This is Amendment 0002 to a Request for Proposal (RFP) for design-build roof repair and replacement services under the Army Reserve National Roofing Program (NRP), FY26 Project 12. The amendment modifies solicitation W912QR26R1C5X and applies to two locations: Fort Rucker, AL (FAC ID AL018) and Camp Shelby, MS (FAC ID MS800), with a combined estimated cost range of $1,000,000 to $5,000,000.
The amendment revises and adds specification sections to the Table of Contents, specifically modifying Statement of Work sections for both Volume A (AL018) and Volume B (MS800). Key project scope includes roof system replacements: at AL018, three sections totaling approximately 19,967 square feet of TPO single-ply roofing will be replaced with 2-ply Modified Bitumen systems; at MS800, multiple buildings totaling approximately 48,432 square feet will have existing TPO single-ply, trapezoidal metal panel, and standing seam metal roofs replaced with either Modified Bitumen or fleece-backed PVC systems. Amendment 0002 adds Attachment D (Pre Proposal Site Visit Photos dated August 18, 2026) and incorporates specific construction requirements including secondary drainage modifications, external ladder installation, roof deck repair assumptions (up to 10% damaged decking and 50% wood nailers), equipment screen removal, and expanded sealant replacement work. Design requirements mandate a Registered Roof Consultant (RRC) with ten years of roofing design experience and current IIBEC licensure as Designer of Record, with design milestones extending from Notice to Proceed through Certified Final Submittal (NTP+160 days). Proposals are due no later than September 9, 2026 at 2:00 PM Eastern Time, submitted to Ethan.S.Phillips@usace.army.mil, with the Government reserving the right to award based on initial proposals without discussion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912QR26R1C5X-0001.pdf | ||
| Site Visit Attendee List - AL018.pdf | ||
| Site Visit Attendee List - MS800.pdf | ||
| W912QR26R1C5X_NRP12-0000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912QR26R1C5X_NRP12-0002
P2: 574437 National Roofing Program (NRP) FY26 Project 12 AL018/MS800 Ft Rucker, AL/Camp Shelby, MS
Version CERTIFIED FINAL Amendment 0002
TABLE OF CONTENTS
VOLUME A: AL018 Ft Rucker, AL
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 50.00 06 SPECIAL PROVISIONS FOR TASK ORDERS
00 80 50.00 06 Submittal Register
DIVISION 01 – GENERAL REQUIREMENTS
01 11 50.00 06 Task Order SCOPE OF WORK
ATTACHMENTS
ATTACHMENT A: Site Location
ATTACHMENT B: Building Layout
ATTACHMENT C: Site Inspection Report, April 1, 2026 (For Information Only)
Amendment 0002***************************************************************
ATTACHMENT D Pre Proposal Site Visit Photos
***************************************************************Amendment 0002
VOLUME B: MS800 Camp Shelby, MS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 50.00 06 SPECIAL PROVISIONS FOR TASK ORDERS
00 80 50.00 06 Submittal Register
DIVISION 01 – GENERAL REQUIREMENTS
01 11 50.00 06 Task Order SCOPE OF WORK
ATTACHMENTS
ATTACHMENT A: Site Location
ATTACHMENT B: Building Layout
ATTACHMENT C: Site Inspection Report, March 20, 2026 (For Information Only)
--End of Table of Contents--
June 2026 Solicitation
ARIMS: 200A
Disposition: Maintain for 15 yrs after construction
Army Reserve National Roofing Program
FY26 Task Order 12
Volume A
AL018 Fort Rucker, AL
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 50.00 06 SPECIAL PROVISIONS FOR TASK ORDERS
00 80 50.00 06 Submittal Register
DIVISION 01 – GENERAL REQUIREMENTS
01 11 50.00 06 Task Order SCOPE OF WORK
ATTACHMENTS
ATTACHMENT A:
ATTACHMENT B:
ATTACHMENT C:
Version CERTIFIED FINAL
Site Location
Building Layout
Site Inspection Report, March 20, 2026 (For Information Only)
Amendment 0002*************************************************************** ATTACHMENT D Pre Proposal Site Visit Photos ***************************************************************Amendment 0002
NRP FY26 Project 12 AL018 Fort Rucker, AL P2 574437 10-Jul-26
SECTION 01 11 50.00 06
SECTION
01 11 50.00 06
Task Order SCOPE OF WORK
1. PROJECT INFORMATION
1.1. GENERAL
Design/Build: The Contractor shall provide all labor, equipment, supplies, and consultant services and all site investigations, surveys, analysis, sampling, testing and verification of existing field conditions as required for design and construction of the Roof Replacement Project at AL018 to result in a complete and useable Facility. Contractor shall provide complete design analysis incorporating all engineering computations, analysis, test, and survey results, building code (including fire protection, life safety, environmental and accessibility) review as it pertains/affects/relates to this project, equipment and material data and documentation of existing conditions.
1.2. SCOPE OF WORK
Unless specifically noted otherwise in this Specification Section or in the base MATOC contract Volume 1 of 2 itself, all requirements of the base MATOC contract Volume 1 of 2 shall apply to this Task Order. The work includes design and construction to replace the following roof systems located at AL018:
Building RFID (SF) Section(s) Existing Roof System USARC (15,709) Section-1 TPO single ply USARC (3,554) Section-2 TPO single ply USARC (704) Section-3 TPO single ply
Design/Build: Design and construction shall comply with the requirements contained in this Task Order Request for Proposal (RFP). The design and technical criteria contained and cited in this RFP and the Unified Facilities Guide Specifications (UFGS) establish minimum standards for design and construction quality. The Designers of Record shall use the Unified Facilities Guide Specifications (UFGS) and the requirements contained in this RFP to fully develop the technical specifications and construction drawings. The objective of this solicitation is to obtain an energy efficient, durable, maintainable, and sustainable space.
Design/Build: The illustrations and exhibits included in this RFP illustrate the conceptual design of the project and are provided to define the scope of work and budget. The concepts provided shall be further developed by the Design/Build Contractor to comply with the customer’s functional needs.
All demolition required to construct the project is included as part of the work of this Contract.
1.3. SITE LOCATION
This project is located at Building 25109 Knox Field Rd Daleville, AL 36322.
1.4. EXISTING SITE UTILITIES
1.4.1. The contractor shall verify the location of all utilities serving the building. Upgrading the existing utilities, (unless noted otherwise) outside the limits of construction, is not a part of this project.
1.5. NOT USED
1.6. NOT USED
1.7. ATTACHMENTS
Design/Build: Information provided in the Attachments is intended to guide the completion of the design by establishing existing conditions, and the desired character, appearance, and function of the new construction. The following Attachments are included and shall be used and strictly adhered-to in completing the design and construction of the project.
a. ATTACHMENT A: Site Location
b. ATTACHMENT B: Building Layout Plans
c. ATTACHMENT C: Site Inspection Report, 20-Mar-26
Amendment 0002***************************************************************
d. ATTACHMENT D: Pre Proposal Site Visit Photos ************************************************************** Amendment 0002
2. DESIGN REQUIREMENTS
2.1. GENERAL
The Contractor shall prepare complete construction documents for all work designed as required by the RFP. The construction documents to be prepared shall include, but are not limited to, construction drawings, specifications, submittals, and design analysis as required in Section 01 33 16.00 10 DESIGN DATA (DESIGN AFTER AWARD), Volume 1. Materials and equipment shall be limited to those specified except that where no specific material and equipment is specified or no basis of design is identified, the Contractor shall use materials and equipment accepted within the construction industry and in compliance with Design Criteria.
2.2. DESIGN
2.2.1. The Contractor shall prepare a 100% design for the project in accordance with the RFP using industry standard materials and efficient practices. The design of the materials selected shall be high quality, durable and easily maintained. The Contractor shall be responsible for the professional quality, code compliance, technical accuracy, and coordination of all designs, drawings, specifications, and other documents or publications upon which the design and construction are based. It shall be the responsibility of the Design/ Build Contractor to verify the accuracy of the documents provided.
2.2.2. CAD/BIM Requirement
The contractor will not be required to produce advanced modeling and design drawings will be limited to CAD files.
2.2.3. Design Submittal Requirements
Instead of a charrette submittal in accordance with the Louisville District Design Guide, the contractor may submit a charrette report after they have conducted an on-site charrette meeting. The charrette report must detail the results of the site visit and identify any discrepancies between the solicitation and field conditions. An interim submittal is not required. The contractor will submit a final design , a corrected final design, and certified final design in accordance with the requirements of the base contract. The independent Registered Roof Observer (RRO) identified under section 01 11 00 shall review the final design as part of the contract design QC review team. The RRO shall attend the final design plan-in-hand meeting.
2.2.4. Design Professionals
Registered Roof Consultant (RRC) - In addition to the requirements of the base MATOC, a Registered Roof Consultant (RRC) shall be a Designer of Record. The RRC shall have a degree in Architecture or Engineering and have at least ten (10) years of experience in roof repair design. The RRC must be currently licensed by the International Institute of Building Envelope Consultants (IIBEC). An independent RRC with the same minimum requirements shall be part of the Independent Technical Review.
2.2.5. Design Milestone Schedule
The sample schedule and sequence of work shown below was prepared for the Contractor’s use in its schedule preparation. This schedule is not intended to be the actual awarded design-build schedule. Upon receipt of the Notice to Proceed, the selected Contractor will be required to submit its proposed design and construction schedule for Government review and acceptance.
Notice to Proceed (NTP) Day 0 Design Quality Control Plan (DQCP) NTP + 14 Days Charrette Meeting (on-site) NTP + 60 Days Final Submittal NTP + 120 Days Final Plan in Hand Meeting (on-site) NTP + 138 Days Corrected Final Submittal NTP + 152 Days Certified Final Submittal NTP + 160 Days
2.3. REQUEST FOR PROPOSAL (RFP) INTENT
The intent of this RFP section is to describe the requirements for appearance, function, materials, and types of construction in sufficient detail to enable engineering and design to be completed by the Contractor.
2.4. Design Milestone Meetings
2.4.1. Charrette Meeting (Shall be in person and on-site.)
2.4.2. Final Design Review Meeting (Shall be in person and on-site.)
2.5. NOT USED
2.6. NOT USED
2.7. NOT USED
2.8. NOT USED
2.9. NOT USED
2.10. NOT USED
2.11. NOT USED
2.12. NOT USED
2.13. DESIGN SUBMITTAL DISTRIBUTION MATRIX
Submittal Reviewers & Mailing Addresses
U.S. Army Corps of Engineers John White
LRL-ED-MR
220 West Main Louisville, KY 40202 Email: John.E.White@usace.army.mil
U.S. Army Corps of Engineers Timothy M. McClellan, P.E., RRC
LRL-EDM
220 West Main Louisville, KY 40202 Email: Timothy.m.mcclellan@usace.army.mil
Michael Brooks
LRL-CDR
220 West Main
Email: Michael.s.brooks@usace.army.mil
Sheryll Impellizzeri, PE
LRL-PM-R
220 West Main
Email: sheryll.s.impellizzeri@usace.army.mil
Steve Coffey, PE USARC G 3/5/7 Engineers - Desk 4N-4001-62 4700 Knox Street, Bldg 8-8108 Ft. Bragg, NC 28310 Phone: 910-570-8961 Email: steven.w.coffey3.civ@army.mil
Justin Reeder, PE, RRC, RRO, CDT USARC-ARIMD Engineering Branch / SAIN Engineering USAR National Roofing Program REM Phone: 843.813.2423 Email: justin.reeder@saineng.com
81st RD William (Bill) Fogarty 81 Wildcat Way Fort Jackson, SC 29207 Phone: 803-351-0977 Email: William.c.fogarty.civ@army.mil
U.S. Army Corps of Engineers Abraham M Goodwin, PMI-CP Fort Campbell Resident Office Cell: 931-367-1217 Email: Abraham.M.Goodwin@usace.army.mil
3. GENERAL CONSTRUCTION REQUIREMENTS
3.1. SUMMARY
3.1.1. The requirements include:
a. Construction considerations and use of the premises.
b. Protection of personnel and Government property.
c. Construction facilities and job site standards.
d. The requirements of this section apply to the entire project including all amendments or modifications that may be issued to modify the contract documents.
3.2. GENERAL INFORMATION
3.2.1. NOT USED
3.2.2. NOT USED
3.2.3. Coordinate all construction activities with:
a. Contracting Officer’s Representative
b. Building Occupants
3.2.4. NOT USED
3.2.5. NOT USED
3.2.6. NOT USED
3.2.7. NOT USED
3.2.8. NOT USED
3.2.9. Project and Safety Signs. See 01 50 00, Paragraph 2.1.3.
3.3. NOT USED
3.4. NOT USED
3.5. Work Schedule under Section 01 11 00.00 06 Paragraph 3.9.1.2 is changed to “Work S WORK SCHEDULE: The Contractor shall schedule the work between the hours of 7:00 a.m. and 4:30 p.m. Monday through Friday except Federal Holidays.
3.5.1. No work shall occur on Federal Holidays.
3.5.2. No work shall occur on drill weekends.
3.5.3. Permission to perform any work outside of these hours must be in writing and submitted five (5) calendar days in advance for approval by the Contracting Officer.
3.5.4. The Government may or may not grant such permission at its discretion.
3.6. Contractor Personal Vehicle Parking under Section 01 11 00.00 06 Paragraph 3.9.1.7 is changed to Contractor Personal Vehicle Parking:
The contractor may use a limited number of parking spaces in the existing lots for the contractor’s employee parking of personal vehicles. The Contractor shall coordinate with the Government on the exact number of available spaces, and shall make provisions to transport employees to the site should inadequate parking spaces be available on site. Parking in these areas is available on a first-come first served basis.
4. NOT USED
5. NOT USED
6. EXTERIOR EQUIPMENT
6.1. All secondary drainage shown on drawings is directly connected into primary drainage immediately below roof deck. This does not meet code requirements. Contractor is required to eliminate all existing secondary drainage and cap drain lines just above junction with primary drain line. Contractor to install all new secondary drains, routed directly to exterior walls and plumbed through wall below roof deck with lamb’s tongue outfalls. Walls are assumed to be concrete block with metal wall panel façade.
6.2. Remove all existing external ladders. Contractor to install new OSHA/EM 385-1-1 ladders and ATFP Security Upgrade compliant ladders between sections and from the ground to the roof where there is no roof access. Ladder security shall comply with UFC 4-026-01 and UFGS 05 51
33. The requirement for new ladders replaces Section 01 11 00 Paragraph 14 requirement for ladder brackets.
6.3. Contractor to design tapered insulation crickets to accommodate overflow drains and allowable height difference between primary and secondary outlets. Remove screen and associated equipment shown on Attachment D.
6.4. Severely rusted housing/shroud shall be replaced, 1 each. Severely rusted gas line shall be replaced, 10 Linear feet.
6.5. All pitch pans are to be eliminated and supports for equipment to be flashed with liquid flashing.
7. ARCHITECTURAL / BUILDING ENVELOPE
7.1. Approximately 600 LF of exterior sealant to be replaced at the
ARC Building – Coordinate with COR for the locations.
7.2. Contractor to remove existing wall panels between lower and upper roof shown in report. Contractor to install water resistant barrier integrated into the roofing waterproofing system and compatible with metal panels and reinstall panels.
7.3. DOR Shall visit the site three times during the construction phase. One of these visits shall be during the final inspection.
7.4. DOR Shall preform structural analysis to determination correct building and roof expansion joint for north side addition – gap shown in Attachment D.
8. NOT USED
9. NOT USED
10. NOT USED
11. NOT USED
12. NOT USED
13. NOT USED
14. Roof System
Roof system installed shall comply with UFC 3-110-03 Roofing, with Change 5, or the latest version available. Where they do not exist contractor shall install roof access ladders from the ground to roof and between roof sections to allow access to all sections.
Contractors shall match existing downspout terminations with either new splash blocks at all downspout terminations or if exiting project has underground piping/storm drains the contractor shall snake/clear drains that have downspouts terminating in them. Pre-proposal site photos shown on Attachment D.
Contractor is responsible for identifying all equipment mounted directly below the deck and utilize a connection method that either avoids the deck or relocates equipment in a way that complies with current building codes.
Modified Bitumen systems shall be two ply systems.
Building RFID (SF) Section(s) New Roof System USARC (15,709) Section-1 2 Ply Modified Bitumen USARC (3,554) Section-2 2 Ply Modified Bitumen USARC (704) Section-3 2 Ply Modified Bitumen
14.1. NOT USED
14.2 ROOF DECK REPAIR
Inspect the roof deck carefully. If there are roof deck areas which require repair or replacement, notify the Contracting Officer. Do not proceed with repair or replacement until directed by the Contracting Officer. Assume replacement up to 10% damaged decking and 50% wood nailers.
--End of Section --
Attachment D
Pre Proposal Site Visit Photos August 18, 2026
Note: This attachment is for documentation of existing conditions. The requirements of the 01 11 50.00 06 and the base MATOC take precedence over any recommended repairs included in this inspection report.
NRP FY26 Project 12 AL018
Tuesday, 18 August 2026
Pre-proposal site photos
10:19 AM 8/18/2610:19 AM 8/18/26
Bldg Id
Assignee 25109
Bldg monument
10:24 AM 8/18/2610:24 AM 8/18/26
East Elevation
10:25 AM 8/18/2610:25 AM 8/18/26
North Elevation
10:25 AM 8/18/2610:25 AM 8/18/26
North Elevation
10:28 AM 8/18/2610:28 AM 8/18/26
South Elevation
10:28 AM 8/18/2610:28 AM 8/18/26
West Elevation
10:45 AM 8/18/2610:45 AM 8/18/26
Equipment Screen To Be Removed. All Pitch Pans To Be Removed
10:46 AM 8/18/2610:46 AM 8/18/26
All Equipment Inside Equipment Screen To Be Removed
10:47 AM 8/18/2610:47 AM 8/18/26
Expansion Joint
11:20 AM 8/18/2611:20 AM 8/18/26
Need Metal Coping Cap
11:21 AM 8/18/2611:21 AM 8/18/26
Metal Panel Replacement
11:38 AM 8/18/2611:38 AM 8/18/26
Secondary Not Independent
11:38 AM 8/18/2611:38 AM 8/18/26
Typical Secondary drainage routing
11:52 AM 8/18/2611:52 AM 8/18/26
Expansion Between North Addition And Main Bldg. Shown On Drawing
MS800 Camp Shelby, MS
13-Jul-26
SECTION
01 11 50.00 06
Task Order SCOPE OF WORK
1. PROJECT INFORMATION
1.1. GENERAL
Design/Build: The Contractor shall provide all labor, equipment, supplies, and consultant services and all site investigations, surveys, analysis, sampling, testing and verification of existing field conditions as required for design and construction of the Roof Replacement Project at MS800 to result in a complete and useable Facility. Contractor shall provide complete design analysis incorporating all engineering computations, analysis, test, and survey results, building code (including fire protection, life safety, environmental and accessibility) review as it pertains/affects/relates to this project, equipment and material data and documentation of existing conditions.
1.2. SCOPE OF WORK
Unless specifically noted otherwise in this Specification Section or in the base MATOC contract Volume 1 of 2 itself, all requirements of the base MATOC contract Volume 1 of 2 shall apply to this Task Order. The work includes design and construction to replace the following roof systems located at MS800:
Building RFID (SF) Section(s) Existing Roof System Administration (2,701) Section-1 Trapezoidal Metal Panel Administration (370) Section-2 Metal R-Panel Administration (160) Section-3 Metal R-Panel Maintenance (20,311) Section-1 TPO Single Ply Membrane Maintenance (1,296) Section-2 TPO Single Ply Membrane Maintenance (8,592) Section-3 TPO Single Ply Membrane Maintenance (7,629) Section-4 TPO Single Ply Membrane
Storage Building #01 (8,373) Section-1 Standing Seam Metal
Design/Build: Design and construction shall comply with the requirements contained in this Task Order Request for Proposal (RFP). The design and technical criteria contained and cited in this RFP and the Unified Facilities Guide Specifications (UFGS) establish minimum standards for design and construction quality. The Designers of Record shall use the Unified Facilities Guide Specifications (UFGS) and the requirements contained in this RFP to fully develop the technical specifications and construction drawings. The objective of this solicitation is to obtain an energy efficient, durable, maintainable, and sustainable space.
Design/Build: The illustrations and exhibits included in this RFP illustrate the conceptual design of the project and are provided to define the scope of work and budget. The concepts provided shall be further developed by the Design/Build Contractor to comply with the customer’s functional needs.
All demolition required to construct the project is included as part of the work of this Contract.
1.3. SITE LOCATION
This project is located at 6159 Warehouse Ave Hattiesburg, MS 39401.
1.4. EXISTING SITE UTILITIES
1.4.1. The contractor shall verify the location of all utilities serving the building. Upgrading the existing utilities, (unless noted otherwise) outside the limits of construction, is not a part of this project.
1.5. NOT USED
1.6. NOT USED
1.7. ATTACHMENTS
Design/Build: Information provided in the Attachments is intended to guide the completion of the design by establishing existing conditions, and the desired character, appearance, and function of the new construction. The following Attachments are included and shall be used and strictly adhered-to in completing the design and construction of the project.
a. ATTACHMENT A: Site Location
b. ATTACHMENT B: Building Layout Plans
c. ATTACHMENT C: Site Inspection Report, 1-Apr-26
2. DESIGN REQUIREMENTS
2.1. GENERAL
The Contractor shall prepare complete construction documents for all work designed as required by the RFP. The construction documents to be prepared shall include, but are not limited to, construction drawings, specifications, submittals, and design analysis as required in Section 01 33 16.00 10 DESIGN DATA (DESIGN AFTER AWARD), Volume 1. Materials and equipment shall be limited to those specified except that where no specific material and equipment is specified or no basis of design is identified, the Contractor shall use materials and equipment accepted within the construction industry and in compliance with Design Criteria.
2.2. DESIGN
2.2.1. The Contractor shall prepare a 100% design for the project in accordance with the RFP using industry standard materials and efficient practices. The design of the materials selected shall be high quality, durable and easily maintained. The Contractor shall be responsible for the professional quality, code compliance, technical accuracy, and coordination of all designs, drawings, specifications, and other documents or publications upon which the design and construction are based. It shall be the responsibility of the Design/ Build Contractor to verify the accuracy of the documents provided.
2.2.2. CAD/BIM Requirement
The contractor will not be required to produce advanced modeling and design drawings will be limited to CAD files.
2.2.3. Design Submittal Requirements
Instead of a charrette submittal in accordance with the Louisville District Design Guide, the contractor may submit a charrette report after they have conducted an on-site charrette meeting. The charrette report must detail the results of the site visit and identify any discrepancies between the solicitation and field conditions. An interim submittal is not required. The contractor will submit a final design , a corrected final design, and certified final design in accordance with the requirements of the base contract. The independent Registered Roof Observer (RRO) identified under section 01 11 00 shall review the final design as part of the contract design QC review team. The RRO shall attend the final design plan-in-hand meeting.
2.2.4. Design Professionals
Registered Roof Consultant (RRC) - In addition to the requirements of the base MATOC, a Registered Roof Consultant (RRC) shall be a Designer of Record. The RRC shall have a degree in Architecture or Engineering and have at least ten (10) years of experience in roof repair design. The RRC must be currently licensed by the International Institute of Building Envelope Consultants (IIBEC). An independent RRC with the same minimum requirements shall be part of the Independent Technical Review.
2.2.5. Design Milestone Schedule
The sample schedule and sequence of work shown below was prepared for the Contractor’s use in its schedule preparation. This schedule is not intended to be the actual awarded design-build schedule. Upon receipt of the Notice to Proceed, the selected Contractor will be required to submit its proposed design and construction schedule for Government review and acceptance.
Notice to Proceed (NTP) Day 0 Design Quality Control Plan (DQCP) NTP + 14 Days Charrette Meeting (on-site) NTP + 60 Days Final Submittal NTP + 120 Days Final Plan in Hand Meeting (on-site) NTP + 138 Days Corrected Final Submittal NTP + 152 Days Certified Final Submittal NTP + 160 Days
2.3. REQUEST FOR PROPOSAL (RFP) INTENT
The intent of this RFP section is to describe the requirements for appearance, function, materials, and types of construction in sufficient detail to enable engineering and design to be completed by the Contractor.
2.4. Design Milestone Meetings
2.4.1. Charrette Meeting (Shall be in person and on-site.)
2.4.2. Final Design Review Meeting (Shall be in person and on-site.)
2.5. NOT USED
2.6. NOT USED
2.7. NOT USED
2.8. NOT USED
2.9. NOT USED
2.10. NOT USED
2.11. NOT USED
2.12. NOT USED
2.13. DESIGN SUBMITTAL DISTRIBUTION MATRIX
Submittal Reviewers & Mailing Addresses
John White
LRL-ED-MR
220 West Main
Email: John.E.White@usace.army.mil
U.S. Army Corps of Engineers Timothy M. McClellan, P.E., RRC
LRL-EDM
220 West Main
Email: Timothy.m.mcclellan@usace.army.mil
Michael Brooks
LRL-CDR
220 West Main
Email: Michael.s.brooks@usace.army.mil
Sheryll Impellizzeri, PE
LRL-PM-R
220 West Main
Email: sheryll.s.impellizzeri@usace.army.mil
Steve Coffey, PE USARC G 3/5/7 Engineers - Desk 4N-4001-62 4700 Knox Street, Bldg 8-8108 Ft. Bragg, NC 28310 Phone: 910-570-8961 Email: steven.w.coffey3.civ@army.mil
Justin Reeder, PE, RRC, RRO, CDT USARC-ARIMD Engineering Branch / SAIN Engineering USAR National Roofing Program REM Phone: 843.813.2423 Email: justin.reeder@saineng.com
81st RD William (Bill) Fogarty 81 Wildcat Way Fort Jackson, SC 29207 Phone: 803-351-0977 Email: William.c.fogarty.civ@army.mil
U.S. Army Corps of Engineers Abraham M Goodwin, PMI-CP Fort Campbell Resident Office Cell: 931-367-1217 Email: Abraham.M.Goodwin@usace.army.mil
3. GENERAL CONSTRUCTION REQUIREMENTS
3.1. SUMMARY
3.1.1. The requirements include:
a. Construction considerations and use of the premises.
b. Protection of personnel and Government property.
c. Construction facilities and job site standards.
d. The requirements of this section apply to the entire project including all amendments or modifications that may be issued to modify the contract documents.
3.2. GENERAL INFORMATION
3.2.1. NOT USED
3.2.2. NOT USED
3.2.3. Coordinate all construction activities with:
a. Contracting Officer’s Representative
b. Building Occupants
3.2.4. NOT USED
3.2.5. NOT USED
3.2.6. NOT USED
3.2.7. NOT USED
3.2.8. NOT USED
3.2.9. Project and Safety Signs. See 01 50 00, Paragraph 2.1.3.
3.3. NOT USED
3.4. NOT USED
3.5. Work Schedule under Section 01 11 00.00 06 Paragraph 3.9.1.2 is changed to “Work S WORK SCHEDULE: The Contractor shall schedule the work between the hours of 7:00 a.m. and 4:30 p.m. Monday through Friday except Federal Holidays.
3.5.1. No work shall occur on Federal Holidays.
3.5.2. No work shall occur on drill weekends.
3.5.3. Permission to perform any work outside of these hours must be in writing and submitted five (5) calendar days in advance for approval by the Contracting Officer.
3.5.4. The Government may or may not grant such permission at its discretion.
3.6. Contractor Personal Vehicle Parking under Section 01 11 00.00 06 Paragraph 3.9.1.7 is changed to Contractor Personal Vehicle Parking:
The contractor may use a limited number of parking spaces in the existing lots for the contractor’s employee parking of personal vehicles. The Contractor shall coordinate with the Government on the exact number of available spaces, and shall make provisions to transport employees to the site should inadequate parking spaces be available on site. Parking in these areas is available on a first-come first served basis.
4. NOT USED
5. NOT USED
6. EXTERIOR EQUIPMENT
6.1. Deleted.
6.2. Deleted.
6.3. Remove all existing external ladders. Contractor to install new
OSHA/EM 385-1-1 ladders and ATFP Security Upgrade compliant ladders between sections and from the ground to the roof where there is no roof access. Ladder security shall comply with UFC 4-026-01 and UFGS 05 51
33. The requirement for new ladders replaces Section 01 11 00 Paragraph 14 requirement for ladder brackets.
7. ARCHITECTURAL / BUILDING ENVELOPE
7.1. Deleted.
7.2. No metal wall panels for walls that transition from a lower roof on this project as all buildings are pre-engineered metal buildings (PEMB) with integral metal wall panels that are part of the PEMB system.
7.3. DOR Shall visit the site three times during the construction phase. One of these visits shall be during the final inspection.
8. NOT USED
9. NOT USED
10. NOT USED
11. NOT USED
12. NOT USED
13. NOT USED
14. Roof System
Roof system installed shall comply with UFC 3-110-03 Roofing, with Change 5, or the latest version available.
Contractors shall match existing downspout terminations with either new splash blocks at all downspout terminations or if exiting project has underground piping/storm drains the contractor shall snake/clear drains that have downspouts terminating in them.
Contractor bids shall include removal of 2-8 inches of insulation.
Existing roof systems may be multi-layered with differing roof system types below the surface membrane. Contractor is responsible for identifying all equipment mounted directly below the deck and utilize a connection method that either avoids the deck or relocates equipment in a way that complies with current building codes.
Fleece-backed PVC membrane with Decor ribs shall be spaced to closely match existing SSMR panels.
Building RFID (SF) Section(s) New Roof System
Administration (2,701) Section-1 Overlay - FB PVC w/ribs Administration (370) Section-2 Overlay - FB PVC w/ribs Administration (160) Section-3 Overlay - FB PVC w/ribs Maintenance (20,311) Section-1 New Roof System - FB PVC Maintenance (1,296) Section-2 New Roof System - FB PVC Maintenance (8,592) Section-3 New Roof System - FB PVC Maintenance (7,629) Section-4 New Roof System - FB PVC
Storage Building #01 (8,373) Section-1 Overlay - FB PVC w/ribs
14.1. NOT USED
14.2 ROOF DECK REPAIR
Inspect the roof deck carefully. If there are roof deck areas which require repair or replacement, notify the Contracting Officer. Do not proceed with repair or replacement until directed by the Contracting Officer. Assume replacement up to 10% damaged decking and 50% wood nailers.