Volume I W912QR26RA050-FIRM NAME-Volume II

Don’t wait until the last minutes to upload your proposal – Late is Late - proposal will not be accepted!

Proposals which fail to address all Amendments will be ineligible for award!!

Small Business Point of Contact Crystal Harbin, Deputy for Small Business

Email: SBO-LRL@usace.army.mil

Small Business Participation Plan and Subcontracting Plan The Small Business Participation Plan is a rated evaluation factor in all unrestricted procurements Both large and small business offerors must submit a participation plan

The participation plan is based on total contract value

Large Business offerors must submit a Small Business Subcontracting Plan Mandated by RFO Clause 52.219-9

This is not a rated element as a part of the Source Selection process; however, the offeror shall submit an acceptable plan prior to award

The subcontracting plan is based on total subcontracted dollars Every option must be broken out separately.

Failure to comply in good faith is in material breach of the contract

Attend Industry Days, Pre-Proposal Conferences, and Site Visits Obtain copies of attendee listings for subcontracting opportunities Register as an interested Vendor on SAM

Attend Workshops, Conferences, Trade Fairs Annual Louisville District Open House is held in January/February

Review Forecast, https://www.lrd.usace.army.mil/Business-With-Us/ Obtain Information

We anticipate executing approximately $1.5B in FY26 through both small and large businesses.

Contracting opportunities are posted in the System for Award Management (SAM) website at www.sam.gov. Use “W912QR” to search for Louisville District projects.

Actively Respond to Sources Sought Notices (Market Surveys) posted to SAM Actively respond to PLA Surveys posted to SAM

Actively Respond to Competitive Requirements posted to SAM (limited number of sole source opportunities) To view Louisville District prime contract holders, please visit https://www.lrd.usace.army.mil/Business-With-Us/ Additional Opportunities

Homestead ARB Project Overview Branden Jones Project Manager US Army Corps of Engineers

OverView of Homestead AAS

LEGEND

1: Phase 1 (Side 06 BAK 12/14 Install)

2: Phase 2 (Side 24 BAK 12/14 Install)

3: Phase 3 (Runway Restriping)

MilestoneApproximate Date
Solicitation18 May 2026
Bids Due23 June 2026
Construction Contract Award08 September 2026
NTP23 September 2026
Contract Required Completion Date17 November 2027

Phase 1 (Side 06 BAK 12/14 Install)

SOW

Demo correctly installed absorber pads Re-Install BAK 12 Install New Bak 14 Install foundations for MB100 Return displaced threshold

PHASE I CONCERNS

FAA permits Generators GF/CI Active Runway / FOD mitigation

Phase 2 (Side 24 BAK 12/14 Install)

SOW

Demo existing BAK12 Shelters Re-Install BAK 12 Install New Bak 14 Install foundations for MB100 Return displaced threshold

PHASE I CONCERNS

Generators GF/CI Active Runway / FOD mitigation Threshold Displacement

Phase 3 (Runway Restriping)

SOW

Restripe remaining runway

PHASE I CONCERNS

- Active Runway / FOD mitigation

OverView of Homestead bomb assembly facility

LEGEND

• Full Design of an 8000 sq ft Bomb Assembly Facility

• The project includes a large portion of utilities being brought in from 3000 ft

• The project includes pull thru bays, office, breakroom, bathrooms,

• The project include demo of the existing facilities on site

• PEMP Construction

Summary Register in SAM.gov to obtain and respond to solicitations

Source Selection Evaluation Criteria are basis for selection by source evaluation boards

Unrestricted solicitations require small business participation plan

New construction and renovation work expected over next several years.

Aircraft Arresting System (AAS) – O&M FY26

Bomb Assembly Facility– TBD

What questions do you have?