NSWC Crane UFWL - Price Breakout Schedule_AMDT 0006 v2.pdf

PDF 197 KB Posted

Attached to
Unmanned Fusion Warfare Laboratory at NSWC Crane IN
Solicitation number
W912QR26BA017
Issued by

About this file

This is a Price Breakout Schedule and Contract Line Item (CLIN) Schedule for a federal construction solicitation issued by NSWC Crane, Indiana for the Unmanned Fusion Warfare Laboratory (UFWL) project (P2 520562).

The base proposal comprises three CLINs: CLIN 0001 for construction of the approximately 7,321 square foot UFWL Primary Facility (real property); CLIN 0002 for construction of supporting facilities and site work (real property); and CLIN 0003 for purchase and installation of equipment within the facility (personal property). The solicitation includes eleven optional bid items (CLINs 0004–0014) allowing the government to select among three facility floorplan sizes: Floorplan A (7,321 SF), Floorplan B (7,938 SF with an additional 617 SF), or Floorplan C (8,970 SF with an additional 1,032 SF). Optional items include fixed furniture and equipment (FF&E), carpet provision for Room 118, and equipment purchases associated with larger floorplans. CLIN 0014 addresses emergency radio coverage testing per UFC 3-580-01 and NFPA 1225 standards requiring at least 95% facility floor coverage. All proposals must include manufacturer price quotes with identified markups. The statutory cost limitation for the project is $9,090,000.00 per 10 U.S.C. § 2805; the maximum allowable bid for real property CLINs 0001 and 0002 combined is $8,045,000.00 to accommodate mandatory government costs including supervision, inspection, overhead, and contingencies. CLIN 0003 (personal property equipment including nitrogen generator, air compressor, fume hood, and blue warning lights) is excluded from the statutory limit. The Contracting Officer may exercise optional CLINs by written notice within specified timeframes (90 or 180 calendar days) following Construction Notice to Proceed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Unmanned Fusion Warfare Laboratory (UFWL) NSWC Crane, Indiana P2 520562

SECTION 00 10 00

CERTIFIED FINAL Design

Amendment 0006

00 10 00

Price Breakout Schedule

Offeror’s Name: _____________________________________________________________

Amendment 0006*************************************************************************************

CONTRACT LINE ITEM SCHEDULE

BASE PROPOSAL

CLIN Description QTY Unit of Measure

Real or Personal Property

Total Price

0001 Construction. UFWL Floorplan A Primary Facility (7,321 SF)

1 Job Real Property $

Construction. UFWL Supporting Facilities Site Work

1 Job Real Property $

0003 UFWL Floorplan A Primary Facility (7,321 SF) – Equipment

1 Job Personal Property $

Total Base

Total Base Bid (Sum of CLINs 0001 – 0003) $

OPTION PROPOSAL

CLIN Description QTY Unit of Measure

Real or Personal Property

Total Price

Bid Option 1. UFWL Floorplan A FF&E 1 Job Personal Property $

0005 Bid Option 2. UFWL Floorplan A (7,321 SF)

– Provide Carpet in Room 118.

1 Job Real Property $

0006 Construction. Bid Option 3. UFWL Floorplan B: Add 617 SF to UFWL Floorplan A

Bid Option 4. UFWL Floorplan B FF&E 1 Job Personal Property $

Bid Option 5. UFWL Floorplan B Equipment 1 Job Personal Property $

0009 Bid Option 6. UFWL Floorplan B – Provide Carpet in Room 118

1 Job Real Property $

0010 Construction. Bid Option 7. UFWL Floorplan C: Add 1,032 SF to UFWL Floorplan B

Bid Option 8. UFWL Floorplan C FF&E 1 Job Personal Property $

Bid Option 9. UFWL Floorplan C Equipment 1 Job Personal Property $

0013 Bid Option 10. UFWL Floorplan C: Provide Carpet in Room 118.

1 Job Real Property $

0014 Bid Option 11. Emergency Radio Coverage Testing

1 Job Real Property $

*************************************************************************************Amendment 0006

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

Amendment 0006

NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

Amendment 0003************************************************************************************* NOTE NO. 2. Offerors must insert a price on all numbered items including options of the CLIN Schedule. Failure to do so may result in the offer being unacceptable. *3*The company name shall be indicated on the face of the price breakout schedule to preclude being misplaced.

*************************************************************************************Amendment 0003 Amendment 0006************************************************************************************* NOTE NO. 3. Pursuant to 10 U.S.C. § 2805, the statutory cost limitation for this project is $9,090,000.00. Offerors are advised that this statutory limit represents the total Government budget for real property and must accommodate all internal Government project costs, including Government Supervision, Inspection, and Overhead (SIOH), Government contingency, and owner fees. Because some bid options in this solicitation are classified as real property, they are subject to this statutory limitation. Therefore, to allow for these mandatory Government costs within the statutory limit, the maximum allowable bid for the Real Property CLINS of this solicitation is $8,045,000.00. Pursuant to DFARS 252.236-7006, any base bid exceeding this maximum allowable amount for CLINs 0001 and 0002 combined will be unawardable. CLIN 0003 is classified as personal property and is excluded from this statutory limit.

*************************************************************************************Amendment 0006

NOTE NO. 4. UFWL Floorplan A is approximately 7,321 square feet as indicated on the construction documents. UFWL Floorplan B is approximately 7,938 square feet as indicated on the construction documents. UFWL Floorplan C is approximately 8,970 square feet as indicated on the construction documents.

NOTE NO. 5 CLINs 0003, 0004 and 0005 are intended to be in support of the base tasks (CLINs 0001 through 0002) for Floorplan A.

NOTE NO. 6 CLINs 0007 through 0009 are intended to be in support of Bid Option 3 (CLIN 0006) for Floorplan B.

NOTE NO. 7 CLINs 0011 through 0013 are intended to be in support of Bid Option 7 (CLIN 0010) for Floorplan C.

NOTE NO. 8 CLIN 0014 is intended to cover facility testing of the floorplan awarded for construction.

DESCRIPTION OF PROPOSAL ITEMS

General. This section comprises an explanation of the bid items identified in the bid schedule. This section is a general scope of work for the bid items described in the bidding schedule and is not intended to be all encompassing in the descriptions. All work specified herein shall be accomplished in accordance with the procedures prescribed in the technical provisions of the specifications and the plans/details as shown on the contract drawings. Some drawings are identified below to reference general locations and detail information for various bid items, however other drawings, details and specifications also apply.

The bidder shall bid each type of work under the applicable bid item. Any item of work described in the contract but not listed in the bid schedule shall be included in the item of work to which it is made subsidiary. The prime contractor shall coordinate with other contractors interfacing with the project. Each portion of the work being performed shall be in accordance with the scope demarcations shown in the AE provided construction drawings. No outside contractors for utilities are expected on this project.

Amendment 0006************************************************************************************* CLIN 0001 “Construction. UFWL Floorplan A Primary Facility (7,321 SF).” Construct an approximately 7,321 square foot Unmanned Fusion Warfare Laboratory (UFWL) building, with vestibule, offices, administration, laboratory, secure vestibule, secure server, secure laboratory, secure collaboration, badging, breakroom/lobby, restrooms, janitorial, mechanical, electrical, and communications rooms, and all associated utilities within a line 5 feet of the facility as indicated on the drawings and per specifications. The work includes a fully complete and usable facility. The prime contractor is also responsible for all civil, structural, electrical, mechanical, and other incidental work necessary to support the installation of all other appurtenances in accordance with the AE provided construction drawings.

CLIN 0002 “Construction. UFWL Supporting Facilities Site Work.” Construct site work and utilities required beyond a line 5 feet outside the UFWL facility including site clearing and grubbing, backfill, compaction, grading, and associated demolition as shown in the construction drawings and stated in the specifications. (text deleted)

CLIN 0003 “UFWL Floorplan A Primary Facility (7,321 SF) Equipment.” Purchase and install personal property items as identified in the construction drawings, stated in the specifications and as noted below. The Contractor shall include the manufacturer price quote and identify applicable markups. (text deleted)

CLIN 0004 “Bid Option 1. UFWL Floorplan A FF&E.” Purchase and install fixed furniture and equipment of items to include furniture, desks, restroom fixtures and other items as identified as FF&E as shown in the construction drawings and stated in the specifications. The Contractor shall include the manufacturer price quote and identify applicable markups. No change to Period of Performance. The Contracting Officer may exercise this option by written notice to the Contractor within 180 calendar days of Construction Notice to Proceed.

CLIN 0005 “Bid Option 2. UFWL Floorplan A (7,321 SF) – Provide Carpet in Room 118.” Provide pricing to provide carpet in lieu of concrete flooring in Room 118, as identified in the construction drawings and stated in the specifications. The Contractor shall include the manufacturer price quote and identify applicable markups. No change to Period of Performance.

The Contracting Officer may exercise this option by written notice to the Contractor within 90 calendar days of Construction Notice to Proceed.

CLIN 0006 “Construction. Bid Option 3. UFWL Floorplan B: Add 617 SF to UFWL Floorplan A.” Add 617 square feet to Item No. 0001 to construct an approximately 7,938 square foot UFWL building, with vestibule, offices, conference room, administration, laboratory, secure vestibule, secure server, secure laboratory, secure collaboration, badging, breakroom/lobby, restrooms, janitorial, mechanical, electrical, and communications rooms, and all associated utilities within a line 5 feet of the facility as indicated on the drawings and per specifications. The work includes a fully complete and usable facility. The prime contractor is also responsible for all civil, structural, electrical, mechanical, and other incidental work necessary to support the installation of all other appurtenances in accordance with the AE provided construction drawings. No change to Period of Performance. The Contracting Officer may exercise this option by written notice to the Contractor within 90 calendar days of Construction Notice to Proceed.

CLIN 0007 “Bid Option 4. UFWL Floorplan B FF&E.” Add the purchase and installation of the additional fixed furniture and equipment based on the additional 617 square feet between Floorplan A and Floorplan B, as indicated on the drawings and per the specifications. The Contractor shall include the manufacturer price quote and identify applicable markups. No change to Period of Performance. The Contracting Officer may exercise this option by written notice to the Contractor within 180 calendar days of Construction Notice to Proceed.

CLIN 0008 “Bid Option 5. UFWL Floorplan B Equipment.” Add the purchase and installation of the additional personal property items based on the additional 617 square feet between Floorplan A and Floorplan B as identified in the construction drawings, stated in the specifications and as noted below. The Contractor shall include the manufacturer price quote and identify applicable markups. No change to Period of Performance. The Contracting Officer may exercise this option by written notice to the Contractor within 90 calendar days of Construction Notice to Proceed.

CLIN 0009 “Bid Option 6. UFWL Floorplan B – Provide Carpet in Room 118.” Provide pricing to provide carpet in lieu of concrete flooring in Room 118 for the additional square footage of Room 118 between Floorplan A and Floorplan B, as identified in the construction drawings and stated in the specifications. The Contractor shall include the manufacturer price quote and identify applicable markups. No change to Period of Performance. The Contracting Officer may exercise this option by written notice to the Contractor within 90 calendar days of Construction Notice to Proceed.

CLIN 0010 “Construction. Bid Option 7. UFWL Floorplan C: Add 1,032 SF to UFWL Floorplan B.” Add 1,032 square feet to Item No. 0006 to construct an approximately 8,970 square foot UFWL building, with vestibule, offices, conference room, administration, laboratory, secure vestibule, secure server, secure laboratory, secure collaboration, badging, breakroom/lobby, restrooms, janitorial, mechanical, electrical, and communications rooms, and all associated utilities within a line 5 feet of the

Amendment 0006 facility as indicated on the drawings and per specifications. The work includes a fully complete and usable facility. The prime contractor is also responsible for all civil, structural, electrical, mechanical, and other incidental work necessary to support the installation of all other appurtenances in accordance with the AE provided construction drawings. No change to Period of Performance. The Contracting Officer may exercise this option by written notice to the Contractor within 90 calendar days of Construction Notice to Proceed.

CLIN 0011 “Bid Option 8. UFWL Floorplan C FF&E.” Add the purchase and installation of the additional fixed furniture and equipment based on the additional 1,032 square feet between Floorplan B and Floorplan C, as indicated on the drawings and per the specifications. The Contractor shall include the manufacturer price quote and identify applicable markups. No change to Period of Performance. The Contracting Officer may exercise this option by written notice to the Contractor within 180 calendar days of Construction Notice to Proceed.

CLIN 0012 “Bid Option 9. UFWL Floorplan C Equipment.” Add the purchase and installation of the additional personal property items based on the additional 1,032 square feet between Floorplan B and Floorplan C, as identified in the construction drawings, stated in the specifications and as noted below. The Contractor shall include the manufacturer price quote and identify applicable markups. No change to Period of Performance. The Contracting Officer may exercise this option by written notice to the Contractor within 90 calendar days of Construction Notice to Proceed.

CLIN 0013 “Bid Option 10. UFWL Floorplan C – Provide Carpet in Room 118.” Provide pricing to provide carpet in lieu of concrete flooring in Room 118 for the additional square footage of Room 118 between Floorplan B and Floorplan C, as identified in the construction drawings and stated in the specifications. The Contractor shall include the manufacturer price quote and identify applicable markups. No change to Period of Performance. The Contracting Officer may exercise this option by written notice to the Contractor within 90 calendar days of Construction Notice to Proceed.

Amendment 0003************************************************************************************* CLIN 0014 “Bid Option 11. Emergency Radio Coverage Testing.” The Contractor shall provide a price to conduct emergency radio signal coverage testing per UFC 3-580-01 2-3.5.4.4 and NFPA 1225 for the facility floor coverage area;

this does not include cellular signals. The building does not have critical areas per NFPA 1225, but the building area needs to have at least 95% coverage. Test results must be reported to the COR immediately upon receipt, for coordination with NSWC Crane and NAVFAC.

********************************************************************************Amendment 0003, 0006

UFWL PERSONAL PROPERTY ITEMS

The following items are included as Equipment items in CLIN 0003, CLIN 0008 and CLIN 0012:

• Nitrogen Generator (GFCI) & Supply Lines (CFCI)

• Air Compressor (GFCI) & Supply Lines (CFCI)

• Fume Hood & ductwork (CFCI)

• Blue Warning Lights (CFCI)