About this file
This Industry Day presentation outlines several upcoming Army Reserve and Energy Resiliency Conservation Investment Program construction projects in Puerto Rico to be awarded through full and open competitive procurements. Opportunities include a new Army Reserve Center and Advanced Skills Training Barracks at Fort Buchanan, as well as microgrid and backup power systems at Ramey Army Reserve Center, LTC H.G. Pesquera Army Reserve Center, and Fort Buchanan. The Louisville District Corps of Engineers will issue solicitations between November 2023 and June 2024, with evaluations occurring 30 to 90 days post-close and awards projected 60 to 120 days thereafter. Offerors are advised to register in the System for Award Management and monitor that system for pre-solicitation notices and full solicitations. Best value determinations will evaluate past performance, technical merit, and price/subcontracting plans. Small business participation is an evaluated factor and subcontracting goals apply to large business offerors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PR Industry Day Participants.docx | DOCX document | |
| 20231102-AR Industry Day Attendance.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”
DATE: 02 NOV 2023
TIME: 0900 AST
LOCATION:
PROFESSIONAL COLLEGE OF ENGINEERS
AND LAND SURVEYORS OF PUERTO RICO
Urb. Roosevelt, 500 C/Antolin Nin, Hato Rey, PR 00918
Webex:
https://usace1.webex.com/meet/john.f.miozza
INDUSTRY DAY FORUM
ARMY RESERVE PROJECTS
https://usace1.webex.com/meet/jason.l.cain
ADMINISTRATIVE ANNOUCEMENTS
• Please turn off all mobile devices
• No recording
• Posting of briefing
• Emergency information
AGENDA
• Army Reserve MILCON Projects Overview
• Fort Buchanan Army Reserve Center
• Fort Buchanan Advanced Skills Training Barracks
• Army Reserve ERCIP Projects Overview
• Ramey ARC Microgrid Control System
• LTC H G Pesquera Microgrid Control System
• Fort Buchanan Microgrid & Backup Power
• Fort Buchanan Potable Water Purification System
AGENDA
• To be discussed after each set of projects
• USACE Contracts
• Procurement Process
• Subcontracting Requirements
• Networking / Discussions
FORT BUCHANAN, PR
MILITARY CONSTRUCTION PROJECTS
John Miozza Project Manger
US Army Corps of Engineers Louisville District
ARMY RESERVE CENTER
FORT BUCHANAN, PR
PROJECT DESCRIPTION
SYNOPSIS POSTED 19OCT2023 TO
SAM.GOV - W912QR24R0009
SOLICITATION TO BE POSTED IN NOVEMBER
New Construction of Army Reserve Center (ARC) Training Building approximately 47,000 square feet.
Primary facilities include offices, classrooms, assembly hall, kitchen, arms vault, restrooms, unit storage and staging areas. Mechanical, Electrical and Telecommunication rooms and site work
SITE PLAN
FLOOR PLAN
ADVANCED SKILLS TRAINING BARRACKS
FORT BUCHANAN
ADVANCED SKILL TRAINING BARRACKS
Advanced Skill Training (AST) Barracks Building two story of approximately 30,000 square feet.
New Construction of:
Site Work and associated utilities 24 two-person quarters with private baths 8 10-person rooms with shared baths Day room per floor Laundry room per floor Common storage areas Janitorial Rooms Mechanical, Electrical and Telecommunication rooms
CONCEPTIONAL SITE PLAN
CONCEPTIONAL FLOOR PLAN
PROCUREMENT PROCESS
ADAM WANTLAND– CONTRACTING OFFICER
LOUISVILLE DISTRICT
OFFICE PHONE 502-315-6197
EMAIL ADAM.M.WANTLAND@USACE.ARMY.MIL
PROCUREMENT SCHEDULE-MILCON
DATES ARE APPROXIMATE AND SUBJECT TO CHANGE
Reserve AST Center Barracks
ISSUE SOLICIATION NOV 2023 APR 2025
SOLICITATION CLOSES FEB 2024 MAY 2025
EVALUATION BOARD FEB 2024 MAY 2025
AWARD APR 2024 JUN 2025
HOW TO OBTAIN THE SOLICITATION
ADAM WANTLAND– CONTRACTING OFFICER, LOUISVILLE DISTRICT
• System for Award Management – www.sam.gov
• Solicitation Number W912QR24R0009 – Ft Buchanan ARC
• Solicitation Number W912QR25R00XX – Ft Buchanan Barracks
• View interested vendors list and register as an interested vendor.
• Register to receive notifications and updates / amendments.
• RFP technical information will be posted on the SAM website at: www.sam.gov.
http://www.sam.gov/
OBTAINING THE ISSUE DOCUMENTS
• Requirements to download Technical Data Package
1) Need to be registered in System for Award Management (SAM)
• Any amendments issued to the RFP will also be posted here.
• Pre-Solicitation Notice – posted to SAM at least 15 days prior to the planned date of advertisement.
• Advertisement – minimum 30 days to prepare proposals.
THE PROCUREMENT PROCESS
• Projects will be a Design-Bid-Build (D-B-B) Request for Proposals (RFP).
• Project awards will be made on a “Best Value Trade-off” basis as described in the evaluation criteria.
• Proposals must be submitted on time.
* The Louisville District is in the Eastern time zone.
• The Source Selection Evaluation Board (SSEB) will evaluate contractors’ proposals based on specific factors which are defined in the RFP Package.
PROPOSAL REQUIREMENTS
• Source Selection Criteria for “Best Value Trade-off” usually consists of three elements:
1. Past Performance Evaluation;
2. Technical Evaluation (Management Plan, Schedule, etc.);
3. Pro-Forma Evaluation (Price, JV agreements, Bonding, etc.)
• Submit your best proposal the 1st time.
Discussions may not be opened, if we receive an initial proposal that is awardable.
• Source Selection Criteria for “Best Value Trade-off” usually consists of three elements:
1. Past Performance Evaluation;
2. Technical Evaluation (Management Plan, Schedule, etc.);
3. Pro-Forma Evaluation (Price, JV agreements, Bonding, etc.)
• Submit your best proposal the 1st time.
Discussions may not be opened, if we receive an initial proposal that is awardable.
• Instructions for submitting a Request for Information (RFI) will be included in the solicitation.
– RFIs for these projects will be received and answered through the Projnet system: www.projnet.org o Any RFIs submitted directly to the project team will not receive a response, and will be directed to the Projnet system.
– Each project will have a Projnet Bidder’s Key, which is used to post your RFIs to the proper project.
o The project Bidder’s Key will be included in the Projnet Instructions section of the RFP.
– Requests for Information and their responses will be available for public review through Projnet.
http://www.projnet.org/
Crystal Harbin Deputy for Small Business
Louisville District
SBO-LRL@usace.army.mil mailto:SBO-LRL@usace.army.mil
• Sources sought notices are issued on SAM to determine industry interest and capability
• Respond to the specific elements in the sources sought notice
• “Rule of Two” for determining set-aside for a procurement
MARKET RESEARCH
• The Small Business Participation Plan is a rated evaluation factor in all unrestricted procurements
• Both large and small business offerors must submit a participation plan
• The participation plan is based on total contract value
• Large Business offerors must submit a Small Business Subcontracting Plan
• Mandated by FAR 19.702
• This is not a rated element as a part of the Source Selection process but the offeror shall submit an acceptable plan prior to award
• The subcontracting plan is based on total subcontracted dollars
• Failure to comply in good faith is in material breach of the contract
SMALL BUSINESS PARTICIPATION PLAN &
SUBCONTRACTING PLAN
OBTAIN INFORMATION
• Attend Site Visits, Pre-Proposal Conferences, & Industry Days (Obtain copies of attendee listings for subcontracting opportunities)
• Register as an Interested Vendor on SAM
• Attend Workshops, Conferences, Trade Fairs
• Great Lakes and Ohio River Division Industry Day: 30 NOV 2023
• Louisville District Open House: 01 FEB 2024
• Review Agency Forecasts (posted on website)
• Construction & IDIQ Forecast is maintained on the Small Business page of LRL website, www.lrl.usace.army.mil.
http://www.lrl.usace.army.mil/
OPPORTUNITIES
• We anticipate executing approximately $1B in FY24 through both small and large businesses.
• Contracting opportunities are posted in the System for Award Management (SAM) website at www.sam.gov. Use “W912QR” to search for Louisville District projects.
• Actively Respond to Competitive Requirements posted to SAM (limited number of sole source opportunities)
To view Louisville District prime contract holders, please visit https://www.lrl.usace.army.mil/Business-With-Us/Small-Business/ http://www.fbo.gov/ https://www.lrl.usace.army.mil/Business-With-Us/Small-Business/
PUERTO RICO
ENERGY RESILIENCY CONSERVATION
INVESTMENT PROGRAM (ERCIP) PROJECTS
John Miozza Project Manger
US Army Corps of Engineers Louisville District
RAMEY ARMY RESERVE CENTER
MICROGRID CONTROL SYSTEM
RAMEY ARMY RESERVE CENTER
Install a new microgrid system capable of islanding the Ramey Army Reserve Center electrical distribution system starting at the automated distribution switch, the point of common coupling with Puerto Rico Electric Power Authority.
New Construction of:
Site Work and associated utilities Electrical Enclosure and controls 460 kW PV Array 275 kW Generator 600 kWh BESS
RAMEY ARC MICROGRID
RAMEY ARC MICROGRID
CONCEPTUAL ONE LINE
LTC H G PESQUERA ARC
LTC H G PESQUERA ARC
Install a new microgrid system capable of islanding the Juana Diaz (LTC Hernan G. Pasquera) Army Reserve Center electrical distribution system starting at the automated distribution switch, the point of common coupling with Puerto Rico Electric Power Authority.
New Construction of:
Site Work and associated utilities Electrical Enclosure and controls 690 kW PV Array 275 kW Generator 570 kWh BESS
LTC H G PESQUERA ARC MG
LTC H G PESQUERA ARC MG
CONCEPTUAL ONE LINE
FORT BUCHANAN INSTALLATION
FORT BUCHANAN MICROGRID
New Construction of an installation-level microgrid at Fort Buchanan with integration of existing PV and wind turbines
Primary facilities include:
4 Continuous duty 2 MW diesel generators 5 MWh battery enery storage system (BESS) Microgrid Control System including:
switchgear, transformers, transfer switches, circuit breakers, protective relaying and fiber optic communications
12 - 12,000 gallon above ground diesel storage tanks with fuel polishing system for diesel fuel Integration of existing ~5MW solar photovoltaic system and 2 275kW wind turbines
CONCEPTUAL SITE RENDERING
CONCEPTUAL/35% DESIGN ONE LINE
POTABLE WATER PURIFICATION SYSTEM
PWPS DESCRIPTION
New Construction of a packaged/modular water purification system at Fort Buchanan capable of treating 100 gpm from the onsite lake, Lake Casas, to potable standards for drinking water purposes and pumping to the existing tank
Primary facilities include:
Lake Intake System Water Purification System Pump and Piping system to existing 500 kg tank
SITE PLAN-PROPOSED ALIGNMENT
PROCUREMENT PROCESS
ADAM WANTLAND– CONTRACTING OFFICER
LOUISVILLE DISTRICT
OFFICE PHONE 502-315-6197
EMAIL ADAM.M.WANTLAND@USACE.ARMY.MIL
PROCUREMENT SCHEDULE-ERCIP
Ramey Pesquera Microgrid Microgrid
ISSUE SOLICIATION DEC 2023 DEC 2023
SOLICITATION CLOSES FEB 2024 FEB 2024
EVALUATION BOARD MAR 2024 MAR 2024
AWARD APR 2024 APR 2024
PROCUREMENT SCHEDULE-ERCIP
Ft Buchanan Ft Buchanan Microgrid Water Potable
ISSUE SOLICIATION Jun 2024 FY26
SOLICITATION CLOSES JUL 2024 FY26
EVALUATION BOARD AUG 2024 FY26
AWARD SEP 2024 FY26
HOW TO OBTAIN THE SOLICITATION
• System for Award Management – www.sam.gov
• Solicitation Number W912QR24R00XX – Ramey MG
• Solicitation Number W912QR24R00XX – Juana Diaz MG
• View interested vendors list and register as an interested vendor.
• Register to receive notifications and updates / amendments.
• RFP technical information will be posted on the SAM website at: www.sam.gov.
OBTAINING THE ISSUE DOCUMENTS
• Requirements to download Technical Data Package
1) Need to be registered in System for Award Management (SAM)
• Any amendments issued to the RFP will also be posted here.
• Pre-Solicitation Notice – posted to SAM at least 15 days prior to the planned date of advertisement.
• Advertisement – minimum 30 days to prepare proposals.
THE PROCUREMENT PROCESS
• Projects will be a Design-Bid-Build (D-B-B) Request for Proposals (RFP).
• Project awards will be made on a “Best Value Trade-off” basis as described in the evaluation criteria.
• Proposals must be submitted on time.
* The Louisville District is in the Eastern time zone.
• The Source Selection Evaluation Board (SSEB) will evaluate contractors’ proposals based on specific factors which are defined in the RFP Package.
• Source Selection Criteria for “Best Value Trade-off” usually consists of three elements:
1. Past Performance Evaluation;
2. Technical Evaluation (Management Plan, Schedule, etc.);
3. Pro-Forma Evaluation (Price, JV agreements, Bonding, etc.)
• Submit your best proposal the 1st time.
Discussions may not be opened, if we receive an initial proposal that is awardable.
• Instructions for submitting a Request for Information (RFI) will be included in the solicitation.
– RFIs for these projects will be received and answered through the Projnet system: www.projnet.org o Any RFIs submitted directly to the project team will not receive a response, and will be directed to the Projnet system.
– Each project will have a Projnet Bidder’s Key, which is used to post your RFIs to the proper project.
o The project Bidder’s Key will be included in the Projnet Instructions section of the RFP.
– Requests for Information and their responses will be available for public review through Projnet.
http://www.projnet.org/
Crystal Harbin Deputy for Small Business
Louisville District
SBO-LRL@usace.army.mil mailto:SBO-LRL@usace.army.mil
• Sources sought notices are issued on SAM to determine industry interest and capability
• Respond to the specific elements in the sources sought notice
• “Rule of Two” for determining set-aside for a procurement
MARKET RESEARCH
• The Small Business Participation Plan is a rated evaluation factor in all unrestricted procurements
• Both large and small business offerors must submit a participation plan
• The participation plan is based on total contract value
• Large Business offerors must submit a Small Business Subcontracting Plan
• Mandated by FAR 19.702
• This is not a rated element as a part of the Source Selection process but the offeror shall submit an acceptable plan prior to award
• The subcontracting plan is based on total subcontracted dollars
• Failure to comply in good faith is in material breach of the contract
SMALL BUSINESS PARTICIPATION PLAN &
SUBCONTRACTING PLAN
OBTAIN INFORMATION
• Attend Site Visits, Pre-Proposal Conferences, & Industry Days (Obtain copies of attendee listings for subcontracting opportunities)
• Register as an Interested Vendor on SAM
• Attend Workshops, Conferences, Trade Fairs
• Great Lakes and Ohio River Division Industry Day: 30 NOV 2023
• Louisville District Open House: 01 FEB 2024
• Review Agency Forecasts (posted on website)
• Construction & IDIQ Forecast is maintained on the Small Business page of LRL website, www.lrl.usace.army.mil.
http://www.lrl.usace.army.mil/
OPPORTUNITIES
• We anticipate executing approximately $1B in FY24 through both small and large businesses.
• Contracting opportunities are posted in the System for Award Management (SAM) website at www.sam.gov. Use “W912QR” to search for Louisville District projects.
• Actively Respond to Competitive Requirements posted to SAM (limited number of sole source opportunities)
To view Louisville District prime contract holders, please visit https://www.lrl.usace.army.mil/Business-With-Us/Small-Business/ http://www.fbo.gov/ https://www.lrl.usace.army.mil/Business-With-Us/Small-Business/
Serving our Military and the Nation
Thank you for your time and interest!
| INDUSTRY DAY FORUM�Army Reserve Projects� |
| ADMINISTRATIVE ANNOUCEMENTS |
| AGENDA |
| AGENDA |
| Fort BUCHANAN, PR�Military Construction Projects |
| �Army Reserve Center�Fort Buchanan, PR |
| �Army Reserve Center�project description |
| �Army Reserve Center�SITE Plan |
| �Army Reserve Center�Floor Plan |
| �Advanced Skills Training Barracks�Fort Buchanan |
| �Advanced skill training barracks�project description |
| �Advanced Skills Training Barracks�conceptional Site Plan |
| �Advanced Skills Training Barracks�conceptional Floor Plan |
| Procurement Process�Adam wantland– Contracting Officer�Louisville district�Office Phone 502-315-6197�Email adam.m.wantland@usace.army.mil |
| PROCUREMENT SCHEDULE-MILCON�Dates are approximate AND SUBJECT TO CHANGE |
| How to obtain the solicitation�Adam wantland– Contracting Officer, Louisville district� |
| Obtaining the Issue Documents�Adam wantland– Contracting Officer, Louisville district |
| The Procurement process�Adam wantland– Contracting Officer, Louisville district� |
| Proposal Requirements�Adam wantland– Contracting Officer, Louisville district |
| Proposal Requirements�Adam wantland– Contracting Officer, Louisville district |
| Proposal Requirements�Adam wantland– Contracting Officer, Louisville district |
| Slide Number 22 |
| Market research |
| Small Business Participation plan & Subcontracting PLAN |
| Obtain information |
| opportunities |
| puerto Rico�Energy Resiliency Conservation investment Program (ERCIP) Projects |
| �Ramey Army Reserve Center�microgrid control system |
| �Ramey Army Reserve Center�microgrid control system |
| �Ramey ARC Microgrid �conceptional SITE Plan |
| �Ramey ARC Microgrid�conceptual one line |
| �LTC H G Pesquera ArC�microgrid control system |
| LTC H G Pesquera ARC�microgrid control system |
| �LTC H G Pesquera ArC MG�conceptional SITE Plan |
| ��LTC H G Pesquera ArC MG�conceptual one line |
| �fort Buchanan installation�microgrid control system |
| �fort Buchanan microgrid�project description |
| �fort Buchanan installation�conceptual site rendering |
| �fort Buchanan microgrid�conceptional SITE Plan |
| fort Buchanan microgrid conceptual/35% design one line |
| �fort Buchanan installation�potable water purification system |
| �fort Buchanan installation�pWPS description |
| �fort Buchanan installation�SITE Plan-Proposed alignment |
| Procurement Process�Adam wantland– Contracting Officer�Louisville district�Office Phone 502-315-6197�Email adam.m.wantland@usace.army.mil |
| PROCUREMENT SCHEDULE-ERCIP�Dates are approximate AND SUBJECT TO CHANGE |
| PROCUREMENT SCHEDULE-ERCIP�Dates are approximate AND SUBJECT TO CHANGE |
| How to obtain the solicitation�Adam wantland– Contracting Officer, Louisville district� |
| Obtaining the Issue Documents�Adam wantland– Contracting Officer, Louisville district |
| The Procurement process�Adam wantland– Contracting Officer, Louisville district� |
| Proposal Requirements�Adam wantland– Contracting Officer, Louisville district |
| Proposal Requirements�Adam wantland– Contracting Officer, Louisville district |
| Slide Number 52 |
| Market research |
| Small Business Participation plan & Subcontracting PLAN |
| Obtain information |
| opportunities |
| Slide Number 57 |
| Slide Number 58 |
File details come from the government source that posted it. Updated .