W912QR21R0075_Olmsted Dam Maintenance Support Contract
Solicitation number
W912QR21R0075
Issued by

About this file

This document outlines a solicitation for dam maintenance support services at Olmsted Locks & Dam in Olmsted, Illinois. The U.S. Army Corps of Engineers Louisville District is seeking proposals for operations associated with lifting and setting a government furnished dive deflector box through a firm-fixed-price contract. The North American Industry Classification System code is 561990 for all other support services. This is a full and open procurement that requires a 10% price evaluation preference for qualified HUBZone small businesses. Proposals will be evaluated on a best value tradeoff basis considering past performance, technical quality, and price, with all non-cost factors considered approximately equal to cost. Discussions may be held at the government's discretion. The solicitation is available at https://sam.gov and amendments will be posted electronically. Offerors must register in the System for Award Management to be eligible for award.

View the file

Other files

File Type Posted
W912QR21R0075-0002_08OCT21.pdf PDF
W912QR21R0075-0001_30SEPT21.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 12:00 PM local time 13 Oct 2021

A X B X C

D

EX

X G F 24 - 36

37 - 44 X H 45

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 45

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W912QR 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 4 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

3 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 6 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

7 - 22

PART II - CONTRACT CLAUSES

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239 502.315.6172

502.315.6195 OR 6193FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

14 Sep 2021

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W912QR21R0075

Section B - Supplies or Services and Prices

PRICE BREAKOUT SCHEDULE

Olmsted Lock and Dam Maintenance Support

Ohio River

PROPOSER'S NAME:

ITEM NO. DESCRIPTION QTY UNIT UNIT PRICE AMOUNT

BASE PROPOSAL

0001 Mobilization and Demobilization 1 JOB $ $

0002 FY 22 High Water Season 1 JOB $ $

TOTAL BASE $

OPTIONS

Option 1: Convert 10 Inactive Days to Active Days for FY22 HWS 5 JOB $ $

Option 2: FY 22 Low Water Season 1 JOB $ $

Option 3: Convert 10 Extended Inactive to Active

Days for FY 22 LWS 5 JOB $ $

Option 4: FY 23 High Water Season 1 JOB $ $

Option 5: Convert 10

Inactive Days to Active Days for FY 23 HWS 5

JOB $ $

Option 6: FY 23 Low Water

Option 7: Convert 10 Extended Inactive days to Active Days for FY 23 LWS 5 JOB $ $

Option 8: FY 24 High Water

Option 9: Convert 10

Active Days for FY 24 HWS 5 JOB $ $

Option 10: FY 24 Low Water

Option 11: Convert 10

Active Days for FY 24 LWS 5 JOB $ $

Option 12: FY 25 High Water Season 1 JOB $ $

Option 13: Convert 10

Active Days for FY 25 HWS 5 JOB $ $

Option 14: FY 25 Low Water

Option 15: Convert 10

Active Days for FY 25 LWS 5 JOB $ $

Option 16: FY 26 High Water Season 1 JOB $ $

Option 17: Convert 10

Active Days for FY 26 HWS 5 JOB $ $

Option 18: FY 26 Low Water

Option 19: Convert 10

Active Days for FY 26 LWS 5 JOB $ $

TOTAL OPTIONS $

TOTAL (BASE PLUS ALL OPTIONS) $

CLIN DESCRIPTIONS:

CLIN 0002: FY 22 High Water Season is from 12/1/2021 – 4/30/2022. Assume 25 Active Days, 10 Inactive Days, and 116 Extended Inactive Days.

CLIN 0003: May be exercised up to 181 days from Date of Award. Can be exercised up to five times.

CLIN 0004: FY 22 Low Water Season is from 5/1/2022 – 11/30/2022. Assume 35 Active Days, 159

Inactive Days, and 20 Extended Inactive Days.

CLIN 0005: May be exercised up to 395 days from Date of Award. Can be exercised up to five times.

CLIN 0006: FY 23 High Water Season is from 12/1/2022 – 4/30/2023. Assume 25 Active Days, 10

CLIN 0007: May be exercised up to 546 from Date of Award. Can be exercised up to five times.

CLIN 0008: FY 23 Low Water Season is from 5/1/2023 – 11/30/2023. Assume 35 Active Days, 159

CLIN 0009: May be exercised up to 760 days from Date of Award. Can be exercised up to five times.

CLIN 0010: FY 24 High Water Season is from 12/1/2023 – 4/30/2024. Assume 25 Active Days, 10

CLIN 0011: May be exercised up to 912 days from Date of Award. Can be exercised up to five times.

CLIN 0012: FY 24 Low Water Season is from 5/1/2024 – 11/30/2024. Assume 35 Active Days, 159

CLIN 0013: May be exercised up to 1126 days from Date of Award. Can be exercised up to five times.

CLIN 0014: FY 25 High Water Season is from 12/1/2024 – 4/30/2025. Assume 25 Active Days, 10

CLIN 0015: May be exercised up to 1277 days from Date of Award. Can be exercised up to five

CLIN 0016: FY 25 Low Water Season is from 5/1/2025 – 11/30/2025. Assume 35 Active Days, 159

CLIN 0017: May be exercised up to 1491 days from Date of Award. Can be exercised up to five

CLIN 0018: FY 26 High Water Season is from 12/1/2025 – 4/30/2026. Assume 25 Active Days, 10

CLIN 0019: May be exercised up to 1642 days from Date of Award. Can be exercised up to five

CLIN 0020: FY 26 Low Water Season is from 5/1/2026 – 11/30/2026. Assume 35 Active Days, 159

CLIN 0021: May be exercised up to 1856 days from Date of Award. Can be exercised up to five

Notes:

NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

NOTE NO. 2. Offerors must insert a price on all numbered items including options of the CLIN Schedule. Failure to do so may result in the offer being unacceptable.

NOTE NO. 3. The Offeror’s Base Proposal and all Options will be evaluated. In accordance with 52.217-5, Evaluation of Options, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

NOTE NO. 4. Option CLINS 0003, 0005, 0007, 0009, 0011, 0013, 0015, 0017, 0019, and 0021 can be exercised up to five times each. When each of these Options are exercised one (1) time, a total of ten (10) Extended Inactive Days will be converted to Active Days.

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT

Ohio River Olmsted Locks & Dam

Dam Maintenance Support

1. GENERAL:

Dive deflector box/wicket deflector box/deflector box/wicket maintenance box are all the same piece of equipment as referenced elsewhere in the RFP and are referenced as the WICKET MAINTENANCE BOX in the drawings supplied.

1.1 General Scope of Work: The Contractor shall provide all labor and equipment necessary to perform all operations associated with lifting and setting a government furnished dive deflector box at Olmsted Locks & Dam. The deflector box will be used to support USACE divers who will remove and replace dam wickets for annual maintenance and clear debris from the concrete area near the wickets’ horse hinge pins. Wicket box dive operations will also be supported by USACE employees including a dive supervisor, tender(s), rigger, signalman / lift supervisor, and topside diver support. In addition to the dive support team, a USACE captain/pilot, engineer, and deckhands will manage the government floating plant responsible for keeping the equipment in position to support the dive. Contracted support for lifting and setting the dive deflector box will be provided while USACE constructs a floating crane to perform these activities independently. Contractor support shall consist of, but is not limited to, anchoring and positioning the floating plant, transporting a dive deflector box weighing 62 tons, picking and setting the dive deflector box in slack water with dam raised, moving the government dam-raising floating plant across and around wicket holes, and underwater excavation. Prior to raising/lowering the dam, the trench upstream of the wickets must be clear of debris. The Contractor’s divers and employees will be responsible for inspecting and cleaning the trench. The minimum requirements of the Contractor’s floating plant shall include a towboat, crane, spud barge, dredging capabilities, anchoring capabilities, a safety vessel, and a floating platform to store the wicket box. All work is to be completed in accordance with these specifications, reference drawings, Industry Standards, and any and all applicable codes, regulations and ordinances. The project site is located on the Ohio River mile 964.4. Address is Olmsted Locks & Dam, 634 New Dam Rd, Olmsted, IL 62970.

1.2 Safety: The Contractor shall complete all work in accordance with the U.S. Army Corps of

Engineers Safety and Health Requirements Manual, EM 385-1-1, and all applicable Federal, State and local laws, codes and regulations.

2. SCHEDULE:

2.1 Base Performance Period: There is a performance period of 151 days. Contractor fleet and personnel shall commence work no later than December 1, 2021 at Olmsted Locks and Dam.

During the high water season, it is anticipated there will be 25 active days, 10 inactive days, and 116 extended inactive days. December 1, 2021 will mark the start of the performance period and start the active, inactive, and extended inactive rates. At the end of the period, the contractor will transfer the wicket box back to a Government furnished barge or other storage location at Olmsted to include the harbor cells and then demobilize from the site.

2.2 Active / Inactive / Extended Inactive Rates: The contractor quote shall be broken into active days, inactive days, and extended inactive days in the quantities listed in the Price Breakout

Schedule. and in CLIN definitions in section 11 of this scope. Do not assume that Active, Inactive, or Extended Inactive days will be consecutive.

2.2.1 Active Day: An active day is to be considered when the contracted floating plant and all contractor personnel are present at Olmsted L&D performing operations. The active days includes the mooring to the anchorage system that was previously installed by the dam contractor, diving in the wicket trench, air lifting material from trench, positioning fleet, dredging, and setting deflector box.

2.2.2 Inactive Day: An inactive day is to be considered when the contracted fleet is moored at or near Olmsted L&D and the contractor personnel except for floating plant personnel are offsite. If contractor towboat is used to support government floating plant making dam operations this is considered an inactive day. When the contractor is in inactive status, onsite personnel must mobilize for active status with 24 hours’ notice.

2.2.3 Extended Inactive Day: An extended inactive day is to be considered when contracted fleet is moored offsite in control of the contractor. During extended inactive days contractor may perform work on projects unrelated to this project.

When the contractor is in extended inactive status, he must arrive at Olmsted L&D, prepared for active status with 72 hours’ notice.

The government will make the determination of when river conditions become conducive to work an active day. Contractor will maintain the wicket deflector box on barge when on extended inactive day.

2.3 Daily Active Shift: An active day shift will consist of one 12-hour shift with contractor having personnel and equipment able to support all functions in this contract (fleet positioning, crane operations, and underwater excavation). The shift will start at 7:00 am and end at 7:00 pm on active days. The Olmsted L&D personnel and divers will also be onsite during the full 12-hour shift assisting in the replacement of wickets. The 12-hour shift will allow fleet positioning, crane operations, surveying, and diving operations to be completed during daylight hours. The contractor must provide a second shift to watch over the floating plant when it is anchored in the middle of the river above the dam. Fleet positioning, crane operations, underwater excavating, surveying, and diving operations will not be taking place on second shift. Active days may land on weekends and off days.

3. REFERENCES / SUBMITTALS:

3.1 References:

UFC 4-159-03 Unified Facilities Criteria Design Moorings

EM 385-1-1 30 NOV 2014 USACE Safety and Health Requirements Manual ASME B30.9 Slings EM 385-1-1 Section 30.A.15 Dive Operations Plan(s)

EM 385-1-1 Section 30.A.16 AHA all aspects of job which involves diving EM 385-1-1 Section 30.A.17 Emergency Management Plan EM 385-1-1 Section 30.A.18 Dive Personnel Qualifications

EM 385-1-1 Section 30.A.05 - 30.A.09

3.2 Submittals: Government approval/acceptance is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with LRL Section 01 33 00.00 06.

Prework Submittals

Fleet Anchorage and Winching Force Calculations, G, RO, OP

Naval Architect Analysis, G, RO, OP

Floating Service Load Chart, G, RO, OP

Box setting critical lift plan, G, RO, OP

USCG towboat inspection, G, RO

Certificates

Crane Certificate of Compliance, G, RO

Crane Annual Inspection, G, RO

Crane Operator Certification, G, RO

Crane Operator Letter of Designation, G, RO

Crane Operator Qualification/Examination, G, RO

Crane Load Test, G, RO

Rigging Personnel Qualifications, G, RO

Rigging Personnel Certification, G, RO

Rigging Personnel Letter of Designation, G, RO

Signal Person Qualifications, G, RO

Signal Person Letter of Designation, G, RO

Towboat Captain and Pilot Qualifications and license, G, OP

Winch Operator Qualification and Winch Operation Plan, G, RO

Standard Lift Plans G, Activity Hazard G, RO

4. FLOATING PLANT EQUIPMENT REQUIRED:

4.1 Crane: The contractor shall supply a suitable capacity floating derrick crane that has a Naval

Architectural Analysis documented in accordance with EM 385-1-1, 30 Nov 2014, Section 16.L and from which a floating service load chart has been developed. The crane shall have a current Periodic (Annual) Inspection. Prior to use onsite, the crane shall be inspected, tested, and certified in writing by a competent person in accordance with the manufacturer's recommendations and the requirements of EM 385-1-1. See Section 16.D Inspection Criteria for Cranes and Hoisting Equipment, 16.E Safety Devices and Operational Aids and 16.F Testing. The contractor shall supply a qualified operator with a current certification from a Nationally Accredited Crane Operator Testing Organization and shall be certified on the class and type of crane being supplied. The operator shall also be designated in writing by the employer to be qualified to operate the crane. The operator shall have a physical current within

2 years and in accordance with EM 385-1-1, Section 16.B.05. Form 16-1, Certificate of Compliance for Load Handling Equipment, is applicable to all contractor Load Handling Equipment (LHE) and rigging gear, cranes, derricks, excavators used for hoisting, and any other hoisting equipment used to lift suspended loads. The certificate shall be signed by an official of the company that provides LHE/cranes and rigging gear for any application under this contract. Any safety or contract deficiencies found shall be corrected within 24 hours after notification of the deficiencies. If crane is subject to load testing requirement due to needing assembly upon arrival then the contractor shall have test weights on hand to complete this requirement.

Before equipment is delivered the following items shall be provided to and accepted by the government: Certificate of Compliance, Standard Lift Plan, Personnel Qualifications, Inspection forms, and Floating Service Load Chart and Naval Architect Analysis. Other requirements will be reviewed during onsite inspection.

The crane shall have the capacity to pick a 62 ton load and set the deflector box with the center of the hook at least 40’ from the deck on the working end. The crane shall have the capacity to reach and pick over its side, a 62 ton load from the center of a 54’ wide barge. Crane shall have the capacity and head room to set the deflector box with the dam raised. The crane barge shall have independent winches for each spud. Spud winches shall be capable of rapidly moving the spuds.

The Crane Barge may be wider than 54’, however, for example, a crane centered on a 100' wide barge must pick the load at a minimum 76' radius if perfectly aligned to the port or starboard side.

The crane barge shall have electric powered winches located on the deck of the working end of the crane. Winches shall have control of the working line at all times (no free unspooling) and rigged with wire rope of a minimum length of 150’. Winches must connect to two lugs on the upstream side of the deflector box, which prevents the box from swinging down river due to the river current. The river could exert a 33 kip horizontal force on the deflector box in the direction of river flow. Each winch shall have a working capacity to half of pull the maximum of the design horizontal force and winch line rigging angle. The actual tension forces on the winches will vary depending on the location of the winches on the crane deck due to the rigging angles. The line tension will have to be calculated and verified by the contractor prior to setting the deflector box.

The crane barge shall have mooring points mounted on the working end of the barge which will typically face downstream. These mooring points shall be used to support the wicket lifter when it would need to span a wicket gap in excess of 10 feet (1 wicket wide) with no more than 7 feet head differential. The restrained wicket lifter is positioned broadside to the current and can exert a total drag force of 106 kip, and should be supported by two mooring wires.

Mooring points on the contractor's barge shall be connected to anchor wires originating from winches on the wicket lifter Keen. See drawing 788-D215-01 in the reference drawings for locations of the winches on the barge. For a given wicket gap, the wicket lifter barge will traverse along the wickets up to 40 feet, while supported by the contractors barge. Mooring points and the anchoring system shall be designed to support the wicket lifter’s resultant drag force during the following conditions: wicket lifter midship in alignment with the longitudinal centerline of the contractor’s barge and the wicket lifter located at its extreme end of travel.

Mooring points shall be designed for all applicable allowable stresses per the AISC ASD 9th edition for 150% of the operating load of the winch wires in the worst case of the 40' traverse, except for Von Mises stress which shall be in accordance with the American Bureau Shipping.

Beam of contractor' s barge shall be adequate to accommodate the wicket lifter to traverse 40' with the contractor's barge in a single position.

USACE will provide a lifting beam and shackles to connect to the deflector box and synthetic slings to lift the deflector box. Contractor will supply new synthetic slings of equivalent style, length, capacity, and meeting ASME B30.9 for lifting the deflector box during the contract and will turn them over to the USACE in serviceable condition at the end of the contract. Purchase price for slings shall be included in CLIN 0001 Mobilization and Demobilization. There are two 100-ton vertical capacity nylon synthetic endless round slings of 30’. All rigging components to pick and replace the wickets and wicket components will be provided by USACE. Rigging used to lift the deflector box shall maintain lifting angles of 45 degrees or larger.

4.2 Towboat: The towboat shall have the capability to position the contracted fleet above the dam with a river velocity of 5 fps and hold until the anchoring system is deployed. The towboat shall have a minimum of 2,000 hp. The towboat shall be in compliance with EM 385-1-1 and all Coast Guard regulations. In case of emergency, the towboat shall have a licensed staff capable of moving the fleet at any time while on active or inactive days. The towboat shall monitor Marine Channel 13 24/7 while on active or inactive days. Days of extended inactivity are at the discretion of the contractor. Towboat Captain and Pilots shall have experience in swift water on either the Ohio or Mississippi Rivers. Contractor shall submit Captain and Pilot qualifications for review. The towboat may be called upon for use in supporting USACE floating plant across any wicket hole on active or inactive days without change in contract price. In this scenario, the towboat will face up to and pull the USACE shallow draft barge(s) off the dam and upstream before reaching the wicket hole, maneuver approximately 200’ past the hole, and then lower the barge back down to resting on the dam before returning to the fleet.

4.3 Spud Barge: The contractor shall supply a flat deck or cargo barge capable of holding a concentrated deck load of 5,000 lbf. This barge or the crane barge shall have the capacity to store the 62 ton deflector box and components. The minimum size barge is a 45’ wide x 100’ long and/or the barge shall have sufficient deck area to store the footprint of the deflector box, deflector box spacers, shutters, and walkways on the deck. The barge shall have at least two working spuds with independent winches for each spud.

4.4 Dredging Equipment: Contractor shall supply floating plant, divers, and diving equipment to clear debris, rock, or sand from trench immediately above the sill face of the wickets. See elevation view of the lowered wicket gate on Reference drawing S-460. With the dam lowered and current flowing through the area, the dredging equipment shall be capable of digging, diving, and clearing debris, with the water level at EL 305 and below. Expected velocities during this operation are 3.5 fps as measured by the onsite USGS velocity gage. Trench must be cleared so that no more than 6” of material remains at the bottom of the trench. Contractor shall be able to clear the full 1400’ section of the trench within two 12-hour days and must coordinate with the Lockmaster to allow traffic to pass outside of the diving footprint.

Excavation is only necessary where there is a buildup of debris against the upstream dam sill face. The need for excavation will be determined by USACE Hydrographic survey prior to the dam being raised. Material must be airlifted or otherwise removed from the trench, between the dam sill and wicket, and placed ahead of the wicket to allow free movement of the wicket. If significant material rests on top of the wicket and within the trench, then a limited amount of power equipment such as barge mounted GPS enabled track hoe or crane clamshell bucket are permitted. Olmsted Dam Sill Survey will be provided of the upstream dam sill face, however, the exact amount of debris to be excavated is unknown since the material moves daily depending on the river current. The contractor’s positioning and anchoring system shall be sufficient to position and hold the excavation equipment. Prior to raising the dam, the contractor shall dredge the area on the left bank of the river where the wicket lifter moors. Dredging shall occur in water up to EL 312 and dredge the area down EL 283. Previous dredging quantities were 1200 cyd. Contractor has five days to remove the material and either swing or transport the material to the downstream side of the dam. The contractor may also be requested to dredge above the lock miter gates before the dam is raised if debris hinders the miter gates from swinging freely. Other possible tasks include dredging the upstream and downstream harbors and using the excavator to remove drift and debris from the top of the lock wall. GPS equipment shall be used during dredging operations to minimize damage to underwater dam features. Dredging will occur on active days.

4.5 Diving: All diving operations shall be in compliance with EM385-1-1 Section 30. By recommendation of the Louisville District Dive Supervisor, the contractor shall provide a dive supervisor, a diver, a standby diver, and two tenders due to the hazardous conditions and remote location of the wicket dam. All dive operations will be approved by the Louisville District Dive Coordinator prior to commencing.

5. SURVEY & VELOCITY MEASURMENTS:

5.1 Survey Equipment: The contractor shall provide survey and/or GPS equipment and personnel for locating the position of the fleet, deflector box, and anchors in open river settings. The contractor will work with LRL Operations Navigation Section to retrieve coordinates.

5.2 River Velocity Measurements: Contractor shall supply all equipment and personnel to record velocity readings. Velocity meter shall be returned to the manufacturer for calibration annually. If velocities exceed the average max velocity of 5 fps during operations, the deflector box shall not be set. Velocity readings shall be measured above the dam sill at a depth of 5-10 feet below the water’s surface where the deflector box will enter the water.

Readings shall be taken prior to setting the deflector box or at the discretion of the USACE Lock Master monitoring the river flows.

6. ANCHORING SYSTEM / SPUDS:

6.1 General: Contractor shall be capable of retrieving and attaching onto existing anchors, winching upstream or downstream, and holding the contracted fleet, including the towboat, a 22’ x 60’ shallow draft wicket barge, and the force of setting the deflector box in dam up and open river conditions. Spuds shall only be considered in the force analysis to stabilize the fleet laterally across the dam and support their own drag force. Spuds on all equipment shall be capable of reaching river bottom with the river elevation of EL. 302’ along the entire length of the dam. River bottom elevation can be as low as EL. 240’. The anchoring and winching system shall allow the fleet to move parallel to the dam a minimum of 150’ without switching anchors. The contracted fleet forces shall be calculated based on a river velocity of 5 fps.

Contractor shall use a minimum of three winch lines to the anchors, of which two will be sized to hold the load of the fleet.

6.2 Winches: All winches used in anchoring system shall meet ASME B30.7. Winches connected to the anchors shall be able to be independently controlled by a single operator.

Winch power unit shall be mounted so that noise levels are low enough that operator can communicate by radio with winching supervisor. Winches should be able to spool and unspool under power and not able to free spool. If winches with free-spooling capability are used, submit operator qualifications and narrative plan describing how operator will maintain all winch lines in a non-slack condition throughout the winching operations. Winches shall have enough line pull to move the fleet in the river velocity above with no assistance of the towboat with the maximum number of layers of wire rope used on this job. Minimal line pull on each drum of the winch to be 25,000 lbs linepull and 75,000 lbs brake holding capacity.

7. WORKING RIVER CONDITIONS:

7.1 General: River velocities during operations may range from 5 fps and lower. While setting the deflector box, the highest averaged river velocity at the dam sill may not exceed 5 fps. River velocities will increase directly above the dam sill profile due to a smaller river cross section at the dam and locks. While excavating and cleaning, river elevations will range from 305 to 295.

While setting the deflector box, river elevations will range from 302 to 295. River traffic will be closed on the navigable pass while setting the deflector box. After the deflector box has been set, river traffic may be passed, at the discretion of the Lockmaster. The contractor fleet shall have appropriate Coast Guard instrumentation and markers to show c o m p l e t e anchorage or restricted ability to maneuver while working around the dam. When the wicket dam is fully raised, traffic is passed through the lock.

8. GOVERNMENT FURNISHED WICKET DEFLECTOR BOX:

8.1 General: Government will provide the wicket deflector box and wicket box storage cradles. The wicket box is currently stored in the upright storage position on the cradle on a flat deck barge. Contractor will relocate the wicket box and cradle to their fleet upon mobilization. Upon demobilization, the box, cradle, and all supporting components shall be offloaded to another barge or a land location at the site per the lockmaster's direction.

See referenced deflector box and cradle drawings for exact measurements and weights.

Installation procedures and safety considerations shall be maintained per the deflector box drawings.

9. ANTI-TERRORISM/OPERATIONS SECURITY:

9.1 Access and General Protection/Security Policy and Procedures: All contractor and all associated sub-contractors’ employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

9.2 Suspicious Activity Reporting Training: The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.

9.3 Pre-screen candidates using E-Verify Program: The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.

10. PRICE BREAKOUT SCHEDULE:

Reference Section B of the SF 33.

11. WAGE RATES:

The three decisions of the Secretary of Labor, covering rates of wages, including fringe benefits to be paid laborers and mechanics performing work under this contract, are attached hereto. The payment for all classes of laborers and mechanics actually employed to perform work under the contract will be specified in the following contract provisions: DAVIS-BACON ACT (DBA), CONTRACT WORK HOURS AND SAFETY STANDARDS ACT, THE COPELAND ACT, and THE SERVICE CONTRACT ACT (SCA).

The work to be performed is located in the State of Illinois, Pulaski County.

Wage Determinations applicable to this project are as follows:

11.1 DBA IL20210016 (Heavy/Highway): Applies to any work associated with the mobilization and demobilization of heavy equipment and the use of heavy equipment, as well as all diving activties on this project (see Attachment 1).

11.2 DBA IL20210019 (Heavy/Dredging): Applies to all dredging activities in the Ohio River associated with this project (see Attachment 2).

11.3 SCA 1999-0326: Applies to all other work on this project (see Attachment 3).

12. REFERENCE GUIDANCE ONLY

12.1 Possible Procedures for Dam Down, Flowing River, Deflector Box Setting: The Contracted fleet will have to set anchors above the navigable pass. The anchoring system will need to allow the floating plant to move upstream, downstream, and side to side across the dam. The fleet will need to be surveyed into position by GPS. The exact fleet location will be dependent on the floating crane’s capacity and load chart. Once in position, spuds will need to be deployed to hold the fleet laterally. Velocity measurements will then need to be taken at the sill to ensure the velocity does not exceed the deflector box capacity of 5fps. The deflector box will then be picked. Contractor will either support the wicket lifter to raise wickets on either side of the box setting, or if conditions are dive able by USACE diver’s contractor will raise wickets with crane rigged by USACE divers prior to setting back. The position of the box will have to be surveyed into position to ensure the box is in the correct location. Once the box is set, access to the box will need to be gained and the box will need to be unhooked from the crane. The box shutters will be installed utilizing the contractor crane. The Lock & Dam personnel will then begin diving operations to replace wickets. The wickets will be hooked to the contractor crane by Lock & Dam divers and personnel. Once new wickets are installed the shutters and box will have to be removed by the contractor crane. The process then repeats itself. This paragraph is for reference only. Not all steps or procedures are included in this paragraph.

12.2 Possible Procedures for Dam Up, Slack Water, Deflector Box Setting: The contracted fleet will have to be positioned using the anchorage system or by towboat. Survey equipment could be utilized to position the fleet, but it may be possible to acquire fleet position from the top of the wickets. Once the fleet is in position the spuds will need to be deployed. Access to the wickets will need to be gained, to spread the wickets apart depending on gap between wickets. Manned taglines will need to be attached to the upstream tagline lugs to keep the box from rotating. Once the box is set over and between the wickets, access to the box will need to be gained. The box will need to be unhooked from the crane. The box shutters will be installed utilizing the contractor crane. The Lock and Dam personnel will then begin diving operations to replace wickets. The wickets will be hooked to the contractor crane by Lock & Dam divers and personnel. Once new wickets are installed the shutters and box will have to be removed by the contractor crane. The process then repeats itself. This paragraph is for reference only. Not all steps or procedures are included in this paragraph.

13. ATTACHMENTS FOR REFERENCE ONLY

13.1 Anchor Drawings (see Attachment A)

13.2 River Bottom Survey in Anchor Area (see Attachment B)

13.3 Wicket Drawings (see Attachment C)

13.4 Wicket Box Drawings (see Attachment D)

13.5 Wicket Box Cradle Drawings (see Attachment E)

13.6 Mooring Pile Location V-224 (see Attachment F)

13.7 Wicket Lifter General Arrangement 788-D215-01 (see Attachment G)

13.8 Typical Wicket Pin Locations (see Attachment H)

13.9 Wicket Gate Locations (see Attachment I)

13.10 Ohio River Main Channel Survey (see Attachment J)

14. Contractor Manpower Reporting

The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Louisville District, USACE via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://www.sam.gov Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at: https://www.sam.gov/

15. Effort Beyond Scope

The contractor will not perform any work or effort beyond what is detailed in this scope without written direction or modification signed by the Contracting Officer. The contractor will inform the COR in writing immediately when the contractor perceives or considers that work or effort beyond this scope has explicitly or in effect been requested or required by a government employee. Work completed beyond this scope, or beyond written direction or modification signed by the Contracting Officer, will not be compensated.

16. Pay Estimates

The Contractor shall submit Pay Estimates using ENG Form 93, Payment Estimate - Contract Performance.

ENG Form 93 may be found on the Internet at: https://www.publications.usace.army.mil/USACE- Publications/Engineer-Forms/

17. Progress Reports

The Contractor shall include a progress report with the ENG Form 93, Payment Estimate as justification for the amount of payment requested. The progress report shall include in narrative form a summary of activities, estimated percentage complete, project schedule evaluation, and problems and recommended solutions. Pay Estimates should be submitted directly to the PE/A. The preferred method of submission is electronic in pdf format.

18. Electronic File Transfer

Electronic files shall be submitted via the Department of Defense (DOD) Safe Access File Exchange (SAFE).

https://safe.apps.mil/. The retention period for files is currently 7 days. This service is for UNCLASSIFIED use only, FOUO information can be sent. PII/PHI data is not authorized. Additionally, electronic files will be provided as detailed in the submittal matrix on a digital optical storage format, either compact disc or digital video disk. Each disc shall be clearly labeled with the date of the compact disc (to the day), the level of completion of the files, and project location and name.

19. Veterans Employment Emphasis for U.S. Army Corps of Engineers Contracts

In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract.

The following resources are available to assist USACE contractors in their outreach efforts:

- U.S. Department of Labor Veterans’ Employment and Training Service (VETS): https://www.dol.gov/vets/

- Federal Veteran Employment Information: https://www.fedshirevets.gov/

- Veterans Opportunity to Work (VOW) Program: https://www.benefits.va.gov/vow/

- U.S. Army Warrior Transition Command Employment Index:

https://wct.army.mil/modules/employers/index.html

- Hiring Our Heroes: https://www.uschamberfoundation.org/hiring-our-heroes

Section E - Inspection and Acceptance

CLAUSES INCORPORATED BY REFERENCE

52.246-4 Inspection Of Services--Fixed Price AUG 1996

Section F - Deliveries or Performance

52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984

Section H - Special Contract Requirements

WAGE DETERMINATION

The following Wage Determinations (WD) are attached to the solicitation as PDF file attachments:

DBA WD - IL20210016 Heavy/Highway, Modification # 11, dtd August 06, 2021 (see Attachment 1) DBA WD - IL20210019 Heavy, Modification # 3, dtd August 06, 2021 (see Attachment 2) SCA WD - 1999-0326 Towing and Tender, Vessels, Revision # 37, dtd July 21, 2021 (see Attachment 3)

NOTE: Please see Section 11, “Wage Rates,” of the Performance Work Statement for further details. All applicable WDs are also available for download for free on the SAM.gov website.

Section I - Contract Clauses

52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government JUN 2020 52.203-7 Anti-Kickback Procedures JUN 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

JUN 2020

52.203-13 Contractor Code of Business Ethics and Conduct JUN 2020 52.203-16 Preventing Personal Conflicts of Interest JUN 2020 52.203-19 Prohibition on Requiring Certain Internal Confidentiality

Agreements or Statements

JAN 2017

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper

MAY 2011

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

JUN 2020

52.204-13 System for Award Management Maintenance OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities.

JUL 2018

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

AUG 2020

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

JUN 2020

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

OCT 2018

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.210-1 Market Research JUN 2020 52.215-2 Audit and Records--Negotiation JUN 2020 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.219-4 (Dev) Notice of Price Evaluation Preference for HUBZone Small

Business Concerns (DEVIATION 2020-O0008)

MAR 2020

52.219-8 Utilization of Small Business Concerns OCT 2018 52.219-9 Alt II Small Business Subcontracting Plan (JUN 2020) Alternate II NOV 2016 52.219-16 Liquidated Damages-Subcontracting Plan JAN 1999 52.222-1 Notice To The Government Of Labor Disputes FEB 1997 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards - Overtime

Compensation

MAY 2018

52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records JUL 2021

52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-27 Affirmative Action Compliance Requirements for

Construction

APR 2015

52.222-37 Employment Reports on Veterans JUN 2020 52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-41 Service Contract Labor Standards AUG 2018 52.222-43 Fair Labor Standards Act And Service Contract Labor

Standards - Price Adjustment (Multiple Year And Option Contracts)

AUG 2018

52.222-50 Combating Trafficking in Persons OCT 2020 52.222-54 Employment Eligibility Verification OCT 2015 52.222-55 Minimum Wages Under Executive Order 13658 NOV 2020 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts

SEP 2013

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-10 Waste Reduction Program MAY 2011 52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

JUN 2020

52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.227-1 Authorization and Consent JUN 2020 52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

JUN 2020

52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 (Dev) Individual Surety--Pledge of Assets (DEVIATION 2020-

O0016)

FEB 2021

52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014 52.228-14 Irrevocable Letter of Credit NOV 2014 52.228-16 (Dev) Performance and Payment Bonds-Other Than Construction

(Deviation 2020-O0016)

APR 2020

52.229-3 Federal, State And Local Taxes FEB 2013 52.229-12 Tax on Certain Foreign Procurements FEB 2021 52.232-1 Payments APR 1984 52.232-8 Discounts For Prompt Payment FEB 2002 52.232-9 Limitation On Withholding Of Payments APR 1984 52.232-11 Extras APR 1984 52.232-17 Interest MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-25 Prompt Payment JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

OCT 2018

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-1 Disputes MAY 2014

52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.237-2 Protection Of Government Buildings, Equipment, And

Vegetation

APR 1984

52.237-3 Continuity Of Services JAN 1991 52.242-13 Bankruptcy JUL 1995 52.243-1 Alt I Changes--Fixed Price (Aug 1987) - Alternate I APR 1984 52.244-6 Subcontracts for Commercial Items JUL 2021 52.245-1 Government Property JAN 2017 52.245-9 Use And Charges APR 2012 52.246-1 Contractor Inspection Requirements APR 1984 52.246-25 Limitation Of Liability--Services FEB 1997 52.249-2 Termination For Convenience Of The Government (Fixed-

Price)

APR 2012

52.249-8 Default (Fixed-Price Supply & Service) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7003 Agency Office of the Inspector General AUG 2019 252.203-7004 Display of Hotline Posters AUG 2019 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Antiterrorism Awareness Training for Contractors. FEB 2019 252.204-7015 Notice of Authorized Disclosure of Information for Litigation

Support

MAY 2016

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services

JAN 2021

252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Country that is a State Sponsor of Terrorism

MAY 2019

252.211-7007 Reporting of Government-Furnished Property AUG 2012 252.215-7013 Supplies and Services Provided by Nontraditional Defense

Contractors.

JAN 2018

252.219-7003 Small Business Subcontracting Plan (DOD Contracts) DEC 2019 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or

Hazardous Materials

SEP 2014

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7012 Preference For Certain Domestic Commodities DEC 2017 252.225-7048 Export-Controlled Items JUN 2013 252.225-7052 Restriction on the Acquisition of Certain Magnets, Tantalum, and Tungsten.

OCT 2020

252.225-7972 (Dev) Prohibition on the Procurement of Foreign-Made Unmanned Aircraft Systems (DEVIATION 2020-O0015)

MAY 2020

252.226-7001 Utilization of Indian Organizations and Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns

APR 2019

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006 252.232-7017 Accelerating Payments to Small Business Subcontractors--

Prohibition on Fees and Consideration

APR 2020

252.236-7002 Obstruction of Navigable Waterways DEC 1991 252.237-7010 Prohibition on Interrogation of…