This document provides an amended solicitation for the Rough River Lake Access Bridge Underside Painting project. The solicitation requires offerors to provide all labor, materials, equipment, transportation and quality control to remove all broken, flaking or chipped paint and repaint the underside of the Rough River Lake water control tower access bridge, conduit and junction boxes under the bridge, and two fuel tanks located underneath in accordance with the scope of work and specifications. Offerors must complete the work within 90 calendar days of receiving a notice to proceed no later than March 3, 2023. The selected contractor will be responsible for safety plans, certifications, schedules, permits and waste disposal in compliance with all applicable federal, state and local laws and regulations. Payment will be provided via electronic funds transfer upon acceptance of completed work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912QR23Q0027.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR23Q0027 for the Rough River Lake Tow er Bridge Underside Painting is hereby modified as follows:
a) The Scope of Work (SOW) has been amended to incorporate project photos and drawing. The SOW has been replaced in its entirety and all changes have been marked by "ADMT 0001."
b) Government Response to Requests for Information received for this procurement are compiled and listed.
c) The hour and date specified for receipt of Offer is extended from 28 February 2023 1:00PM to 03 March 2023 1:00PM.
d) All Amendments must be acknowledged.
e) All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR23Q0027
X 9B. DATED (SEE ITEM 11)
13-Feb-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0001
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Feb-2023
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QR23Q0027
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
REQUESTS FOR INFORMATION
QUESTION: Are there as-built drawings of the bridge?
USACE RESPONSE: As-built drawing will not be provided until after the award. Furthermore, the proposed bidder is strongly recommended to visit the job site for quantities, materials, critical dimensions, and work conditions used to calculate a quote.
QUESTION: What is the bridge weight rating?
USACE RESPONSE: The bridge is rated for 14,000lbs.
QUESTION: Can you confirm that the intent of this contract is to prep and paint the entire steel substructure?
USACE RESPONSE: Yes, it is to prep and paint the entire structure below and under the walkway.
QUESTION: TP-3.1 General Specification, Painting states, ... “after bridge support steel, conduits, and fuel lines are painted.” Please confirm the intent of “underneath” scope, i.e., exposed concrete underneath the bridge is out of scope.
USACE RESPONSE: The concrete under the bridge is not part of the scope of the painting project.
QUESTION: TP-2.1 items 2, 3, 4, and 5 – what is the duration of the security courses for all on site employees and is there any sort of delay receiving confirmation that the training is completed?
USACE RESPONSE: Anti-terrorism and I-watch training takes 30-45 minutes to complete.
QUESTION: After the successful contractor submits the required information for all employees that will be on site to the Louisville District Security Management Office, how long does the background investigation take to complete and can the NTP be delayed or the contract duration be extended during any delay (if impactful)?
USACE RESPONSE: It should not impact any start dates as long as the contractor provides the necessary information in a timely manner. This is all part of the pre-work requirements. Normal turn-around time is two days once the security office receives all necessary personnel information.
QUESTION: The scope does not detail a method of paint removal, however, the (page 17 of 52) scoped primer – Amercoat 68HS is a zinc base material that requires a SSPC SP-6 (commercial abrasive blast). Will the government consider alternative prep and coating methodology?
USACE RESPONSE: The method of paint removal and application is entirely up to the contractor. The only requirement is that per TP-3.1 section 3 SPECIAL CONDITIONS: All necessary precautions are to be followed for the preparation and painting of surfaces coated with paint containing lead. Air quality permit may be required depending on the method of paint removal. The work will be elevated over water. Contractor must ensure that no paint being removed or being applied comes in contact with the water surface. Maintenance personnel must always have access to the water control tower. As long as it meets the color requirements (grey) and the other specifications in TP-3.1 section 1.
QUESTION: Is there a water source for pressure washing or do we need to supply our own water
USACE RESPONSE: The contractors should plan on supplying their own water.
QUESTION: What component is the existing bonding strap?
USACE RESPONSE: Steel/Metal.
QUESTION: What is the access method for the TPOC to conduct his inspection? Do we need to provide access?
USACE RESPONSE: Access will need to be arranged with the TPOC and the TPOC will be present during the inspection.
SECTION 00 20 00 - INSTRUCTIONS FOR PROCUREMENT
The following have been modified:
Scope of Work
U.S. Army Corps of Engineers
Rough River Lake
14957 Falls of Rough Road
Falls of Rough, KY 40119
Phone: 270-257-2061 Fax: 270-257-2623
REVISED 21 FEBRUARY 2023
TP-1.1 GENERAL:
1. Description. The contractor shall furnish all materials, supplies, tools, parts, equipment, transportation, labor, supervision, communication, and quality control to remove all broken/flaking/chipped paint and repaint the underneath of the water control tower access bridge, conduit under the bridge that runs the length of the bridge, junction boxes under the bridge, and two fuel tanks located under the bridge in accordance with the specifications listed in section “TP-3.1 General Specifications”. All work will take place in Breckinridge County Kentucky.
2. Terms. Work shall be provided in accordance with all Terms, Conditions, General, Specific and Technical Provision, Maps, etc. contained herein or incorporated by Reference. This includes all mandatory provisions of the Federal Acquisition Regulation (FAR), current at time of award.
3. Contractor Responsibility. Contractor’s work and responsibility shall include but are not limited to supply of equipment/materials, all planning, programming, administration, management, supervision, and inspection required to assure all equipment/materials are acquired and services are conducted in accordance with the contract and all applicable laws, regulations, or directives. The Contractor shall ensure all work meets or exceeds specifications.
The prime Contractor shall be responsible for ensuring all subcontractors comply with the provisions of this contract.
4. Performance Required. Special consideration of the Contractor is directed to the fact that the required accuracy, thoroughness, safety, and progress of this work are essential to the intended purpose. The contractor must be cognizant of the difficulties involved and of the contingencies which may arise, and must make certain that their personnel, equipment, transportation facilities and supply of materials are adequate at all times to ensure complete compliance with all provisions of these specifications. The work shall be done under supervision by competent employees. All contract services shall be in accordance with the submitted documents, and any additions, revisions or deletions must be approved by the Contracting Officer.
5. Completion of Work. Completion of work shall include acceptable performance of all aspects of this contract.
6. Compliance and Certifications: The contractor is responsible for obtaining any permits, conducting any tests or inspections, and paying any associated fees necessary to complete work as specified herein. The work shall be accomplished in accordance with all local, state, and federal laws and regulations including but not limited to American Society for Testing and Material (ASTM), American Society of Mechanical Engineering (ASME), American Nation Standards Institute (ANSI), Occupational Safety and Health Administration (OSHA) and all applicable codes.
The Contractor’s work and responsibility shall include all planning, measurements and estimates of quantities, administration, supervision, communications and inspections necessary to assure that all services are conducted in accordance with the contract requirements and all applicable Federal, state, and local laws and regulations.
7. Pre-Work Conference. The contractor will be required to attend a pre-work conference at least one week prior to beginning work, during which time the Contractor shall supply the Technical Point of Contact (TPOC) with an Accident Prevention Plan (APP) and Activity Hazard Analysis (AHA), in accordance with EM385-1-1 (latest edition) covering the contractor’s plan of work procedures, safety procedures, security, schedule, and equipment.
This manual will be available on the Internet at:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
The Contractor shall supply material submittals as listed in TP 3.1-1 that will be used for this project, which must be approved by the TPOC prior to start of work.
8. Damages. The contractor shall be responsible for all damages to government or private property resulting from negligent operations during the course of this contract. The contractor shall have appropriate insurance to cover liability and damages. The contractor shall be responsible for compensating the government for any damage to government property and/or restoring and replacing in kind any such existing property damaged or destroyed by the Contractor through faulty handling as the Technical Point of Contact (TPOC) directs, at no expense to the Government.
9. Hours and Days of Work. Construction work may be conducted between 0630 and 1600 Central Time, Monday through Friday. No work shall be performed outside of these times, on Saturday or Sunday, or on federal Holidays, unless approved by the TPOC.
New Year's Day (January 1st)
Martin Luther King Day (3rd Monday in January)
President's Day (3rd Monday in February)
Memorial Day (Last Monday in May)
Juneteenth (June 19th)
Independence Day (July 4th)
Labor Day (1st Monday in September)
Columbus Day (2nd Monday in October)
Veterans Day (November 11th)
Thanksgiving Day (4th Thursday in November)
Christmas Day (December 25th)
10. Payment Procedure/Additional Work. At no time should the contractor do additional work without prior authorization of the Contracting Officer, and no work shall be performed that will cause the Contractor to exceed the contract price. Work performed without a binding contract document authorizing such work shall result in the Contractor not being paid for that work performed. During the course of the contract, any additional work determined to be needed may be requested by the TPOC to the Contracting Officer for a Contract Modification.
11. Contract Start and Completion Dates. Work under this contract shall begin within 14 calendar days of Notice to Proceed (NTP) and must be completed no later than 90 calendar days from NTP. Additional time may be granted for inclement weather.
12. TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER. In order for the Contracting Officer to award a time extension due to an excusable delay, the following conditions must be satisfied.
a. The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
b. The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
c. The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON (5) DAY WORK WEEK
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
[5] [4] [5] [6] [6] [6] [5] [4] [4] [4] [4] [6]
Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily Contractor Quality Control (CQC) report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated listed above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification.
14. Liquidated Damages. Not Used.
15. Wage Rates: Department of Labor wage rates apply to this work and are included. The contractor is required to provide payroll documents for all work performed under this contract.
16. Material, Equipment, Supplies Protection. The Contractor shall, at all times prior to delivery, take care to protect and preserve all materials, supplies, and equipment of every description (including material and property which may be Government owned) and all work performed. All reasonable requests of the Contracting Officer or his/her authorized representative to enclose or specially protect such property shall be complied with. If so determined by the Contracting Officer, material, equipment, supplies, and work performed are not adequately protected by the Contractor, such property may be protected by the Government and the cost thereof may be charged to the Contractor or deducted from any payment due to them. This work will take place in a public use area. The contractor is responsible for the security of any equipment left on the job site. The contractor shall provide for the safety of the public through housekeeping, signage, and adequate designation of treatment zones.
17. Communication. The Contractor will notify the Contracting Officer or TPOC, upon commencement of work activities, and difficulties, interruption, or suspension of work, and when the required work has been completed.
The Contractor shall update the Contracting Officer, or TPOC, no less than once weekly on status of work being done. Work will commence when a notice to proceed has been issued from the Contracting Officer and TPOC notified.
18. Site Visit. It is strongly recommended that each offeror should visit the job site and assume responsibility for quantities, materials, critical dimensions and work conditions used to calculate a quote. All offerors interested in visiting the site must schedule an appointment with the TPOC. The TPOC’s contact information is as follows:
Bryan Duvall, Mechanical Lead
Blake Sullivan, and
David McWhorter
USACE Louisville District
Rough River Lake
14957 Falls of Rough Road
Falls of Rough, KY 40119
Phone: 270-257-2061
19. Utilities. Electric is available at the work site.
TP-1.2 CONTRACTOR SUBMITTAL. Unless otherwise specified, the Contractor shall submit the following information to the TPOC prior to the pre-work conference for this contract:
1. Safety Plans. The Contractor shall submit, for acceptance by the TPOC, an Accident Prevention Plan, Activity Hazard Analysis (AHA), Fall Protection Plan, and Scaffolding Plan in accordance with the requirements of the Corps of Engineer’s Safety and Health Requirements Manual, EM 385-1-1, hereinafter referred to as the Safety Manual, current at the time of award.
2. Certification of Employees Qualified to Administer First Aid and CPR. The Contractor shall submit proof the appropriate number of employees, as required in the Safety Manual, are certified to administer First Aid and CPR.
3. Certificate of Insurance. The Contractor shall, at their own expense, provide and maintain during the entire performance of this contract the following Insurance Type: General Liability (Bodily Injury and Property Damage Combined) Minimum Amounts of Liability, $1,000,000.00 Each Occurrence, $1,000,000.00 Aggregate. The contractor is required to provide a Certificate of Insurance to the TPOC at the time of the Pre-Work Conference.
TP-1.3 SAFETY.
1. General Safety. The Contractor shall comply with the safety standards contained in Corps of Engineers Manual, EM 385-1-1, “Safety and Health Requirements Manual”, current at the time of award, as well as all current provisions of the Occupational Safety and Health Act (OSHA). Per Par. 01.A.17 of EM 385-1-1, the Site Safety and Health Officer (SSHO) is only required to have the minimum listed requirements. The contractor can find it at this link: http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
Copies of documents proving that the Site Safety and Health Officer has met all minimum requirements per Par.01.A.17 of EM 385-1-1 shall be provided to the TPOC before work begins under this contract.
2. Safety Manual Requirements. The Contractor and employees shall comply with all pertinent sections of the Corps of Engineer’s Safety and Health Requirements Manual, EM 385-1-1, current at the time of award, and any subsequent revisions. The Contractor’s safety plan must be submitted in writing prior to onsite work and can be turned in at the same time as the pre-work conference.
3. Personal Protective Apparel and Equipment. Protective apparel and equipment, as identified in the Activity Hazard Analysis (AHA), shall be provided to eliminate or minimize hazards to personnel. As a minimum, each employee shall wear a sleeved shirt, long trousers and safety-toe shoes or boots during all contract work. Hard hats, face shields, safety glasses with side-shields, or goggles, and hearing protection shall be worn by employees when required by safety manual. Fire extinguisher(s) and first aid kit(s) meeting the Safety Manual standards shall also be provided and easily accessible to all employees.
4. Contractor Employees Certified in First Aid & CPR. The Contractor shall schedule employees so the appropriate numbers of certified personnel are on duty to administer First Aid and CPR as required by the Safety Manual. Copies of their certification shall be provided before work begins under this contract.
5. Equipment Compliance. The USACE EM 385-1-1 is more stringent than OSHA, especially for load handling equipment. IT specifically includes, but is not limited to the items in Chapter 16 (Load Handling Equipment) and 18 of the manual or the items listed below:
a. Certification of compliance (16.A.02)
b. Standard lift planning (16.A.03)
c. Critical lift planning (16.H)
d. Personnel Qualifications (16.B) (i.e. NCCCO and physicals)
e. Equipment Inspections and forms (16.D)
f. Safety Devices and Operational Aids (16.E)
g. Operational Manuals, Load Charts, Logs (16.G.01)
TP-1.4 ACCIDENT REPORTING. The Contractor shall maintain accurate accident records and report accidents as prescribed by the TPOC. Accidents shall be reported within 24 hours of occurrence, including accidents occurring on holidays and weekends and all serious accidents (those resulting in death or injury requiring medical attention or lost time) shall be reported immediately.
TP-1.5 DAMAGE REPORTS. In all instances where Government property, equipment, natural features, waterway, landscape, or trees are damaged by contract employees, an immediate notification shall be made to the TPOC. A full report of the incident and extent of such damage shall be submitted to the TPOC within two working days of occurrence, excluding weekends and holidays.
TP-1.6 CONTRACT EMPLOYEES. All contract employees shall conduct themselves in a proper and courteous manner at all times. Contract employees shall comply with all provisions of Title 36, Chapter III, Part 327, CFR and obey all posted signs and regulations in the performance of the work under this contract. Being under the influence of, or consuming alcoholic beverages or controlled substances by the Contractor or employees while on duty is prohibited.
TP-1.7 QUALITY ASSURANCE. The Government will monitor the Contractor’s work and examine completed work to determine whether work is performed and completed in compliance with purchase order specifications. The TPOC is responsible for the Government’s Quality Assurance Program under the purchase order. The TPOC and/or his designated Quality Assurance Inspector (QAI) will observe the work being performed and inspect completed work. The contractor and the TPOC/QAI shall coordinate work schedules and inspections to best evaluate contractor performance. The Government will use 100% inspections to evaluate the work provided under this contract. If the completed work does not conform to the requirements under the contract, the Government may require the contractor to remedy the work until it satisfactorily meets the requirements of the contract specification.
When the deficiencies cannot be corrected by re-performance, the Government may reduce or deduct the purchase order price to reflect the reduced value of the work performed or pursue claims as detailed in the FAR clauses contained in the contract.
TP- 2.1 SPECIAL REQUIREMENTS:
1. General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
2. Antiterrorism (AT) Level I Training: All contract personnel requiring routine access to Army installations, facilities, and controlled access areas, or requiring network access shall complete initial and annual refresher AT Level I awareness training. Online AT Level I awareness training is available at https://jko.jten.mil/ (website subject to change).
3. Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.
4. Suspicious Activity Reporting Training (e.g., iWATCH, Corps Watch, or See something, Say Something).
All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.
5. Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements.
Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.
6. SUPPLEMENTAL SECURITY REQUIREMENTS
All Contractors and subcontractor employee(s) working on this contract who require access to any Louisville District Lake Projects and Lock and Dam Projects shall receive authorization to be on site at these facilities based upon a favorable background investigation in accordance with “Homeland Security Presidential Directive 12:
Policy for a Common Identification Standard for Federal Employees and Contractors” (HSPD 12). The Louisville District Security Management Office shall submit contractor(s) personal information to complete the basic background investigation in order to make a recommendation to the Contracting Office of an employee’s suitability for work on Government property. The Procuring Contracting Officer (PCO) has the right to deny any contractor or subcontractor employee from working on the contract based upon the results of the background investigation provided by the Louisville District Security Office. The Government, Contractor, and subcontractors shall not permit any employee(s) access to drawings, blueprints, records, photos, sites, or projects until the Louisville District Security Management Office has completed an Operations Security (OPSEC) review of such items and determined they can be released.
Contractors shall submit a complete investigation packet for each contractor and subcontractor employee to the Louisville District Security Management office within 10 working days after award of any contract, or prior to the individual being permitted access to Louisville District facilities.
The Contractor must also provide the following: (1) Name of the Contract Specialist with whom he/she is working,
(2) Project Name, (3) Contract Number (4) Task Order Number when applicable, and (5) US Citizens Security Access Form or Pre-Bid/Site Visit Form; each employee working on site must have a background investigation form submitted directly to the Louisville District Security Office.
The Contractor must provide a full legal name, complete SSN#, Date of Birth, Place of Birth (City and State) and Driver’s license number if available. It is the Contractor’s responsibility to ensure the above information is accurate and legible, otherwise delays may occur.
Contractors shall have background checks completed for their employees annually in the case of Contracts with an initial period of performance (POP) greater than 1 year and those Contracts with Options or Modifications Which Extend the POP beyond 1 year. For instance, if the employee was cleared in May of 2022, they shall be cleared again in May of 2023. It is the Contractor’s responsibility to ensure that each employee’s security is up to date.
Failure to comply may lead to possible removal from the project/jobsite.
The Contractor must ensure if new employees are brought in to work on an existing Contract with the U.S. Army Corps of Engineers (USACE), they must process the employee through the Louisville District USACE Security Office for background purposes.
FOREIGN NATIONALS
The Contractor shall provide the package listed above, as well as additional materials noted below for all Foreign Nationals. The Contractor is to expect additional time in the approval process for all Foreign Nationals due to the level of review and elevation of the review to Headquarters staff to complete. All Foreign Nationals must comply with the following paragraph:
In accordance with Engineering Regulation 380-1-18, “Technology Transfer, Disclosure of Information and Contacts with Foreign Representatives” dated 1 August 1996, Section 4, all foreign nationals who work on Corps of Engineers’ contracts shall be approved by the Headquarters US Army Corps of Engineers (HQ USACE) Foreign Disclosure Officer before beginning work on this contract; this regulation includes subcontractor employees. The Contractor shall submit to the Security Management Office, the names of all foreign nationals proposed for performance under this contract, along with documentation to verify legal admittance into the United States. Such documentation shall include at least one of the following: a U.S. passport, Certificate of U.S. Citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), Alien Registration Card with photograph (INS Form I-151 or I-551), Employment Authorization Card (INS Form I-688A), etc.
In order to assure forms are properly completed, and to minimize time delays, the Contractor is encouraged to work closely with the Louisville District Security Office. The Government will return for correction incomplete forms, illegible forms, etc. which will delay the contractor / subcontractor from beginning work.
Security requirements are subject to change in accordance with HSPD-12, Office of Personnel Management, regulation or policy changes, etc. The Government shall add any changes to security requirements by modification to the contract.
The Contractor shall contact the Louisville District Security Office by phone, letter, or email at the following numbers/addresses:
CELRL-SC
600 Martin Luther King Jr. Pl
Louisville, KY 40202
Charles R. Tanner, phone (502) 315-6929; email Charles.R.Tanner@usace.army.mil
James R. Milner, phone (502) 315-6916; email James.R.Milner@usace.army.mil
Jason Almodovar, phone (502) 315-6754; email Jason.Almodovar@usace.army.mil
7. Payment. Payment will be made by Electronic Funds Transfer (EFT), upon acceptance of the completed work and providing final invoice and labor records. This process can take approximately 30 calendar days to process after the invoice is submitted to the U.S. Army Corps of Engineers at Rough River Lake for payment following completion of work.
8. Unique Entity Identifier and SAM Registration. The successful offeror will be required to provide a Unique Entity Identifier (UEI) and will be required to be registered with System for Award Management (SAM), (https://www.sam.gov/) to do business with the government. (NOTE: Pay careful attention when typing in the SAM website address on your browser). In order to register with SAM, you must have a UEI. If you are unsure of your UEI, or have questions regarding this, you can call contact the SAM.gov helpdesk for assistance. Offerors must complete their registration in SAM in order to be eligible submit a quote under this contract.
9. Unresponsive Quote. Failure to provide all information requested within this solicitation and to complete SAM registration may be grounds for considering the quote unresponsive.
10. Veterans Employment Emphasis for U.S. Army Corps of Engineers Contracts In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
- U.S. Department of Labor Veterans’ Employment and Training Service (VETS): https://www.dol.gov/vets/
- Federal Veteran Employment Information: https://www.fedshirevets.gov/
- Veterans Opportunity to Work (VOW) Program: https://www.benefits.va.gov/vow/
- U.S. Army Warrior Transition Command Employment Index: https://wct.army.mil/modules/employers/index.html
- Hiring Our Heroes: https://www.uschamberfoundation.org/hiring-our-heroes
TP-3.1 GENERAL SPECIFICATIONS:
1. General. Unless otherwise specified, the Contractor shall furnish the following: Personnel, materials, and equipment to properly remove all broken/flaking/chipped paint and repaint using specified paint the underneath of the water control tower access bridge, conduit under the bridge that runs the length of the bridge, junction boxes under the bridge, and two fuel tanks located under the bridge in accordance with the specifications listed below.
Work shall be provided in accordance with all Terms, Conditions, General, Specific and Technical Provision, Exhibits, Attachments, Maps, Drawings, etc. contained herein or incorporated by Reference.
This includes all mandatory provisions of the Federal Acquisition Regulation (FAR), whether referenced or not, current at time of award.
Removal of broken/flaking chipped paint: Contractor will supply all materials, tools, labor and transportation in order to complete the requirements of this Scope of Work. The contractor will remove broken/flaking/chipped paint from the underneath of the water control tower access bridge, conduit under the bridge that runs the length of the bridge, junction boxes under the bridge, and two fuel tanks located under the bridge in accordance with the specifications. This includes all nuts and bolts. The existing uni-strut conduit hangers, clamps, and hardware that supports the electrical conduits and fuel lines shall be removed to facilitate prep and painting and shall be replaced with all new-galvanized components and hardware after bridge support steel, conduits, and fuel lines are painted. Existing bonding straps are to be reused. Note: An air quality permit may be required depending on the method of removal and disposal.
Inspection prior to painting: Prior to beginning painting the paint removal work must be inspected by the TPOC to ensure surfaces are ready for paint.
Painting: Contractor will supply all materials, tools, labor, and transportation to complete the requirements of this Scope of Work. The contractor will repaint the underneath of the water control tower access bridge, conduit under the bridge that runs the length of the bridge, junction boxes under the bridge, and two fuel tanks located under the bridge in accordance with the specifications. This includes all nuts and bolts. The existing uni-strut conduit hangers, clamps, and hardware that supports the electrical conduits and fuel lines that were removed to facilitate prep and painting shall be replaced with all new-galvanized components and hardware after bridge support steel, conduits, and fuel lines are painted. Existing bonding straps are to be reused.
Contractor will prime all prepared surfaces with one coat of Amercoat 68 HS, (or approved equal), minimum dry film thickness of 3.0 mils. Follow paint manufacturer’s instructions for all paint procedures and requirements. Contractor will apply an intermediate coat of Amercoat 385, (or approved equal), minimum dry film thickness of 3.0 mils. Follow paint manufacturer’s instructions for all paint procedures and requirements. Color to be half strength of finish coating color and with an average dry thickness of 6 mils. Note: The average dry thickness of primer and intermediate coating shall be 9 mils. Contractor will apply the finish coat with Amercoat 450 H/Sigmadur 550 US, (or approved equal), minimum dry film thickness of 3.0 mils. Follow paint manufacturer’s instructions for all paint procedures and requirements.
Color to match existing color of the structure and must be approved by the TPOC prior to painting.
Minimum dry film thickness of finish coat shall be 3 mils. A total dry thickness of primer, intermediate and finish coats is to be a minimum of 12 mils. Contractor will replace all conduit and fuel line supports and clamps with new galvanized uni-strut, (or approved equal), supports, clamps and hardware.
Contractor will be responsible to provide adequate support for the conduits and fuel lines during the painting process.
2. Dimensions. The contractor should field verify dimensions, etc. prior to submitting a quote.
3. Special Considerations: All necessary precautions are to be followed for the preparation and painting of surfaces coated with paint containing lead. Air quality permit may be required depending on the method of paint removal. The work will be elevated over water. Contractor must ensure that no paint being removed or being applied comes into contact with the water surface. Maintenance personnel must always have access to the water control tower.
4. Submittals. The Contractor submittals shall be furnished in accordance with the specifications. All listed items shall be submitted for Government approval by the TPOC. Associated work items shall not be performed until receiving approval from the TPOC. TPOC shall provide a response to the submittals within 15 calendar days of receipt.
a. Accident Prevention Plan (APP)
b. Activity Hazard Analysis (AHA)
c. Fall Protection Plan
d. Project Schedule
e. CPR and General First Aid certification
5. Waste Disposal. The contractor will be responsible for removing all debris from project lands and disposing of it in accordance with state and local laws. The contractor is responsible for any waste disposal and any permits and fees associated with disposal.
6. Permits. The contractor is responsible for obtaining any construction permits, conducting any tests or inspections, and paying any associated fees necessary for this contract. All work shall be coordinated through the TPOC’s, Bryan Duvall, David McWhorter, or Blake Sullivan, 270-257-2061.
***************************************ADMT 0001***************************************
Exhibits:
A. Project Photos B. Project Drawing
PROJECT PHOTOS
PROJECT DRAWING
***************************************ADMT 0001***************************************
(End of Summary of Changes)