SEE ADDENDUM

(No Collect Calls)

W912QR23Q0057 25-Apr-2023

b. TELEPHONE NUMBER

502.315.6252

8. OFFER DUE DATE/LOCAL TIME

10:00 AM 09 May 2023

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912QR9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

ALEX J HAMILTON

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W22W9K30479931

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: 502.315.7494 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$9,000,000

NAICS:

561790

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912QR23Q0057

Section SF 1449 - CONTINUATION SHEET

SPECIAL INSTRUCTIONS

The contractor shall furnish all personnel, equipment, supplies, and materials necessary to video inspect entire toe drain, remove sediment between Manhole #1 and Manhole #2, and video inspect Manhole #1 and Manhole #2 after sediment removal. Prices should include mobilization and de-mobilization, fuel, labor, materials, and equipment. The contractor’s work and responsibility shall include all planning, programming, administration, management, supervision, communications, and inspection necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State, and local laws and regulations. All work shall be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. Work will conclude within 180 calendar days after Award.

The contract award will be based on Lowest Total Price (sum of all line items) to the Government, and result in a Firm Fixed Price contract.

This procurement is 100% set-aside for Small Business, NAICS 561790 Other Services to Buildings and Dwellings (Size Standard $9,000,000.00).

Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.

One award will be made from this Solicitation.

In addition to the completed price breakout shcedule, the Offeror must complete their Representations and Certifications page located in this Request for Quote (RFQ).

Questions for this RFQ shall be emailed to Alex Hamilton at alex.j.hamilton@usace.army.mil NLT 04 May 2023 at 12:00 PM Eastern Time.

Site visits are highly encouraged. Please contact:

Evan McKinney, Project Manager

(502) 477-8882, 2825 Overlook Rd.

Taylorsville, KY 40071

Submit Quotes to Alex J. Hamilton. Quotes are due no later than 09 May 2023 at 10:00 AM Eastern Time. Fax submittals will not be accepted. Electronic submittals will be accepted and may be emailed to alex.j.hamilton@usace.army.mil

For contractual/technical questions, please contact Alex Hamilton by e-mail at alex.j.hamilton@usace.army.mil.

Technical Points of Contact shall not be contacted prior to award.

All contractors must be registered in the System for Award Management (www.SAM.gov) prior to quote submittal. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer – System for Award Management, which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by going to the website http://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier (previously DUNS number) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from DUN and Bradstreet by calling 1-800-333-0505. Refer to www.SAM.gov for information formerly found in CCR, EPLS, ORCA and FedReg.

Training tools are available on the SAM website to help you get familiar with SAM. Start by going to www.sam.gov, and then click on the SAM HELP tab. Under User Help you will find the full User Guide as well mailto:alex.j.hamilton@usace.army.mil mailto:alex.j.hamilton@usace.army.mil mailto:kari.a.rogers@usace.army.mil http://www.sam.gov/ http://www.sam.gov/ http://www.sam.gov/ as Quick Start Guides and Helpful Hints that will help you create an account, migrate your roles, perform updates , and search for the information you need. These guides can also be viewed at http://www.acquisition.gov.

PLEASE NOTE: SAM is completely free of charge for both registrants and users.

http://www.acquisition.gov/

Price Breakout Schedule

Line Item Description QTY Unit Total

Video inspect entire toe drain, remove sediment between Manhole #1 and Manhole #2, and video inspect between Manhole #1 and Manhole #2 after sediment removal.

1 Job

Total Base

Option 1: Remove Sediment between Manhole #2 and the outlet and video inspect between Manhole #2 and the outlet after sediment removal.

1 Job

Option 2: Remove sediment between Manhole #2 and Manhole #3 and video inspect between Manhole #2 and Manhole #3 after sediment removal.

1 Job

Total Options

Total (Base plus Options)

Note: Exercising of the options will not extend the Period of Performance.

REPRESENTATIONS & CERTIFICATIONS

COMPANY NAME AND ADDRESS: __________________________________________

PHONE NUMBER _____________________ FAX NUMBER _____________________

EMAIL ADDRESS ________________________________________________________

BUSINESS SIZE (select one)

Large Business _____ Small Business_____ HUBZone Business_____ 8A _____

Woman-Owned ____ Service-Disabled Veteran-Owned ____

Contractor is registered with SAM: _____ YES _____ NO (See FAR 52.204-7)

TAX ID # ______________________

INDICATE Unique Entity Identifier (previously DUNS NUMBER) ___________________ (Note: See Unique

Entity Identifier (FAR 52.204-7). (This is 9-digit numeric code)

CAGE NO. ____________

STATEMENT OF WORK

Toe Drain Video Inspections and Sediment Removal

Project Location:

Taylorsville Lake 2825 Overlook Rd Taylorsville, KY 40071

General Requirements The contractor shall furnish all personnel, equipment, supplies and materials necessary to video inspect entire toe drain, remove sediment between Manhole #1 and Manhole #2, and video inspect between Manhole #1 and Manhole #2 after sediment removal, and options. Prices should include mobilization & de-mobilization, fuel, labor, material and equipment. The contractor’s work and responsibility shall include all planning, programming, administration, management, supervision, communications and inspection necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work shall be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein.

Statement of Work:

The objective of this Statement of Work (SOW) includes video inspections of the entire toe drain systems, remove sediment between Manhole #1 and Manhole #2 at Taylorsville Lake. The video inspections equipment used shall enable the contractor to video inspect the full pipe and isolate specific areas of potential concern. The contractor shall coordinate inspection day with USACE to ensure a USACE employee with certifications from the National Association of Sewer Service Companies’ (NASSCO) in the Pipeline Assessment Certification Program (PACP) is able to attend the inspection.

a. Project Description:

The purpose of this investigation is to evaluate the condition of the existing toe drain system and to remove sediment from the toe drain and video inspect between Manhole #1 and Manhole #2 after sediment removal. Options include removing sediment and video inspecting the other two segments of the drainage system. The toe drain is a part of the dam’s internal drainage system designed to control seepage and pore water pressures within the dam. This inspection will evaluate the condition of the pipe material and identify pipe defects, as well as identify sedimentation within the existing pipe system. Controlling these parameters increases the stability of the downstream slope against sliding and prevents erosion.

b. Site Access and Trafficability:

Site access requirements shall be obtained and adhered to by the contractor. The contractor will be able to use limited access paved roads in the vicinity of the manholes but should visit the site prior to verify current conditions. The contractor will be required to restore site to original conditions as described below.

Description of Services for Toe Drain Video Inspections:

a. Toe Drain Locations:

The location of the toe drains, and access points are shown on exhibits provided in this SOW.

b. Inspection Procedures:

The approximate distance of the toe drain is four hundred twenty feet (420’). Toe drain is 18-inch perforated corrugated metal pipe in the collection system (MH1 to MH2 and MH2 to MH 3), and 24-inch bitumen coated corrugated metal pipe in the discharge pipe (MH2 to outlet). The contractor is responsible for the verification of exact distance. Physical inspection and cleaning should occur between June and August to eliminate need for dewatering/by passing pipe segments. The contractor shall initially CCTV camera inspection to document the approximate amount and location of sediment/debris within the pipes.

This initial camera inspection is intended to be a cursory inspection to provide information related to the performance of the existing toe drain systems.

• Pipes will be inspected using CCTV cameras.

• Inspection date(s) will be coordinated with the TPOC to occur during low flow. Physical inspection and cleaning should occur between June and August to eliminate need for dewatering/by passing pipe segments. In the event there is more than 3 inches of water in the invert of the pipe, the pipe will need to be dewatered prior to video inspection.

• The flow rate obtained at the outlet on 12April2023 was approximately 5 gallons per minute.

Precipitation totals at the project site since 1April2023 totaled 0.48” and occurred on 1April2023 (0.37”) and 7April2023 (0.11”).

1) An inspection system specifically designed and constructed for pipe inspection shall be used. The

CCTV camera shall be capable of panning 360° and tilting 270°. The camera is positioned in the center of circular pipes. Lighting for the CCTV camera shall be suitable to allow a clear picture of the entire periphery of the pipe. The camera shall be capable of operating in 100% humidity conditions. The minimum acceptable camera resolution is 720p. The CCTV monitor and other components of the CCTV system shall be capable of producing a color picture/CCTV quality to the Corps of Engineers satisfaction.

2) The CCTV camera needs to move through the pipe at a constant rate, stopping to permit proper documentation of the pipe's condition for coding. The CCTV camera shall not move at a speed greater than 25 feet per minute. Obtain a still picture (color jpeg format) of all significant defects observed during inspection. Record segment, location along pipe, clock position, time and defect code for each picture. Obtain a still photograph coaxial with each lateral. The CCTV camera shall have to ability to fully stop traversing and record a 360° view of each pipe joint.

3) During the inspection the following information shall be clearly and continuously displayed on the periphery of the screen, monitor and CCTV recording: starting location ID, ending location ID, and distance from starting location. If inspection of an entire pipe segment cannot be completed due to a collapse, excessive deformation, debris, intruding connections, obstructions or large displaced joints, move equipment to another access location in the opposite direction (if possible).

Advise COR immediately if the complete pipe segment cannot be inspected. Track all locations where a complete inspection is not obtained and clearly document the length of pipe not inspected, location, segment, distance from starting location, etc.

4) The contractor will provide a separate report for each segment of the toe drain: MH1 to MH2, MH2 to MH3, and MH2 to outlet.

c. Sediment Removal:

Once the initial video inspection is complete the removal of sediment between Manhole #1 and Manhole #2 is required. If sediment was identified between Manhole #3 and Manhole #2 or between Manhole #2 and the outlet during the initial video inspection, the COR may exercise additional contract options to clean these additional segments with no impact to period of performance. All sediment and debris shall be removed from reach segment(s) and disposed following federal, state, and local laws. Pipes shall be cleaned as required to clearly expose the interior surface of the pipe. Cleaning shall be performed by utilizing a combination cleaning truck and shall consist of up to 3 passes. The pipe shall have no more than 3 passes of cleaning. To ensure the integrity of the pipe the maximum water pressure utilized for cleaning shall not exceed 1,800 psi. The contractor shall verify with the Technical Point of Contact (TPOC) that cleaning has been accomplished. Once all sediment and debris has been removed a post cleaning inspection shall be completed on all segments that were cleaned.

d. Pipe Condition Coding:

Pipe condition coding for pipes subjected to CCTV inspection is done in line with NASSCO PACP or equivalent rating system. A Government Representative will complete the pipe coding for this work.

During the video inspection, there is information that should be noted in order to ensure proper coding can be completed by the Government Representative. The information called out includes, but is not limited to the following:

o Structural condition and deformation of the pipe walls o Segment length (from inside walls of adjacent manholes) o Blockages or obstructions o Condition of joints and pipe walls o Standing water/sag conditions o Infiltration/exfiltration o Fluctuations in water level o Size, location and condition of sewer laterals with the clock position

Distance measurements are referenced to the nearest 0.1 foot, using a readily identifiable baseline such as a headwall, manhole, or flap gate.

e. Site Restoration:

Cleanup of work and storage areas shall be performed upon completion of work. All trash or debris shall be disposed of in accordance with all federal and state requirements. Care shall be taken to leave the project sites in the same condition as prior to inspections. Additionally, any disturbed grass areas shall be restored to original condition.

Grass Seed/Fertilizer/Straw Matting

• If any turf is damaged due to equipment usage the following shall be used by Contractor to correct damage. Topsoil shall be used as backfill to ensure that grass can be properly established and supported in the backfilled areas.

• Immediately prior to spreading the grass seed/fertilizer on the graded backfill an inspection by the Government Representative shall be completed and no material shall be placed thereon until that area has been approved.

• The Contractor shall seed, fertilize, and place straw matting on the backfilled area. Straw matting shall be stapled/anchored per the manufacture’s specifications. Areas shall be seeded according to the following seed mixture and applied (at a rate of 4-6 pounds per cubic yard):

25% Kentucky Bluegrass (1 Variety) 25% Perennial Ryegrass (1 Variety) 25% Annual Ryegrass (1 Variety) 25% Creeping Red Fescue

• If similar mix is used, it shall be approved by Government Representative prior to application.

• All fertilizer used shall be 12-12-12.

Paved areas are to be cleaned to remove tracked mud and debris as necessary. Site cleanup shall be performed to the satisfaction of the TPOC/Lake Manager.

f. Deliverables:

Submit two copies of the following items within 2 weeks following completion of inspection activities:

o Clearly labeled and organized electronic inspection videos and still pictures (jpeg) on CD, DVD, or external hard drive.

o Electronic (pdf) and hard copy inspection logs with the following information:

o A narrative report summarizing the pipe inspection location, start and end points, conditions of the inspection, equipment used, and general condition of the pipe.

o Date of the inspection o Name of the dam and as-built stationing of the pipes being inspected o Coordinates of the inlet and outlet locations for each pipe segment inspected. Coordinates shall be in Latitude/Longitude and to six-decimal accuracy.

o Total length of each pipe segment and the length inspected o Type of pipe including material, size, shape o Inspection method o Defect information including:

Clock position of defect Distance from starting location (starting manhole) Defect measurements to establish height, width, depth, if possible Picture of each defect o A copy of as-built drawing with an arrow added to show the pipe location and direction of CCTV camera travel.

The inspection video shall be either configured for viewing using the latest version of Windows Media Player, or the appropriate viewing software must be submitted on each CD, DVD, or external hard drive. Files are configured to have the ability to use all features of the CCTV player including fast forward capability.

NOTE: No payment is made for poor or unacceptable quality CCTVs or for portions of pipes that are not inspected for any reason. If, in the opinion of the USACE, the CCTV is of such poor quality that the condition of the pipe cannot be adequately assessed, the Contractor shall re-inspect the unacceptable segments and resubmits all deliverables for that segment at no additional cost to the Owner.

g. Government Data Security and Property:

The Contractor shall not release any data, reports, or materials collected and/or developed during this project without the expressed written consent of the USACE.

All documents, maps, photographs, graphics, computer files and the like developed by the Contractor while completing the requirements of this SOW are government property and will be delivered to the TPOC upon completion of this project.

TAYLORSVILLE LAKE TOE DRAIN INSPECTION

TABLE OF CONTENTS

SPECIFICATIONS/DESCRIPTION

PAGE

1. Project Information

2. Performance Work Statement

3. Technical Point of Contact (TPOC)

4. Pre-Work Conference

5. Working Hours

6. Contract Start and Completion Dates

7. Contractor Submittals

8. Permits and Licenses

9. Identification of Contract Employees and Vehicles

10. Safety Requirements

11. Required Security Training and Planning

12. Accident Reporting

13. Damage Reports

14. Contractor Employees’ Conduct and Competency

15. Damage or Loss of Contractor’s Supplies and Property

16. Supervision

17. Environmental Program

18. Contract Discrepancy Report (CDR)

19. Meetings

20. Quality Control

21. Quality Assurance

22. Deficiencies

23. Interruptions to Systems

24. Government Furnished Materials and Equipment

25. Contractor Furnished Items

26. Safeguarding Government Property

27. Minimum Manpower Requirements

28. Minimum Personnel Qualifications

29. Cooperation with other Contractors, Lessees, and Volunteers

30. Reports

31. Applicable Publications

32. Warranty N/A

33. Wage Rates

34. Definitions

35. Index of Exhibits

SPECIFICATIONS/DESCRIPTION

1. Project Information.

Toe Drain Video Inspections and Sediment Removal at Taylorsville Lake.

2. Performance Work Statement.

The contractor shall furnish all personnel, equipment, supplies and materials necessary to inspect toe drain, remove sediment from toe drain, and inspect toe drain after sediment removal. Prices should include mobilization & de-mobilization, fuel, labor, material, and equipment. The contractor’s work and responsibility shall include all planning, programming, administration, management, supervision, communications, and inspection necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work shall be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein.

3. Technical Point of Contact (TPOC):

Evan McKinney U.S. Army Corps of Engineers Taylorsville Lake 2825 Overlook Rd Taylorsville, KY 40071 502-477-8882 Evan.s.mckinney@usace.army.mil

4. Pre-Work Conference:

The contractor will be required to attend a pre-work conference prior to beginning work during which the Contractor’s plan of work, safety procedures, start date and other items in this contract will be discussed.

5 . Working Hours.

a. Normal working hours, except as otherwise specified herein, shall be Monday through Friday, 7:00 a.m.

to 5:00 p.m. Eastern Time. Work inside Government buildings or other secured areas shall be performed during the above referenced work hours. Work that interferes with other ongoing functions at the project shall be scheduled around normal working hours, as specified by the Project Manager.

Holiday Work. The eleven Federal holidays observed are:

New Year's Day (January 1st) Martin Luther King Day (3rd Monday in January) President's Day (3rd Monday in February) Memorial Day (Last Monday in May) Juneteenth (June 19th) Independence Day (July 4th) Labor Day (1st Monday in September) Columbus Day (2nd Monday in October) Veterans Day (November 11th) Thanksgiving Day (4th Thursday in November) Christmas Day (December 25th)

When one of the above designated holidays falls on a Sunday, the following Monday is observed as a legal holiday. When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday. Work shall be scheduled around the above listed Federal holidays except as specified herein or as approved by the

TPOC.

b. Inclement Weather Work.

The Contractor shall maintain the schedule of services regardless of inclement weather. Exceptions may be approved by the TPOC when severe conditions make it impractical or dangerous to perform the work.

6. Contract Start and Completion Dates.

mailto:Evan.s.mckinney@usace.army.mil

All work will conclude 180 calendar days after the date of award. Inspection date(s) will be coordinated with the TPOC to occur during low flow. Physical inspection and cleaning should occur between June and August to eliminate need for dewatering/by passing pipe segments. In the event there is more than 3 inches of water in the invert of the pipe, the pipe will need to be dewatered prior to video inspection.

7. Contractor Submittals.

Unless otherwise specified, the Contractor will submit the following information to the TPOC prior to the pre-work conference for this contract:

a. Contractor Representatives. List of names of Contractor Representatives.

b. Accident Prevention Plan (APP). A suggested outline for the Contractor’s Accident Prevention Plan

Appendix A of EM 385-1-1 See Section C-1.9 for APP requirements. Exhibit D.

c. Emergency Contacts. A prioritized list, including phone numbers, of those persons (normally Contractor

Representatives) to call in case of emergencies.

d. Operators. A list of names of qualified equipment/vehicle operators, including experience, training and qualification to operate specific equipment.

e. Security Requirements.

8. Permits and Licenses.

The Contractor will obtain, at own expense, any required licenses, permits or certifications necessary to perform the specified services. Required licenses, permits and certifications will be kept current during the period the work is performed. The Contractor is also responsible for any and all costs associated with the training of Contractor personnel to acquire and maintain valid licenses, permits or certifications necessary to perform the contract services specified herein. The Contractor, Contractor personnel and any persons acting on behalf of the Contractor will comply with all applicable Federal, State and local laws and regulations, including any subsequent changes to these laws and regulations.

Minimum Personnel and Training Requirements. The Contractor will provide an adequate number of fully trained and qualified personnel to perform the work specified herein. Contractor personnel will be properly trained to perform their assigned work in a safe and effective manner. Training will include but is not limited to instruction on the proper and safe use and operation of Contractor equipment and any Contractor provided tools, supplies and materials required to perform the specified services. Only properly trained and qualified employees will be used in the performance of services specified herein. The Contractor will also assume responsibility for training or Orienting Contractor personnel to perform the services specified in the contract. In the event the Contracting Officer or his/her Authorized Representative determines that the Contractor does not have a qualified employee performing the specified work, the Contractor will be required to provide qualified personnel, or subcontract the work to a person or persons who are trained and qualified to perform the work. The Contractor acknowledges that the employment of undocumented migrant workers to perform services under this contract will not be permitted.

9. Identification of Contract Employees and Vehicles.

All Contractor employees will be in good appearance while performing services. Employees must wear long pants, shirt with no vulgar or obscene graphics with at least sleeves equivalent of a t-shirt, and durable work type shoes.

Vehicles and any motorized equipment utilized for transportation will be in good operating condition with no display of obscene or vulgar material such as stickers, flags, or etc. Vehicles will be maintained in accordance with federal, state, and local laws.

10. Safety Requirements.

a. General. Performance of all services will assure complete safety to public visitors, Contractor employees, and all other persons in the area. The Contractor will comply with any pertinent requirements contained in the Corps of Engineers Safety Manual (EM 385-1-1), current at the time of award and any subsequent revisions to that document. Furthermore, the Contractor will comply with pertinent occupational safety and health standards for general industry (29 CFR Part 1910) as required by the Occupational Safety and Health Administration (OSHA). If the Contractor fails or refuses to promptly comply with safety and security requirements as specified herein, the TPOC or any other project employee may stop all or part of the work until satisfactory corrective action has been taken.

No part of the time lost due to any such work stoppage will be made subject to any claims for extension of time or for excess costs or damages sustained by the Contractor. Also, the Contractor will not be paid for work not performed as a result of the stop order.

b. The Contractor will comply with the Occupational Safety and Health Act (OSHA), the Corps of Engineers Manual, EM 385-1-1, https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf or latest version and as otherwise stated herein. Special attention will be given to the requirements for safety meetings.

The Contractor will inform the TPOC a minimum of 7 calendar days prior to a Contractor monthly safety meeting, to permit a Government representative to attend.

c. Accident Prevention Plan (APP). The Contractor will prepare an Accident Prevention Plan to assure that requirements of the safety program are provided as specified. This plan must be accepted by the Contracting Officer prior to commencement of any work. One copy of the Accident Prevention Plan will be provided to the Contracting Officer and the TPOC one week prior to the pre-work conference.

The Accident Prevention Plan must be in the outline and form prescribed in Appendix A of EM 385-1- 1.

d. Activity Hazard Analysis (AHA). The Contractor will use Activity Hazard Analyses (AHA’s) as one of many tools to insure safe performance of work. It is the Contractor’s responsibility to prepare the AHA. Sample AHA’s may be available at the project office for review and use by the Contractor to assist in the development of site specific Activity Hazard Analyses prior to the Contractor performing the job. The Contractor is encouraged to revise or add to these sample AHA’s as necessary to address changing conditions. Prior to performing jobs with inherent hazards, the Contractor will review, at a “Tool Box” safety meeting, the approved AHA’s with those employees who will perform that work each time the work is ordered. The Government may request advanced notification of the time and date of the above AHA “Tool Box” safety meeting for Contractor employees so that the Government may attend such reviews.

The Government will require the Contractor to prepare an AHA for any jobs for which an adequate AHA does not already exist. A copy of this AHA will be submitted to the TPOC and must be accepted before the Contractor starts the job. This copy of the AHA will become the property of the Government. Guidance is included, which will be used by the Contractor as a guide for the preparation of required AHA's.

A copy of the approved AHA’s will be available at all times to workers at each associated job site and a copy will be provided to the Government.

e. Public Safety. The Contractor will ensure that reasonable precautions are taken to protect the public at all times where work is being performed. The Contractor will immediately report to the TPOC any potential hazards found by his employees on the project. The Accident Prevention Plan will include procedures to be taken to provide for public safety. Additionally, the Contractor will not allow any persons, except employees, into work areas that are not otherwise open to the public; nor will the Contractor transport in Contractor work vehicles any persons, except employees, during times the Contractor is on the project performing work under a contract.

f. Personal Protective Apparel and Equipment. Protective apparel and equipment, as identified in the AHA, will be provided to eliminate or minimize hazards to personnel. As a minimum, each employee will wear a short-sleeved shirt, long trousers, and appropriate footwear during all contract work. Face shields, spectacles with side-shields, or goggles, and hearing protection will be worn by employees when required by safety manual. Fire extinguisher(s) and first aid kit(s) meeting the Safety Manual standards will also be provided and easily accessible to all employees.

g. Contractor Employees Certified in First Aid & CPR. The Contractor will schedule employees so the appropriate numbers of certified personnel are on duty to administer First Aid and CPR as required by the Safety Manual.

Copies of their certification will be provided in accordance with regulations. Two people per crew will be trained in First Aid and CPR. Individuals working alone will be trained in First Aid.

h. Hazard Communication Program. The Contractor will be responsible for implementing a hazard communication program for Contractor employees, as required by the Safety Manual. The Contractor will provide Material Safety Data Sheets (MSDS) and/or Safety Data Sheets (SDS) for review by the TPOC prior to use of any hazardous substance on the project and provide a plan for the proper handling, transportation, storage and usage of hazardous substances on the project.

https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

11. Required Security Training and Planning.

A. General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures—this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

B. Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location.

Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.

C. Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

D. Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

https://www.e-verify.gov/

SUPPLEMENTAL SECURITY REQUIREMENTS

All Contractors and subcontractor employee(s) working on this contract who require access to any Louisville District Lake Projects and Lock and Dam Projects shall receive authorization to be on site at these facilities based upon a favorable background investigation in accordance with “Homeland Security Presidential Directive 12: Policy for a Common Identification Standard for Federal Employees and Contractors” (HSPD 12). The Louisville District Security Management Office shall submit contractor(s) personal information to complete the basic background investigation in order to make a recommendation to the Contracting Office of an employee’s suitability for work on Government property. The Procuring Contracting Officer (PCO) has the right to deny any contractor or subcontractor employee from working on the contract based upon the results of the background investigation provided by the Louisville District Security Office. The Government, Contractor, and subcontractors shall not permit any employee(s) access to drawings, blueprints, records, photos, sites, or projects until the Louisville District Security Management Office has completed an Operations Security (OPSEC) review of such items and determined they can be released.

FOR ALL LOUISVILLE DISTRICT CONTRACTS:

Contractors shall submit a complete investigation packet for each contractor and subcontractor employee to the Louisville District Security Management office within 10 working days after award of any contract, or prior to the individual being permitted access to Louisville District facilities.

The Contractor must also provide the following: (1) Name of the Contract Specialist with whom he/she is working,

(2) Project Name, (3) Contract Number (4) Task Order Number when applicable, and (5) US Citizens Security Access Form or Pre-Bid/Site Visit Form; each employee working on site must have a background investigation form submitted directly to the Louisville District Security Office.

The Contractor must provide a full legal name, complete SSN#, Date of Birth, Place of Birth (City and State) and Driver’s license number if available. It is the Contractor’s responsibility to ensure the above information is accurate and legible, otherwise delays may occur.

Contractors shall have background checks completed for their employees annually in the case of Contracts with an initial period of performance (POP) greater than 1 year and those Contracts with Options or Modifications Which Extend the POP beyond 1 year. For instance, if the employee was cleared in May of 2022, they shall be cleared again in May of 2023. It is the Contractor’s responsibility to ensure that each employee’s security is up to date.

Failure to comply may lead to possible removal from the project/jobsite.

The Contractor must ensure if new employees are brought in to work on an existing Contract with the U.S. Army Corps of Engineers (USACE), they must process the employee through the Louisville District USACE Security Office for background purposes.

FOR CONTRACTORS REQUIRING DOD COMMON ACCESS CARDS (CAC)

The documents listed below are required:

SF 85, Questionnaire for Non-Sensitive Positions (see http://www.opm.gov/forms/ to print form). Fingerprints are captured electronically at the closest Army Recruiting Station to the contractor’s home of record or at the USACE, Louisville District Security Office.

Contractor shall report any changes in personnel, or at any time conditions change at least 5 working days prior to individual(s) need to have access to the site. The Contractor shall provide the same information as listed above for all new employees.

Following submission of paperwork, the Louisville District Security Office will conduct an initial criminal check based upon the information provided. If there are no issues, the Louisville District Security Office will make recommendations to the PCO or their Designated Representative. The Louisville District Security Office cannot give approval due to unfavorable report(s). The Louisville District Security Office shall coordinate with Office of Counsel and will jointly make recommendations to the PCO and/or the Designated Representative should a http://www.opm.gov/forms/ background investigation come back with derogatory information. The PCO will make the determination whether to allow the Contractor personnel to work on the site based on Security and Office of Counsel recommendations, and the PCO will advise the Contractor of the decision.

FOREIGN NATIONALS

The Contractor shall provide the package listed above, as well as additional materials noted below for all Foreign Nationals. The Contractor is to expect additional time in the approval process for all Foreign Nationals due to the level of review and elevation of the review to Headquarters staff to complete. All Foreign Nationals must comply with the following paragraph:

In accordance with Engineering Regulation 380-1-18, “Technology Transfer, Disclosure of Information and Contacts with Foreign Representatives” dated 1 August 1996, Section 4, all foreign nationals who work on Corps of Engineers’ contracts shall be approved by the Headquarters US Army Corps of Engineers (HQ USACE) Foreign Disclosure Officer before beginning work on this contract; this regulation includes subcontractor employees. The Contractor shall submit to the Security Management Office, the names of all foreign nationals proposed for performance under this contract, along with documentation to verify legal admittance into the United States. Such documentation shall include at least one of the following: a U.S. passport, Certificate of U.S. Citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), Alien Registration Card with photograph (INS Form I-151 or I-551), Employment Authorization Card (INS Form I-688A), etc.

In order to assure forms are properly completed, and to minimize time delays, the Contractor is encouraged to work closely with the Louisville District Security Office. The Government will return for correction incomplete forms, illegible forms, etc. which will delay the contractor / subcontractor from beginning work.

Security requirements are subject to change in accordance with HSPD-12, Office of Personnel Management, regulation or policy changes, etc. The Government shall add any changes to security requirements by modification to the contract.

The Contractor shall contact the Louisville District Security Office by phone, letter, or email at the following numbers/addresses:

CELRL-SC

600 Martin Luther King Jr. Pl Louisville, KY 40202

Charles R. Tanner, phone (502) 315-6929; email Charles.R.Tanner@usace.army.mil James R. Milner, phone (502) 315-6916; email James.R.Milner@usace.army.mil Jason Almodovar, phone (502) 315-6754; email Jason.Almodovar@usace.army.mil

*When contracts are with individuals, the individuals will be required to complete a Form I- 9, Employment Eligibility Verification, with the designated Government representative.

This Form will be provided to the Contracting Officer and will become part of the official contract file.

Emergency Contacts. A prioritized list, including phone numbers, of those persons (normally Contractor Representatives) to call in case of emergencies.

The contractor will supply the Technical Point of Contact (TPOC) with an Accident Prevention Plan (APP), Scaffolding Plan, Control of Hazardous Energy Plan (LO/TO), and an Activity Hazard Analysis (AHA) prior to site work in accordance with EM 385-1-1.

12. Accident Reporting.

The Contractor is responsible for reporting all accidents to the Project Manager immediately. Prompt action will be taken to ensure immediate and appropriate medical treatment. The Contractor will maintain an accurate record of any accidents in the manner and on the forms prescribed by the Project Manager. For property damage accidents of $2,000 or more, the Contractor will complete and submit to the Project Manager a copy of ENG Form 3394.

The Contractor will maintain an OSHA 300 Log of On – The – Job injuries and first aid treatments.

mailto:Charles.R.Tanner@usace.army.mil mailto:James.R.Milner@usace.army.mil mailto:Jason.Almodovar@usace.army.mil

The Contractor will also provide a monthly record of all exposure and accident experience incidental to the performance of services under the contract. This reporting requirement includes exposure and accident experience of both the Prime Contractor and any subcontractor(s). A Monthly Record of Work-Related Injuries/Illnesses & Exposure form will be available from the Project Manager. The Monthly Record of Work-Related Injuries/Illnesses & Exposure report will be provided to the Project Manager by the 5th working day of the month for the previous month.

13. Damage Reports.

All instances where Government materials, supplies, property, and/or equipment are damaged will be reported immediately to the Project Manager. When the damage was caused by contract employees, a written report of the incident and extent of such damage will be submitted to the Project Manager, within 2 work days (less weekends and holidays) of occurrence. For property damage accidents of $2,000 or more the Contractor will complete and submit to the Project Manager a copy of ENG 3394.

14. Contractor Employees’ Conduct and Competency.

All contract employees will conduct themselves in a proper and courteous manner at all times. Since the majority of work is performed in the presence of the general public, the conduct of all employees is critical and will be closely monitored. Contract employees will comply with all provisions of Title 36, Chapter III, Part 327, CFR and obey all posted signs and regulations in the performance of the work under this contract. Being under the influence of or consuming alcoholic beverages or controlled substances by the Contractor or employees while on duty is prohibited.

a. Employee Dismissal. The Contractor expressly agrees to dismiss any employee or subcontractor employee whose continued employment is deemed by the Project Manager to be inconsistent with the best interests of the public or the U.S. Army Corps of Engineers. The KO or the Project Manager may require the Contractor to immediately remove from the work site any employee or subcontractor who is incompetent, endangers persons or property, or whose physical or mental condition would impair their ability to satisfactorily perform the work. Notification to the Contractor will be promptly made in writing if time and circumstances permit.