This document summarizes the bid opening results for construction of a soccer field at Fort Campbell. Four bids were received for the project, ranging from $2,432,000 as the lowest bid submitted by Faulkner Contracting Group at 31.45% below the independent government estimate (IGE), to the highest bid of $3,934,130 submitted by Adams Contracting at 10.88% above the IGE of $3,548,011. JGM Property submitted the second lowest bid at $2,899,754 or 18.27% below the IGE, while Howard W. Pence Inc. provided the third lowest bid of $3,260,000 at 8.12% below the IGE. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Louisville for soccer field construction at Fort Campbell, with bid submissions to be delivered electronically by the date and time specified in the solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Opening Results July 21, 2023 Ft Campbell Soccer

W912QR23B0003

Bid Opening Officer: Joshua K. Westgate Opening and Recorder: Andrew J. Fleming

1st Low Bidder: $2,432,000.00 Faulkner Contracting Group 10160 State Route OO Bloomsdale, Missouri 63627-8966, USA -31.45% Below IGE

2nd Low Bidder : $2,899,754.21 JGM Property 7747 25 Mile RD, Suite 104 Shelby Township, Michigan 48316-1811, United States -18.27% below IGE

3rd Low Bidder: $3,260,000.00 Howard W. Pence Inc.

342 E DIXIE AVE.

ELIZABETHTOWN, KY 42701-1106 US

-8.12 below IGE

4th Low Bidder: $3,934,130.00 Adams Contracting 131 Prosperous PL STE 19A Lexington, Kentucky 40509-1844, United States 10.88% above the IGE

Government Estimate: $3,548,011.00