W912QR22Q0006 (1).pdf

PDF 21 MB Posted

Attached to
Green River M&M
Solicitation number
W912QR22Q0006
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912QR22Q0006

b. TELEPHONE NUMBER

502.315.6213

8. OFFER DUE DATE/LOCAL TIME

12:00 PM 04 Jan 2021

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

17-Dec-2021

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912QR9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

MARCIE BILLOTTO

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W22W9K12922491

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE H2P0A00 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

CONTRACTING DIVISION

600 DR. MLKJ PLACE P.O. BOX 59 ROOM 821

LOUISVILLE KY 40202-2230

TEL: FAX:

502.315.6195 OR 6193FAX:

TEL: 502.315.6172 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$8,000,000

NAICS:

561730

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF38

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912QR22Q0006

Section SF 1449 - CONTINUATION SHEET

SPECIAL INSTRUCTIONS

SPECIAL INSTRUCTIONS

This Request for Quote (RFQ) is for an Indefinite Delivery Indefinite Quantity Contract to provide mowing, maintenance and cleaning services for Green River Lake is in South Central Kentucky, in Taylor and Adair counties, approximately 8 miles South of Campbellsville, Kentucky. Principal cities in the area are Campbellsville and Columbia, Kentucky.

The Contractor shall furnish all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles required to perform mowing and maintenance services at Green River Lake project as specified and in strict accordance with the Performance Work Statement (PWS), attached specifications and attached Wage Determination.

The Base Year will be from Date of Award through 31 December 2022. The Contractor’s services and responsibility shall include all planning, programming, administration, management, supervision, communications, and inspection necessary to assure that all services are conducted in accordance with the contract requirements and all applicable Federal, state, and local laws and regulations

Note: This solicitation contains an option clause to extend the awarded contract for up to four (4) additional one-year periods. The one-year option periods are as follows:

Option Year 1: 01 January 2023 through 31 December 2023 Option Year 2: 01 January 2024 through 31 December 2024 Option Year 3: 01 January 2025 through 31 December 2025 Option Year 4: 01 January 2026 through 31 December 2026

Location:

Green River Lake 544 Lake Road Campbellsville, KY 42718-9805

One award will be made from this RFQ. The contract type is a Firm-Fixed Price, Indefinite Delivery Indefinite Quantity (IDIQ). The minimum guarantee for the Base Year is $1,946.00 in services. There is no guaranteed minimum for the option periods, if exercised.

This procurement is 100% set-aside for Small Business, NAICS 561730 ($8 million).

Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.

Note: The Contract award will be based on Lowest Total Price (base plus option years).

SITE VISITS HIGHLY ENCOURAGED. The scope of work contains the measurements and location of this project for reference. It is highly recommended each offeror attends a site visit. The contractor assumes responsibility for all quantities, materials, critical dimensions, and site conditions used to calculate their quote and perform the requested work. To schedule a site visit please contact Lori Brewster at (270)465-4463.

Quotes are due 4 January 2021 at 12:00PM Eastern Time. Faxed, telephoned, or mailed quotes will not be accepted. Electronic submittals will be accepted and may be emailed to Marcie Billotto at marcie.billotto@usace.army.mil.

Note: Page numbering in this document may not be accurate.

W912QR22Q0006

All contractors must be registered in the System for Award Management (www.SAM.gov) prior to award of a contract. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer – System for Award Management, which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by going to the website http://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier (formerly DUNS number) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from http://www.SAM.gov.

Refer to www.SAM.gov for information formerly found in CCR, EPLS, ORCA and FedReg.

Please begin the registration process immediately in order to avoid delay of the contract award should your firm be selected.

ALERT: You must submit a notarized letter appointing the authorized Entity Administrator before your registration will be activated. This requirement now applies to both new and existing entities. Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record. The notarized letter is mandatory and is required before the GSA Federal Service Desk (FSD) will activate the entity's registration.

Effective 29 June 2018, vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM.

Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier (formerly known as DUNS). The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards.

Remember, there is no cost to use SAM.

To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov).

Bid Schedule

Green River Lake- Operation and Maintenance Services This is an Indefinite Quanity Type Contract to furnish all necessary management, personnel, materials, supplies, tools, parts, equipment, and vehicles required to perform mowing services at Green River Lake with options to extend the term of the contract.

Offerors are strongly encouraged to attend the site inspection meeting and tour.

(Unit Key: AC = acrea, GP = gross product, TN = ton, CD = cubic yard)

BASE YEAR

Section C-1 General

SECTION C-2 - Grass Mowing and Maintenance of Landscape Areas

Est. Unit Item # Quant. Unit Price Total 0001 Mow all Visitor Center Area - 9 Each 0002 Mow around Office and Visitor Center only - Individiual 22 Each 0003 Mow Shop and Storage Area - Individual 15 Each 0004 Mow All Operation Areas 6 Each 0005 Mow Dike 3 Each 0006 Mow Field Below Dam 3 Each 0007 Mow Fields by Maintenance Shop 3 Each 0008 Mow All Recreation Areas 9 Each 0009 Mow All Holmes Bend 9 Each 0010 Mow All Holmes Bend except Campground 6 Each 0011 Mow Holmes Bend Campground Sites 1-23 and 85-125 6 Each 0012 Mow Holmes Bend Campground Sites 24-84 6 Each 0013 Mow Holmes Bend Shelter Area 6 Each 0014 Mow All Site 1 9 Each 0015 Mow All Site 1 except Boat Ramp and access 6 Each 0016 Mow Big Oak Shelter Area 6 Each 0017 Mow All Tailwater 9 Each 0018 Mow Tailwater Shelter Area 6 Each 0019 Mow All Smith Ridge 9 Each 0020 Mow Smith Ridge except Campground Beach & Picnic Area 6 Each 0021 Mow Smith Ridge Campground Sites 1-30 6 Each 0022 Mow Smith Ridge Campground Sites 31-80 6 Each 0023 Mow Smith Ridge Beach Area 6 Each 0024 Mow Smith Ridge Picnic Area 6 Each 0025 Mow Pikes Ridge 9 Each 0026 Mow Wilson Creek 9 Each 0027 Cut and Remove Cedar Trees from Upstream face of Dam and Dike and Downstream face of Dam and floor of Spillway per acre 120 AC

0028 Remove Standing Trees 25 Each 0029 Remove Fallen Trees 25 Each 0030 Remove Tree Limbs (up to 35' above ground level) 200 Each 0031 Remove Tree Limbs (above 35' above ground level to top of tree) 20 Each 0032 * Cut Back of Roadways and Other Edged Area 10 Linear ft 5,300 10 LF

0033 Remove Leaves from Ditches 1 GP 0034 Remove Leaves from Campsites 1 GP 0035 Furnish and Spread Playground Sand at 1 playground at Site One Area (Includes playgrounds at: Big Oak, Visitor Center, and Tailwater) 50 TN

0036 Furnish and Spread Playground Sand at 1 playground at Holmes Bend Area (Includes playgrounds at: Holmes Bend Campground and Holmes Bend Picnic Shelter Area) 50 TN

0037 Furnish and Spread Playground Sand at Smith Ridge Campground playground 50 TN

0038 Furnish and Spread Playground Sand at Pikes Ridge Campground playground 50 TN

0039 Remove Drift Wood 200 CD 0040 Remove Driftwood from Dam and Dike 20 CD

SECTION C-7- Beach and Buoy Maintenance 0041 Furnish and Spread Beach Sand at Smith Ridge (Minimum 150 TN

50 TN)

0042 Furnish and Spread Beach Sand at Pikes Ridge (Minimum 50 TN

25 TN)

0043 Furnish and Spread Beach Sand at Holmes Bend (Minimum 150 TN

50 TN)

SECTION C-6 - Drift, Debris, and Trash Removal

0044 Spray herbicides at Dam (3 qts/acre (AC)) 36 AC 0045 Spray herbicide at Spillway (3 qts/acre (AC)) 70 AC 0046 Spray herbicide at Dike (3 qts/acre (AC)) 14 AC

Base Year Total

SECTION C-10 - Herbicide Application Services

This is an Indefinite Quanity Type Contract to furnish all necessary management, personnel, materials, supplies, tools, parts, equipment, and vehicles required to perform mowing services at Green River Lake with options to extend the term of the contract.

Offerors are strongly encouraged to attend the site inspection meeting and tour.

(Unit Key: AC = acrea, GP = gross product, TN = ton, CD = cubic yard)

OPTION YEAR 1

Section C-1 General

SECTION C-2 - Grass Mowing and Maintenance of Landscape Areas

Est. Unit Item # Quant. Unit Price Total 0001 Mow all Visitor Center Area - 9 Each 0002 Mow around Office and Visitor Center only - Individiual 22 Each 0003 Mow Shop and Storage Area - Individual 15 Each 0004 Mow All Operation Areas 6 Each 0005 Mow Dike 3 Each 0006 Mow Field Below Dam 3 Each 0007 Mow Fields by Maintenance Shop 3 Each 0008 Mow All Recreation Areas 9 Each 0009 Mow All Holmes Bend 9 Each 0010 Mow All Holmes Bend except Campground 6 Each 0011 Mow Holmes Bend Campground Sites 1-23 and 85-125 6 Each 0012 Mow Holmes Bend Campground Sites 24-84 6 Each 0013 Mow Holmes Bend Shelter Area 6 Each 0014 Mow All Site 1 9 Each 0015 Mow All Site 1 except Boat Ramp and access 6 Each 0016 Mow Big Oak Shelter Area 6 Each 0017 Mow All Tailwater 9 Each 0018 Mow Tailwater Shelter Area 6 Each 0019 Mow All Smith Ridge 9 Each 0020 Mow Smith Ridge except Campground Beach & Picnic Area 6 Each 0021 Mow Smith Ridge Campground Sites 1-30 6 Each 0022 Mow Smith Ridge Campground Sites 31-80 6 Each 0023 Mow Smith Ridge Beach Area 6 Each 0024 Mow Smith Ridge Picnic Area 6 Each 0025 Mow Pikes Ridge 9 Each 0026 Mow Wilson Creek 9 Each 0027 Cut and Remove Cedar Trees from Upstream face of Dam and Dike and Downstream face of Dam and floor of Spillway per acrea 120 AC

0028 Remove Standing Trees 25 Each 0029 Remove Fallen Trees 25 Each 0030 Remove Tree Limbs (up to 35' above ground level) 200 Each 0031 Remove Tree Limbs (above 35' above ground level to top of tree) 20 Each 0032 * Cut Back of Roadways and Other Edged Area 10 Linear ft 5,300 10 LF

0033 Remove Leaves from Ditches 1 GP 0034 Remove Leaves from Campsites 1 GP 0035 Furnish and Spread Playground Sand at 1 playground at Site One Area (Includes playgrounds at: Big Oak, Visitor Center, and Tailwater) 50 TN

0036 Furnish and Spread Playground Sand at 1 playground at Holmes Bend Area (Includes playgrounds at: Holmes Bend Campground and Holmes Bend Picnic Shelter Area) 50 TN

0037 Furnish and Spread Playground Sand at Smith Ridge Campground playground 50 TN

0038 Furnish and Spread Playground Sand at Pikes Ridge Campground playground 50 TN

0039 Remove Drift Wood 200 CD 0040 Remove Driftwood from Dam and Dike 20 CD

SECTION C-7- Beach and Buoy Maintenance 0041 Furnish and Spread Beach Sand at Smith Ridge (Minimum 150 TN

50 TN)

0042 Furnish and Spread Beach Sand at Pikes Ridge (Minimum 50 TN

25 TN)

0043 Furnish and Spread Beach Sand at Holmes Bend (Minimum 150 TN

50 TN)

0044 Spray herbicides at Dam (3 qts/acre (AC)) 36 AC 0045 Spray herbicide at Spillway (3 qts/acre (AC)) 70 AC 0046 Spray herbicide at Dike (3 qts/acre (AC)) 14 AC

Option Year 1 Total

This is an Indefinite Quanity Type Contract to furnish all necessary management, personnel, materials, supplies, tools, parts, equipment, and vehicles required to perform mowing services at Green River Lake with options to extend the term of the contract.

Offerors are strongly encouraged to attend the site inspection meeting and tour.

(Unit Key: AC = acrea, GP = gross product, TN = ton, CD = cubic yard)

OPTION YEAR 2

Section C-1 General

SECTION C-2 - Grass Mowing and Maintenance of Landscape Areas

Est. Unit Item # Quant. Unit Price Total 0001 Mow all Visitor Center Area - 9 Each 0002 Mow around Office and Visitor Center only - Individiual 22 Each 0003 Mow Shop and Storage Area - Individual 15 Each 0004 Mow All Operation Areas 6 Each 0005 Mow Dike 3 Each 0006 Mow Field Below Dam 3 Each 0007 Mow Fields by Maintenance Shop 3 Each 0008 Mow All Recreation Areas 9 Each 0009 Mow All Holmes Bend 9 Each 0010 Mow All Holmes Bend except Campground 6 Each 0011 Mow Holmes Bend Campground Sites 1-23 and 85-125 6 Each 0012 Mow Holmes Bend Campground Sites 24-84 6 Each 0013 Mow Holmes Bend Shelter Area 6 Each 0014 Mow All Site 1 9 Each 0015 Mow All Site 1 except Boat Ramp and access 6 Each 0016 Mow Big Oak Shelter Area 6 Each 0017 Mow All Tailwater 9 Each 0018 Mow Tailwater Shelter Area 6 Each 0019 Mow All Smith Ridge 9 Each 0020 Mow Smith Ridge except Campground Beach & Picnic Area 6 Each 0021 Mow Smith Ridge Campground Sites 1-30 6 Each 0022 Mow Smith Ridge Campground Sites 31-80 6 Each 0023 Mow Smith Ridge Beach Area 6 Each 0024 Mow Smith Ridge Picnic Area 6 Each 0025 Mow Pikes Ridge 9 Each 0026 Mow Wilson Creek 9 Each 0027 Cut and Remove Cedar Trees from Upstream face of Dam and Dike and Downstream face of Dam and floor of Spillway per acrea 120 AC

0028 Remove Standing Trees 25 Each 0029 Remove Fallen Trees 25 Each 0030 Remove Tree Limbs (up to 35' above ground level) 200 Each 0031 Remove Tree Limbs (above 35' above ground level to top of tree) 20 Each 0032 * Cut Back of Roadways and Other Edged Area 10 Linear ft 5,300 10 LF

0033 Remove Leaves from Ditches 1 GP 0034 Remove Leaves from Campsites 1 GP 0035 Furnish and Spread Playground Sand at 1 playground at Site One Area (Includes playgrounds at: Big Oak, Visitor Center, and Tailwater) 50 TN

0036 Furnish and Spread Playground Sand at 1 playground at Holmes Bend Area (Includes playgrounds at: Holmes Bend Campground and Holmes Bend Picnic Shelter Area) 50 TN

0037 Furnish and Spread Playground Sand at Smith Ridge Campground playground 50 TN

0038 Furnish and Spread Playground Sand at Pikes Ridge Campground playground 50 TN

0039 Remove Drift Wood 200 CD 0040 Remove Driftwood from Dam and Dike 20 CD

0041 Furnish and Spread Beach Sand at Smith Ridge (Minimum 150 TN

50 TN)

0042 Furnish and Spread Beach Sand at Pikes Ridge (Minimum 50 TN

25 TN)

0043 Furnish and Spread Beach Sand at Holmes Bend (Minimum 150 TN

50 TN)

0044 Spray herbicides at Dam (3 qts/acre (AC)) 36 AC 0045 Spray herbicide at Spillway (3 qts/acre (AC)) 70 AC 0046 Spray herbicide at Dike (3 qts/acre (AC)) 14 AC

Option Year 2 Total

This is an Indefinite Quanity Type Contract to furnish all necessary management, personnel, materials, supplies, tools, parts, equipment, and vehicles required to perform mowing services at Green River Lake with options to extend the term of the contract.

Offerors are strongly encouraged to attend the site inspection meeting and tour.

(Unit Key: AC = acrea, GP = gross product, TN = ton, CD = cubic yard)

OPTION YEAR 3

Section C-1 General

SECTION C-2 - Grass Mowing and Maintenance of Landscape Areas

Est. Unit Item # Quant. Unit Price Total 0001 Mow all Visitor Center Area - 9 Each 0002 Mow around Office and Visitor Center only - Individiual 22 Each 0003 Mow Shop and Storage Area - Individual 15 Each 0004 Mow All Operation Areas 6 Each 0005 Mow Dike 3 Each 0006 Mow Field Below Dam 3 Each 0007 Mow Fields by Maintenance Shop 3 Each 0008 Mow All Recreation Areas 9 Each 0009 Mow All Holmes Bend 9 Each 0010 Mow All Holmes Bend except Campground 6 Each 0011 Mow Holmes Bend Campground Sites 1-23 and 85-125 6 Each 0012 Mow Holmes Bend Campground Sites 24-84 6 Each 0013 Mow Holmes Bend Shelter Area 6 Each 0014 Mow All Site 1 9 Each 0015 Mow All Site 1 except Boat Ramp and access 6 Each 0016 Mow Big Oak Shelter Area 6 Each 0017 Mow All Tailwater 9 Each 0018 Mow Tailwater Shelter Area 6 Each 0019 Mow All Smith Ridge 9 Each 0020 Mow Smith Ridge except Campground Beach & Picnic Area 6 Each 0021 Mow Smith Ridge Campground Sites 1-30 6 Each 0022 Mow Smith Ridge Campground Sites 31-80 6 Each 0023 Mow Smith Ridge Beach Area 6 Each 0024 Mow Smith Ridge Picnic Area 6 Each 0025 Mow Pikes Ridge 9 Each 0026 Mow Wilson Creek 9 Each 0027 Cut and Remove Cedar Trees from Upstream face of Dam and Dike and Downstream face of Dam and floor of Spillway per acrea 120 AC

0028 Remove Standing Trees 25 Each 0029 Remove Fallen Trees 25 Each 0030 Remove Tree Limbs (up to 35' above ground level) 200 Each 0031 Remove Tree Limbs (above 35' above ground level to top of tree) 20 Each 0032 * Cut Back of Roadways and Other Edged Area 10 Linear ft 5,300 10 LF

0033 Remove Leaves from Ditches 1 GP 0034 Remove Leaves from Campsites 1 GP 0035 Furnish and Spread Playground Sand at 1 playground at Site One Area (Includes playgrounds at: Big Oak, Visitor Center, and Tailwater) 50 TN

0036 Furnish and Spread Playground Sand at 1 playground at Holmes Bend Area (Includes playgrounds at: Holmes Bend Campground and Holmes Bend Picnic Shelter Area) 50 TN

0037 Furnish and Spread Playground Sand at Smith Ridge Campground playground 50 TN

0038 Furnish and Spread Playground Sand at Pikes Ridge Campground playground 50 TN

0039 Remove Drift Wood 200 CD 0040 Remove Driftwood from Dam and Dike 20 CD

0041 Furnish and Spread Beach Sand at Smith Ridge (Minimum 150 TN

50 TN)

0042 Furnish and Spread Beach Sand at Pikes Ridge (Minimum 50 TN

25 TN)

0043 Furnish and Spread Beach Sand at Holmes Bend (Minimum 150 TN

50 TN)

0044 Spray herbicides at Dam (3 qts/acre (AC)) 36 AC 0045 Spray herbicide at Spillway (3 qts/acre (AC)) 70 AC 0046 Spray herbicide at Dike (3 qts/acre (AC)) 14 AC

Option Year 3 Total

This is an Indefinite Quanity Type Contract to furnish all necessary management, personnel, materials, supplies, tools, parts, equipment, and vehicles required to perform mowing services at Green River Lake with options to extend the term of the contract.

Offerors are strongly encouraged to attend the site inspection meeting and tour.

(Unit Key: AC = acrea, GP = gross product, TN = ton, CD = cubic yard)

OPTION YEAR 4

Section C-1 General

SECTION C-2 - Grass Mowing and Maintenance of Landscape Areas

Est. Unit Item # Quant. Unit Price Total 0001 Mow all Visitor Center Area - 9 Each 0002 Mow around Office and Visitor Center only - Individiual 22 Each 0003 Mow Shop and Storage Area - Individual 15 Each 0004 Mow All Operation Areas 6 Each 0005 Mow Dike 3 Each 0006 Mow Field Below Dam 3 Each 0007 Mow Fields by Maintenance Shop 3 Each 0008 Mow All Recreation Areas 9 Each 0009 Mow All Holmes Bend 9 Each 0010 Mow All Holmes Bend except Campground 6 Each 0011 Mow Holmes Bend Campground Sites 1-23 and 85-125 6 Each 0012 Mow Holmes Bend Campground Sites 24-84 6 Each 0013 Mow Holmes Bend Shelter Area 6 Each 0014 Mow All Site 1 9 Each 0015 Mow All Site 1 except Boat Ramp and access 6 Each 0016 Mow Big Oak Shelter Area 6 Each 0017 Mow All Tailwater 9 Each 0018 Mow Tailwater Shelter Area 6 Each 0019 Mow All Smith Ridge 9 Each 0020 Mow Smith Ridge except Campground Beach & Picnic Area 6 Each 0021 Mow Smith Ridge Campground Sites 1-30 6 Each 0022 Mow Smith Ridge Campground Sites 31-80 6 Each 0023 Mow Smith Ridge Beach Area 6 Each 0024 Mow Smith Ridge Picnic Area 6 Each 0025 Mow Pikes Ridge 9 Each 0026 Mow Wilson Creek 9 Each 0027 Cut and Remove Cedar Trees from Upstream face of Dam and Dike and Downstream face of Dam and floor of Spillway per acrea 120 AC

0028 Remove Standing Trees 25 Each 0029 Remove Fallen Trees 25 Each 0030 Remove Tree Limbs (up to 35' above ground level) 200 Each 0031 Remove Tree Limbs (above 35' above ground level to top of tree) 20 Each 0032 * Cut Back of Roadways and Other Edged Area 10 Linear ft 5,300 10 LF

0033 Remove Leaves from Ditches 1 GP 0034 Remove Leaves from Campsites 1 GP 0035 Furnish and Spread Playground Sand at 1 playground at Site One Area (Includes playgrounds at: Big Oak, Visitor Center, and Tailwater) 50 TN

0036 Furnish and Spread Playground Sand at 1 playground at Holmes Bend Area (Includes playgrounds at: Holmes Bend Campground and Holmes Bend Picnic Shelter Area) 50 TN

0037 Furnish and Spread Playground Sand at Smith Ridge Campground playground 50 TN

0038 Furnish and Spread Playground Sand at Pikes Ridge Campground playground 50 TN

0039 Remove Drift Wood 200 CD 0040 Remove Driftwood from Dam and Dike 20 CD

SECTION C-7- Beach and Buoy Maintenance 0041 Furnish and Spread Beach Sand at Smith Ridge (Minimum 150 TN

50 TN)

0042 Furnish and Spread Beach Sand at Pikes Ridge (Minimum 50 TN

25 TN)

0043 Furnish and Spread Beach Sand at Holmes Bend (Minimum 150 TN

50 TN)

0044 Spray herbicides at Dam (3 qts/acre (AC)) 36 AC 0045 Spray herbicide at Spillway (3 qts/acre (AC)) 70 AC 0046 Spray herbicide at Dike (3 qts/acre (AC)) 14 AC

Option Year 4 Total

BASE + OPTION YEARS TOTAL =

* Bid price will be for 10 linear feet along an edged area and will be called out in 10 linear feet increments. (Line Bid Item 0032)

Reference Section C-2.7 e. in the Contract

GREEN RIVER LAKE

SERVICES CONTRACT

TABLE OF CONTENTS

SECTION C-1

GENERAL

GENERAL

C-1.1 PROJECT INFORMATION

C-1.2 SCOPE OF PERFORMANCE

C-1.3 TASK ORDERS

C-1.4 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF

ENGINEERS CONTRACTS

C-1.5 WORKING HOURS

C-1.6 CONTRACTOR SUBMITTALS

C-1.7 PERMITS AND LICENSES

C-1.8 IDENTIFICATION OF CONTRACTOR EMPLOYEES AND VEHICLES

C-1.9 SAFETY AND SECURITY REQUIREMENTS

C-1.10 ACCIDENT REPORTING

C-1.11 C-1.12

DAMAGE REPORTS

CONTRACTOR EMPLOYEES’ CONDUCT AND COMPETENCY

C-1.13 DAMAGE OR LOSS OF CONTRACTORS SUPPLIES AND PROPERTY

C-1.14 SUPERVISION

C-1.15 ENVIRONMENTAL PROGRAM

C-1.16 CONTRACTOR DISCREPANCY REPORT (CDR)

C-1.17 MEETINGS

C-1.18 QUALITY CONTROL

C-1.19 QUALITY ASSURANCE

C-1.20 DEFICIENCIES

C-1.21 INTERRUPTIONS TO SYSTEMS

C-1.22 GOVERNMENT FURNISHED MATERIALS AND EQUIPMENT

C-1.23 CONTRACTOR FURNISHED ITEMS

C-1.24 SAFEGUARDING GOVERNMENT PROPERTY

C-1.25 NOTIFICATION OF SERVICE TO BE DONE

C-1.26 MINIMUM MANPOWER REQUIREMENTS

C-1.27 MINIMUM PERSONNEL QUALIFICATIONS

C-1.28 COOPERATION WITH OTHER CONTRACTORS, LESSEES, AND

VOLUNTEERS

C-1.29 REPORTS

C-1.30 APPLICABLE PUBLICATIONS

C-1.31 DEFINITIONS

SECTION C-2

GRASS MOWING AND MAINTENANCE OF LANDSCAPED AREAS

C-2 A MOWING AND RIMMING

C-2.1 GENERAL

C-2.2 WORK TO BE PERFORMED

C-2.4 LOCATION OF WORK

C-2.5 SCHEDULE OF WORK

C-2 B GROUNDS MAINTENANCE

C-2.6 GENERAL

C-2.7 WORK TO BE PERFORMED

C-2.8 SPECIAL PROVISIONS

C- 2.9 PROJECT SPECIFIC CONDITIONS

SECTION C-6

DRIFT, DEBRIS, AND TRASH REMOVAL

SECTION C-6

C-6.1 GENERAL

C-6.2 WORK TO BE PERFORMED

C-6.3 SPECIAL PROVISIONS

C-6.4 PROJECT SPECIFIC CONDITIONS

SECTION C-7

BEACH AND BUOY MAINTENANCE

SECTION C-7

C-7.1 BEACH AREA SAMPLING

C-7.2 SPECIAL PROVISIONS

C -7-3 PROJECT SPECIFIC CONDITIONS

SECTION C-10

HERBICIDE APPLICATION SERVICES

SECTION C-10

C-10.1 GENERAL

C-10.2 WORK TO BE PERFORMED

C -10.3 SPECIAL PROVISIONS

C-10.4 PROJECT SPECIFIC CONDITIONS

DESCRIPTION/SPECIFICATIONS

General

C-1.1 PROJECT INFORMATION. Green River Lake is in South Central Kentucky, in Taylor and Adair counties, approximately 8 miles South of Campbellsville, Kentucky. Principal cities in the area are Campbellsville and Columbia, Kentucky.

C-1.2 SCOPE OF PERFORMANCE. The Contractor shall furnish all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, except as otherwise provided herein, required to perform mowing and cleaning services at the Green River Lake project recreation and operational areas, as specified and in strict accordance with all Terms, Conditions, General, Specific and Technical Provisions, Drawings, Attachments, Exhibits, etc., contained herein or incorporated by reference. The Contractor’s performance and responsibility shall include all planning, programming, administration, management, supervision, communications and inspection necessary to ensure that all services are conducted in accordance with the contract requirements and all applicable Federal, State and local laws and regulations. The Contractor is required to attend a pre-performance meeting to be scheduled by the Technical Point of Contact (TPOC).

It is emphasized that the performance described in this contract is a critical part of the Corps mission. The performance described will be performed in a public recreation area. The Corps is committed to "Customer Care" and providing quality professional service.

C-1.3 TASK ORDERS. All performance under this contract will be ordered by issuance of individual Task Orders (DD Form 1155).

No performance shall be performed under this contract before an individual Task Order has been issued by the Contracting Officer (KO).

Only the KO, by issuance of a modification, may make any change to a Task Order. The Task Order will list those items from the price breakout schedule that are to be performed.

C-1.4. VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS. In addition to complying with the requirements outlined in FAR Part 22.13, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

U.S. Department of Labor Veterans employment: www.vets.gov/ Federal veteran employment information: www.fedshirevets.gov/index.aspx Veterans’ Employment and Training Service (VETS): http://www.dol.gov/vets/ Veterans Opportunity to Work (VOW) Program: http://benefits.va.gov/vow/ U.S. Army Warrior Transition Command Employment Index: wtc.army.mil/modules/employers/index.html Hiring Our Heroes initiative: www.uschamberfoundation.org/hiring-our-heroes

C-1.5 WORKING HOURS.

a. Normal Working Hours. Normal working hours, except as otherwise specified herein, shall be Monday through Friday, 7:00 a.m. to 5:00 p.m. Eastern Time or as specified on the Task Order. Performance inside Government buildings or other secured areas shall be performed during the above referenced work hours. Work that interferes with other ongoing functions at the project shall be scheduled around normal working hours, as specified by the Technical Point of Contact (TPOC). Refer to individual sections of this specification for specific schedules of work.

b. Holiday Work. The ten Federal holidays observed are:

New Year's Day (January 1st) Martin Luther King Day (3rd Monday in January) President's Day (3rd Monday in February) Memorial Day (Last Monday in May) Juneteenth (June 19th) Independence Day (July 4th) Labor Day (1st Monday in September) Columbus Day (2nd Monday in October) Veterans Day (November 11th) Thanksgiving Day (4th Thursday in November) Christmas Day (December 25th)

When one of the above designated holidays falls on a Sunday, the following Monday is observed as a legal holiday. When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday. Services shall be scheduled around the above listed Federal holidays except as specified herein or as stated within each Task Order.

c. Inclement Weather. The Contractor shall maintain the schedule of services regardless of inclement weather. Exceptions may be approved by the TPOC when unusually severe conditions make services impractical or dangerous. The KO will notify the Contractor, by modification to the Task Order, of any change that extends the performance period due to unusually severe weather.

C-1.6 CONTRACTOR SUBMITTALS. Unless otherwise specified, the Contractor shall submit the following information to the TPOC prior to the pre-performance conference for this contract:

a. Quality Control Plan. A suggested outline for the Contractor's Quality Control Plan. See Exhibit D

b. Contractor Quality Control Inspector. List of Quality Control Inspectors.

c. Contractor Representatives. List of names of Contractor Representatives.

d. Accident Prevention Plan (APP). A suggested outline for the Contractor’s Accident Prevention Plan. See Section C-1.9(b) for APP requirements. Exhibit E

e. Emergency Contacts. A prioritized list, including phone numbers, of those persons (normally Contractor Representatives) to call in case of emergencies.

f. Operators. A list of names of qualified equipment/vehicle operators, including experience, training and qualification to operate specific equipment.

g. Certificate of Insurance

h. Performance Bond (where applicable)

i. Security Requirements – Section C-1.9

C-1.7 PERMITS AND LICENSES. The Contractor shall, at his own expense, obtain any licenses or permits required to perform all aspects, requirements under this contract. The Contractor shall comply with all current Federal, State, and local laws and regulations and shall comply with any subsequent changes.

C-1.8 IDENTIFICATION OF CONTRACT EMPLOYEES AND VEHICLES. All Contractor employees shall be in good appearance while performing services. Employees must wear long pants, shirt with no vulgar or obscene graphics with at least sleeves equivalent of a t-shirt, and durable safety toe shoes. Contractor name shall be visible on shirts. Vehicles and any motorized equipment utilized for transportation shall be in good operating condition with no display of items such as stickers, flags, or etc. Vehicles shall be maintained in accordance with federal, state, and local laws and display contractor name.

C-1.9 SAFETY AND SECURITY REQUIREMENTS.

a. General. If the Contractor fails or refuses to promptly comply with safety and security requirements as specified herein, the TPOC or any other project employee may stop all or part of the performance until satisfactory corrective action has been taken.

No part of the time lost due to any such stoppage shall be made subject to any claims for extension of time or for excess costs or damages sustained by the Contractor. Also, the Contractor will not be paid for performance not performed as a result of the stop order.

The Contractor shall comply with the Occupational Safety and Health Act (OSHA), the Corps of Engineers Manual, EM 385-1- 1 (https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf) and as otherwise stated herein. Special attention shall be given to the requirements for safety meetings. The Contractor shall inform the TPOC a minimum of 7 business days prior to a Contractor monthly safety meeting, to permit a Government representative to attend.

b. Accident Prevention Plan (APP). The Contractor shall prepare an Accident Prevention Plan to ensure that requirements of the safety program are provided as specified. This plan must be accepted by the TPOC prior to commencement of any services.

One copy of the Accident Prevention Plan shall be provided to the TPOC one week prior to the pre-service conference. The Accident Prevention Plan must be in the outline and form prescribed in Appendix A of EM 385-1-1.

c. Activity Hazard Analysis (AHA).

1) The Contractor shall use Activity Hazard Analyses (AHA’s) as one of many tools to ensure safe performance of services. It is the Contractor’s responsibility to prepare the AHA. An approved AHA must be prepared by the Contractor for each Task Order issued by the Government. Sample AHA’s may be available at the project office for review and use by the Contractor to assist in the development of site-specific Activity Hazard Analyses prior to the Contractor performing the service. The Contractor is encouraged to revise or add to these sample AHA’s as necessary to address changing conditions. Prior to performing services with inherent hazards, the Contractor shall review, at a “Toolbox” safety meeting, the approved AHA’s with those employees who shall perform that service each time the service is ordered. The Government may request advanced notification of the time and date of the above AHA Toolbox safety meeting for Contractor employees so that the Government may attend such reviews.

2) The Government will require the Contractor to prepare an AHA for any services for which an adequate AHA does not already exist. A copy of this AHA shall be submitted to the TPOC and must be accepted before the Contractor starts the service. This copy of the AHA will become the property of the Government. Guidance is included, which shall be used by the Contractor as a guide for the preparation of required AHA's.

3) A copy of an approved AHA is required for each Task Order issued by the Government. A copy of the approved AHA’s shall be available at all times to workers at each associated service site and a copy shall be provided to the Government.

d. Public Safety. The Contractor shall ensure that reasonable precautions are taken to protect the public at all times where services are being performed. The Contractor shall immediately report to the TPOC any potential hazards found by his employees on the project. The Accident Prevention Plan shall include procedures to be taken to provide for public safety. Additionally, the Contractor shall not allow any persons, except employees, into areas that are not otherwise open to the public; nor shall the Contractor transport in Contractor vehicles any persons, except employees, during times the Contractor is on the project performing services under a Task Order.

e. Personal Protective Apparel and Equipment. Protective apparel and equipment, as identified in the AHA, shall be provided to eliminate or minimize hazards to personnel. As a minimum, each employee shall wear a short-sleeved shirt, long trousers, and appropriate footwear during all contract service. Face shields, spectacles with side-shields, or goggles, and hearing protection shall be worn by employees when required by safety manual. Contractor personnel involved in handling or application of pesticides or herbicides shall use all protective apparel per manufacturer's recommendations. Fire extinguisher(s) and first aid kit(s) meeting the Safety Manual standards shall also be provided and easily accessible to all employees.

f. Contractor Employees Certified in First Aid & CPR. The Contractor shall schedule employees, so the appropriate numbers of certified personnel are on duty to administer First Aid and CPR as required by the Safety Manual. Copies of their certification shall be provided in accordance with regulations. Two people per crew shall be trained in First Aid and CPR. Individuals performing services alone shall be trained in First Aid.

g. Hazard Communication Program. The Contractor shall be responsible for implementing a hazard communication program for Contractor employees, as required by the Safety Manual. The Contractor shall provide Material Safety Data Sheets (MSDS) and/or Safety Data Sheets (SDS) for review by the TPOC prior to use of any hazardous substance on the project and provide a plan for the proper handling, transportation, storage and usage of hazardous substances on the project.

h. Required Security Training and Planning

1) AT Level I Training All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the TPOC or to the contracting officer, within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website:

http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.

2) Access, General Protection, and Security Policy and Procedures All contractor and all associated sub-contractors’ employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

3) Contractors Who Do Not Require CAC, But Require Access To A DoD Facility Or Installation Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

4) Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something) The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the TPOC NLT 5 calendar days after the completion of the training.

5) Contracts that Require OPSEC Training All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the TPOC or to the contracting officer, within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites: https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html; or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum.

6) Contractors Will Be Escorted In Areas Where They May Be Exposed To Classified And/Or Sensitive Materials And/Or Sensitive Or Restricted Areas. All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas. All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges will be escorted in area where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.

7) The Prime Contractor Company must have a Facility Clearance (FCL) at the appropriate level (IAW the NISPOM DOD 5220.22-M and AR 380-49) prior to the start of the contract awarded period of performance. Contractor personnel performing services under this contract must have the required security clearance, per AR 380-67, at the appropriate level at the start of the period of performance. Security Clearances and FCL requirements are required to be maintained for the life of the contract IAW the DD Form 254 attached to the contract. If no FCL, the supporting Government Contracting Activity will sponsor the prime contract company in obtaining the FCL.

8) Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program

(http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the TPOC no later than 3 business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This form will be provided to the Contracting Officer and shall become part of the official contract file.

C-1.10 ACCIDENT REPORTING. The Contractor is responsible for reporting all accidents to the TPOC immediately. Prompt action shall be taken to ensure immediate and appropriate medical treatment. The Contractor shall maintain an accurate record of any accidents in the manner and on the forms prescribed by the TPOC. For property damage accidents of $2,000 or more, the Contractor shall complete and submit to the TPOC a copy of ENG Form 3394. The Contractor shall maintain an OSHA 300 Log of On – The – Job injuries and first aid treatments. The Contractor shall also provide a monthly record of all exposure and accident experience incidental to the performance of services under the contract. This reporting requirement includes exposure and accident experience of both the Prime Contractor and any subcontractor(s). A Monthly Record of Work-Related Injuries/Illnesses & Exposure form will be available from the TPOC. The Monthly Record of Work-Related Injuries/Illnesses & Exposure report shall be provided to the TPOC by the 5th working day of the month for the previous month.

C-1.11 DAMAGE REPORTS. All instances where Government materials, supplies, property, and/or equipment are damaged shall be reported immediately to the TPOC. When the damage was caused by contract employees, a written report of the incident and extent of such damage shall be submitted to the TPOC, within 2 workdays (less weekends and holidays) of occurrence. For property damage accidents of $2,000 or more the Contractor will complete and submit to the TPOC a copy of ENG 3394.

C-1.12 CONTRACTOR EMPLOYEES' CONDUCT AND COMPETENCY. All contract employees shall conduct themselves in a proper and courteous manner at all times. Since the majority of service is performed in the presence of the general public, the conduct of all employees is critical and will be closely monitored. Contract employees shall comply with all provisions of Title 36, Chapter III, Part 327, CFR and obey all posted signs and regulations in the performance of services under this contract. Being under the influence of or consuming alcoholic beverages or controlled substances by the Contractor or employees while on duty is prohibited.

a. Employee Dismissal. The Contractor expressly agrees to dismiss any employee or subcontractor employee whose continued employment is deemed by the TPOC to be inconsistent with the best interests of the public or the U.S. Army Corps of Engineers.

The KO or the TPOC may require the Contractor to immediately remove from the work site any employee or subcontractor who is incompetent, endangers persons or property, or whose physical or mental condition would impair their ability to satisfactorily perform the work. Notification to the Contractor will be promptly made in writing if time and circumstances permit. Otherwise, notification will be verbal and confirmed in writing as soon as possible. No removal shall reduce the Contractor's obligation to perform all services required under this contract nor be the basis for time extension. Immediate replacement of the employee shall be made.

C-1.13 DAMAGE OR LOSS OF CONTRACTOR'S SUPPLIES AND PROPERTY. The Contractor is responsible for taking the action necessary to protect Contractor supplies, materials and equipment, and the personal property of Contractor employees from loss, damage or theft. The Government assumes no responsibility for theft, damage, etc., of the above.

C-1.14 SUPERVISION. The Contractor or a Contractor Representative shall personally supervise the work or be readily available by phone or other means of communication to respond to any contract issue that may arise when services are in progress. The Contractor Representative(s) shall conduct overall management coordination and be the central point of contact with the Government for performance of all services under the contract.

Each Contractor Representative shall have full authority to contractually commit the Contractor for prompt action on all matters pertaining to administration of this contract and shall be the on-site Contractor employee who is responsible for safety.

In addition to Contractor Representative(s), the Contractor shall also appoint Quality Control Inspectors (QCI) who shall perform the Contractor's Quality Control Program. QCI’s shall be responsible for implementing the Contractor’s Accident Prevention Plan. All QCI'S shall have the authority to determine for the Contractor when completed services are ready for Government inspection and to make decisions for the Contractor on re-performance when necessary. A QCI shall be appointed for each crew. For services performed outside normal working hours, a Contractor Representative or QCI shall be present at the job site.

The TPOC and Government Inspectors will deal directly with the QCI’s or Contractor…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .