The document provided is a solicitation (W912QR24B0010) for the repair of HVAC, air handling units (AHUs), and chillers at the Wright-Patterson Air Force Base in Ohio. The contract is a firm-fixed-price construction contract with an estimated duration of 549 calendar days. The North American Industry Classification System (NAICS) code is 238220 for Plumbing, Heating, and Air-Conditioning Contractors. This is a full and open procurement, but it requires a HUBZone 10% price evaluation. The solicitation will be awarded based on the lowest priced complete offer, and the government intends to award without discussions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPAIR HVAC SYSTEM
PROJECT NUMBER: P2# 495504
WPAFB BUILDING 10271
ZHTV NUMBER : 160020
CERTIFIED FINAL
VICINITY MAP PROJECT SITE
CONTRACT NO. : W912QR19D0041
NN
G-001
C O
VE
R
S H
EE
T
SC
H
M
IT
Z
R
ID
D
LE
AL
BE
R S
SHEET TITLE
GENERAL
G-001 COVER SHEET
G-002 PHASING PLAN
G-003 PHASING PLAN
HAZARDOUS MATERIALS
HM101 HAZARDOUS MATERIAL PLANS
HM102 HAZARDOUS MATERIAL PLANS
HM103 HAZARDOUS MATERIAL PLANS
HM104 HAZARDOUS MATERIAL PLANS
HM105 HAZARDOUS MATERIAL PLANS
CIVIL
V-101 EXISTING CONDITIONS
V-102 EXISTING CONDITIONS
CD101 DEMOLITION PLAN
CS101 SITE PLAN
CS102 SITE PLAN
CU101 CHILLER PIPE PLAN & PROFILE
CU102 DRAIN PIPING PLAN & PROFILE
CU103 WATERLINE RELOCATION PLAN & PROFILE
C-501 DETAIL SHEET
STRUCTURAL
S-001 STRUCTURAL NOTES
S-201 FONDATION PLAN AND DETAILS
S-501 DETAILS
FIRE PROTECTION
FP101 FIRE PROTECTION PLAN -FIRST FLOOR
FP102 FIRE PROTECTION PLAN - SECOND FLOOR
MECHANICAL
M-001 ABBREVIATIONS
M-002 SYMBOLS
M-003 GENERAL NOTES
M-004 GENERAL ENVIRONMENTAL NOTES
MD101 FIRST FLOOR OVERALL DEMOLITION PLAN
MD401 ENLARGED DEMOLITION PLAN
MD402 ENLARGED DEMOLITION PLAN
MD403 ENLARGED DEMOLITION PLAN
MD404 ENLARGED MECHANICAL ROOM PLAN
MD405 ENLARGED MECHANICAL ROOM PLAN
MD801 MECHANICAL DEMOLITION SCHEMATIC
PROPOSED HAUL ROUTE
N
SHEET TITLE
M-101 FIRST FLOOR PIPING PLAN - WEST
M-102 FIRST FLOOR PIPING PLAN - EAST
M-103 FIRST FLOOR HVAC ATFP PLAN - WEST
M-104 FIRST FLOOR HVAC ATFP PLAN - EAST
M-105 SECOND FLOOR HVAC ATFP PLAN
M-301 SECTIONS
M-302 SECTIONS
M-303 SECTIONS
M-401 ENLARGED MECHANICAL ROOM PLAN
M-402 ENLARGED MECHANICAL ROOM PLAN
M-403 ENLARGED MECHANICAL ROOM PLAN
M-404 PARTIAL PLAN - COOLING TOWER
M-405 ENLARGED MECHANICAL ROOM PLAN
M-406 ENLARGED MECHANICAL ROOM PLAN
M-501 DETAILS
M-502 DETAILS
M-601 SCHEDULES
M-602 SCHEDULES
M-701 CONTROLS
M-702 CONTROLS
M-703 CONTROLS
M-704 CONTROLS
M-705 CONTROLS
M-706 CONTROLS
M-801 MECHANICAL SCHEMATIC
ELECTRICAL
E-001 GENERAL NOTES, SYMBOLS
&ABBREVIATIONS
ED101 1ST FLOOR PARTIAL POWER DEMOLITIONPLAN
ED102 PARTIAL 1ST FLOOR & COOLING TOWERPOWER
DEMOLITION PLAN
ED103 2ND FLOOR PARTIAL POWER DEMOLITIONPLAN
E-100 OVERALL 1ST FLOOR POWER PLAN
E-101 1ST FLOOR PARTIAL POWER PLAN
E-102 PARTIAL 1ST FLOOR & COOLING TOWERPOWER
PLAN
E-103 2ND FLOOR PARTIAL POWER PLAN
E-601 ELECTRICAL SCHEDULES
E-602 ELECTRICAL SCHEDULES AND DETAILS
E-801 PARTIAL ONE LNE DIAGRAM - NEW WORK
E-802 PARTIAL EXISTING ONE LINE DIAGRAM
-REFERENCE ONLY
E-803 EXISTING PARTIAL ONE LINE DIAGRAM
-REFERENCE ONLY
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
KZ
F
D
ES
IG
N
BR
O
AD
W
AY
S
T.
C
IN
C
IN
N
AT
I, O H
IO
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-1
7-
AN
SI
D
R
EP
AI
R
H
VA
C A
H U
'S
, 2 , 4
A N
D C
H
IL
LE
R
S
C G
B
W
PA
FB
B
U
IL
D
IN
G
, A R
EA
A
W R
IG
H
T
PA
TT
ER
SO
N
A
FB
, O H
IO
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AUGUST 02, 2024 - 100% CORRECTED FINAL
BLDG 10271
ZH
TV
EB
Y
BUILDING 10271
GATE 26A
LOOP RD
SKEEL AVE
KUGLICS BLVD
GATE 26A
BLDG 10271
W
2Q R
B0
0_
C or r_ Fi na l_
Pl an s-
05 August 2024
W912QR24B0010
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
KZ
F
D
ES
IG
N
BR
O
AD
W
AY
S
T.
C
IN
C
IN
N
AT
I, O H
IO
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-1
7-
AN
SI
D
R
EP
AI
R
H
VA
C A
H U
'S
, 2 , 4
A N
D C
H
IL
LE
R
S
C G
B
W
PA
FB
B
U
IL
D
IN
G
, A R
EA
A
W R
IG
H
T
PA
TT
ER
SO
N
A
FB
, O H
IO
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AUGUST 02, 2024 - 100% CORRECTED FINAL
BLDG 10271
ZH
TV
EB
Y
PH
AS
IN
G P
LA
N
G-002
FY
E/
PA
R
K
FY
E/
PA
R
K
N
AD
ER
THE CONSTRUCTION BASE BID AND BID OPTIONS ARE DESCRIBED WITHIN THE CONSTRUCTION PLAN
ON SHEETS G-002 AND G-003.
THE SEQUENCE OF CONSTRUCTION DESCRIBED ON SHEETS G-002 AND G-003 FOR THE BASE BID AND EACH BID OPTION IS A PLAN OUTLINE AND NOT INCLUSIVE OF ALL REQUIRED PROCEDURES FOR THE CONSTRUCTION OF EACH BASE BID OR BID OPTION. THE CONTRACTOR MAY ADJUST AND MODIFY THE CONSTRUCTION SEQUENCE WITHIN THE BASE BID AND EACH BID OPTION TO COMPLETE THE SCOPE OF WORK FOR THE PROJECT WHILE ADHERING TO THE GENERAL OUTLINE PRESENTED HERE.
THE CONTRACTOR TO PROVIDE A FINALIZED CONSTRUCTION PLAN TO THE GOVERNMENT FOR
APPROVAL PRIOR TO STARTING ANY WORK.
MECHANICAL CONTRACTOR TO COORDINATE WITH THE ELECTRICAL CONTRACTOR AND BAS
CONTROLS CONTRACTOR AT EACH BASE BID AND BID OPTION TO MAINTAIN CHILLED WATER SYSTEM
AND AIR HANDLING UNIT OPERATION. THE ELECTRICAL CONTRACTOR AND BAS CONTROLS
CONTRACTOR SHALL PROVIDE ANY NEW AND OR TEMPORARY SYSTEMS TO MAINTAIN THE CHILLED
WATER SYSTEM AND AIR HANDLING UNIT OPERATION.
BASE BID
THE MAIN SYSTEMS AFFECTED DURING BASE BID INCLUDE THE CHILLED WATER SYSTEM,
CONDENSER WATER SYSTEM, AND COOLING TOWERS. THE CONSTRUCTION AREA DURING BASE BID INCLUDES, BUT IS NOT LIMITED TO, THE FIRST FLOOR MECHANICAL ROOM AND THE EXTERIOR OF
THE BUILDING SUPPORTING THIS CONSTRUCTION.
TEMPORARY CHILLED WATER COOLING TO BE PROVIDED BY A RENTAL AIR-COOLED CHILLER WITH
PUMP PACKAGE LOCATED OUTSIDE ON GRADE OR TRAILER. DURATION OF TEMPORARY CHILLER
RENTAL IS SIX MONTHS. UNIT TO BE LOCATED OUTSIDE OF THE SOUTH SIDE OF THE FIRST FLOOR
MECHANICAL ROOM.
RENTAL CHILLER SIZED TO PROVIDE A NOMINAL 500 TONS OF COOLING. MULTIPLE SMALLER UNITS
MAY BE PROVIDED AND COMBINED TO MEET THE COOLING TONNAGE REQUIREMENT.
PROVIDE PACKAGED CHILLER(S) COMPLETE WITH THE FOLLOWING:
· HOSE BOX AND HOSE SECTIONS
· FLANGE ADAPTERS
· COUPLINGS
· PUMP(S)
· CABLE BOX
· MANIFOLD PIPING AT EXTERIOR
· CHILLED WATER PIPING FROM RENTAL CHILLER MANIFOLD TO EXTERIOR BUILDING
TEMPORARY CHILLED WATER CONNECTIONS
· MISCELLANEOUS
ELECTRICAL CONTRACTOR SHALL PROVIDE ELECTRICAL FEEDER FOR TEMPORARY 500 TON CHILLER THAT THE PROPOSED LOCATION IS ON THE EXTERIOR SOUTH SIDE OF THE MAIN MECHANICAL ROOM.
THERE IS A SPARE 1200AMP, 480V, 3P SWITCH WITHIN SUB-STATION #1 LOCATED IN THE MAIN ELECTRICAL ROOM. EXTEND 3 SETS OF 3# 600KCMIL, 1#3/ 0 GND IN 4" CONDUIT OR EXTERIOR AERIAL
CABLE FROM SPARE SWITCH THRU THAT ROOM, THRU STORAGE ROOM AND THRU MECHANICAL RM
TO EXTERIOR DISCONNECT SWITCH ON THE TEMPORARY CHILLER TRAILER. TEMPORARY UNIT
COMES WITH 1200AMP RATED MAIN CIRCUIT BREAKER
LEAD TIMES TO OBTAIN TEMPORARY MECHANICAL SYSTEMS, ELECTRICAL DISTRIBUTION, AND/OR
GENERATOR SHALL BE FACTORED TO MEET THE CONSTRUCTION PLAN TIME LINE.
DEMOLITION / NEW WORK SEQUENCE OUTLINE BELOW:
CONDENSER WATER SYSTEM - BASE BID PART 1A
1. CONSTRUCT NEW COOLING TOWER BASIN ON THE NORTH SIDE OF THE BUILDING.
2. CONNECT TEMPORARY AIR-COOLED CHILLER INTO THE EXISTING CHILLED WATER SYSTEM.
3. EXISTING CHILLED WATER SYSTEM BACK UP AND RUNNING.
4. AFTER NEW COOLING TOWER BASIN IS COMPLETE AND TEMPORARY AIR-COOLED CHILLER IS
CONNECTED TO CHILLED WATER SYSTEM, COMPLETE THE FOLLOWING:
a. RELOCATE EXISTING COOLING TOWERS (CT-1, 2, & 3) AND INSTALL ONTO NEW COOLING
TOWER BASIN.
b. INSTALL NEW CONDENSER WATER SUPPLY AND RETURN PIPING AROUND THE EXISTING
COOLING TOWER BASIN TO THE NEW COOLING TOWERS LOCATION.
c. INSTALL NEW DOMESTIC MAKEUP WATER PIPING AROUND THE EXISTING COOLING TOWER
BASIN TO THE NEW COOLING TOWERS LOCATION.
d. INSTALL NEW CONDENSER WATER PUMPS CWP-1, 2, & 3.
e. DEMOLISH EXISTING COOLING TOWER BASIN.
5. UNCOVER EXISTING BELOW GRADE CONDENSER WATER SUPPLY AND RETURN LINES FROM
THE EXISTING COOLING TOWERS INTO THE BUILDING.
6. DEMOLISH THE BELOW GRADE EXISTING CONDENSER WATER SUPPLY AND RETURN LINES
FROM THE EXISTING COOLING TOWERS INTO THE BUILDING.
7. INSTALL NEW BELOW GRADE CONDENSER WATER SUPPLY AND RETURN LINES FROM THE
RELOCATED COOLING TOWERS INTO THE BUILDING.
8. UNCOVER BELOW GRADE DOMESTIC MAKEUP WATER PIPING SERVING OLD LOCATION OF
COOLING TOWERS. DEMOLISH EXISTING TO POINT SHOWN ON DRAWINGS.
9. INSTALL NEW BELOW GRADE DOMESTIC MAKEUP WATER PIPING FROM TIE-IN LOCATION ON
DRAWINGS TO RELOCATED COOLING TOWERS.
10. DEMOLISH CONDENSER WATER PUMPS IN THE FIRST FLOOR MECHANICAL ROOM PIT.
NOTE: AFTER REMOVAL, CWP-3 TO BE TURNED OVER TO WPAFB FACILITIES MANAGER;
DISPOSE OF CWP-1 AND CWP-2.
11. MODIFY CONDENSER WATER PIPING INSIDE THE FIRST FLOOR MECHANICAL ROOM PIT.
12. DEMOLISH EXISTING SUMP PUMP IN THE FIRST FLOOR MECHANICAL ROOM PIT.
13. INSTALL NEW SUMP PUMP IN PIT.
14. INSTALL NEW DOMESTIC WATER MAKEUP PIPING FROM TIE-IN LOCATION IN PIT TO NEW
CONDENSER WATER PIPING IN PIT.
15. INSTALL NEW WATER SOFTENER IN THE COOLING TOWER WATER SUPPLY PIPING.
16. FILL AND RUN THE NEW CONDENSER WATER SYSTEM.
17. THE EXISTING WATER-COOLED CHILLERS (CH-1 AND CH-3) TO OPERATE WITH THE EXISTING
COOLING TOWERS AND NEW CONDENSER WATER PUMPS.
18. BALANCE WATER FLOWS IN THE CONDENSER WATER SYSTEMS FOR EXISTING CHILLERS
CH-1 AND CH-3.
CONSTRUCTION PLAN
CHILLED WATER SYSTEM - BASE BID PART 1B
TEMPORARY OUTAGE (24 HOURS) OF THE CHILLED WATER SYSTEM WHILE ISOLATION VALVES ARE INSTALLED AT THE SECONDARY PUMPS. PROVIDE WPAFB OWNED PORT-O-COOL UNITS IN CRITICAL
SPACES WHILE CHILLED WATER SYSTEM IS DOWN.
TEMPORARY OUTAGE (48 HOURS) OF THE CHILLED WATER SYSTEM WHILE SECONDARY CHILLED
WATER PUMPS (CHWP-4, 5, & 6) ARE REPLACED. PROVIDE WPAFB OWNED PORT-O-COOL UNITS IN
CRITICAL SPACES WHILE CHILLED WATER SYSTEM IS DOWN.
1. ISOLATE AND DEMOLISH EXISTING WATER-COOLED CHILLER CH-2.
2. INSTALL ISOLATION VALVES IN MAIN CHILLED WATER PIPING TO MINIMIZE DOWNTIME FOR
DEMOLITION AND INSTALLATION OF NEW SECONDARY PUMPS.
3. PRE-PIPE THE CHW SUPPLY AND RETURN PIPING, VALVES AND ACCESSORIES, AND PUMP
ASSEMBLY OFFSITE FOR ALL THREE SECONDARY PUMPS PRIOR TO INSTALLATION TO
MINIMIZE DOWNTIME.
4. DEMOLISH AND INSTALL NEW SECONDARY CHILLED WATER PUMPS (CHWP-4, 5, & 6).
5. INSTALL NEW PUMPS IN THE SAME LOCATION. RECONNECT TO EXISTING PIPING.
6. RECOVER AND STORE CHILLED WATER FOR
7. DEMOLISH AND INSTALL NEW PRIMARY CHILLED WATER PUMPS (CHWP- 2 & 3) ONE AT A TIME.
ISOLATE EACH PUMP SEPARATELY, DEMOLISH PUMP, THEN INSTALL NEW PUMP IN THE SAME
LOCATION. RECONNECT TO EXISTING PIPING. REPEAT FOR PRIMARY PUMP CHWP-3.
8. BALANCE WATER FLOWS IN THE CHILLED WATER AND CONDENSER WATER SYSTEMS FOR
EXISTING CHILLERS CH-1 AND CH-3.
9. FINAL BAS CONTROL SYSTEM REVIEW AND CHECK OUT.
COMPUTER ROOM AIR CONDITIONING UNITS (CRAC) - BASE BID PART 1C
1. RETRO FIT THE IT ROOM CRAC UNITS WITH NEW 2-WAY CONTROL VALVES AND UPGRADED
CONTROLS.
2. ACCORDING TO EXISTING DRAWINGS, CRAC UNITS HAVE SHUTOFF VALVES AT EACH UNIT.
ISOLATE EACH CRAC UNIT SEPARATELY, REPLACE 3-WAY VALVE WITH 2-WAY VALVE (AS
REQUIRED) AND UPGRADE CONTROLS (AS REQUIRED), THEN INSTALL NEW IN THE SAME
LOCATION. RECONNNECT TO EXISTING. REFER TO MECHANICAL DRAWINGS AND
SCHEDULES FOR CRAC UNITS REQUIRING 3-WAY VALVE AND CONTROL VALVE KIT
REPLACEMENT.
3. REPEAT FOR ALL CRAC UNITS.
4. WPAFB OWNED PORT-O-COOL UNITS TO BE PROVIDED IN COMPUTER ROOM SPACES, AS
NEEDED, WHILE CRAC UNITS ARE OFF.
NOTE: CONTRACTOR TO GIVE THE GOVERNMENT 14 DAYS NOTICE PRIOR TO DISCONNECTING ANY
CRAC UNITS WITHIN THE BUILDING. ALL WORK SHALL BE PERFORMED DURING NORMAL
WORKING HOURS.
BID OPTION #1
THE MAIN SYSTEMS AFFECTED DURING BID OPTION #1 INCLUDE AIR HANDLING UNIT AHU-4 AND RETURN FAN RF-4. THE CONSTRUCTION AREA DURING BID OPTION #1 INCLUDES, BUT IS NOT LIMITED
TO, THE SECOND FLOOR MECHANICAL ROOM AND THE EXTERIOR OF THE BUILDING SUPPORTING
THIS CONSTRUCTION.
TEMPORARY HEATING AND COOLING SHALL BE PROVIDED BY A RENTAL DX COOLING, ELECTRIC
HEATING AIR HANDLING UNIT LOCATED OUTSIDE ON GRADE OR TRAILER. DURATION OF TEMPORARY AHU RENTAL IS TWO MONTHS. UNIT TO BE LOCATED OUTSIDE OF THE SOUTH SIDE OF THE SECOND FLOOR MECHANICAL ROOM. RENTAL AHU SIZED TO PROVIDE A MINIMUM OF 22,000 CFM. MINIMUM OF 1070 CFM OUTSIDE AIR TO BE PROVIDED BY THE TEMPORARY AHU. PROVIDE TEMPORARY DUCTWORK
CONNECTIONS FROM THE RENTAL AHU TO CONNECTION LOCATIONS INSIDE THE BUILDING.
FOR TEMPORARY AHU-4 / RF-4, FOR TEMPORARY ELECTRICAL, THERE IS A EXISTING SPARE 600AMP
FUSED DISCONNECT SWITCH LOCATED ON WEST MECHANICAL RM WALL MARKED AS DISCONNECT
SWITCH FOR CHILLER #2, THAT SWITCH IS A SPARE AND SHALL BE USED FOR BID OPTION #1, #2, #3 AND #4. EACH OF THOSE BID OPTIONS SHALL BE CONDUCTED ONE AT A TIME FEED FROM THIS SWITCH. FOR BASIS OF DESIGN, THE TEMPORARY AHU-4 / RF-4 WILL BE PROVIDED WITH 300A, 480V, 3P MAIN CIRCUIT BREAKER LOCATED ON UNIT. ELECTRICAL CONTRACTOR TO PROVIDE A
TEMPORARY FEEDER FROM THE SPARE 600A FUSED DISCONNECT SWITCH WITH 1 SET OF
3#350KCMIL, 1# 3 GND IN 3" TO THE TEMPORARY AHU-4 / RF-4 LOCATED ON THE EXTERIOR GRADE OF
THE SOUTHEAST CORNER OF BELOW THE 2ND FL MECHANICAL ROOM. ROUTE CABLE THRU MAIN
MECHANICAL ROOM AND TURN VERTICAL OVER CHILLER #3 TO GET ABOVE LOWER ROOF BEFORE
PENETRATING THE WALL TO ROUTE TEMPORARY FEEDER ACROSS THE ROOF. TURNING FEEDER
DOWN OFF ROOF TO TEMPORARY MECHANICAL UNIT AHU-4 / RF-4. IN LIEU OF CONDUIT, MAY USE
EXTERIOR EXPOSED AERIAL RATED CABLE. COORDINATE EXACT LOCATION WITH MECHANICAL
CONTRACTOR.
LEAD TIMES TO OBTAIN TEMPORARY MECHANICAL SYSTEMS, ELECTRICAL DISTRIBUTION, AND/OR
GENERATOR SHALL BE FACTORED TO MEET THE CONSTRUCTION PLAN TIME LINE.
TEMPORARY OUTAGE (1 WEEKEND) OF THE AIR HANDLING SYSTEM SERVING SPACES CONNECTED TO
AHU-4 AND RF-4 TO TAKE PLACE WHILE THE TEMPORARY AHU SYSTEM IS CONNECTED AND
DISCONNECTED.
TEMPORARY OUTAGE (1 WEEKEND) OF AHU- 3 / RF-3, AHU-4 / RF-4, AND AHU-5 / RF-5 IS EXPECTED WHILE THE RELIEF AIR IS BEING DISCONNECTED AND RECONNECTED TO THE EXISTING LOUVERS AND
WHILE LOUVERS ARE REMOVED AND THEN RELOCATED BACK INTO PLACE.
DEMOLITION / NEW WORK SEQUENCE OUTLINE BELOW:
1. REMOVE EXISTING LOUVERS, PLENUM BOXES, AND EF-10 IN SECOND FLOOR MECHANICAL
ROOM TO GET EQUIPMENT AND TEMPORARY AHU CONNECTIONS IN / OUT OF THE BUILDING.
2. RETAIN LOUVERS AND EF-10 FOR REINSTALLATION AFTER COMPLETION OF BID OPTION #2
NEW WORK.
3. RELIEF AIR FROM EXISTING OPERATING SYSTEMS (AHU-5, RF-5, AHU-3, RF-3) AND
ASSOCIATED AUTOMATIC AIR DAMPERS TO BE MAINTAINED. PROVIDE TEMPORARY FLEXIBLE
DUCTWORK CONNECTIONS FROM THE RELIEF AIR HARD DUCT OUT THRU THE BUILDING
LOUVER OPENING. RECONNECT AND REINSTALL AUTOMATIC AIR DAMPERS INTO HARD
DUCTWORK PRIOR TO FLEXIBLE DUCTWORK CONNECTION.
4. PROVIDE FLEXIBLE SUPPLY AND RETURN DUCTWORK INTO THE BUILDING FROM THE
TEMPORARY AHU THRU EXISTING REMOVED LOUVER OPENING ON THE SOUTH SIDE OF THE
BUILDING.
5. SHUTDOWN AHU-4 AND RF-4.
6. CONNECT FLEXIBLE DUCTWORK TO EXISTING SUPPLY AND RETURN DUCTWORK MAINS
SERVING SPACES CONNECTED TO AHU-4. REFER TO FLOOR PLAN DRAWINGS FOR
RECOMMENDED CONNECTION LOCATION. CONTRACTOR TO FIELD VERIFY TEMPORARY
CONNECTION LOCATIONS PRIOR TO WORK.
7.
BID OPTION #1 - CONTINUED
7. DISCONNECT AHU-4 AND RF-4 FROM EXISTING SUPPLY, RETURN, AND OUTSIDE AIR
DUCTWORK. CAP EXISTING SUPPLY AND RETURN DUCTWORK. OUTSIDE AIR DUCTWORK TO
BE CONNECTED TO FLEX DUCT AND DISCHARGED OUT OF THE CLOSEST LOUVER OPENING.
8. TURN ON TEMPORARY AHU TO CONDITION SPACES WHILE DEMOLITION OF AIR HANDLING
EQUIPMENT IS IN PROGRESS.
9. DEMOLISH AHU-4 AND RF-4, KNOCKDOWN DEMOLITION RECOMMENDED, AND REMOVE THRU
EASTSIDE LOUVER. CAP EXISTING CHWS AND CHWR PIPING.
10. INSTALL NEW AHU-4 AND RF-4. KNOCKDOWN CONFIGURATION INSTALLATION
RECOMMENDED. BRING NEW EQUIPMENT INTO MECHANICAL ROOM THRU EXISTING SOUTH
SIDE OPENING.
11. RECONNECT NEW EQUIPMENT TO EXISTING SUPPLY, RETURN AND OUTSIDE AIR DUCTWORK
AND CHWS / CHWR PIPING.
12. TURN OFF TEMPORARY AHU.
13. DISCONNECT TEMPORARY FLEXIBLE SUPPLY AND RETURN DUCTWORK. CAP CONNECTION
OPENINGS AT DUCTWORK MAINS.
14. REINSTALL AND RECONNECT LOUVERS, PLENUM BOXES, AND EF-10.
15. REMOVE FLEXIBLE DUCTWORK CONNECTIONS FROM RELIEF AIR OF REMAINING EXISTING
SYSTEMS (AHU-5, RF-5, AHU-3, RF-3) OUT THRU BUILDING LOUVER OPENING AND
RECONNECT HARD DUCT TO LOUVER PLENUM BOXES. RECONNECT AND REINSTALL
AUTOMATIC AIR DAMPERS IN DUCT IF PREVIOUS LOCATION CANNOT BE MAINTAINED.
16. START UP NEW AHU-4 AND RF-4.
17. REBALANCE ALL AFFECTED DUCTWORK AND PIPING SYSTEMS.
18. INSTALL NEW ANTI-TERRORISM HVAC SHUTDOWN BUTTON(S). REFER TO MECHANICAL
DRAWINGS FOR LOCATIONS.
19. BAS CONTROL SYSTEM REVIEW AND CHECK OUT.
BID OPTION #2
THE MAIN SYSTEMS AFFECTED DURING BID OPTION #2 INCLUDE AIR HANDLING UNIT AHU-1 AND RETURN FAN RF-1. THE CONSTRUCTION AREA DURING BID OPTION #2 INCLUDES, BUT IS NOT LIMITED TO, THE FIRST FLOOR MECHANICAL ROOM AND THE EXTERIOR OF THE BUILDING SUPPORTING THIS
CONSTRUCTION.
TEMPORARY HEATING AND COOLING SHALL BE PROVIDED BY A RENTAL DX COOLING, ELECTRIC
HEATING AIR HANDLING UNIT LOCATED OUTSIDE ON GRADE OR TRAILER. DURATION OF TEMPORARY AHU RENTAL IS THREE MONTHS. UNIT TO BE LOCATED OUTSIDE OF THE WEST SIDE OF THE FIRST FLOOR MECHANICAL ROOM. RENTAL AHU SIZED TO PROVIDE A MINIMUM OF 42,300 CFM. MULTIPLE
SMALLER UNITS MAY BE PROVIDED AND COMBINED TO MEET THE SUPPLY AIR REQUIREMENT.
MINIMUM OF 2100 CFM OUTSIDE AIR TO BE PROVIDED BY THE TEMPORARY AHU. PROVIDE
TEMPORARY DUCTWORK CONNECTIONS FROM THE RENTAL AHU TO CONNECTION LOCATIONS INSIDE
THE BUILDING.
FOR TEMPORARY AHU-1 / RF-1, FOR TEMPORARY ELECTRICAL, THERE IS A EXISTING SPARE 600AMP
FUSED DISCONNECT SWITCH LOCATED ON WEST MECHANICAL RM WALL MARKED AS DISCONNECT
SWITCH FOR CHILLER #2, THAT SWITCH IS A SPARE AND SHALL BE USED FOR BID OPTION #1, #2, #3 AND #4. EACH OF THOSE BID OPTIONS SHALL BE CONDUCTED ONE AT A TIME FEED FROM THIS SWITCH. FOR BASIS OF DESIGN, THE TEMPORARY AHU-1 / RF-1 WILL REQUIRE (2) UNITS. EACH UNIT SHALL BE PROVIDED WITH (1)300A, 480V, 3P MAIN CIRCUIT BREAKER LOCATED ONE ON EACH UNIT.
ELECTRICAL CONTRACTOR TO PROVIDE A TEMPORARY FEEDER FROM THE SPARE 600A FUSED
DISCONNECT SWITCH WITH 1 SET OF 3#350KCMIL, 1# 3 GND IN 3" TO EACH OF THE TEMPORARY AHU-1 / RF-1 LOCATED ON THE EXTERIOR GRADE OF THE WEST CORNER OF MAIN MECHANICAL ROOM. THIS IS THE SAME CABLE SET FOR BID OPTION 3. ROUTE CABLE THRU MAIN MECHANICAL ROOM AND
PENETRATE THE WALL WITH MINIMUAL IMPACT TO ROUTE TEMPORARY FEEDER TO UNIT. PATCH
EXTERIOR WALL TO MATCH EXISTING. COORDINATE EXACT LOCATION WITH MECHANICAL
CONTRACTOR.
LEAD TIMES TO OBTAIN TEMPORARY MECHANICAL SYSTEMS, ELECTRICAL DISTRIBUTION, AND/OR
GENERATOR SHALL BE FACTORED TO MEET THE CONSTRUCTION PLAN TIME LINE.
TEMPORARY OUTAGE (1 WEEKEND) OF THE AIR HANDLING SYSTEM SERVING SPACES CONNECTED
TO AHU-1 AND RF-1 TO TAKE PLACE WHILE THE TEMPORARY AHU SYSTEM IS CONNECTED AND
DISCONNECTED.
DEMOLITION / NEW WORK SEQUENCE OUTLINE BELOW:
1. REMOVE EXISTING LOUVER AND AUTOMATIC AIR DAMPER IN FIRST FLOOR MECHANICAL
ROOM ON THE WEST SIDE OF THE ROOM TO GET TEMPORARY AHU CONNECTIONS IN / OUT
OF THE BUILDING.
2. RETAIN LOUVER AND AUTOMATIC AIR DAMPER FOR REINSTALLATION AFTER COMPLETION OF
BID OPTION #2 NEW WORK.
3. PROVIDE FLEXIBLE SUPPLY AND RETURN DUCTWORK INTO THE BUILDING FROM THE
TEMPORARY AHU THRU EXISTING REMOVED LOUVER OPENING ON THE WEST SIDE OF THE
BUILDING.
4. SHUTDOWN AHU-1 AND RF-1.
5. CONNECT FLEXIBLE DUCTWORK TO EXISTING SUPPLY AND RETURN DUCTWORK MAINS
SERVING SPACES CONNECTED TO AHU-1. REFER TO FLOOR PLAN DRAWINGS FOR
RECOMMENDED CONNECTION LOCATION. CONTRACTOR TO FIELD VERIFY TEMPORARY
CONNECTION LOCATIONS PRIOR TO WORK.
6. DISCONNECT AHU-1 AND RF-1 FROM EXISTING SUPPLY, RETURN, AND OUTSIDE AIR
DUCTWORK. CAP EXISTING SUPPLY AND RETURN DUCTWORK. OUTSIDE AIR DUCTWORK TO
BE CONNECTED TO FLEX DUCT AND DISCHARGED OUT OF THE CLOSEST LOUVER OPENING.
7. TURN ON TEMPORARY AHU TO CONDITION SPACES WHILE DEMOLITION OF AIR HANDLING
EQUIPMENT IS IN PROGRESS.
8. DEMOLISH AHU-1 AND RF-1 LOCATED ON MEZZANINES OVER EXISTING CHILLERS,
KNOCKDOWN DEMOLITION RECOMMENDED, AND REMOVE THRU MECHANICAL ROOM DOCK
BAY DOORS. CAP EXISTING CHWS AND CHWR PIPING.
9. INSTALL NEW AHU-1 AND RF-1. NEW EQUIPMENT TO BE LOCATED ON EXISTING MEZZANINES.
KNOCKDOWN CONFIGURATION INSTALLATION RECOMMENDED. BRING NEW EQUIPMENT INTO
MECHANICAL ROOM THRU EXISTING MECHANICAL ROOM DOCK BAY DOORS.
10. RECONNECT NEW EQUIPMENT TO EXISTING SUPPLY, RETURN AND OUTSIDE AIR DUCTWORK
AND CHWS / CHWR PIPING.
11. TURN OFF TEMPORARY AHU.
12. DISCONNECT TEMPORARY FLEXIBLE SUPPLY AND RETURN DUCTWORK. CAP CONNECTION
OPENINGS AT DUCTWORK MAINS.
13. REINSTALL AND RECONNECT LOUVER AND AUTOMATIC AIR DAMPER.
14. START UP NEW AHU-1 AND RF-1.
15. REBALANCE ALL AFFECTED DUCTWORK AND PIPING SYSTEMS.
18. INSTALL NEW ANTI-TERRORISM HVAC SHUTDOWN BUTTON(S). REFER TO MECHANICAL
DRAWINGS FOR LOCATIONS.
19. BAS CONTROL SYSTEM REVIEW AND CHECK OUT.
W
2Q R
B0
0_
C or r_ Fi na l_
Pl an s-
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
KZ
F
D
ES
IG
N
BR
O
AD
W
AY
S
T.
C
IN
C
IN
N
AT
I, O H
IO
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-1
7-
AN
SI
D
R
EP
AI
R
H
VA
C A
H U
'S
, 2 , 4
A N
D C
H
IL
LE
R
S
C G
B
W
PA
FB
B
U
IL
D
IN
G
, A R
EA
A
W R
IG
H
T
PA
TT
ER
SO
N
A
FB
, O H
IO
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AUGUST 02, 2024 - 100% CORRECTED FINAL
BLDG 10271
ZH
TV
EB
Y
PH
AS
IN
G P
LA
N
G-003
FY
E/
PA
R
K
FY
E/
PA
R
K
N
AD
ER
CONSTRUCTION PLAN (CONTINUTED)
BID OPTION #4
THE MAIN SYSTEMS AFFECTED DURING BID OPTION #4 INCLUDE AIR HANDLING UNIT AHU-5 AND RETURN FAN RF-5. THE CONSTRUCTION AREA DURING BID OPTION #4 INCLUDES, BUT IS NOT LIMITED
TO, THE SECOND FLOOR MECHANICAL ROOM AND THE EXTERIOR OF THE BUILDING SUPPORTING
THIS CONSTRUCTION.
TEMPORARY HEATING AND COOLING TO BE PROVIDED BY A RENTAL DX COOLING, ELECTRIC HEATING
AIR HANDLING UNIT LOCATED OUTSIDE ON GRADE OR TRAILER. DURATION OF TEMPORARY AHU
RENTAL IS ONE MONTH. UNIT TO BE LOCATED OUTSIDE OF THE SOUTH SIDE OF THE SECOND FLOOR MECHANICAL ROOM. RENTAL AHU SIZED TO PROVIDE A MINIMUM OF 4,250 CFM. MINIMUM OF 400 CFM
OUTSIDE AIR TO BE PROVIDED BY THE TEMPORARY AHU. PROVIDE TEMPORARY DUCTWORK
CONNECTIONS FROM THE RENTAL AHU TO CONNECTION LOCATIONS INSIDE THE BUILDING.
FOR TEMPORARY AHU-5 / RF-5, FOR TEMPORARY ELECTRICAL, THERE IS A EXISTING SPARE 600AMP
FUSED DISCONNECT SWITCH LOCATED ON WEST MECHANICAL RM WALL MARKED AS DISCONNECT
SWITCH FOR CHILLER #2, THAT SWITCH IS A SPARE AND SHALL BE USED FOR BID OPTION #1, #2, #3 AND #4. EACH OF THOSE BID OPTIONS SHALL BE CONDUCTED ONE AT A TIME FEED FROM THIS SWITCH. FOR BASIS OF DESIGN, THE TEMPORARY AHU-5 / RF-5 WILL BE PROVIDED WITH 50A, 480V, 3P MAIN CIRCUIT BREAKER LOCATED ON UNIT. ELECTRICAL CONTRACTOR TO PROVIDE A TEMPORARY FEEDER FROM THE SPARE 600A FUSED DISCONNECT SWITCH WITH 1 SET OF 3#350KCMIL, 1# 3 GND IN
3" TO THE TEMPORARY AHU-5 / RF-5 LOCATED ON THE EXTERIOR GRADE OF THE SOUTHEAST
CORNER OF BELOW THE 2ND FL MECHANICAL ROOM. THIS IS THE SAME CABLE SIZE FOR BID OPTION 2 TO BE REUSED. ROUTE CABLE THRU MAIN MECHANICAL ROOM AND TURN VERTICAL OVER CHILLER
#3 TO GET ABOVE LOWER ROOF BEFORE PENETRATING THE WALL TO ROUTE TEMPORARY FEEDER
ACROSS THE ROOF. TURNING FEEDER DOWN OFF ROOF TO TEMPORARY MECHANICAL UNIT AHU-5 / RF-5. IN LIEU OF CONDUIT, MAY USE EXTERIOR EXPOSED AERIAL RATED CABLE. COORDINATE EXACT
LOCATION WITH MECHANICAL CONTRACTOR
LEAD TIMES TO OBTAIN TEMPORARY MECHANICAL SYSTEMS, ELECTRICAL DISTRIBUTION, AND/OR
GENERATOR SHALL BE FACTORED TO MEET THE CONSTRUCTION PLAN TIME LINE.
TEMPORARY OUTAGE (1 WEEKEND) OF THE AIR HANDLING SYSTEM SERVING SPACES CONNECTED
TO AHU-5 AND RF-5 TO TAKE PLACE WHILE THE TEMPORARY AHU SYSTEM IS CONNECTED AND
DISCONNECTED.
TEMPORARY OUTAGE (1 WEEKEND) OF AHU- 3 / RF-3, AHU-4 / RF-4, AND AHU-5 / RF-5 IS EXPECTED WHILE THE RELIEF AIR IS BEING DISCONNECTED AND RECONNECTED TO THE EXISTING LOUVERS
AND WHILE LOUVERS ARE REMOVED AND THEN RELOCATED BACK INTO PLACE.
DEMOLITION / NEW WORK SEQUENCE OUTLINE BELOW:
1. REMOVE EXISTING LOUVERS, PLENUM BOXES, AND EF-10 IN SECOND FLOOR
MECHANICAL ROOM TO GET EQUIPMENT AND TEMPORARY AHU CONNECTIONS IN / OUT
OF THE BUILDING.
2. RETAIN LOUVERS AND EF-10 FOR REINSTALLATION AFTER COMPLETION OF BID OPTION
#4 NEW WORK.
3. RELIEF AIR FROM EXISTING OPERATING SYSTEMS (AHU-4, RF-4, AHU-3, RF-3) AND
ASSOCIATED AUTOMATIC AIR DAMPERS TO BE MAINTAINED. PROVIDE TEMPORARY
FLEXIBLE DUCTWORK CONNECTIONS FROM THE RELIEF AIR HARD DUCT OUT THRU THE
BUILDING LOUVER OPENING. RECONNECT AND REINSTALL AUTOMATIC AIR DAMPERS
INTO HARD DUCTWORK PRIOR TO FLEXIBLE DUCTWORK CONNECTION.
4. PROVIDE FLEXIBLE SUPPLY AND RETURN DUCTWORK INTO THE BUILDING FROM THE
TEMPORARY AHU THRU EXISTING REMOVED LOUVER OPENING ON THE SOUTH SIDE OF
THE BUILDING.
5. SHUTDOWN AHU-5 AND RF-5.
6. CONNECT FLEXIBLE DUCTWORK TO EXISTING SUPPLY AND RETURN DUCTWORK MAINS
SERVING SPACES CONNECTED TO AHU-5. REFER TO FLOOR PLAN DRAWINGS FOR
RECOMMENDED CONNECTION LOCATION. CONTRACTOR TO FIELD VERIFY TEMPORARY
CONNECTION LOCATIONS PRIOR TO WORK.
7. DISCONNECT AHU-5 AND RF-5 FROM EXISTING SUPPLY, RETURN, AND OUTSIDE AIR
DUCTWORK. CAP EXISTING SUPPLY AND RETURN DUCTWORK. OUTSIDE AIR DUCTWORK
TO BE CONNECTED TO FLEX DUCT AND DISCHARGED OUT OF THE CLOSEST LOUVER
OPENING.
8. TURN ON TEMPORARY AHU TO CONDITION SPACES WHILE DEMOLITION OF AIR HANDLING
EQUIPMENT IS IN PROGRESS.
9. DEMOLISH AHU-5 AND RF-5, KNOCKDOWN DEMOLITION RECOMMENDED, AND REMOVE
THRU EASTSIDE LOUVER. CAP EXISTING HWS AND HWR PIPING.
10. INSTALL NEW AHU-5 AND RF-5. KNOCKDOWN CONFIGURATION INSTALLATION
RECOMMENDED. BRING NEW EQUIPMENT INTO MECHANICAL ROOM THRU EXISTING
SOUTH SIDE OPENING.
11. RECONNECT NEW EQUIPMENT TO EXISTING SUPPLY, RETURN AND OUTSIDE AIR
DUCTWORK AND HWS / HWR PIPING.
12. TURN OFF TEMPORARY AHU.
13. DISCONNECT TEMPORARY FLEXIBLE SUPPLY AND RETURN DUCTWORK. CAP
CONNECTION OPENINGS AT DUCTWORK MAINS.
14. REINSTALL AND RECONNECT LOUVERS, PLENUM BOXES, AND EF-10.
15. REMOVE FLEXIBLE DUCTWORK CONNECTIONS FROM RELIEF AIR OF REMAINING EXISTING
SYSTEMS (AHU-4, RF-4, AHU-3, RF-3) OUT THRU BUILDING LOUVER OPENING AND
RECONNECT HARD DUCT TO LOUVER PLENUM BOXES. RECONNECT AND REINSTALL
AUTOMATIC AIR DAMPERS IN DUCT IF PREVIOUS LOCATION CANNOT BE MAINTAINED.
16. START UP NEW AHU-5 AND RF-5.
17. REBALANCE ALL AFFECTED DUCTWORK AND PIPING SYSTEMS.
18. INSTALL NEW ANTI-TERRORISM HVAC SHUTDOWN BUTTON(S). REFER TO MECHANICAL
DRAWINGS FOR LOCATIONS.
19. BAS CONTROL SYSTEM REVIEW AND CHECK OUT.
BID OPTION #5
INSTALL NEW CHILLER CH-2 AND ASSOCIATED SIDE STREAM FILTER SSF-2 AND CONNECT TO
EXISTING PIPING.
BID OPTION #3
THE MAIN SYSTEMS AFFECTED DURING BID OPTION #3 INCLUDE AIR HANDLING UNIT AHU-2 AND RETURN FAN RF-2. THE CONSTRUCTION AREA DURING BID OPTION #3 INCLUDES, BUT IS NOT LIMITED TO, THE FIRST FLOOR MECHANICAL ROOM AND THE EXTERIOR OF THE BUILDING SUPPORTING THIS
CONSTRUCTION.
TEMPORARY HEATING AND COOLING SHALL BE PROVIDED BY A RENTAL DX COOLING, ELECTRIC
HEATING AIR HANDLING UNIT LOCATED OUTSIDE ON GRADE OR TRAILER. DURATION OF TEMPORARY AHU RENTAL IS THREE MONTHS. UNIT TO BE LOCATED OUTSIDE OF THE WEST SIDE OF THE FIRST FLOOR MECHANICAL ROOM. RENTAL AHU SIZED TO PROVIDE A MINIMUM OF 19,050 CFM. MULTIPLE
SMALLER UNITS MAY BE PROVIDED AND COMBINED TO MEET THE SUPPLY AIR REQUIREMENT.
MINIMUM OF 950 CFM OUTSIDE AIR TO BE PROVIDED BY THE TEMPORARY AHU. PROVIDE TEMPORARY
DUCTWORK CONNECTIONS FROM THE RENTAL AHU TO CONNECTION LOCATIONS INSIDE THE
BUILDING.
FOR TEMPORARY AHU-2 / RF-2, FOR TEMPORARY ELECTRICAL, THERE IS A EXISTING SPARE 600AMP
FUSED DISCONNECT SWITCH LOCATED ON WEST MECHANICAL RM WALL MARKED AS DISCONNECT
SWITCH FOR CHILLER #2, THAT SWITCH IS A SPARE AND SHALL BE USED FOR BID OPTION #1, #2, #3 AND #4. EACH OF THOSE BID OPTIONS SHALL BE CONDUCTED ONE AT A TIME FEED FROM THIS
SWITCH. FOR BASIS OF DESIGN, THE TEMPORARY AHU-2 / RF-2 IS ONE UNIT . ELECTRICAL
CONTRACTOR SHALL BE PROVIDED WITH (1)300A, 480V, 3P MAIN CIRCUIT BREAKER LOCATED ONE ON EACH UNIT. ELECTRICAL CONTRACTOR TO PROVIDE A TEMPORARY FEEDER FROM THE SPARE 600A
FUSED DISCONNECT SWITCH WITH 1 SET OF 3#350KCMIL, 1# 3 GND IN 3" TO EACH OF THE
TEMPORARY AHU-1 / RF-1 LOCATED ON THE EXTERIOR GRADE OF THE WEST CORNER OF MAIN
MECHANICAL ROOM. THIS IS THE SAME CABLE SIZE FOR BID OPTION 2. ROUTE CABLE THRU MAIN
MECHANICAL ROOM AND PENETRATE THE WALL WITH MINIMUAL IMPACT TO ROUTE TEMPORARY
FEEDER TO UNIT. PATCH EXTERIOR WALL TO MATCH EXISTING. COORDINATE EXACT LOCATION WITH
MECHANICAL CONTRACTOR
LEAD TIMES TO OBTAIN TEMPORARY MECHANICAL SYSTEMS, ELECTRICAL DISTRIBUTION, AND/OR
GENERATOR SHALL BE FACTORED TO MEET THE CONSTRUCTION PLAN TIME LINE.
TEMPORARY OUTAGE (1 WEEKEND) OF THE AIR HANDLING SYSTEM SERVING SPACES CONNECTED
TO AHU-2 AND RF-2 TO TAKE PLACE WHILE THE TEMPORARY AHU SYSTEM IS CONNECTED AND
DISCONNECTED.
DEMOLITION / NEW WORK SEQUENCE OUTLINE BELOW:
1. REMOVE EXISTING LOUVER AND AUTOMATIC AIR DAMPER IN FIRST FLOOR MECHANICAL
ROOM ON THE WEST SIDE OF THE ROOM TO GET TEMPORARY AHU CONNECTIONS IN / OUT
OF THE BUILDING.
2. RETAIN LOUVER AND AUTOMATIC AIR DAMPER FOR REINSTALLATION AFTER COMPLETION OF
BID OPTION #3 NEW WORK.
3. PROVIDE FLEXIBLE SUPPLY AND RETURN DUCTWORK INTO THE BUILDING FROM THE
TEMPORARY AHU THRU EXISTING REMOVED LOUVER OPENING ON THE WEST SIDE OF THE
BUILDING.
4. SHUTDOWN AHU-2 AND RF-2.
5. CONNECT FLEXIBLE DUCTWORK TO EXISTING SUPPLY AND RETURN DUCTWORK MAINS
SERVING SPACES CONNECTED TO AHU-2. REFER TO FLOOR PLAN DRAWINGS FOR
RECOMMENDED CONNECTION LOCATION. CONTRACTOR TO FIELD VERIFY TEMPORARY
CONNECTION LOCATIONS PRIOR TO WORK.
6. DISCONNECT AHU-2 AND RF-2 FROM EXISTING SUPPLY, RETURN, AND OUTSIDE AIR
DUCTWORK. CAP EXISTING SUPPLY AND RETURN DUCTWORK. OUTSIDE AIR DUCTWORK TO
BE CONNECTED TO FLEX DUCT AND DISCHARGED OUT OF THE CLOSEST LOUVER OPENING.
7. TURN ON TEMPORARY AHU TO CONDITION SPACES WHILE DEMOLITION OF AIR HANDLING
EQUIPMENT IS IN PROGRESS.
8. DEMOLISH AHU-2 AND RF-2 LOCATED ON MEZZANINES OVER EXISTING CHILLERS,
KNOCKDOWN DEMOLITION RECOMMENDED, AND REMOVE THRU MECHANICAL ROOM DOCK
BAY DOORS. CAP EXISTING CHWS AND CHWR PIPING.
9. INSTALL NEW AHU-2 AND RF-2. NEW AHU-2 TO BE LOCATED ON EXISTING MEZZANINE. REFER
TO FLOOR PLAN DRAWINGS FOR NEW RF-2 LOCATION. KNOCKDOWN CONFIGURATION
INSTALLATION RECOMMENDED. BRING NEW EQUIPMENT INTO MECHANICAL ROOM THRU
EXISTING MECHANICAL ROOM DOCK BAY DOORS.
10. RECONNECT NEW EQUIPMENT TO EXISTING SUPPLY, RETURN AND OUTSIDE AIR DUCTWORK
AND CHWS / CHWR PIPING.
11. TURN OFF TEMPORARY AHU.
12. DISCONNECT TEMPORARY FLEXIBLE SUPPLY AND RETURN DUCTWORK. CAP CONNECTION
OPENINGS AT DUCTWORK MAINS.
13. REINSTALL AND RECONNECT LOUVER AND AUTOMATIC AIR DAMPER.
14. START UP NEW AHU-2 AND RF-2.
15. REBALANCE ALL AFFECTED DUCTWORK AND PIPING SYSTEMS.
18. INSTALL NEW ANTI-TERRORISM HVAC SHUTDOWN BUTTON(S). REFER TO MECHANICAL
DRAWINGS FOR LOCATIONS.
19. BAS CONTROL SYSTEM REVIEW AND CHECK OUT.
ADDITIONAL COORDINATION NOTES
A. COORDINATE ALL OUTAGES WITH ALL TRADES PRIOR TO OUTAGE.
B. COORDINATE AND SCHEDULE WITH FACILITIES MANAGER ALL SYSTEM OUTAGES PRIOR TO
OUTAGE.
C. OCCUPANCY RESTRICTIONS DURING CONSTRUCTION:
1. SPACES 128, 128A, 130, 131, 134, 177, AND 194 ARE CRITICAL AND ARE TO REMAIN
OPERATIONAL AND MANNED THROUGHOUT CONSTRUCTION.
2. SPACE 177 OPERATES ON TWO SHIFTS. ONE WEEK OUTAGE MAXIMUM AT A TIME OF THIS
AREA IS ALLOWABLE, HOWEVER ANY VACATING OF THIS AREA REQUIRES A 30 DAY
NOTICE PRIOR TO VACANCY.
ENVIRONMENTAL COORDINATION NOTES
A. MERCURY CONTAMINATION -
BE ADVISED THAT THERE WAS A HISTORIC MERCURY CONTAMINATION EVENT AT THIS SITE
THAT HAS SINCE BEEN CLEANED UP. IF THE PRESENCE OF MERCURY IS DETECTED OR
SUSPECTED DURING CONSTRUCTION, EXCAVATION, TESTING, ETC., CONTACT MR. JOHN
CROCKER, RESTORATION PROGRAM MANAGER, AT 937-257-2312 IMMEDIATELY.
W
2Q R
B0
0_
C or r_ Fi na l_
Pl an s-
LA
SH
LE
Y
ST
EP
H
EN
S
SC
H
M
IT
Z
THE FOLLOWING LOCATIONS WERE REPORTED TO NOT CONTAIN ACM
ACM IS NOT PRESENT IN THE PIPING INSULATION WITH WHITE COATING ON PIPING LEADING TO THE COOLING TOWER. (271-01-01, 271-01-02, 271-01-03).
ACM IS NOT PRESENT IN THE GREY MASTIC IN SEAM OF THE COOLING TOWER (271-02-01)
ACM IS NOT PRESENT IN THE BLACK MASTIC IN THE SEAM OF THE COOLING TOWER(271-03-01)
ACM IS NOT PRESENT IN THE GREEN MASTIC ON THE WATER PIPING (271-05-01)
ACM IS NOT PRESENT IN THE BEIGE MASTIC NEAR THE ACCESS LADDER (271-04-01)
ACM IS NOT PRESENT IN THE WHITE ELECTRICAL WIRING COATING AT THE COOLING TOWER (271-06-01, 02, 02)
THE FOLLOWING LOCATION WAS REPORTED TO CONTAIN MOLD
MOLD WAS OBSERVED ON THE EXTERIOR OF THE COOLING TOWER. IF THE COOLING TOWER IS NOT REPLACED, THE MOLD SHALL BE REMEDIATED BY A LICENSED CONTRACTOR.
HAZARDOUS MATERIAL NOTES:
REFER TO HAZARDOUS MATERIALS REPORT IN THE
SPECIFICATION SECTION 01 35 43 FOR HAZARDOUS
MATERIALS RECOMMENDATION.
THE CONTRACTOR SHALL ADHERE TO SPECIFICATION
SECTION 02 82 00 FOR ALL AREAS IMPACTED BY
HAZARDOUS MATERIAL ABATEMENT.
IT IS ASSUMED THAT CATEGORY 1 ACM IS ASSOCIATED
WITH THE FLANGES AND VALVES OF THE COOLING
TOWER AND SHALL BE REMEDIATED.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
KZ
F
D
ES
IG
N
BR
O
AD
W
AY
S
T.
C
IN
C
IN
N
AT
I, O H
IO
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-1
7-
AN
SI
D
R
EP
AI
R
H
VA
C A
H U
'S
, 2 , 4
A N
D C
H
IL
LE
R
S
C G
B
W
PA
FB
B
U
IL
D
IN
G
, A R
EA
A
W R
IG
H
T
PA
TT
ER
SO
N
A
FB
, O H
IO
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AUGUST 02, 2024 - 100% CORRECTED FINAL
BLDG 10271
ZH
TV
EB
Y H
AZ
AR
D O
U S
M
AT
ER
IA
LS
P
LA
N
S
HM101
ASSUMED ACM
GASKETS (~24 SF)
CONTRACTOR TO
REMOVE
(TYP. OF 4)
W
2Q R
B0
0_
C or r_ Fi na l_
Pl an s-
THE FOLLOWING LOCATIONS WERE REPORTED TO NOT CONTAIN ACM
ACM IS NOT PRESENT IN THE FIBERGLASS INSULATION WITH BEIGE MASTIC ON THE ELECTRICAL BOX BETWEEN TRANE COOLING UNITS. (271-10-01, 02, 03).
ACM IS NOT PRESENT IN THE PIPE JOINTS PATCH WITH CLOTH AND MASTIC ABOVE THE TRANE COOLING UNITS ASSOCIATED WITH CHILLERS 1 AND 2 (271-11-01, 02, 03) ACM IS NOT PRESENT IN THE FIBERGLASS PIPE INSULATION WITH TAN MASTIC ON THE HVAC EXTERIOR (271-12-01,02,03) ACM IS NOT PRESENT IN THE BLACK RUBBER GASKETS ON THE VIBRATION COIL FOR CHILLER #1 (271-07-01)
ACM IS NOT PRESENT IN THE BLACK RUBBER GASKETS FOR CHILLER #1 (271-08-01)
ACM IS NOT PRESENT IN THE DISCARDED GASKET ON CHILLER #1 (271-09-01)
ACM IS NOT PRESENT IN THE BLUE MASTIC AROUND THE BOLTS ON CHILLER #2 (271-24-01)
ACM IS NOT PRESENT IN THE DISCARDED GASKETS ON THE CHILLED WATER PIPING IN THE MECHANICAL ROOM (271-22-01, 02) ACM IS NOT PRESENT IN THE FIBERGLASS PIPE INSULATION WITH TAN MASTIC ON THE CHILLED WATER PIPES #1, #2, #3 (271-15-01,02,03
MOLD WAS REPORTED IN THE FOLLOWING AREAS:
A MOLD SAMPLE WAS TAKEN ON THE UNDERSIDE OF CHILLER #2, THE RESULTS INDICTED THAT A LOW CONCENTRATION OF CLADOSPORIUM WAS PRESENT ON THE UNDERSIDE OF THE CHILLER #2. THE MOLD SHOULD BE REMEDIATED BY A LICENSED CONTRACTOR (271-24-01)
HAZARDOUS CHEMICALS WERE REPORTED IN THE FOLLOWING LOCATION
A 200 GALLON TANK OF REFRIGERANT OILS WAS OBSERVED ON CHILLER #1. REMOVE AND DISPOSAL OF THE MINERAL OIL SHALL FOLLOW THE WPAFB STANDARD SPECIFICATION SECTION 01 35 43.
(3) MERCURY THERMOSTATS WERE
LOCATED ON WATER PIPING WITHIN THIS
AREA AND SHALL BE REMOVED.
ASSUMED ACM
GASKETS (~24 SF)
CONTRACTOR TO
REMOVE
(TYP. OF 25)
HAZARDOUS MATERIAL NOTES:
REFER TO HAZARDOUS MATERIALS REPORT IN THE
SPECIFICATION SECTION 01 35 43 FOR HAZARDOUS
MATERIALS RECOMMENDATION.
THE CONTRACTOR SHALL ADHERE TO SPECIFICATION
SECTION 02 82 00 FOR ALL AREAS IMPACTED BY
HAZARDOUS MATERIAL ABATEMENT.
IT IS ASSUMED THAT CATEGORY 1 ACM IS PRESENT WITH
THE FLANGES AND VALVES IN THE FIRST FLOOR
MECHANICAL ROOM AND PUMP ROOM, APPROXIMATELY
144 SF, AND SHALL BE REMEDIATED.
IT IS ASSUMED THAT CATEGORY 2 ACM IS PRESENT IN
VIBRATION CLOTH ASSOCIATED WITH THE AHUS IN THE
FIRST FLOOR MECHANICAL ROOM APPROXIMATELY 55 SF
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
KZ
F
D
ES
IG
N
BR
O
AD
W
AY
S
T.
C
IN
C
IN
N
AT
I, O H
IO
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-1
7-
AN
SI
D
R
EP
AI
R
H
VA
C A
H U
'S
, 2 , 4
A N
D C
H
IL
LE
R
S
C G
B
W
PA
FB
B
U
IL
D
IN
G
, A R
EA
A
W R
IG
H
T
PA
TT
ER
SO
N
A
FB
, O H
IO
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AUGUST 02, 2024 - 100% CORRECTED FINAL
BLDG 10271
ZH
TV
EB
Y
LA
SH
LE
Y
ST
EP
H
EN
S
SC
H
M
IT
Z H
AZ
AR
D O
U S
M
AT
ER
IA
LS
P
LA
N
S
HM102
W
2Q R
B0
0_
C or r_ Fi na l_
Pl an s-
THE FOLLOWING LOCATIONS WERE REPORTED TO NOT CONTAIN ACM:
ACM IS NOT PRESENT IN THE FIBERGLASS INSULATION WITH TAN MASTIC ON THE HVAC DUCTWORK ASSOCIATED WITH AHU-1 & AHU-2 (271-13-01, 02,03,04,05,06,07).
ACM IS NOT PRESENT IN THE GREY MASTIC ON THE HVAC INTAKE ASSOCIATED WITH AHU-1 & AHU-2 (271-14-01,02,03) ACM IS NOT PRESENT IN THE FIBERGLASS INSULATION WITH CLOTH ASSOCIATED WITH THE INTERIOR OF AHU-1 (271-16-01, 02) ACM IS NOT PRESENT IN GREY MASTIC ON THE CHILLED WATER PIPING ASSOCIATED WITH AHU-1(271-17-01,02) ACM IS NOT PRESENT IN THE FIBERGLASS PIPE INSULATION WITH WHITE MASTIC ON CHILLED WATER PIPE ASSOCIATED WITH AHU-11 (271-18-01, 02,03) ACM IS NOT PRESENT IN THE FIBERGLASS PIPE INSULATION WITH TAN MASTIC ON CHILLED WATER PIPE ASSOCIATED WITH AHU-1 (271-19-01,02,03,04,05,06) CM IS NOT PRESENT IN THE FIBERGLASS PIPE INSULATION WITH TAN MASTIC ON CHILLED WATER PIPE ASSOCIATED WITH AHU-2 (271-23-01,02,03)
ASSUMED ACM
VIBRATION CLOTH
(~25 SF) (TYP. OF 5)
HAZARDOUS MATERIAL NOTES:
REFER TO HAZARDOUS MATERIALS REPORT IN THE
SPECIFICATION SECTION 01 35 43 FOR HAZARDOUS
MATERIALS RECOMMENDATION.
THE CONTRACTOR SHALL ADHERE TO SPECIFICATION
SECTION 02 82 00 FOR ALL AREAS IMPACTED BY
HAZARDOUS MATERIAL ABATEMENT.
IT IS ASSUMED THAT CATEGORY 1 ACM IS PRESENT WITH
THE FLANGES AND VALVES IN THE FIRST FLOOR
MECHANICAL ROOM AND THE CATWALK ABOVE,
APPROXIMATELY 144 SF, AND SHALL BE REMEDIATED.
IT IS ASSUMED THAT CATEGORY 2 ACM IS PRESENT IN
VIBRATION CLOTH ASSOCIATED WITH THE AHUS IN THE
FIRST FLOOR MECHANICAL ROOM AND THE CATWALK
ABOVE, APPROXIMATELY 55 SF
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
KZ
F
D
ES
IG
N
BR
O
AD
W
AY
S
T.
C
IN
C
IN
N
AT
I, O H
IO
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-1
7-
AN
SI
D
R
EP
AI
R
H
VA
C A
H U
'S
, 2 , 4
A N
D C
H
IL
LE
R
S
C G
B
W
PA
FB
B
U
IL
D
IN
G
, A R
EA
A
W R
IG
H
T
PA
TT
ER
SO
N
A
FB
, O H
IO
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AUGUST 02, 2024 - 100% CORRECTED FINAL
BLDG 10271
ZH
TV
EB
Y
LA
SH
LE
Y
ST
EP
H
EN
S
SC
H
M
IT
Z H
AZ
AR
D O
U S
M
AT
ER
IA
LS
P
LA
N
S
HM103
W
2Q R
B0
0_
C or r_ Fi na l_
Pl an s-
THE FOLLOWING CHEMICALS WERE
OBSERVED IN THE PUMP ROOM AND ARE
USED TO SOFTEN WATER FROM THE COOLING
TOWER. THESE MATERIALS NEED TO BE
PROPERLY DISPOSED OF WITHING STATE AND
FEDERAL REGULATIONS.
SODIUM HYPO CHLORINATE (220 GAL)
MICRO CONTROL 15N (20 GAL)
CL-2150 (20 GAL)
CL-5556 CHEMTREAT (20 GAL)
HYPOCHLORITE SOLUTION (12-15% (55 GAL))
THE FOLLOWING LOCATIONS WERE REPORTED TO NOT CONTAIN ACM
ACM IS NOT PRESENT IN THE FIBERGLASS INSULATION WITH WHITE MASTIC IN THE PUMP PIT IN THE PUMP ROOM (271-20-01).
ACM IS NOT PRESENT IN THE WHITE FIRESTOPPING AROUND THE PIPE ABOVE THE DOOR (271-21-01) ACM IS NOT PRESENT IN THE FIBERGLASS PIPE INSULATION WITH TAN MASTIC ON THE HOT AND CHILLED WATER PIPES (271-19-01,02,03,04,05,06)
ASSUMED ACM
GASKETS (~26 SF)
CONTRACTOR TO
REMOVE
(TYP. OF 10) HAZARDOUS MATERIAL NOTES:
REFER TO HAZARDOUS MATERIALS REPORT IN THE
SPECIFICATION SECTION 01 35 43 FOR HAZARDOUS
MATERIALS RECOMMENDATION.
THE CONTRACTOR SHALL ADHERE TO SPECIFICATION
SECTION 02 82 00 FOR ALL AREAS IMPACTED BY
HAZARDOUS MATERIAL ABATEMENT.
IT IS ASSUMED THAT CATEGORY 1 ACM IS PRESENT WITH
THE FLANGES AND VALVES IN THE FIRST FLOOR
MECHANICAL ROOM AND PUMP ROOM, APPROXIMATELY
144 SF, AND SHALL BE REMEDIATED.
IT IS ASSUMED THAT CATEGORY 2 ACM IS PRESENT IN
VIBRATION CLOTH ASSOCIATED WITH THE AHUS IN THE
FIRST FLOOR MECHANICAL ROOM APPROXIMATELY 55 SF
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
KZ
F
D
ES
IG
N
BR
O
AD
W
AY
S
T.
C
IN
C
IN
N
AT
I, O H
IO
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-1
7-
AN
SI
D
R
EP
AI
R
H
VA
C A
H U
'S
, 2 , 4
A N
D C
H
IL
LE
R
S
C G
B
W
PA
FB
B
U
IL
D
IN
G
, A R
EA
A
W R
IG
H
T
PA
TT
ER
SO
N
A
FB
, O H
IO
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AUGUST 02, 2024 - 100% CORRECTED FINAL
BLDG 10271
ZH
TV
EB
Y
LA
SH
LE
Y
ST
EP
H
EN
S
SC
H
M
IT
Z H
AZ
AR
D O
U S
M
AT
ER
IA
LS
P
LA
N
S
HM104
W
2Q R
B0
0_
C or r_ Fi na l_
Pl an s-
THE FOLLOWING LOCATIONS WERE REPORTED TO NOT CONTAIN ACM
THE CHWS FIBERGLASS PIPE INSULATION WITH CLOTH AND WHITE MASTIC ASSOCIATED WITH AHU-3 HAS TESTED NEGATIVE FOR ACM . (271-25-01, 02, 03).
THE HVAC FIBERGLASS INSULATION WITH TAN MASTIC ON THE EXTERIOR OF THE HVAC UNIT HAS TESTED NEGATIVE FOR ACM (271-26-01,02,03,04,05) THE DRYWALL AND MUD WITHIN THE SECOND FLOOR MECHANICAL ROOM HAS TESTED NEGATIVE FOR ACM (271-27-01, 02, 03) THE FIBERGLASS PIPE INSULATION WITH CLOTH AND TAN MASTIC IN THE LWTR/S PIPING ASSOCIATED WITH AHU-5 HAS TESTED NEGATIVE FOR ACM (271-28-01, 02, 03)
ASSUMED ACM
GASKETS (~9 SF)
CONTRACTOR TO
REMOVE
(TYP. OF 9)
ASSUMED ACM
VIBRATION CLOTH
(~30 SF) (TYP. OF 6)
HAZARDOUS MATERIAL NOTES:
THE CONTRACTOR SHALL ADHERE TO SPECIFICATION
SECTION 02 82 00 FOR ALL AREAS IMPACTED BY HAZARDOUS
MATERIAL ABATEMENT.
IT IS ASSUMED THAT CATEGORY 1 ACM IS PRESENT WITH
THE FLANGES AND VALVES IN THE SECOND FLOOR
MECHANICAL ROOM, APPROXIMATELY 144 SF, SHALL BE
REMEDIATED
IT IS ASSUMED THAT CATEGORY 2 ACM IS PRESENT IN
VIBRATION CLOTH ASSOCIATED WITH THE AHUS IN THE
SECOND FLOOR MECHANICAL ROOM (APPROXIMATELY 55 sf).
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
KZ
F
D
ES
IG
N
BR
O
AD
W
AY
S
T.
C
IN
C
IN
N
AT
I, O H
IO
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
-1
7-
AN
SI
D
R
EP
AI
R
H
VA
C A
H U
'S
, 2 , 4
A N
D C
H
IL
LE
R
S
C G
B
W
PA
FB
B
U
IL
D
IN
G
, A R
EA
A
W R
IG
H
T
PA
TT
ER
SO
N
A
FB
, O H
IO
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AUGUST 02, 2024 - 100% CORRECTED FINAL
BLDG 10271
ZH
TV
EB
Y
LA
SH
LE
Y
ST
EP
H
EN
S
SC
H
M
IT
Z H
AZ
AR
D O
U S
M
AT
ER
IA
LS
P
LA
N
S
HM105
W
2Q R
B0
0_
C or r_ Fi na l_
Pl an s-
SAN SAN SAN SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SD SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SAN
SAN
SAN
SAN
SAN
SAN
SAN E
E
E E
E E
E
E
W W
W
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SAN SAN SAN
G
G
GGGGGGGGGGGGGGGGGG
SD
SAN
SA
N
SD
SD
SD
SAN
SAN
SAN
W
W
W W
W W
W W
W
W
W
W
W W W W W W W W W
SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD
SD SD SD SD SD SD SD SD SD SD SD
SD
SD
W
DD
D
D
D
S
S
S
S
S
CB
CB
CB
CO
CO
CO
G
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
C
IN
C
IN
N
AT
I, O
H
IO
LO
U
IS
VI
LL
E D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
KY
AN
SI
D
R
EP
AI
R
H
VA
C A
H U
'S
, 2 , 4
A N
D C
H
IL
LE
R
S
C G
B
W
PA
FB
B
U
IL
D
IN
G
, A R
EA
W
R
IG
H T
PA
TT
ER
SO
N A
FB
, O
H
IO
BR
O
AD
W
AY
S
T.
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
BLDG 10271
ZH
TV
EB
Y
SEAL
KW
W
JA
H
PS
B
-1
7-
AUGUST 02, 2023 - 100% CORRECTED FINAL
V-101
10' 20'0
PLAN
NORTH
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
AUGUST 02, 2024 - 100% CORRECTED FINAL
W
2Q R
B0
0_
C or r_ Fi na l_
Pl an s-
E E
E E
E
E
E
E
EE
E
E
E
E
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
CO
M
M
CO
M
M
CO
M
M
CO
M
M
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
W
W W W
W
W
W
W
W
W
SAN
SAN
SAN
SAN
G G
G G
G G
G G
G
G
G
G
G
G
G
G
G
G
G
G
S
S
CI
CO
T
E
W
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
C
IN
N
AT
I, O
IS
VI
LL
E D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
D
R
EP
AI
R
H
VA
C A
H U
'S
, 2 , 4
A N
D C
H
IL
LE
R
S
C G
B
W
PA
FB
B
U
IL
D
IN
G
, A R
IG
H T
PA
TT
ER
SO
N A
FB
, O
H
IO
BR
O
AD
W
AY
S
T.
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
BLDG 10271
ZH
TV
EB
Y
SEAL
KW
W
JA
H
PS
B
-1
7-
AUGUST 02, 2023 - 100% CORRECTED FINAL
V-102
10' 20'0
PLAN
NORTH
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
AUGUST 02, 2024 - 100% CORRECTED FINAL
W
2Q R
B0
0_
C or r_ Fi na l_
Pl an s-
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SD SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SAN
SAN
SAN
SAN
SAN
SAN
SAN E
E
E E
E E
E
E
W W
W
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SAN SAN SAN
G
G
GGGGGGGGGGGGGGGGGG
SD
SAN
SA
N
SD
SD
SD
SAN
SAN
SAN
W
W
W W
W W
W W
W
W
W
W
W W W W W W W W W
SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD
SD SD SD SD SD SD SD SD SD SD SD
SD
SD
W
DD
D
D
D
S
S
S
S
S
CB
CB
CB
CO
CO
CO
G
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
C
IN
N
AT
I, O
IS
VI
LL
E D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
D
R
EP
AI
R
H
VA
C A
H U
'S
, 2 , 4
A N
D C
H
IL
LE
R
S
C G
B
W
PA
FB
B
U
IL
D
IN
G
, A R
IG
H T
PA
TT
ER
SO
N A
FB
, O
H
IO
BR
O
AD
W
AY
S
T.
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
BLDG 10271
ZH
TV
EB
Y
SEAL
KW
W
JA
H
PS
B
-1
7-
AUGUST 02, 2023 - 100% CORRECTED FINAL
CD101
10' 20'0
PLAN
NORTH
DRAWING NOTES
D
EM
O
LI
TI
O
N P
LA
N
AUGUST 02, 2024 - 100% CORRECTED FINAL
W
2Q R
B0
0_
C or r_ Fi na l_
Pl an s-
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SD SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SAN
SAN
SAN
SAN
SAN
SAN
SAN E
E
E E
E E
E
E
W W
W
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SAN SAN SAN
G
G
GGGGGGGGGGGGGGGGGG
SD
SAN
SA
N
SD
SD
SD
SAN
SAN
SAN
W
W
W W W W W W W W W
SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD
SD SD SD SD SD SD SD SD SD SD SD
SD
SD
DD
D
D
D
S
S
S
S
S
CB
CB
CB
CO
CO
CO
G
W
W
W
W
W
W
W
CO
S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
C
IN
N
AT
I, O
IS
VI
LL
E D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
D
R
EP
AI
R
H
VA
C A
H U
'S
, 2 , 4
A N
D C
H
IL
LE
R
S
C G
B
W
PA
FB
B
U
IL
D
IN
G
, A R
IG
H T
PA
TT
ER
SO
N A
FB
, O
H
IO
BR
O
AD
W
AY
S
T.
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
BLDG 10271
ZH
TV
EB
Y
SEAL
KW
W
JA
H
PS
B
-1
7-
AUGUST 02, 2023 - 100% CORRECTED FINAL
CS101
10' 20'0
PLAN
NORTH
DRAWING NOTES
SI
TE
P
LA
N
AUGUST 02, 2024 - 100% CORRECTED FINAL
W
2Q R
B0
0_
C or r_ Fi na l_
Pl an s-
E E
E E
E
E
E
E
EE
E
E
E
E
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
CO
M
M
CO
M
M
CO
M
M
CO
M
M
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
W
W W W
W
W
W
W
W
W
SAN
SAN
SAN
SAN
G G
G G
G G
G G
G
G
G
G
G
G
G
G
G
G
G
G
S
S
CI
CO
T
E
W
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
C
IN
N
AT
I, O
IS
VI
LL
E D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
D
R
EP
AI
R
H
VA
C A
H U
'S
, 2 , 4
A N
D C
H
IL
LE
R
S
C G
B
W
PA
FB
B
U
IL
D
IN
G
, A R
IG
H T
PA
TT
ER
SO
N A
FB
, O
H
IO
BR
O
AD
W
AY
S
T.
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
BLDG 10271
ZH
TV
EB
Y
SEAL
KW
W
JA
H
PS
B
-1
7-
AUGUST 02, 2023 - 100% CORRECTED FINAL
CS102
10' 20'0
PLAN
NORTH
DRAWING NOTES
SI
TE
P
LA
N
AUGUST 02, 2024 - 100% CORRECTED FINAL
W
2Q R
B0
0_
C or r_ Fi na l_
Pl an s-
SAN SAN
SAN
SAN
SAN
SAN
SAN
SD
SD
SD
SD
SD
SAN
SAN
SAN
E E
E
E
W
SD
SD
SD
SD
SD
SD
SD
SAN
G
GGGGGGGGG
SD
SAN
SAN
W
W W W W
SD SD SD SD SD SD SD SD
SD SD SD SD SD
SD
DD
D
D
D
S
S
S
S
S
CB
CB
CB
CO
CO
CO
G
W
W
W
CO
S
20' 40'0
PLAN
NORTH
4' -6
" M
IN
M
IN
EX. SAN.
EX. STM.
EX. WTR. EX. ELEC.
EX. GAS
EX. BUILDING
EXISTING SURFACE
8" STM 8" STM
STA. = 3+28.77
SEE SHEET M-405
STA. = 0+00.00
SEE SHEET M-401 2 ~ 12" NEW CHILLER PIPING
PLANTER BOX
STA. 0+00.00
SEE SHEET M-401
STA. = 3+33.56
SEE SHEET M-405
8" CWS
COOLING TOWER BASIN
SEE MECHANICAL DRAWINGS
1 ~ EX. 2" DCW
1 ~ 1 1/2" DCW
EX. 2" DCW
START NEW
1 1/2" DCW
COOLING TOWER
BASIN. TOP AT 835.00.
SEE MECHANICAL DRAWINGS
12" CWR
SUBJECT PROFILE BELOW
12" CWS
12" CWR
1 1/2" DCW
DRAWING NOTES
6" BASIN DRAIN, SDR 26
WORK TO BE DONE BY AMERICAN
WATER UNDER SEPERATE
CONTRACT.
NEW SAN MH
TOP = 831.25
INV 6" (N) = 823.50
INV 10" (E) = 822.81
INV 10" (W) = 822.81
WORK TO BE DONE BY AMERICAN
WATER UNDER SEPERATE
CONTRACT.
8" WATER LINE RELOCATION,
DUCTILE IRON PIPE. WORK TO BE
DONE BY AMERICAN WATER UNDER
SEPERATE CONTRACT.
8 SANITARY CLEANOUT TO BE
INSTALLED BY AMERICAN WATER
UNDER SEPERATE CONTRACT.
CLEANOUT IF THE POINT OF
DEMARCATION BETWEEN
RESPONSIBILITY. *ALL UPSTREAM
PIPING OF THE CLEANOUT TO BE
INSTALLED BY THE CONTRACTOR.*
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
C
IN
N
AT
I, O
IS
VI
LL
E D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
D
R
EP
AI
R
H
VA
C A
H U
'S
, 2 , 4
A N
D C
H
IL
LE
R
S
C G
B
W
PA
FB
B
U
IL
D
IN
G
, A R
IG
H T
PA
TT
ER
SO
N A
FB
, O
H
IO
BR
O
AD
W
AY
S
T.
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
BLDG 10271
ZH
TV
EB
Y
SEAL
KW
W
JA
H
PS
B
-1
7-
AUGUST 02, 2023 - 100% CORRECTED FINAL
CU101
C H
IL
LE
R P
IP
E
PL
AN
P
R O
FI
LE
AUGUST 02, 2024 - 100% CORRECTED FINAL
W
2Q R
B0
0_
C or r_ Fi na l_
Pl an s-
SAN SAN
SAN
SAN
SAN
SAN
SAN
SD
SD
SD
SD
SD
SAN
SAN
SAN
E E
E
E
W
SD
SD
SD
SD
SD
SD
SD
SAN
G
GGGGGGGGG
SD
SAN
SAN
W
W W W W
SD SD SD SD SD SD SD SD
SD SD SD SD SD
SD
DD
D
D
D
S
S
S
S
S
CB
CB
CB
CO
CO
CO
G
W
W
W
CO
S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
C
IN
N
AT
I, O
IS
VI
LL
E D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
D
R
EP
AI
R
H
VA
C A
H U
'S
, 2 , 4
A N
D C
H
IL
LE
R
S
C G
B
W
PA
FB
B
U
IL
D
IN
G
, A R
IG
H T
PA
TT
ER
SO
N A
FB
, O
H
IO
BR
O
AD
W
AY
S
T.
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
BLDG 10271
ZH
TV
EB
Y
SEAL
KW
W
JA
H
PS
B
-1
7-
AUGUST 02, 2023 - 100% CORRECTED FINAL
CU102
20' 40'0
PLAN
NORTH
STA. 0+00.00
SEE SHEET M-401
STA. = 3+33.56
SEE SHEET M-405
COOLING TOWER BASIN
SEE MECHANICAL DRAWINGS
EX. 2" DCW
SUBJECT PROFILE BELOW
12" CWS
12" CWR
1 1/2" DCW
DRAWING NOTES
6" BASIN DRAIN, SDR 26
WORK TO BE DONE BY AMERICAN
WATER UNDER SEPERATE
CONTRACT.
NEW SAN MH
TOP = 831.25
INV 6" (N) = 823.50
INV 10" (E) = 822.81
INV 10" (W) = 822.81
WORK TO BE DONE BY AMERICAN
WATER UNDER SEPERATE
CONTRACT.
8" WATER LINE RELOCATION,
DUCTILE IRON PIPE. WORK TO BE
DONE BY AMERICAN WATER UNDER
SEPERATE CONTRACT.
8 SANITARY CLEANOUT TO BE
INSTALLED BY AMERICAN WATER
UNDER SEPERATE CONTRACT.
CLEANOUT IF THE POINT OF
DEMARCATION BETWEEN
RESPONSIBILITY. *ALL UPSTREAM
PIPING OF THE CLEANOUT TO BE
INSTALLED BY THE CONTRACTOR.*
FINISHED SURFACE
COOLING TOWER
BASIN. TOP AT 835.00.
SEE MECHANICAL DRAWINGS
EX. 10" SAN.
INV = 822.81
6' BASIN
OVERFLOW
6" BASIN DRAIN
" M
IN
12" CWS
12" EX STORM
INV = 826.19
D R
AI
N
P
IP
IN
G
P
LA
N
P R
O
FI
LE
AUGUST 02, 2024 - 100% CORRECTED FINAL
W
2Q R
B0
0_
C or r_ Fi na l_
Pl an s-
W
CO
S
SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SD
SD
SD
SD
SD
SAN
SAN
SAN
E E
E
E
W
SD
SD
SD
SD
SD
SD
SD
SAN
G
GGGGGGGGG
SD
SAN
SAN
W
W W W W
SD SD SD SD SD SD SD SD
SD SD SD SD SD
SD
DD
D
D
D
S
S
S
S
S
CB
CB
CB
CO
CO
CO
G
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
C
IN
N
AT
I, O
IS
VI
LL
E D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
D
R
EP
AI
R
H
VA
C A
H U
'S
, 2 , 4
A N
D C
H
IL
LE
R
S
C G
B
W
PA
FB
B
U
IL
D
IN
G
, A R
IG
H T
PA
TT
ER
SO
N A
FB
, O
H
IO
BR
O
AD
W
AY
S
T.
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
BLDG 10271
ZH
TV
EB
Y
SEAL
KW
W
JA
H
PS
B
-1
7-
AUGUST 02, 2023 - 100% CORRECTED FINAL
CU103
10' 20'0
PLAN
NORTH
W
AT
ER
L
IN
E
R
EL
O C
AT
IO
N P
LA
N
P
R O
FI
LE
SIDEWALK TO BE REMOVED AND REPLACED
4.5' MIN
EXISTING SURFACE
SUBJECT PROFILE BELOW
12" CWS
12" CWR
1 1/2" DCW
DRAWING NOTES
6" BASIN DRAIN, SDR 26
WORK TO BE DONE BY AMERICAN
WATER UNDER SEPERATE
CONTRACT.
NEW SAN MH
TOP = 831.25
INV 6" (N) = 823.50
INV 10" (E) = 822.81
INV 10" (W) = 822.81
WORK TO BE DONE BY AMERICAN
WATER UNDER SEPERATE
CONTRACT.
8" WATER LINE RELOCATION,
DUCTILE IRON PIPE. WORK TO BE
DONE BY AMERICAN WATER UNDER
SEPERATE CONTRACT.
8 SANITARY CLEANOUT TO BE
INSTALLED BY AMERICAN WATER
UNDER SEPERATE CONTRACT.
CLEANOUT IF THE POINT OF
DEMARCATION BETWEEN
RESPONSIBILITY. *ALL UPSTREAM
PIPING OF THE CLEANOUT TO BE
INSTALLED BY THE CONTRACTOR.*
COOLING TOWER BASIN
SEE MECHANICAL DRAWINGS
3 4
STA. 0.+00.00
SEE SHEET M-401
EX. 2" DCW
STA. = 3+33.56
SEE SHEET M-405
AUGUST 02, 2024 - 100% CORRECTED FINAL
W
2Q R
B0
0_
C or r_ Fi na l_
Pl an s-
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
C
IN
N
AT
I, O
IS
VI
LL
E D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
D
R
EP
AI
R
H
VA
C A
H U
'S
, 2 , 4
A N
D C
H
IL
LE
R
S
C G
B
W
PA
FB
B
U
IL
D
IN
G
, A R
IG
H T
PA
TT
ER
SO
N A
FB
, O
H
IO
BR
O
AD
W
AY
S
T.
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
BLDG 10271
ZH
TV
EB
Y
SEAL
KW
W
JA
H
PS
B
-1
7-
AUGUST 02, 2023 - 100% CORRECTED FINAL
C-501
D
ET
AI
L
SH
EE
T
L
L
12"
48"
V A R
IA
B
LE
R
IS
E R
V A R
IA
B
LE
"M A X
M
IN
C O N E
GENERAL SITE NOTES
AUGUST 02, 2024 - 100% CORRECTED FINAL
W
2Q R
B0
0_
C…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .