Contractor Asked Questions and Answers – This document will be updated as questions are asked.

Document Updated 4/5/22 Document Updated By Joel Huberman – USACE Contracting Specialist – Louisville District

Question 1 – Can the site superintendent, QC and SSHO be the same person onsite?

Answer 1 – Yes- site superintendent, QC, and SSHO can be the same person

Question 2 – On page 4 breakout schedule lists under the description “ The contractor shall furnish tools, equipment, labor, supervision, communication, and quality control to design and construct” to what extent would the gov’t be looking at for the design ex: shop drawings or?

Answer 2 – Design plans will be looked at in-house by various staff members with experience in construction and materials.

Question 3 – Can the aluminum handrails be substituted with hot dipped galvanized reducing the cost of the overall project helping it to become a more awardable contract?

Answer 3 – We are not interested in substituting the aluminum handrail requirement.