W912QR24Q0048.pdf

PDF 2 MB Posted

Attached to
Nolin Admin Area Paving and Parking Improvements
Solicitation number
W912QR24Q0048
Issued by

About this file

This document is a Request for Quote (RFQ) for asphalt repaving and improvement work at the Nolin River Lake Administrative Area in Kentucky. The work is 100% set aside for small businesses under NAICS code 237310, with an estimated construction cost between $50,000 and $125,000.

The RFQ includes a base item for repaving the main office access road and interpretive building turn-in, along with four optional items for additional paving, crack filling, seal coating, and new parking construction. Contractors are encouraged to attend a site visit to review existing conditions. Quotes are due by April 26, 2024, and the contractor selected will be required to begin work within 14 calendar days of award and complete the project within 60 calendar days. Payment will be made by Electronic Funds Transfer. All contractors must be registered in the System for Award Management prior to submitting a proposal.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Nolin River Lake Office Administrative Area Road and Parking Improvement Project

Estimated Construction Cost: $50,000 and $125,000.

NAICS code 237310, Size determination: $45,000,000. Please note that the business size in SAM is determined by the NACIS code. If the vendor is not listed correctly for a particular code in SAM the business w ill be considered other than a small business.

Site visit is recommended, Please reach out to Libby Watt at (270)286-6606 to schedule a site visit.

One firm-f ixed price construction purchase order w ill be aw arded on the low est total price quote.

This project is set-aside 100% for Small Business.

Contractors must register and complete the respresentation and certif ication requirements in the System for Aw ard Management (SAM) database, available at https://sam.gov. Please ensure your annual SAM registration is current. Offerers must comply w ith the requirements of 52.204-7, 52.204-8, 52.232-33, and any other representation and certif ication requirements in this solicitation through SAM.

Please Note: SAM is completely free of charge for both registrants and users.

MARCIE BILLOTTO 502.315.6213

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

12-Apr-2024

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______14 calendar days and complete it w ithin ________60 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________26 Apr 2024 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

12:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: 502.315.7494 TEL: FAX:

W912QR24Q0048 36

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912QR24Q0048

Section 00 10 00 - Solicitation

SPECIAL INSTRUCTIONS

Contractor shall provide paving and parking improvements to the administrative area office at Nolin River Lake

The contractor’s work and responsibility will include furnishing all labor, materials, supplies, tools and, equipment necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work will be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. Work will shall begin with in 14 calendar days of award and must conclude 60 calendar days after date of award.

Location:

United States Corps of Engineers Nolin River Lake 2150 Nolin Dam Road Mammoth Cave, KY 42259

This procurement is 100% set-aside for Small Business, NAICS 237310, Size Standard $45M.

Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.

Note: The contract award will be based on lowest total price to the Government.

A site visit is strongly recommended, Contractors are encouraged to attend a site visit to review the complexities of the work site, verify existing conditions, and exact measurements. please reach out to Libby Watt at (270) 286- 6606 to schedule a site visit.

Quotes are due 26 April 2024, 12:00PM Eastern Time. Fax and mailed submittals will not be accepted.

Electronic submittals may be emailed to Marcie Billotto at marcie.billotto@usace.army.mil.

Offerors shall submit any questions regarding this solicitation in writing to marcie.billotto@usace.army.mil no later than 11:00 AM ET on 19 April 2024, in order to allow a written response prior to the quote due date. No remarks or written responses to questions by government personnel will change the terms or conditions of this RFQ.

The RFQ will only be changed by a formal written amendment.

All contractors must be registered in the System for Award Management (www.SAM.gov) prior to submission of proposal. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer – System for Award Management, which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by going to the website http://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier (formerly DUNS number) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from http://www.SAM.gov.

Please begin the registration process immediately in order to avoid delay of the contract award should your firm be selected.

ALERT: You must submit a notarized letter appointing the authorized Entity Administrator before your registration will be activated. This requirement now applies to both new and existing entities. Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record. The notarized letter is mandatory and is required before the GSA Federal Service Desk (FSD) will activate the entity's registration.

Effective 29 June 2018, vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM.

Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier.

The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM.

To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov).

07 March 2024 Scope of Work

Office Administrative Area Road and Parking Improvement Project U.S. Army Corps of Engineers

Nolin River Lake 2150 Nolin Dam Road

Mammoth Cave, KY 42259 Phone: 270-286-4511

Point of contact: Libby Watt

REQUEST FOR QUOTE

Please provide a quotation on the following items. Your quote must be submitted in writing using your company letterhead or this quote form. Depending on future funding status, items may or may not be purchased. The work under this request for quote is 100% set aside for small business award.

Large businesses are not eligible for award. If not currently registered in SAM, the successful offeror will have one week from notice of intent to proceed to

Scope of Work

Price Breakout Schedule

Line Item Description Quantity / Unit of Issue

Total Price

CLIN 001

BASE

NRL OFC access Road and Interpretive Turn- In Repaving and Resurfacing

1 Job

CLIN 002

Option 1

Interpretive Bldg Lot Crack, Fill, and Seal Coat

CLIN 003

Option 2

New Parking @ NRL OFC

CLIN 004

Option 3

Connector Access to Lower Parking Lot

CLIN 005

Option 4

ALT Interpretive Bldg Lot Resurface and repave

1 job

Total Price

Office Administrative Area Road and Parking Improvement Project

U.S. Army Corps of Engineers Nolin River Lake

2150 Nolin Dam Road Mammoth Cave, KY 42259

Phone: 270-286-4511 Point of contact: Libby Watt

TP-1.1 GENERAL:

1. Description. The contractor shall furnish all materials, supplies, tools, parts, equipment, transportation, labor, supervision, communication, and quality control to repave and resurface the Nolin River Lake Administrative area entrance road and facilities.

2. Terms. Work shall be provided in accordance with all Terms, Conditions, General, Specific and Technical Provisions, , Maps, etc. contained herein or incorporated by Reference. This includes all mandatory provisions of the Federal Acquisition Regulation (FAR), current at time of award.

3. Contractor Responsibility. The Contractor will furnish all labor, materials, tools and equipment necessary to perform installation of new pavement, repaving and resurfacing of existing paved area and patching some previously paved areas before resurfacing as necessary to provide uniform resurfacing work at Nolin River Lake, Kentucky in accordance with these specifications and requirements. The Contractor’s work and responsibility will include all planning, measurements and estimates of quantities, administration, supervision, communications, and inspection necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, state, and local laws and regulations. Prevailing Construction wage rates will be required and should be considered with your quote.

This contract is composed of one BASE ITEM and four OPTION ITEMs described in the Scope of Work section TP 3.1.

4. Performance Required. Special consideration of the Contractor is directed to the fact that the required accuracy, thoroughness, safety, and progress of this work are essential to the intended purpose.

The contractor must be cognizant of the difficulties involved and of the contingencies which may arise, and must make certain that their personnel, equipment, transportation facilities and supply of materials are adequate at all times to ensure complete compliance with all provisions of these specifications. The work shall be done under supervision by competent employees. All construction activities shall be in accordance with the submitted documents, and any additions, revisions or deletions must be approved by the Contracting Officer.

5. Completion of Work. Completion of work shall include acceptable performance of all aspects of this contract.

6. Compliance and Certifications: The contractor is responsible for obtaining any permits, conducting any tests or inspections, and paying any associated fees necessary to complete work as specified herein.

The work shall be accomplished IAW all local, state, and federal laws and regulations including but not limited to Kentucky Department of Highways Standard Specification for Road and Bridge Construction (KYDOH SSRBC), Unified Guide Specifications, ASTM, ASME, ANSI, OSHA and all applicable codes.

The Contractor’s work and responsibility shall include all planning, measurements and estimates of quantities, administration, supervision, communications and inspections necessary to assure that all construction activities are conducted in accordance with the contract requirements and all applicable Federal, state, and local laws and regulations.

7. Pre-Work Conference. The contractor will be required to attend a pre-work conference at least one week prior to beginning work, during which time the Contractor shall supply the Technical Point of Contact (TPOC) with an Accident Prevention Plan (APP) and Activity Hazard Analysis (AHA), in accordance with EM385-1-1 (latest edition) covering the contractor’s plan of work procedures, safety procedures, security, schedule, and equipment. This manual will be available on the Internet at:

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

8. Damages. The contractor shall be responsible for all damages to government or private property resulting from negligent operations during the course of this contract. The contractor shall have appropriate insurance to cover liability and damages. The contractor shall be responsible for compensating the government for any damage to government property and/or restoring and replacing in kind any such existing property damaged or destroyed by the Contractor through faulty handling as the Technical Point of Contact (TPOC) directs, at no expense to the Government.

9. Hours and Days of Work. Construction work may be conducted between 0630 and 1600, Monday through Friday. No work shall be performed outside of these times, or on Saturday or Sunday or on federal Holidays, unless approved by the Technical POC.

New Year's Day (January 1st) Martin Luther King Day (3rd Monday in January) President's Day (3rd Monday in February) Memorial Day (Last Monday in May) Juneteenth (June 19th) Independence Day (July 4th) Labor Day (1st Monday in September) Columbus Day (2nd Monday in October) Veterans Day (November 11th) Thanksgiving Day (4th Thursday in November) Christmas Day (December 25th)

10. Payment Procedure/Additional Work. At no time should the contractor do additional work without prior authorization of the Contracting Officer, and no work shall be performed that will cause the Contractor to exceed the contract price. Work performed without a binding contract document authorizing such work shall result in the Contractor not being paid for that work performed. During the course of the contract, any additional work determined to be needed may be requested by the TPOC to the Contracting Officer for a Contract Modification.

11. Contract Start and Completion Dates. Work under this contract shall begin within 14 calendar days of Notice to Proceed and must be completed no later than 60 days beyond the award date. Options selected for completion will be exercised with the base and be completed in the same timeframe of 60 days beyond the award date. Additional time may be granted for inclement weather.

12. Mobilization. Contractor will be responsible for all costs involved in mobilization and demobilization to and from the address listed below and shell be a part of the contract price.

13. Wage Rates: Department of Labor wage rates apply to this work and are included. The contractor is required to provide payroll documents for all work performed under this contract if requested.

14. Material, Equipment, Supplies Protection. The Contractor shall, at all times prior to delivery, take care to protect and preserve all materials, supplies, and equipment of every description (including material and property which may be Government owned) and all work performed. All reasonable requests of the Contracting Officer or his/her authorized representative to enclose or specially protect such property shall be complied with. This work will take place in a public use area. The contractor is responsible for the security of any equipment left on the job site. The contractor shall provide for the safety of the public through housekeeping, signage, and adequate designation of treatment zones.

15. Communication. The Contractor will notify the Contracting Officer or TPOC, upon commencement of work activities, and difficulties, interruption, or suspension of work, and when the required work has been completed. The Contractor shall update the TPOC no less than once weekly on status of work being done. Work will commence when NTP has been issued from the Contracting Officer and TPOC notified.

16. SITE VISIT. The Scope of Work only contains approximate measurements for reference. Each offeror should visit the job site and assume responsibility for quantities, materials, critical dimensions and work conditions used to calculate a quote.

Sites visits should be arranged by scheduling an appointment with the TPOC. All offerors interested in visiting the site must attend the site visit at that scheduled time. No other site visits will be conducted.

The Technical POC’s contact information is as follows:

Libby Watt USACE Louisville District Nolin River Lake 2150 Nolin Dam Road Mammoth Cave, KY 42259 Phone: 270-286-6606

17. Utilities. The contractor may utilize Government furnished utilities (water and electricity) to undertake work under this contract.

18. Warranty of Construction The contractor warrants that work performed under this contract is free of defects in installed equipment, materials and workmanship for work performed by the contractor or supplier for a period of 1 year from the date of the Government takes possession.

TP-1.2 CONTRACTOR SUBMITTAL. Unless otherwise specified, the Contractor shall submit the following information to the TPOC prior to the pre-work conference for this contract:

1. Safety Plans. The Contractor shall submit, for acceptance by the TPOC, an Accident Prevention Plan, Activity Hazard Analysis (AHA), Fall Protection Plan, and Hazard Communications Plan in accordance with the requirements of the Corps of Engineer’s Safety and Health Requirements Manual, EM 385-1-1, hereinafter referred to as the Safety Manual, current at the time of award.

2. Certification of Employees Qualified to Administer First Aid and CPR. The Contractor shall submit proof the appropriate number of employees, as required in the Safety Manual, are certified to administer First Aid and CPR.

3. Certificate of Insurance. The Contractor shall, at their own expense, provide and maintain during the entire performance of this contract the following Insurance Type: General Liability (Bodily Injury and Property Damage Combined) Minimum Amounts of Liability, $1,000,000.00 Each Occurrence, $1,000,000.00 Aggregate. The contractor is required to provide a Certificate of Insurance to the TPOC at the time of the Pre-Work Conference.

TP-1.3 SAFETY.

1. General Safety. The Contractor shall comply with the safety standards contained in Corps of Engineers Manual, EM 385-1-1, “Safety and Health Requirements Manual”, current at the time of award, as well as all current provisions of the Occupational Safety and Health Act (OSHA). Per Par. 01.A.17 of EM 385-1-1, the Site Safety and Health Officer is only required to have the minimum listed requirements.

The contractor can find it at this link:

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

Copies of documents proving that the Site Safety and Health Officer has met all minimum requirements per Par.01.A.17 of EM 385-1-1 shall be provided to the Technical POC before work begins under this contract.

2. Safety Manual Requirements. The Contractor and employees shall comply with all pertinent sections of the Corps of Engineer’s Safety and Health Requirements Manual, EM 385-1-1, current at the time of award, and any subsequent revisions. The Contractor’s safety plan must be submitted in writing prior to onsite work and can be turned in at the same time as the pre-work conference.

3. Personal Protective Apparel and Equipment. Protective apparel and equipment, as identified in the Activity Hazard Analysis (AHA), shall be provided to eliminate or minimize hazards to personnel. As a minimum, each employee shall wear a sleeved shirt, long trousers and safety-toe shoes or boots during all contract work. Hard hats, face shields, safety glasses with side-shields, or goggles, and hearing protection shall be worn by employees when required by safety manual. Fire extinguisher(s) and first aid kit(s) meeting the Safety Manual standards shall also be provided and easily accessible to all employees.

4. Contractor Employees Certified in First Aid & CPR. The Contractor shall schedule employees so the appropriate numbers of certified personnel are on duty to administer First Aid and CPR as required by the Safety Manual. Copies of their certification shall be provided before work begins under this contract.

5. Equipment Compliance. The USACE EM 385-1-1 is more stringent than OSHA, especially for load handling equipment. Is specifically includes but is not limited to the items in Chapter 16 (Load Handling Equipment) and 18 of the manual or the items listed below:

a. Certification of compliance (16.A.02)

b. Standard lift planning (16.A.03)

c. Critical lift planning (16.H)

d. Personnel Qualifications (16.B) (i.e. NCCCO and physicals)

e. Equipment Inspections and forms (16.D)

f. Safety Devices and Operational Aids (16.E)

g. Operational Manuals, Load Charts, Logs (16.G.01)

TP-1.4 ACCIDENT REPORTING. The Contractor shall maintain accurate accident records and report accidents as prescribed by the TPOC. Accidents shall be reported within 24 hours of occurrence, including accidents occurring on holidays and weekends, and all serious accidents (those resulting in death or injury requiring medical attention or lost time) shall be reported immediately.

TP-1.5 DAMAGE REPORTS. In all instances where Government property, equipment, natural features, landscape, or trees are damaged by contract employees, an immediate notification shall be made to the TPOC. A full report of the incident and extent of such damage shall be submitted to the TPOC within two working days of occurrence, excluding weekends and holidays.

TP-1.6 CONTRACT EMPLOYEES. All contract employees shall conduct themselves in a proper and courteous manner at all times. Contract employees shall comply with all provisions of Title 36, Chapter III, Part 327, CFR and obey all posted signs and regulations in the performance of the work under this contract. Being under the influence of, or consuming alcoholic beverages or controlled substances by the Contractor or employees while on duty is prohibited.

TP-1.7 QUALITY ASSURANCE. The Government will monitor the Contractor’s work and examine completed work to determine whether work is performed and completed in compliance with purchase order specifications. The TPOC is responsible for the Government’s Quality Assurance Program under the purchase order. The TPOC and/or his designated Quality Assurance Inspector (QAI) will observe the work being performed and inspect completed work. The contractor and the TPOC/QAI shall coordinated work schedules and inspections to best evaluate contractor performance. The Government will use 100% inspections to evaluate the work provided under this contract. If the completed work does not conform to the requirements under the contract, the Government may require the contractor remedy the work until it satisfactorily meets the requirements of the contract specification. When the deficiencies cannot be corrected by re-performance, the Government may reduce or deduct the purchase order price to reflect the reduced value of the work performed or pursue claims as detailed in the FAR clauses contained in the contract.

TP- 2.1 SPECIAL REQUIREMENTS:

a. Security

1. General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures—this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

2. Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location.

Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the

RA.

3. Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See something, Say Something). All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

4. Pre-Screen Candidates/E-Verify Program. Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E- Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

b. SUPPLEMENTAL SECURITY REQUIREMENTS

1. All Contractors and subcontractor employee(s) working on this contract who require access to any Louisville District Lake Projects and Lock and Dam Projects shall receive authorization to be on site at these facilities based upon a favorable background investigation in accordance with “Homeland Security Presidential Directive 12: Policy for a Common Identification Standard for Federal Employees and Contractors” (HSPD 12). The Louisville District Security Management Office shall submit contractor(s) personal information to complete the basic background investigation in order to make a recommendation to the Contracting Office of an employee’s suitability for work on Government property. The Procuring Contracting Officer (PCO) has the right to deny any contractor or subcontractor employee from working on the contract based upon the results of the background investigation provided by the Louisville District Security Office. The Government, Contractor, and subcontractors shall not permit any employee(s) access to drawings, blueprints, records, photos, sites, or projects until the Louisville District Security Management Office has completed an Operations Security (OPSEC) review of such items and determined they can be released.

FOR ALL LOUISVILLE DISTRICT CONTRACTS:

1. Contractors shall submit a complete investigation packet for each contractor and subcontractor employee to the Louisville District Security Management office within 10 working days after award of any contract, or prior to the individual being permitted access to Louisville District facilities.

2. The Contractor must also provide the following: (1) Name of the Contract Specialist with whom he/she is working, (2) Project Name, (3) Contract Number (4) Task Order Number when applicable, and (5) US Citizens Security Access Form each employee working on site must have a background investigation form submitted directly to the Louisville District Security Office.

3. The Contractor must provide a full legal name, complete SSN#, Date of Birth, Place of Birth (City and State) and Driver’s license number if available. It is the Contractor’s responsibility to ensure the above information is accurate and legible, otherwise delays may occur.

4. Contractors shall have background checks completed for their employees annually in the case of Contracts with an initial period of performance (POP) greater than 1 year and those Contracts with Options or Modifications Which Extend the POP beyond 1 year. For instance, if the employee was cleared in May of 2022, they shall be cleared again in May of 2023. It is the Contractor’s responsibility to ensure that each employee’s security is up to date. Failure to comply may lead to possible removal from the project/jobsite. The Contractor must ensure if new employees are brought in to work on an existing Contract with the U.S. Army Corps of Engineers (USACE), they must process the employee through the Louisville District USACE Security Office for background purposes.

5. In order to assure forms are properly completed, and to minimize time delays, the Contractor is encouraged to work closely with the Louisville District Security Office. The Government will return for correction incomplete forms, illegible forms, etc. which will delay the contractor / subcontractor from beginning work.

6. Security requirements are subject to change in accordance with HSPD-12, Office of Personnel Management, regulation, or policy changes, etc. The Government shall add any changes to security requirements by modification to the contract.

The Contractor shall contact the Louisville District Security Office by phone, letter, or email at the following numbers/addresses:

CELRL-SM

600 Martin Luther King Jr. Pl Louisville, KY 40202

Primary Email: DLL-CELRL-Security-SM@usace.army.mil Alternate (if no response in 72 hours):

James R. Milner, phone (502) 315-6916; James.R.Milner@usace.army.mil Jason Almodovar, phone (502) 315-6754; Jason.Almodovar@usace.army.mil

4. Payment. Payment will be made by Electronic Funds Transfer (EFT), upon acceptance of the completed work and providing final invoice and labor records. This process can take approximately 30 calendar days to process after the invoice is submitted to the U.S. Army Corps of Engineers at Nolin River Lake for payment following completion of work.

5. SAM Registration. The successful offeror will be required to be registered with System for Award Management (SAM), (https://www.sam.gov/) to do business with the government. (NOTE: Pay careful attention when typing in the SAM website address on your browser). In order to register with SAM, you must have a UNIQUE ENTITY IDENTIFIER number. If you are unsure of your UNIQUE ENTITY IDENTIFIER number, or have questions regarding this, you can call 1-800-333-0505 for assistance.

Offerors must complete their registration in SAM in order to be eligible submit a quote under this contract.

6. Unresponsive Quote. Failure to provide all information requested within this solicitation and to complete SAM registration may be grounds for considering the quote unresponsive.

TP-3.1 GENERAL SPECIFICATIONS:

Scope of Work (SOW):

General. The work will involve new paving, paving repairs, and repaving, shouldering, and water mitigation at specified areas per this scope of work. The asphalt mixture, construction, and placement are to meet the requirements of Kentucky Department of Highways Standard Specification for Road and Bridge Construction (KYDOH SSRBC), current edition, unless otherwise specified in this scope of work.

See technical specifications in Section TP 3.2 for in depth requirements pertaining to

Resurfacing/Patching/Repairing Existing Distressed Asphalt, New Asphalt Paving General Design Flagging and Signage (if needed)

This work shall be accomplished through a BASE (CLIN 0001) line item and any other of 4 option items exercised. The dimensions and estimated quantities for these items are included on the map with this solicitation. Appendix A

BASE ITEM (CLINE 001): Main office access road improvements include 3 sections the TOP resurfaced with milling of failed asphalt, MIDDLE excavated, removed, and paved, and BOTTOM resurfaced with milling of failed asphalt. Shouldering required for all sections. Refer to section specs below. Map reference Exhibit 1:

Top Section -Resurfacing pavement.

Approximate dimensions 106’ x 25’ or 2, 650 sq ft

1. Edge back, degrass, and sweep remaining existing asphalt.

2. Mill edge keys at termination points to tie in and be the same height as the existing pavement without unusual dip.

3. Mill out any deteriorating surfaces, breaks, joints, transversal cracks that may impact the overall structural integrity of the pavement, remove all failed asphalt and overlay based per industrial standards.

Provide 1.5” KYTC asphalt re-surfacing on the remaining asphalt and provide shouldering.

Middle Section-Excavate and remove concrete and asphalt.

Approximate Dimensions of access road 290’ x 25’ or 7,250 sq ft. Approximate dimensions of interpretive building turn in 30’ x 17’ or 510 sq ft

1. The contractor will excavate and remove existing concrete and asphalt pavement to subgrade and provide full depth asphalt pavement to include the turn in to the interpretive building with shouldering.

Additionally, the contractor shall install of three permanent “Bleeders” to drain subgrade moisture on the main access road.

2. Bleeders shall be excavated to a depth of 24” and daylight to slope. Bleeders shall be 24”w x 18”d fabric wrapped consisting of Clean KYTC #5 stone. Contractor shall replace a minimum of 8” of topsoil cover, seed, and straw. If necessary, contractor is responsible for removal and replacement of guardrail.

Bottom section starting from CR 728

Approximately dimensions 95’ x 25’ or 2,090 sq ft.

1. Edge back, degrass, and sweep remaining existing asphalt.

2. Mill edge keys at termination points to tie in and be the same height as the existing pavement without unusual dip.

3. Mill out any deteriorating surfaces, breaks, joints, transversal cracks that may impact the overall structural integrity of the pavement, remove all failed asphalt and overlay based per industrial standards.

Provide 1.5” KYTC asphalt re-surfacing on the remaining asphalt and provide shouldering.

OPTION 1 ITEM (CLIN 002)

Interpretive building lot – Crack Fill & Seal Coat Approximate dimensions 10,607 sq ft

1. Clean and Sweep all existing asphalt pavement, removing any loose debris and dirt

2. Remove vegetation, dirt, and debris from cracks greater than or equal to 1/4" in width by routing or air lance

3. Provide Hot Pour Rubberized Crack Fill to all visible cracks greater than or equal to 1/4" in width.

4. Seal Coat remaining asphalt pavement with Polymer Modified Asphalt Sealer (2 coats)

5. Include 2-3 lbs sand per gallon in initial coating.

6. Layout and Reapply all disturbed pavement markings.

OPTION 2 ITEM (CLIN 003)

New Parking Area at NRL OFC Approximate dimensions 38’ x 52’ or 1970 sq ft

1. Excavate existing conditions as needed

2. Place new full depth asphalt pavement

3. Stripe for additional parking stalls and install wheel stops to match existing

OPTION 3 ITEM (CLIN 004)

Connector access to lower parking lot approximate dimensions 60’ x 30’ or 1,800 sq ft

1. Excavate existing conditions and drainage pipe taking care NOT to affect the grated drain. NOTE:

Only a depth of 8” will be achieved, natural base below existing gravel is solid rock. Underground utility may be present in this area.

2. Place 2 new 10" CMP Culvert that led to grated drain located at the point of this connector and adjacent to CR 728. Shallow Utilities of less than 24" cover shall be capped with 36" w x 4"d 4000psi concrete prior to placement of additional materials.

3. Place New Asphalt Pavement

OPTION 4 ITEM (CLIN 005)

Interpretive building Lot Asphalt mill and resurface improvements Approximate dimensions 10,607 sq ft

1. Edge back, degrass, and sweep remaining existing asphalt.

2. Mill edge keys at termination points to tie in and be the same height as the existing pavement without unusual dips.

3. Mill out any deteriorating surfaces, breaks, joints, transversal cracks that may impact the overall structural integrity of the pavement, remove all failed asphalt and overlay based per industrial standards.

Provide 1.5” KYTC asphalt re-surfacing on the remaining asphalt and provide shouldering.

4. Layout and Reapply all disturbed pavement markings

**Note: There is a AC compressor with ballasts that is located between the parking and backside of the building.

2. TECHNICAL SPECIFICATIONS

Technical Specifications.

General

A. The contractor will perform asphalt resurfacing, which includes patching previously paved areas that are damaged or severely distressed before resurfacing, in accordance with the attached specifications and requirements. The asphalt mixture, construction, and placement are to meet the requirements of the Kentucky Department of Highways Standard Specification, Division 400 Asphalt Pavement 2019.All work in this contract will follow current Kentucky Department of Highways guidelines:

https://transportation.ky.gov/Construction/Standard%20amd%20Supplemental%20Specifications/Co mplete%20KYTC%20Standard%20Specifications%20-%202019.pdf

Resurfacing/Patching/Repairing Existing Distressed Asphalt

A. Pave over existing pavement with 1.5 inches of compacted asphalt pavement surface course. Prior to paving contractor will remove soil, vegetation, loose stone, and other debris from areas to be re-paved with a power broom or similar equipment to expose a clean surface. All cutback material will be removed from the site. The contractor will apply asphalt tack coat to all pavement to be repaved.

Placing of the asphalt surface course will follow and be laid in a single course to a compacted thickness of 1.5 inches. The asphalt will be spread and struck off with a paver. Any irregularities in the surface of the pavement course will be corrected directly behind the paver. Excess material forming high spots will be removed with a shovel or a lute. Indented areas will be filled with hot mix and smoothed with a lute or the edge of a shovel being pulled over the surface. Broadcasting of the material will not be permitted. Any lumps that do not break down readily will be removed.

B. Where patching/repair of asphalt is required, the Contractor will excavate existing distressed asphalt through the top and base coats, as necessary. Contractor will follow standard industry practices and standards as to depth of excavation required. Afterwards, specifications for new asphalt paving general design and new asphalt construction procedures will be followed, as shown herein, for installation of new pavement in these areas.

C. The Contractor will furnish, if requested, representative samples of materials to be used in the work, including the mixture of asphalt. The samples may be retained and tested by the Government at no cost to the Contractor. The contractor will provide certification that material is in accordance with the Kentucky Department of Highways Standard Specification for Road and Bridge Construction (Latest

Edition). Sampling and testing will be in accordance with the latest rev. of the American Association of State Highway and Transportation Officials or the ASTM standard procedures for sampling and testing the materials being used on the project. No recycled asphalt pavement will be allowed in the asphalt surface.

D. Thoroughly and uniformly compact the surface by making a minimum of three passes with rollers.

Rollers will be in good condition and will be operated at slow speeds to avoid displacement of the asphalt mixture. The number, type, and weight of rollers will be sufficient to compact the mixture to the required density while it is still in a workable condition. Perform initial compaction while the mixture is above 250º F and as soon as the hot mix material can be compacted without displacement.

Rolling will continue until thoroughly compacted and all roller marks have disappeared. In areas too small for the roller, a vibrating plate compacter or hand tamper will be used to achieve thorough compaction. At the contact end of paving with existing pavement, new pavement will be tapered by milling underlying pavement to match existing pavement or concrete with a minimum 3 foot transition zone and removal of a minimum of 2 inches depth of existing pavement with a replacement of an appropriate amount of compacted asphalt pavement surface course to match new and existing pavement.

New Asphalt Paving General Design A. New asphalt pavement will consist of a 1.5 inch thick surface course and a 3.5 inch base course, all constructed on prepared subgrade.

B. Paved areas will be so constructed that water will quickly drain from the surface and be conducted away from the area through approved systems. Transverse and/or longitudinal slopes of not less than 5/8 inch in 10 feet will be provided.

C. On the prepared sub-grade the asphalt base will be laid in a single course to a compacted thickness of 3 inches. Placing of the asphalt surface course will follow and be laid in a single course to a compacted thickness of 1.5 inches. The asphalt will be spread and struck off with a paver. Any irregularities in the surface of the pavement course will be corrected directly behind the paver.

Excess material forming high spots will be removed with a shovel or a lute. Indented areas will be filled with hot mix and smoothed with a lute or the edge of a shovel being pulled over the surface.

Casting of mix over such areas will not be permitted. If it is impractical to use a paver or spread box in areas of 1000 sq.yd. or less asphalt base and surface courses may be spread and finished by hand. Wood or steel forms, rigidly supported to assure correct grade and cross section, may be used. Placing by hand will be performed carefully to avoid segregation of the mix. Broadcasting of the material will not be permitted. Any lumps that do not break down readily will be removed.

Rolling will start as soon as the hot mix material can be compacted without displacement. Rolling will continue until thoroughly compacted and all roller marks have disappeared. In areas too small for the roller, a vibrating plate compacter or hand tamper will be used to achieve thorough compaction. The surface of the completed work, when tested with a ten foot straightedge, will not contain irregularities in excess of ¼ inch.

D. A tack coat will be applied on each layer.

E. Priming material for the sub-grade will be of good quality according to industry standards.

F. Longitudinal joint spacing will not exceed 12.5 feet.

G. Transverse joint spacing will be at regular intervals of 20 feet.

H. All transverse construction joints will have a depth equal to ¼ of the pavement thickness

The contractor will dispose of removed material off Corps of Engineer property in accordance with appropriate state and federal requirements.

Flagging and Signage (if needed)

a. Maintain the portion of the project used by public traffic, and adequately accommodate through and local traffic. Furnish, erect, and maintain all traffic control devices, including signs, signals, channelization devices, temporary pavement markings, pilot cars and other items necessary to maintain traffic according to the Manual on Uniform Traffic Control Devices (MUTCD) throughout the duration of the project.

b. All flaggers shall be trained in current MUTCD flagging procedures. Proof of training must be available for review at the Government’s request. Flagging credentials must be current within the last 5 years.

c. Make provisions for the timely passage of an emergency vehicle through the work zone. When maintaining traffic over a section of highway or a bridge, provide facilities for the safe movement of traffic at all times. Notify the TECHNICAL POC before erecting traffic control devices, changing the location of devices in place, or beginning a traffic operation of any kind, except in case of an emergency. Notify the TECHNICAL POC in writing a minimum of one week in advance, when it is necessary to do work such as detour signing outside the limits of the project.

d. Place all traffic control devices starting and proceeding in the direction of the flow of traffic.

Remove traffic control devices starting and proceeding in the direction opposite to the flow of traffic.

e. Take responsibility for all damage caused by the failure of any traffic control device or person protecting it. Whenever evidence of damage is found before the job is called complete, the TECHNICAL POC may order immediate removal and replacement of the damaged portion of the work.

f. Remove all traffic control devices when they are not needed for the project.

This is the start of the file's text. The full file is on GovTribe.