Master Industry Day-Youngstown Fire Station MILCON 30JAN25 - Copy.pdf
PDF 2 MB Posted
- Solicitation number
- W912QR25YoungstownARSFireStationOH
- Issued by
-
Department of the Army
About this file
This is a presentation from an Industry Day forum held on January 30, 2025, for a new fire station construction project at Youngstown Air Reserve Station in Ohio. The presentation outlines an upcoming unrestricted Design-Bid-Build Invitation for Bid (IFB) opportunity from the US Army Corps of Engineers Louisville District.
The project involves constructing a new 24,500 square foot fire station, including demolition of existing Building 415. The facility will feature drive-through bays for Aircraft Rescue and Firefighting vehicles and sleeping quarters for 22 personnel. The estimated construction cost is between $10M-$25M with a 790-calendar day performance period. Key dates include advertisement in February/March 2025, pre-bid site visit in March 2025, proposals due April 2025, with award planned for May 2025 and construction completion in April 2027. The procurement will use electronic bid submission through PIEE, requires registration in SAM.gov, and large business offerors must submit small business subcontracting plans. Questions must be submitted through ProjNet, and the solicitation number will begin with "W912QR."
View the file
Other files
| File | Type | Posted |
|---|---|---|
| INDUSTY DAY ROSTER POCS 30JAN25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”
Presenters:
Carolyn Russell, PMP - Project Manager John Hearn - Supervisory Construction
Control Rep, COR Karla Wright - Contracting Specialist Crystal Harbin- Deputy for Small Business
INDUSTRY DAY FORUM
YOUNGSTOWN AIR RESERVE BASE, OHIO
30 JAN 2025
ADMINISTRATIVE ANNOUCEMENTS
• Please ensure that you have signed in
• Send in chat for remote participants
• Company Name, POC Name, Email, Phone
• Are you interested in being the Prime or Subcontractor
• If you’re interested in being a subcontractor, state the type of work you are interested (Electrical, Mechanical, Roofing, etc.)
• Please turn off all mobile devices
• No recording
• This briefing and the attendee roster will be posted to SAM. GOV
• Please be advised that none of the information discussed today is contractually-binding
AGENDA
• Introduction of Team Members
• USACE Procurement Process Overview
• Small Business Briefing
• Overview of the Project
• Q&A Session
GOVERNMENT TEAM MEMBERS
Jonathan Powell, PE Project Manager, Air Force Reserve Command Bob Woods, PE Chief Design & Construction, 910th Civil Engineering Brock Elsea Engineer, 910th Civil Engineering Glady Simpson, RA Design Project Architect (Louisville District Office)
Karla Wright Contracting Specialist (Louisville District Office)
Carolyn Russell, PMP Project Manager (Louisville District Office)
Renee Booth Contracting Officer (Louisville District Office)
Crystal Harbin Deputy for Small Business (Louisville District Office)
Edward McBride, P.E. Area Engineer/ACO, Construction (WP Area Office)
John Hearn QA Supervisor/COR, Construction (WP Area/Resident Office)
Alex McCoy, P.E. Regional Resident Engineer/ACO, Construction (Louisville District Office)
USACE PROCUREMENT PROCESS OVERVIEW
Karla Wright Contracting Specialist
US Army Corps of Engineers
THE PROCUREMENT PROCESS
• This project will be a Design-Bid-Build (D-B-B) Invitation for Bid
(IFB).
• This is an unrestricted procurement
• A virtual, public bid opening will be hosted where the apparent winner will be announced.
• Project award will be made to the responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price and price-related factors included in the invitation.
• It will be awarded as a single firm fixed price contract.
HOW TO OBTAIN THE SOLICITATION
• The Solicitation will be posted to SAM.gov
• Solicitation Numbers will begin with “W912QR” and can be found by searching for key words. (examples Youngstown; Fire Station)
• You will have at least 30 days from the time the Solicitation is posted to submit a bid.
• Pre-Solicitation Notice – will be posted on www.sam.gov at least 15 days prior to the initial issuance of the Solicitation package http://www.sam.gov/ http://www.sam.gov/
OBTAINING THE ISSUE DOCUMENTS
• Please register in System for Award Management (SAM.gov)
• To accomplish the following:
• Download Technical Data Package: (i.e. plans/specs)
• Receive amendments issued to the solicitation
• Receive notifications on the solicitation
• View Interested Vendor List
Submitting Questions - ProjNet
• Instructions for submitting a Request for Information (RFI) will be included in the Solicitation.
• RFIs for this project will be received and answered through the ProjNet system http://www.ProjNet.org/ProjNet
• Any RFIs submitted directly to the project team will not receive a response and will be directed to the ProjNet system.
• This project will have a Projnet Bidder’s Key, which is used to post your RFIs to the proper project.
• DO NOT WAIT UNTIL THE LAST MINUTE TO ASK QUESTIONS
http://www.projnet.org/ProjNet
Submitting Questions - Continued
• DO NOT WAIT UNTIL THE LAST MINUTE TO ASK/SUBMIT QUESTIONS
via ProjNet
• Please submit your questions from the date the Solicitation is posted until ProjNet closes. The sooner the better.
• ProjNet will close, generally 5 to 10 days before bids are due.
BID SUBMISSION
• We will utilize the Electronic Receipt of Bid process – Instruction will be in
Section 00 21 00 of the solicitation package
• All proposals will be submitted through the PIEE Solicitation Module. Offerors must register in advance for a user ID and Password to access this system.
• It is recommended to perform a test run well in advance.
• Technical support is available through PIEE.
• https://piee.eb.mil/
• Don’t wait until the last minute to upload your proposal – Late is Late (NO EXCEPTIONS!)
* The Louisville District is in the Eastern time zone.
Crystal Harbin Deputy for Small Business
Louisville District
SBO-LRL@usace.army.mil mailto:SBO-LRL@usace.army.mil
• Large Business offerors must submit a Small Business Subcontracting Plan
• Mandated by FAR 19.702
• This is not a rated element as a part of the Source Selection process but the offeror shall submit an acceptable plan prior to award
• The subcontracting plan is based on total subcontracted dollars
• Failure to comply in good faith is in material breach of the contract
SUBCONTRACTING PLAN
OBTAIN INFORMATION
• Attend Site Visits, Pre-Proposal Conferences, & Industry Days
• Obtain copies of attendee listings for subcontracting opportunities
• Register as an Interested Vendor on SAM
• Attend Workshops, Conferences, Trade Fairs
• Louisville District Open House: 05 February 2025 https://app.smartsheetgov.com/b/form/69413fa1c43f4cb393095d88eab8440f
• Review Agency Forecasts (posted on website)
• https://www.lrd.usace.army.mil/Opportunity-Forecast/ https://app.smartsheetgov.com/b/form/69413fa1c43f4cb393095d88eab8440f https://www.lrd.usace.army.mil/Opportunity-Forecast/
LOUISVILLE DISTRICT OPPORTUNITIES
• We anticipate executing approximately $1.3B in FY25 through both small and large businesses.
• Contracting opportunities are posted in the System for Award Management (SAM) website at www.sam.gov. Use “W912QR” to search for Louisville District projects.
• Actively Respond to Sources Sought Notices (Market Surveys) posted to SAM
• Actively Respond to Competitive Requirements posted to SAM (limited number of sole source opportunities) http://www.fbo.gov/
PROJECT OVERVIEW
John Hearn Supervisory Construction Control Rep, COR
US Army Corps of Engineers
YOUNGSTOWN AIR RESERVE STATION (YARS)
The installation is located at Youngstown– Warren Regional Airport. The host wing for the installation is the 910th Airlift Wing (910 AW), an Air Force Reserve Command unit operationally gained by the Air Mobility Command.
https://en.wikipedia.org/wiki/Youngstown%E2%80%93Warren_Regional_Airport https://en.wikipedia.org/wiki/Youngstown%E2%80%93Warren_Regional_Airport https://en.wikipedia.org/wiki/Youngstown%E2%80%93Warren_Regional_Airport https://en.wikipedia.org/wiki/910th_Airlift_Wing https://en.wikipedia.org/wiki/910th_Airlift_Wing https://en.wikipedia.org/wiki/Air_Force_Reserve_Command https://en.wikipedia.org/wiki/Air_Force_Reserve_Command https://en.wikipedia.org/wiki/Air_Force_Reserve_Command https://en.wikipedia.org/wiki/Air_Mobility_Command https://en.wikipedia.org/wiki/Air_Mobility_Command
Project Highlights:
Demolition of Building 415 in the footprint of the new facility. Construction of new 24,500 SFT Fire Station. The facility will include drive through bays sized to current Aircraft Rescue and Fire fighting vehicle requirements and a sleep space sized to accommodate 22 beds. Facility next to active airfield.
Project Delivery Method: Design-Bid-Build Procurement Method: Unrestricted IFB (Invitation For Bid) Estimated Construction Duration: 790 Calendar days
Magnitude of Construction: Between $10M and $25M
Youngstown Fire Station MILCON
Milestone Target Month Advertisement FEB 2025 Pre-Bid Site Visit MAR 2025 Proposals Due APR 2025 Contract Award MAY 2025 Notice to Proceed (Admin) JUN 2025 Construction Complete APR 2027
SITE LOCATION FOR NEW FIRE STATION
1/30/2025
CONSTRUCT NEW FIRE STATION, YARS, OHIO
YARS FIRE STATION – GREY IMAGE
File Name
SUMMARY
• Register www.SAM.gov to obtain and respond to solicitations.
• Unrestricted solicitations require small business participation.
• Scheduled for advertisement late February/early March 2025.
• Site Visit will be offered after advertisement.
Q&A
| INDUSTRY DAY FORUM�Youngstown AIR RESERVE Base, Ohio� |
| ADMINISTRATIVE ANNOUCEMENTS |
| AGENDA |
| Government TEAM MEMBERS |
| USACE PROCUREMENT PROCESS OVERVIEW |
| THE PROCUREMENT PROCESS� |
| HOW TO OBTAIN THE SOLICITATION� |
| OBTAINING THE ISSUE DOCUMENTS� |
| Submitting Questions - ProjNet |
| Submitting Questions - Continued |
| BID SUBMISSION� |
| Slide Number 12 |
| Slide Number 13 |
| OBTAIN INFORMATION |
| LOUISVILLE DISTRICT OPPORTUNITIES |
| Project OVERVIEW |
| Youngstown Air RESERVE Station (YARS) |
| Slide Number 18 |
| Site Location for New Fire Station |
| Construct New Fire Station, YARS, Ohio |
| YARS Fire Station – GreY Image |
| SUMMARY |
| Q&A |
File details come from the government source that posted it. Updated .