W912QR22B0008_Specs_Vol2of2-0000.pdf
PDF 3 MB Posted
- Attached to
- Johnson County Phase II Construction
- Solicitation number
- W912QR22B0008
About this file
This solicitation is for a firm-fixed-price construction contract to complete Phase II of the Paintsville Flood Risk Management Project in Johnson County, Kentucky. The scope of work includes constructing approximately 100 feet of V-shaped earthen levee across a drainage channel with a single gate well control structure and sluice gate, as well as 1,400 linear feet of 10-foot-tall concrete T-wall/I-wall with drainage pipe penetrations and some regrading. The U.S. Army Corps of Engineers Engineering District Louisville will award the contract. Responses are due by the date specified in the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BAA Waiver Flap gate_Redacted.pdf | ||
| W912QR22B0008_Plans-0002.pdf | ||
| Site Visit Vendor List.xlsx | XLSX spreadsheet | |
| W912QR22B0008-0002.pdf | ||
| W912QR22B0008-0001.pdf | ||
| W912QR22B0008_Specs_Vol1of2-0000.pdf | ||
| W912QR22B0008_Plans_Vol1-0000.pdf | ||
| W912QR22B0008_Plans_Vol2-0000.pdf | ||
| W912QR22B0008_Plans_Vol4-0000.pdf | ||
| W912QR22B0008_Plans_Vol3-0000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Paintsville East Levee & Paintsville West Floodwall, Johnson County, KY FRM Project, Phase 2
P2: 475556
Design-Bid-Build
Specifications Vol. 2 of 2 (Div.02-33) Certified Final Design
27 June 2022
W912QR22B0008
RIMS: 1200
Disposition: Permanent
W912QR22B0008_Specs_Vol2of2-0000
Paintsville FRM Project Johnson County, KY Phase 2 East Levee & West Floodwall P2 475556
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 00.00 06 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 20 00 PRICE AND PAYMENT PROCEDURES
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 62 15.00 06 FLOWABLE FILL (CLSM)
DIVISION 05 - METALS
05 05 20.00 27 POST-INSTALLED CONCRETE AND MASONRY ANCHORS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 52 00 METAL RAILINGS
05 59 20 FABRICATION OF HYDRAULIC STEEL STRUCTURES
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 71 33 FIBERGLASS REINFORCED PLASTIC (FRP) LADDERS
DIVISION 09 - FINISHES
09 97 02 PAINTING: HYDRAULIC STRUCTURES
DIVISION 26 - ELECTRICAL
26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
26 05 19.10 10 INSULATED WIRE AND CABLE
26 24 16.00 40 PANELBOARDS
26 42 17 IMPRESSED CURRENT CATHODIC PROTECTION (ICCP) SYSTEM
DIVISION 31 - EARTHWORK
31 00 00.00 06 EARTHWORK
31 05 19.13 GEOTEXTILES
31 11 00 CLEARING AND GRUBBING
31 41 16 METAL SHEET PILING
PROJECT TABLE OF CONTENTS Page 1 Certified Final
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 AGGREGATE BASE COURSES
32 11 23.23 BASE COURSE DRAINAGE LAYERS
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 ROAD-MIX ASPHALT PAVING
32 15 00 AGGREGATE SURFACING
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 11 23 NATURAL GAS AND LIQUID PETROLEUM PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 49 33.00 06 FLAP GATES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 16.54 SLIDE GATES AND ACTUATORS
35 31 19.20 ARTICULATING CONCRETE BLOCK REVETMENTS
35 41 00 LEVEE CONSTRUCTION
35 42 37.00 06 STONE PROTECTION
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 23.19 REMOVABLE WINCH SYSTEM
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SECTION TABLE OF CONTENTS
DIVISION 02 - EXISTING CONDITIONS
SECTION 02 41 00
DEMOLITION
PART 1 GENERAL
1.1 REFERENCES
1.2 PROJECT DESCRIPTION
1.2.1 Definitions
1.2.1.1 Demolition
1.2.1.2 Deconstruction
1.2.1.3 Demolition Plan
1.2.1.4 Deconstruction Plan
1.2.2 Demolition/Deconstruction Plan
1.2.3 General Requirements
1.3 ITEMS TO REMAIN IN PLACE
1.3.1 Existing Construction Limits and Protection
1.3.2 Weather Protection
1.3.3 Trees
1.3.4 Utility Service
1.3.5 Facilities
1.4 BURNING
1.5 NOT USED
1.6 SUBMITTALS
1.7 QUALITY ASSURANCE
1.7.1 Dust and Debris Control
1.8 PROTECTION
1.8.1 Traffic Control Signs
1.8.2 Protection of Personnel
1.9 NOT USED
1.10 RELOCATIONS
1.11 EXISTING CONDITIONS
PART 2 PRODUCTS
2.1 FILL MATERIAL
PART 3 EXECUTION
3.1 EXISTING FACILITIES TO BE REMOVED
3.1.1 Structures
3.1.2 Utilities and Related Equipment
3.1.2.1 General Requirements
3.1.2.2 Disconnecting Existing Utilities
3.1.3 Chain Link Fencing
3.1.4 Paving and Slabs
3.1.5 Roofing
3.1.5.1 Temporary Roofing
3.1.5.2 Reroofing
3.1.6 Masonry
SECTION 02 41 00 Page 237
3.1.7 Concrete
3.1.8 Structural Steel
3.1.9 Miscellaneous Metal
3.1.10 Carpentry
3.1.11 Carpet
3.1.12 Acoustic Ceiling Tile
3.1.13 Airfield Lighting
3.1.14 Patching
3.1.15 Air Conditioning Equipment
3.1.16 Cylinders and Canisters
3.1.17 Locksets on Swinging Doors
3.1.18 Mechanical Equipment and Fixtures
3.1.18.1 Preparation for Storage
3.1.18.2 Piping
3.1.18.3 Ducts
3.1.18.4 Fixtures, Motors and Machines
3.1.19 Electrical Equipment and Fixtures
3.1.19.1 Fixtures
3.1.19.2 Electrical Devices
3.1.19.3 Wiring Ducts or Troughs
3.1.19.4 Conduit and Miscellaneous Items
3.1.20 Elevators and Hoists
3.2 CONCURRENT EARTH-MOVING OPERATIONS
3.3 DISPOSITION OF MATERIAL
3.3.1 Title to Materials
3.3.2 Reuse of Materials and Equipment
3.3.3 Salvaged Materials and Equipment
3.3.4 Disposal of Ozone Depleting Substance (ODS)
3.3.4.1 Special Instructions
3.3.4.2 Fire Suppression Containers
3.3.5 Transportation Guidance
3.3.6 Unsalvageable and Non-Recyclable Material
3.4 CLEANUP
3.5 DISPOSAL OF REMOVED MATERIALS
3.5.1 Regulation of Removed Materials
3.5.2 Burning on Government Property
3.5.3 Removal to Spoil Areas on Government Property
3.5.4 Removal from Government Property
3.6 REUSE OF SALVAGED ITEMS
-- End of Section Table of Contents --
SECTION 02 41 00 Page 238
SECTION 02 41 00
DEMOLITION
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)
AHRI Guideline K (2009) Guideline for Containers for Recovered Non-Flammable Fluorocarbon Refrigerants
AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)
ASSP A10.6 (2006) Safety & Health Program Requirements for Demolition Operations - American National Standard for Construction and Demolition Operations
ASTM INTERNATIONAL (ASTM)
ASTM D2487 (2017; E 2020) Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System)
CARPET AND RUG INSTITUTE (CRI)
CRI 104 (2015) Carpet Installation Standard for Commercial Carpet
CRI 105 (2015) Carpet Installation Standard for Residential Carpet
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. DEFENSE LOGISTICS AGENCY (DLA)
DLA 4145.25 (Jun 2000; Reaffirmed Oct 2010) Storage and Handling of Liquefied and Gaseous Compressed Gases and Their Full and Empty Cylinders http://www.aviation.dla.mil/UserWeb/aviationengineering/HazInfo/
SECTION 02 41 00 Page 239
U.S. DEPARTMENT OF DEFENSE (DOD)
DOD 4000.25-1-M (2006) MILSTRIP - Military Standard Requisitioning and Issue Procedures
MIL-STD-129 (2014; Rev R; Change 1 2018; Change 2 2019) Military Marking for Shipment and Storage
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 61 National Emission Standards for Hazardous Air Pollutants
40 CFR 82 Protection of Stratospheric Ozone
49 CFR 173.301 Shipment of Compressed Gases in Cylinders and Spherical Pressure Vessels
1.2 PROJECT DESCRIPTION
1.2.1 Definitions
1.2.1.1 Demolition
Demolition is the process of wrecking or taking out any load-supporting structural member of a facility together with any related handling and disposal operations.
1.2.1.2 Deconstruction
Deconstruction is the process of taking apart a facility with the primary goal of preserving the value of all useful building materials.
1.2.1.3 Demolition Plan
Demolition Plan is the planned steps and processes for managing demolition activities and identifying the required sequencing activities and disposal mechanisms.
1.2.1.4 Deconstruction Plan
Deconstruction Plan is the planned steps and processes for dismantling all or portions of a structure or assembly, to include managing sequencing activities, storage, re-installation activities, salvage and disposal mechanisms.
1.2.2 Demolition/Deconstruction Plan
Prepare a Demolition Plan and submit proposed salvage, demolition, and removal procedures for approval before work is started. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress, a disconnection schedule of utility services, a detailed description of methods and equipment to be used for each operation and of the sequence of operations.
Provide procedures for safe conduct of the work in accordance with EM 385-1-1 . Plan shall be approved by Contracting Officer prior to work beginning.
SECTION 02 41 00 Page 240
1.2.3 General Requirements
Do not begin demolition or deconstruction until authorization is received from the Contracting Officer. Remove rubbish and debris from the project site; do not allow accumulations inside or outside the buildings . In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1 , Section 23, Demolition, and other applicable Sections.
1.3 ITEMS TO REMAIN IN PLACE
Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair or replace damaged items as approved by the Contracting Officer.
Coordinate the work of this section with all other work indicated.
Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded. Increase structural supports or add new supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract. Do not overload pavements to remain. Provide new supports and reinforcement for existing construction weakened by demolition, deconstruction, or removal work. Repairs, reinforcement, or structural replacement require approval by the Contracting Officer prior to performing such work.
1.3.1 Existing Construction Limits and Protection
Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of building components to prevent settlement or other movement. Provide protective measures to control accumulation and migration of dust and dirt in all work areas. Remove snow, dust, dirt, and debris from work areas daily.
1.3.2 Weather Protection
For portions of the building to remain, protect building interior and materials and equipment from the weather at all times. Where removal of existing roofing is necessary to accomplish work, have materials and workmen ready to provide adequate and temporary covering of exposed areas.
1.3.3 Trees
Protect trees within the project site which might be damaged during demolition or deconstruction, and which are indicated to be left in place, by a 6 foot high fence. Erect and secure fence a minimum of 5 feet from the trunk of individual trees or follow the outer perimeter of branches or clumps of trees. Replace any tree designated to remain that is damaged during the work under this contract with like-kind or as approved by the Contracting Officer.
1.3.4 Utility Service
Maintain existing utilities indicated to stay in service and protect against damage during demolition and deconstruction operations. Prior to start of work, utilities serving each area of alteration or removal will be shut off by the owner of the utility and coordinated by the contractor.
SECTION 02 41 00 Page 241
1.3.5 Facilities
Protect electrical and mechanical services and utilities. Where removal of existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities. Floors, roofs, walls, columns, pilasters, and other structural components that are designed and constructed to stand without lateral support or shoring, and are determined to be in stable condition, must remain standing without additional bracing, shoring, or lateral support until demolished or deconstructed, unless directed otherwise by the Contracting Officer.
Ensure that no elements determined to be unstable are left unsupported and place and secure bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract.
1.4 BURNING
The use of burning at the project site for the disposal of refuse and debris will not be permitted . Where burning is permitted, adhere to federal, state, and local regulations.
1.5 NOT USED
1.6 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Demolition Plan; G, RO Deconstruction Plan; G, RO Existing Conditions
SD-07 Certificates
Notification;
SD-11 Closeout Submittals
Receipts
1.7 QUALITY ASSURANCE
Submit timely notification of demolition projects to Federal, State, regional, and local authorities in accordance with 40 CFR 61 , Subpart M.
Notify the Contracting Officer in writing 10 working days prior to the commencement of work in accordance with 40 CFR 61 , Subpart M. Comply with federal, state, and local hauling and disposal regulations. In addition to the requirements of the "Contract Clauses," conform to the safety requirements contained in ASSP A10.6 . Comply with the Environmental Protection Agency requirements specified. Use of explosives will not be permitted.
SECTION 02 41 00 Page 242
1.7.1 Dust and Debris Control
Prevent the spread of dust and debris and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution. Sweep pavements as often as necessary to control the spread of debris .
1.8 PROTECTION
1.8.1 Traffic Control Signs
a. Where pedestrian and driver safety is endangered in the area of removal work, use traffic barricades with flashing lights. Anchor barricades in a manner to prevent displacement by wind. Notify the Contracting Officer prior to beginning such work.
1.8.2 Protection of Personnel
Before, during and after the demolition work continuously evaluate the condition of the structure being demolished and take immediate action to protect all personnel working in and around the project site. No area, section, or component of floors, roofs, walls, columns, pilasters, or other structural element will be allowed to be left standing without sufficient bracing, shoring, or lateral support to prevent collapse or failure while workmen remove debris or perform other work in the immediate area.
1.9 NOT USED
1.10 RELOCATIONS
Perform the removal and reinstallation of relocated items as indicated with workmen skilled in the trades involved. Repair or replace items to be relocated which are damaged by the Contractor with new undamaged items as approved by the Contracting Officer.
1.11 EXISTING CONDITIONS
Before beginning any demolition or deconstruction work, survey the site and examine the drawings and specifications to determine the extent of the work. Record existing conditions in the presence of the Contracting Officer showing the condition of structures and other facilities adjacent to areas of alteration or removal. Digital photographs will be acceptable as a record of existing conditions. Include in the record the elevation of the top of foundation walls, finish floor elevations, possible conflicting electrical conduits, plumbing lines, alarms systems, the location and extent of existing cracks and other damage and description of surface conditions that exist prior to before starting work. It is the Contractor's responsibility to verify and document all required outages which will be required during the course of work, and to note these outages on the record document. Submit survey results. Several utilities to be removed traverse the proposed floodwall line of protection. The utilities within the zone of influence of the levee and I-wall (20' from the I-wall face or 20' from the levee toe) must be backfilled with compacted satisfactory material for levee fill or CLSM. Refer to Sections 31 00 00.00 06 Earthwork and 35 41 00 Levee Construction for compaction requirements.
SECTION 02 41 00 Page 243
PART 2 PRODUCTS
2.1 FILL MATERIAL
a. Comply with excavating, backfilling, and compacting procedures for soils used as backfill material to fill basements, voids, depressions or excavations resulting from demolition or deconstruction of structures.
b. Fill material shall conform to the definition of satisfactory soil as defined in 31 00 00.00 06 EARTHWORK for work outside the levee/I-wall influence zone and 35 41 00 LEVEE CONSTRUCTION for work inside the levee I-wall influence zone. c. Proposed fill material must be sampled and tested by an approved soil testing laboratory, as follows:
Soil classification ASTM D2487
Moisture-density relations ASTM D698 or ASTM D1557
PART 3 EXECUTION
3.1 EXISTING FACILITIES TO BE REMOVED
Inspect and evaluate existing structures onsite for reuse. Existing construction scheduled to be removed for reuse shall be disassembled.
Dismantled and removed materials are to be separated, set aside, and prepared as specified, and stored or delivered to a collection point for reuse, remanufacture, recycling, or other disposal, as specified.
Materials shall be designated for reuse onsite whenever possible.
3.1.1 Structures
a. Remove existing structures indicated to be removed entirely. Interior walls, other than retaining walls and partitions, shall be removed Remove sidewalks, curbs, gutters and street light bases as indicated.
b. Demolish structures in a systematic manner from the top of the structure to the ground, then demolish any features below ground.
Complete demolition work above each tier or floor before the supporting members on the lower level are disturbed. Demolish concrete and masonry walls in small sections. Remove structural framing members and lower to ground by means of derricks, platforms hoists, or other suitable methods as approved by the Contracting Officer.
c. Locate demolition and deconstruction equipment throughout the structure and remove materials so as to not impose excessive loads to supporting walls, floors, or framing.
3.1.2 Utilities and Related Equipment
3.1.2.1 General Requirements
Do not interrupt existing utilities serving occupied or used facilities, except when authorized in writing by the Contracting Officer. Do not interrupt existing utilities serving facilities occupied and used by the
SECTION 02 41 00 Page 244
Government except when approved in writing and then only after temporary utility services have been approved and provided. Do not begin demolition or deconstruction work until all utility disconnections have been made.
Shut off and cap utilities for future use, as indicated.
3.1.2.2 Disconnecting Existing Utilities
Remove existing utilities , as indicated and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the Contracting Officer. When utility lines are encountered but are not indicated on the drawings, notify the Contracting Officer prior to further work in that area. Remove meters and related equipment and deliver to a location in accordance with instructions of the Contracting Officer.
3.1.3 Chain Link Fencing
Remove chain link fencing, gates and other related salvaged items scheduled for removal and transport to designated areas. Remove gates as whole units. Cut chain link fabric to 25 foot lengths and store in rolls off the ground.
3.1.4 Paving and Slabs
Remove sawcut concrete and asphaltic concrete paving and slabs as indicated facilitate construction of new grade. Provide neat sawcuts at limits of pavement removal as indicated. Pavement and slabs designated to be recycled and utilized in this project shall be moved, ground and stored as directed by the Contracting Officer. Pavement and slabs not to be used in this project shall be removed from the Installation at Contractor's expense.
3.1.5 Roofing
Remove existing roof system and associated components in their entirety down to existing roof deck. Sequence work to minimize building exposure between demolition or deconstruction and new roof materials installation.
3.1.5.1 Temporary Roofing
Install temporary roofing and flashing as necessary to maintain a watertight condition throughout the course of the work. Remove temporary work prior to installation of permanent roof system materials unless approved otherwise by the Contracting Officer. The existing deck is deteriorated where indicated, such that ability to support foot traffic and construction loads is unknown. Make provisions for worker safety during demolition, deconstruction, and installation of new materials as described in paragraphs entitled "Statements" and "Regulatory and Safety Requirements."
3.1.5.2 Reroofing
When removing the existing roofing system from the roof deck, remove only as much roofing as can be recovered by the end of the work day, unless approved otherwise by the Contracting Officer. Do not attempt to open the roof covering system in threatening weather. Reseal all openings prior to suspension of work the same day.
SECTION 02 41 00 Page 245
3.1.6 Masonry
Sawcut and remove masonry so as to prevent damage to surfaces to remain and to facilitate the installation of new work. Where new masonry adjoins existing, the new work shall abut or tie into the existing construction as specified for the new work. Provide square, straight edges and corners where existing masonry adjoins new work and other locations. Masonry removed in pieces shall be crushed.
3.1.7 Concrete
Saw concrete along straight lines to a depth of a minimum 2 inch. Make each cut in walls perpendicular to the face and in alignment with the cut in the opposite face. Break out the remainder of the concrete provided that the broken area is concealed in the finished work, and the remaining concrete is sound. At locations where the broken face cannot be concealed, grind smooth or saw cut entirely through the concrete.
3.1.8 Structural Steel
Dismantle structural steel at field connections and in a manner that will prevent bending or damage. Salvage for recycle structural steel, steel joists, girders, angles, plates, columns and shapes. Flame-cutting torches are permitted when other methods of dismantling are not practical.
Transport steel joists and girders as whole units and not dismantled.
Transport structural steel shapes to a designated recycling facility , stacked according to size, type of member and length, and stored off the ground, protected from the weather.
3.1.9 Miscellaneous Metal
Salvage shop-fabricated items such as access doors and frames, steel gratings, metal ladders, wire mesh partitions, metal railings, metal windows and similar items as whole units. Salvage light-gage and cold-formed metal framing, such as steel studs, steel trusses, metal gutters, roofing and siding, metal toilet partitions, toilet accessories and similar items. Scrap metal shall become the Contractor's property.
Recycle scrap metal as part of demolition and deconstruction operations.
Provide separate containers to collect scrap metal and transport to a scrap metal collection or recycling facility, in accordance with the Waste Management Plan.
3.1.10 Carpentry
Salvage for recycle lumber, millwork items, and finished boards, and sort by type and size. Remove windows, doors, frames, and cabinets, and similar items as whole units, complete with trim and accessories. Salvage hardware attached to units for reuse. Brace the open end of door frames to prevent damage.
3.1.11 Carpet
Remove existing carpet for reclamation in accordance with manufacturer recommendations and as follows. Remove used carpet in large pieces, roll tightly, and pack neatly in a container. Remove adhesive according to recommendations of the Carpet and Rug Institute (CRI). Adhesive removal solvents shall comply with CRI 104 / CRI 105 . Recycle removed carpet cushion.
SECTION 02 41 00 Page 246
3.1.12 Acoustic Ceiling Tile
Remove, neatly stack, and recycle acoustic ceiling tiles. Recycling may be available with manufacturer. Otherwise, priority shall be given to a local recycling organization. Recycling is not required if the tiles contain or may have been exposed to asbestos material.
3.1.13 Airfield Lighting
Remove existing airfield lighting as indicated and terminate in a manner satisfactory to the Contracting Officer. Remove edge lights, associated transformers as indicated.
3.1.14 Patching
Where removals leave holes and damaged surfaces exposed in the finished work, patch and repair these holes and damaged surfaces to match adjacent finished surfaces, using on-site materials when available. Where new work is to be applied to existing surfaces, perform removals and patching in a manner to produce surfaces suitable for receiving new work. Finished surfaces of patched area shall be flush with the adjacent existing surface and shall match the existing adjacent surface as closely as possible as to texture and finish. Patching shall be as specified and indicated, and shall include:
a. Concrete and Masonry: Completely fill holes and depressions, caused by previous physical damage or left as a result of removals in existing masonry walls to remain, with an approved masonry patching material, applied in accordance with the manufacturer's printed instructions.
b. Where existing partitions have been removed leaving damaged or missing resilient tile flooring, patch to match the existing floor tile.
c. Patch acoustic lay-in ceiling where partitions have been removed. The transition between the different ceiling heights shall be effected by continuing the higher ceiling level over to the first runner on the lower ceiling and closing the vertical opening with a painted sheet metal strip.
3.1.15 Air Conditioning Equipment
Remove air conditioning, refrigeration, and other equipment containing refrigerants without releasing chlorofluorocarbon refrigerants to the atmosphere in accordance with the Clean Air Act Amendment of 1990.
3.1.16 Cylinders and Canisters
Remove all fire suppression system cylinders and canisters and dispose of in accordance with the paragraph entitled "Disposal of Ozone Depleting Substance (ODS)."
3.1.17 Locksets on Swinging Doors
Remove all locksets from all swinging doors indicated to be removed and disposed of. Deliver the locksets and related items to a designated location for receipt by the Contracting Officer after removal.
SECTION 02 41 00 Page 247
3.1.18 Mechanical Equipment and Fixtures
Disconnect mechanical hardware at the nearest connection to existing services to remain, unless otherwise noted. Disconnect mechanical equipment and fixtures at fittings. Remove service valves attached to the unit. Salvage each item of equipment and fixtures as a whole unit;
listed, indexed, tagged, and stored. Salvage each unit with its normal operating auxiliary equipment. Transport salvaged equipment and fixtures, including motors and machines, to a designated storage area as directed by the Contracting Officer. Do not remove equipment until approved. Do not offer low-efficiency equipment for reuse.
3.1.18.1 Preparation for Storage
Remove water, dirt, dust, and foreign matter from units; tanks, piping and fixtures shall be drained; interiors, if previously used to store flammable, explosive, or other dangerous liquids, shall be steam cleaned.
Seal openings with caps, plates, or plugs. Secure motors attached by flexible connections to the unit. Change lubricating systems with the proper oil or grease.
3.1.18.2 Piping
Disconnect piping at unions, flanges and valves, and fittings as required to reduce the pipe into straight lengths for practical storage. Store salvaged piping according to size and type. If the piping that remains can become pressurized due to upstream valve failure, end caps, blind flanges, or other types of plugs or fittings with a pressure gage and bleed valve shall be attached to the open end of the pipe to ensure positive leak control. Carefully dismantle piping that previously contained gas, gasoline, oil, or other dangerous fluids, with precautions taken to prevent injury to persons and property. Store piping outdoors until all fumes and residues are removed. Box prefabricated supports, hangers, plates, valves, and specialty items according to size and type.
Wrap sprinkler heads individually in plastic bags before boxing. Classify piping not designated for salvage, or not reusable, as scrap metal.
3.1.18.3 Ducts
Classify removed duct work as scrap metal.
3.1.18.4 Fixtures, Motors and Machines
Remove and salvage fixtures, motors and machines associated with plumbing, heating, air conditioning, refrigeration, and other mechanical system installations. Salvage, box and store auxiliary units and accessories with the main motor and machines. Tag salvaged items for identification, storage, and protection from damage. Classify broken, damaged, or otherwise unserviceable units and not caused to be broken, damaged, or otherwise unserviceable as debris to be disposed of by the Contractor.
3.1.19 Electrical Equipment and Fixtures
Salvage motors, motor controllers, and operating and control equipment that are attached to the driven equipment. Salvage wiring systems and components. Box loose items and tag for identification. Disconnect primary, secondary, control, communication, and signal circuits at the point of attachment to their distribution system.
SECTION 02 41 00 Page 248
3.1.19.1 Fixtures
Remove and salvage electrical fixtures. Salvage unprotected glassware from the fixture and salvage separately. Salvage incandescent, mercury-vapor, and fluorescent lamps and fluorescent ballasts manufactured prior to 1978, boxed and tagged for identification, and protected from breakage.
3.1.19.2 Electrical Devices
Remove and salvage switches, switchgear, transformers, conductors including wire and nonmetallic sheathed and flexible armored cable, regulators, meters, instruments, plates, circuit breakers, panelboards, outlet boxes, and similar items. Box and tag these items for identification according to type and size.
3.1.19.3 Wiring Ducts or Troughs
Remove and salvage wiring ducts or troughs. Dismantle plug-in ducts and wiring troughs into unit lengths. Remove plug-in or disconnecting devices from the busway and store separately.
3.1.19.4 Conduit and Miscellaneous Items
Salvage conduit except where embedded in concrete or masonry. Consider corroded, bent, or damaged conduit as scrap metal. Sort straight and undamaged lengths of conduit according to size and type. Classify supports, knobs, tubes, cleats, and straps as debris to be removed and disposed.
3.1.20 Elevators and Hoists
Remove elevators, hoists, and similar conveying equipment and salvage as whole units, to the most practical extent. Remove and prepare items for salvage without damage to any of the various parts. Salvage and store rails for structural steel with the equipment as an integral part of the unit.
3.2 CONCURRENT EARTH-MOVING OPERATIONS
Do not begin excavation, filling, and other earth-moving operations that are sequential to demolition or deconstruction work in areas occupied by structures to be demolished or deconstructed until all demolition and deconstruction in the area has been completed and debris removed. Fill holes, open basements and other hazardous openings.
3.3 DISPOSITION OF MATERIAL
3.3.1 Title to Materials
Except for salvaged items specified in related Sections, and for materials or equipment scheduled for salvage, all materials and equipment removed and not reused or salvaged, shall become the property of the Contractor and shall be removed from Government property. Title to materials resulting from demolition and deconstruction, and materials and equipment to be removed, is vested in the Contractor upon approval by the Contracting Officer of the Contractor's demolition, deconstruction, and removal procedures, and authorization by the Contracting Officer to begin demolition and deconstruction. The Government will not be responsible for
SECTION 02 41 00 Page 249 the condition or loss of, or damage to, such property after contract award. Showing for sale or selling materials and equipment on site is prohibited.
3.3.2 Reuse of Materials and Equipment
Remove and store materials and equipment to be reused or relocated to prevent damage, and reinstall as the work progresses. Coordinate the re-use of materials and equipment with the re-use requirements in accordance with Section 01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. Capture re-use of materials in the diversion calculations for the project.
3.3.3 Salvaged Materials and Equipment
Remove materials and equipment that are to be removed by the Contractor and that are to remain the property of the Government, and deliver to a storage site .
a. Salvage items and material to the maximum extent possible.
b. Store all materials salvaged for the Contractor as approved by the Contracting Officer and remove from Government property before completion of the contract. Coordinate the salvaged materials with tracking requirements in accordance with Section 01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. Capture salvaged materials in the diversion calculations for the project.
c. Remove salvaged items to remain the property of the Government in a manner to prevent damage, and packed or crated to protect the items from damage while in storage or during shipment. Items damaged during removal or storage must be repaired or replaced to match existing items. Properly identify the contents of containers. Deliver the following items reserved as property of the Government to the areas designated.
d. Remove the following items reserved as property of the using service prior to commencement of work under this contract: .
e. Remove historical items in a manner to prevent damage. Deliver the following historical items to the Government for disposition: Corner stones, contents of corner stones, and document boxes wherever located on the site.
f. Remove and capture all Class I ODS refrigerants in accordance with the Clean Air Act Amendment of 1990, and turn in to the Navy as directed by the Commanding Officer.
3.3.4 Disposal of Ozone Depleting Substance (ODS)
Class I and Class II ODS are defined in Section, 602(a) and (b), of The Clean Air Act. Prevent discharge of Class I and Class II ODS to the atmosphere. Place recovered ODS in cylinders meeting AHRI Guideline K suitable for the type ODS (filled to no more than 80 percent capacity) and provide appropriate labeling. Recovered ODS shall be removed from Government property and disposed of in accordance with 40 CFR 82 .
Products, equipment and appliances containing ODS in a sealed, self-contained system (e.g. residential refrigerators and window air conditioners) shall be disposed of in accordance with 40 CFR 82 . Submit
SECTION 02 41 00 Page 250
Receipts or bills of lading, as specified. Submit a shipping receipt or bill of lading for all containers of ozone depleting substance (ODS) shipped to the Defense Depot, Richmond, Virginia.
3.3.4.1 Special Instructions
No more than one type of ODS is permitted in each container. A warning/hazardous label shall be applied to the containers in accordance with Department of Transportation regulations. All cylinders including but not limited to fire extinguishers, spheres, or canisters containing an ODS shall have a tag with the following information:
a. Activity name and unit identification code
b. Activity point of contact and phone number
c. Type of ODS and pounds of ODS contained
d. Date of shipment
e. National stock number (for information, call (804) 279-4525).
3.3.4.2 Fire Suppression Containers
Deactivate fire suppression system cylinders and canisters with electrical charges or initiators prior to shipment. Also, safety caps must be used to cover exposed actuation mechanisms and discharge ports on these special cylinders.
3.3.5 Transportation Guidance
Ship all ODS containers in accordance with MIL-STD-129 , DLA 4145.25 (also referenced one of the following: Army Regulation 700-68, Naval Supply Instruction 4440.128C, Marine Corps Order 10330.2C, and Air Force Regulation 67-12), 49 CFR 173.301 , and DOD 4000.25-1-M .
3.3.6 Unsalvageable and Non-Recyclable Material
Dispose of unsalvageable and non-recyclable noncombustible material in a class D landfill facility. Dispose of unsalvageable and non-recyclable combustible material in a class D landfill facility.
3.4 CLEANUP
Remove debris and rubbish from basement and similar excavations. Remove and transport the debris in a manner that prevents spillage on streets or adjacent areas. Apply local regulations regarding hauling and disposal.
3.5 DISPOSAL OF REMOVED MATERIALS
3.5.1 Regulation of Removed Materials
Dispose of debris, rubbish, scrap, and other nonsalvageable materials resulting from removal operations with all applicable federal, state and local regulations as contractually specified . Storage of removed materials on the project site is prohibited.
SECTION 02 41 00 Page 251
3.5.2 Burning on Government Property
Burning of materials removed from demolished and deconstructed structures will not be permitted on Government property .
3.5.3 Removal to Spoil Areas on Government Property
Transport noncombustible materials removed from demolition and deconstruction structures to designated spoil areas on Government property.
3.5.4 Removal from Government Property
Transport waste materials removed from demolished and deconstructed structures, except waste soil, from Government property for legal disposal. Dispose of waste soil as directed.
3.6 REUSE OF SALVAGED ITEMS
Recondition salvaged materials and equipment designated for reuse before installation. Replace items damaged during removal and salvage operations or restore them as necessary to usable condition.
-- End of Section --
SECTION 02 41 00 Page 252
SECTION TABLE OF CONTENTS
DIVISION 03 - CONCRETE
SECTION 03 30 00
CAST-IN-PLACE CONCRETE
PART 1 GENERAL
1.1 UNIT OF MEASURE
1.1.1 I-Wall Concrete Liner
1.1.1.1 Payment
1.1.1.2 Measurement
1.1.1.3 Unit of Measure
1.1.2 Gatewell
1.1.2.1 Payment
1.1.2.2 Measurement
1.1.2.3 Unit of Measure
1.1.3 Roller Gate Closure
1.1.3.1 Payment
1.1.3.2 Measurement
1.1.3.3 Unit of Measure
1.1.4 West Levee Headwalls
1.1.4.1 Payment
1.1.4.2 Measurement
1.1.4.3 Unit of Measure
1.2 REFERENCES
1.3 DEFINITIONS
1.4 SUBMITTALS
1.5 MODIFICATION OF REFERENCES
1.6 DELIVERY, STORAGE, AND HANDLING
1.6.1 Reinforcement
1.6.1.1 Epoxy Coated Reinforcing Steel
1.6.2 Waterstops and Embedded Items
1.7 LABORATORY TESTING FACILITIES
1.8 GOVERNMENT SAMPLING AND TESTING
1.9 CONTRACTOR QUALITY CONTROL
1.9.1 Design Data
1.9.1.1 Formwork Calculations
1.9.1.2 Concrete Mix Design
1.9.2 Shop Drawings
1.9.2.1 Reinforcing Steel
1.9.2.2 Waterstops
1.9.3 Control Submittals
1.9.3.1 Pumping Concrete
1.9.3.2 Finishing Plan
1.9.3.3 VOC Content for form release agents, curing compounds, and concrete penetrating sealers
1.9.3.4 Safety Data Sheets
1.9.4 Test Reports
1.9.4.1 Portland Cement Test Reports
1.9.4.2 Fly Ash and Pozzolan Test Reports
1.9.4.3 Slag Cement Test Reports
SECTION 03 30 00 Page 253
1.9.4.4 Aggregate Test Reports
1.9.5 Test Sections
1.9.5.1 Wall Demonstration Panel
1.9.6 Quality Control Plan (QCP)
1.9.7 Quality Control Personnel Certifications
1.9.7.1 Quality Manager Qualifications
1.9.7.2 Field Testing Technician and Testing Agency
1.9.8 Laboratory Qualifications for Concrete Testing
1.9.9 Laboratory Validation
1.9.10 Concrete Superintendent
1.10 CONCRETING PLAN
1.11 ENVIRONMENTAL REQUIREMENTS
1.11.1 Submittals for Environmental Performance
1.12 QUALIFICATIONS FOR WELDING WORK
PART 2 PRODUCTS
2.1 FORMWORK MATERIALS
2.1.1 Wood Forms
2.1.1.1 Concrete Form Plywood (Standard Rough)
2.1.1.2 Overlaid Concrete Form Plywood (Standard Smooth)
2.1.2 Plastic Forms
2.1.3 Steel Forms
2.2 FORMWORK ACCESSORIES
2.2.1 Form Ties
2.2.2 Waterstops
2.2.2.1 Testing Requirements
2.2.2.2 PVC Waterstop
2.2.2.3 Hydrophilic Waterstop
2.2.3 Biodegradable Form Release Agent
2.2.4 Chamfer Materials
2.2.5 Construction and movement joints
2.2.6 Other Embedded items
2.3 AGGREGATE
2.3.1 Aggregate Sources
2.3.1.1 Aggregate Samples
2.3.2 Aggregate Quality
2.3.3 Alkali-Silica Reactivity
2.3.4 Aggregate Grading
2.3.4.1 Fine Aggregate Grading
2.3.4.2 Coarse Aggregate Grading
2.3.4.3 Particle Shape
2.3.4.4 Maximum-Size of Aggregate (MSA)
2.4 CEMENTITIOUS MATERIALS
2.4.1 Portland Cement
2.4.2 Pozzolan
2.4.3 Ground Granulated Blast-Furnace Slag
2.4.4 Temperature of Cementitious Materials
2.5 ADMIXTURES
2.5.1 Air-Entraining Admixtures
2.5.2 Accelerating Admixture
2.5.3 Retarding Admixture
2.5.4 Water-Reducing Admixture
2.5.5 High-Range Water-Reducing Admixture (HRWRA)
2.5.6 Hydration Stabilizer
2.6 WATER
2.7 CURING MATERIALS
2.7.1 Sheet Materials
2.7.2 Membrane-Forming Curing Compound
SECTION 03 30 00 Page 254
2.7.3 Burlap
2.8 MISCELLANEOUS MATERIALS
2.8.1 Nonshrink Grout
2.8.2 Bonding Agents
2.8.2.1 Latex Bonding Agent
2.8.2.2 Epoxy Resin
2.8.3 Expansion/Contraction Joint Filler
2.8.4 Backer Rod
2.8.5 Joint Sealants
2.8.5.1 Horizontal Surfaces, 3 Percent Slope, Maximum
2.8.5.2 Vertical Surfaces Greater Than 3 Percent Slope
2.8.5.3 Preformed Polychloroprene Elastomeric Type
2.9 MIXTURE PROPORTIONING
2.9.1 Proportioning Responsibility
2.10 CONCRETE MIX DESIGN REQUIREMENTS
2.10.1 Design Requirements
2.10.2 Concrete Compressive Strength
2.10.2.1 Average Compressive Strength From Test Records
2.10.2.2 Average Compressive Strength Without Previous Test Records
2.11 TRIAL BATCHES
2.12 READY MIX CONCRETE
2.13 REINFORCEMENT
2.13.1 Reinforcing Bars
2.13.1.1 Headed Reinforcing Bars
2.13.1.2 Bar Mats
2.13.1.3 Headed Shear Stud Reinforcement
2.13.2 Dowel Bars
2.13.3 Mechanical Reinforcing Bar Connectors
2.13.4 Welded wire reinforcement
2.13.5 Reinforcing Bar Supports
2.13.6 Welding
2.13.7 Wire Ties
PART 3 EXECUTION
3.1 EXAMINATION
3.2 PREPARATION
3.2.1 General
3.2.2 Subgrade Under Foundations and Footings
3.2.3 Subgrade Under Slabs on Ground
3.2.4 Edge Forms and Screed Strips for Slabs
3.2.5 Reinforcement and Other Embedded Items
3.3 FORMS
3.3.1 Coating
3.3.2 Reuse
3.3.3 Form Ties
3.3.4 Tolerances for Form Construction
3.3.5 Removal of Forms and Supports
3.3.6 Strength of Concrete Required for Removal of Formwork
3.3.6.1 Formwork for Non-Load Bearing Concrete
3.3.6.1.1 Formwork for Load Bearing Concrete
3.4 WATERSTOP INSTALLATION AND SPLICES
3.4.1 PVC Waterstop
3.4.2 Hydrophilic Waterstop
3.5 PLACING REINFORCEMENT AND MISCELLANEOUS MATERIALS
3.5.1 General
3.5.2 Reinforcement Supports
3.5.3 Splicing
3.5.4 Future Bonding
SECTION 03 30 00 Page 255
3.5.5 Setting Miscellaneous Material
3.5.6 Fabrication
3.5.7 Placing Reinforcement
3.5.8 Spacing of Reinforcing Bars
3.6 BATCHING, MEASURING, MIXING, AND TRANSPORTING CONCRETE
3.6.1 Measuring
3.6.2 Mixing
3.6.3 Transporting
3.7 TRANSPORTING AND PLACING CONCRETE
3.7.1 Transporting and Conveying Equipment
3.7.2 Placing
3.7.2.1 Time Interval Between Mixing and Placing
3.7.2.2 Hot-Weather Placing Requirements
3.7.2.3 Cold-Weather Placing Requirements
3.7.2.4 Bonding
3.7.2.5 Concrete Lifts
3.8 WASTE MANAGEMENT
3.9 SURFACE FINISH GENERAL REQUIREMENTS
3.9.1 General Finishing Requirements
3.9.1.1 Floated Finish
3.9.1.2 Broomed Finish
3.9.1.3 Burlap Drag
3.9.1.4 Pavement Texturing
3.9.1.5 Cork Floated Finish
3.9.2 Not Against Forms (Top of Walls)
3.9.3 Formed Surfaces
3.9.3.1 Tolerances
3.10 FINISHING REQUIREMENTS BY SURFACE
3.10.1 Pavement
3.10.2 Concrete Walks
3.10.3 Curbs
3.10.4 T-Walls, I-Wall, Gatewells, Headwalls, and Closure Abutments
3.11 SURFACE REPAIR
3.11.1 Mix #1 General Structural Concrete Repairs
3.11.1.1 Plan for Mix #1 Concrete Material and Procedure for
Repairs
3.11.2 Material and Procedure for Repairs
3.12 JOINTS
3.12.1 Construction Joints
3.12.1.1 Maximum Allowable Construction Joint Spacing
3.12.1.2 Construction Joints for Constructability Purposes
3.12.2 Contraction Joints in Slabs on Ground
3.12.3 Sealing Joints in Slabs on Ground
3.13 CURING AND PROTECTION
3.13.1 Curing Methods
3.13.1.1 Moist Curing
3.13.1.2 Sheet Curing
3.13.1.3 Membrane Curing
3.13.1.3.1 Nonpigmented
3.13.1.3.2 Application
3.13.1.4 Sealed Insulation Curing
3.13.2 Curing Periods
3.13.3 Curing Formed Surfaces
3.13.4 Curing Unformed Surfaces
3.13.5 Protection
3.13.5.1 Protection from Mechanical Injury
3.13.5.2 Protection After Curing
3.13.6 Cold-Weather Protection
3.14 FIELD QUALITY CONTROL
SECTION 03 30 00 Page 256
3.14.1 Government Quality Assurance, Inspection, and Testing
3.14.2 General
3.14.3 Sampling
3.14.4 Testing
3.14.4.1 Cementitious Materials
3.14.4.2 Admixtures
3.14.4.3 Water
3.14.4.4 Concrete Mixture
3.14.4.4.1 Air Content
3.14.4.4.2 Air Content Corrective Action
3.14.4.4.3 Slump Testing
3.14.4.4.4 Slump Corrective Action
3.14.4.4.5 Compression Test Cylinders
3.14.4.4.6 Temperature Tests
3.14.4.4.7 Unit Weight of Structural Concrete
3.14.4.4.8 Strength of Concrete Structure
3.14.4.4.9 Non-Conforming Materials
3.14.4.4.10 Testing Concrete Structure for Strength
3.14.5 Aggregate Quality Testing During Production
3.14.5.1 Fine Aggregate
3.14.5.2 Coarse Aggregate
3.14.5.3 Quality of Aggregates From Source
3.14.5.4 Deleterious Substances
3.14.6 Pre-Placement Inspection
3.14.7 Concrete Placement
3.14.7.1 Placing Inspection
3.14.7.2 Placing Corrective Action
3.14.8 Post Placement Inspection
3.14.8.1 Surface Finish Tolerance inspection
3.14.8.2 Surface Repair Inspection
3.14.9 Curing Inspection
3.14.9.1 Moist Curing Inspections
3.14.9.2 Moist Curing Corrective Action
3.14.9.3 Membrane Curing Inspection
3.14.9.4 Membrane Curing Corrective Action
3.14.9.5 Sheet Curing Inspection
3.14.9.6 Sheet Curing Corrective Action
3.14.9.7 Cold Weather Protection and Sealed Insulation Curing
3.14.9.8 Cold Weather Protection Corrective Action
3.14.10 Reports
3.14.11 Waterstops
3.15 REPAIR, REHABILITATION AND REMOVAL
3.15.1 Failure of Test Results
-- End of Section Table of Contents --
SECTION 03 30 00 Page 257
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 03 30 00 Page 258
SECTION 03 30 00
CAST-IN-PLACE CONCRETE
PART 1 GENERAL
This specification addresses all concrete and concrete material requirements for this contract. This includes, but is not limited to, references, submittals, qualtiy control personnel, preconstruction testing and approvals, mixture proportioning. trial batching, batch plant requirements for testing, operation, etc. Where conflicts between specifications arise, this specification governs for all concrete related items.
All materials stored and permanent concrete produced at the batch plant shall meet the material requirements contained herein. During periods where permanent concrte is not being produced, temporary concrete, or concrete for other projects, may be batched, but any temporary materials or materials for other projects must be fully separated, contained, and fully removed from plant machinary/hoppers prior to production of perament concrete. All other provisions of this specification apply unless otherwise noted.
Related Sections:
32 16 19 Concrete Curbs, Gutters, and Sidewalks 31 00 00.00 06 Earthworks
1.1 UNIT OF MEASURE
1.1.1 I-Wall Concrete Liner
This includes all structural concrete (Stuctural Concrete Mix #1), all miscellaneous and concrete, and all incidental items associated with construction and finishing of I-Walls and overtopping splash pad.
1.1.1.1 Payment
All incidental costs associated with the performance of work in this section are included in the contract price designated for I-Walls. Payment will be made to include all labor, equipment, materials, and supplies for completing the general structural concrete as shown on the contract drawings and as specified. These costs include all costs associated with furnishing and delivery of concrete and concrete materials including but not limited to Portland cement, fly ash, ground granulated blast furnace slag (GGBFS), mineral and chemical admixtures, aggregates and water. This also includes but is not limited to costs associated with concrete production and placement including mixing, transportation, conveying, placement, reinforcing steel, water stops, formwork, miscellaneous metals, consolidating, finishing, curing, joint sealants, and other incidental costs required to place the concrete to the lines and grades required. The unit cost for each constituent component required for the concrete mix shall be submitted as part of the mix design process to establish the basis of cost adjustments should percentages require adjustment by the Government. No payment will be made for concrete wasted or not otherwise placed during production. No separate compensation associated with concrete materials testing, as part of the Contractor's Quality Control, SECTION 03 30 00 Page 259 will be made and these costs shall be incidental to concrete construction.
1.1.1.2 Measurement
Concrete will be measured for payment based upon the actual linear feet of I-Wall concrete liner placed to include the overtopping splash pad. Pay lines will be taken as the starting and stopping station of each I-Wall segment. No deductions will be made for rounded or beveled edges, space occupied by metal work, electrical conduits, or reinforcing steel, nor for voids or embedded items that are either less than 5 cubic feet in volumn or 1 square foot in cross section. Concrete will be measured from the I-Wall starting station to I-Wall segment ending station along the centerline of the I-Wall alignment to the nearest half linear foot.
1.1.1.3 Unit of Measure
Unit of Measure: Linear Feet
1.1.2 Gatewell
This includes all structural concrete (Stuctural Concrete Mix #1), all miscellaneousand concrete, and all incidental items associated with construction and finishing of Gatewells.
1.1.2.1 Payment
All incidental costs associated with the performance of work in this section are included in the contract price designated for Gatewells.
Payment will be made to include all labor, equipment, materials, and supplies for completing the general structural concrete as shown on the contract drawings and as specified. These costs include all costs associated with furnishing and delivery of concrete and concrete materials including but not limited to Portland cement, fly ash, ground granulated blast furnace slag (GGBFS), mineral and chemical admixtures, aggregates and water.