W912QR21R0063_SID-0000.pdf
PDF 5 MB Posted
- Solicitation number
- W912QR21R0063
About this file
This solicitation package includes design documents and specifications for the construction of an Equipment Concentration Site in Gainesville, Florida. The project involves constructing a 45,694 square foot Tactical Equipment Maintenance Facility, altering a 26,642 square foot Organizational Storage Building, adding a 4,300 square foot Organizational Storage Building, and developing 161,650 square yards of Military Equipment Parking area. Supporting facilities include site work such as land clearing, paving, wash racks, equipment loading ramps, fencing, and utility connections. Interior and exterior finish materials are specified, along with furniture, fixtures and equipment requirements. The U.S. Army Corps of Engineers Louisville District issued Solicitation Number W912QR21R0063 as a Design-Bid-Build request for proposal for construction of this Equipment Concentration Site project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Gainesville ECS TEMF Warehouse Gainesville, FL
P2: 481444
Design Bid Build
SID
Certified Final
04 August 2021
W912QR21R0063
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR21R0063-0000
SID
CERTIFIED FINAL DESIGN SUBMITTAL
1. DESIGN NARRATIVE
2. POC
3. INTERIOR FINISH BOARDS
4. EXTERIOR FINISH BOARDS
TABLE OF CONTENTS
ARMY RESERVE ECS
GAINESVILLE, FLORIDA
Contract #W912QR-17-0029
PN: 082197
FY 2021
POND PROJECT NUMBER: 1200182
1301 Gervais St Suite 1300, Columbia SC 2920112/14/2020
DESIGN NARRATIVE
CERTIFIED FINAL DESIGN SUBMITTAL
ARMY RESERVE ECS
GAINESVILLE, FLORIDA
Contract #W912QR-17-0029
PN: 082197
FY 2021
POND PROJECT NUMBER: 1200182
Tetra Tech/Pond 54
INTERIOR DESIGN
5.1 Comprehensive Interior Design (CID)
The Comprehensive Interior Design (CID) is provided by the design team and includes the Structural Interior Design (SID) and the Furniture, Fixtures and Equipment (FF&E) Design. The furniture design for these facilities is based on the provided scope of work and has been defined by thorough consultation with the users to establish requirements best suited to their needs. Selections have been made based on functionality, durability, and cost-effectiveness.
The FF&E includes the design, selection, specification, color coordination and procurement documentation of the required items necessary to meet the functional, operational, sustainability, and aesthetic needs of the facility. The FF&E package will include placement plans, ordering and finish information on all freestanding furnishings and accessories and will be coordinated with the SID interior finish materials. The selection of furniture style, function and configuration has been coordinated with the CID defined requirements from the Design Team. The FF&E package is Government Furnished, Government Installed.
5.2 Furniture Fixtures and Equipment
Furniture for the facilities consist of, but not be limited to, furniture systems in open office areas, freestanding modular desk units in private offices, lateral file cabinets, lockable storage cabinets, training tables with power/data, wood top work benches in maintenance bays, task seating for office areas and stack chairs for breakroom/conference. Equipment such as computers, computer related software, TV's, faxes, printers, copiers, ovens, ranges, refrigerators, washers and dryers and will be procured and installed by the government (GFGI). Fire extinguishers, and fire extinguisher cabinets, Lockers, and high density storage will be part of General Contractors’ package. G.C. to review all design options.
Finishes for the furniture has been selected to compliment the interior architecture finishes of the building and coordinate with the ARS blue scheme.
The SID and CID packages is fully coordinated and demonstrates a thorough understanding of the activity requirements to develop an optimum, functional, professional, working environment consistent with quality commercial interior design.
5.3 Finish Selections
The design and finish selections are based on the government's minimum standards and the request for proposal developed for this project. Finish schedules specific to each room location describing finishes for flooring, wall base, walls, ceilings, millwork and miscellaneous items are provided.
The selected finishes will provide focus on low maintenance, longer life expectancy, sustainability, cleanability, and durable room finishes that are commercially standard for the industry and the functions specified. The completed interiors is attractive, Tetra Tech/Pond 55 reflect quality standards and avoids trendy color palettes. The colors selected are appropriate for the building type and coordinate with the building finishes for a cohesive design. Permanent fixtures within the buildings, such as millwork, are specified in neutral tones so that it will sustain its usage as the surrounding elements may change in color and appearance. Finishes throughout this facility comply with applicable codes and regulations and will be selected with careful attention to function, long-term appearance retention, and budgetary concerns, while also upholding the updated standard. Materials and finishes support the health, safety and welfare of the occupants and support sustainable design practices. The use of environmentally friendly, “sustainable” products has been specified wherever feasible. The paint, as well as adhesives and other products, will be selected containing low levels of Volatile Organic Compounds (VOC’s). Bathrooms will receive epoxy paint finish and porcelain wall tile on wet walls. Stainless steel corner guards to be used throughout. Restrooms shall have solid plastic toilet partitions with stainless steel hardware. All toilet accessories shall be manual, no automatic fixtures.
All countertops shall have under-mount sink and be solid surface.
5.3.1 Walls
Gypsum board walls will be painted with primer and two topcoat standard low-VOC interior wall paint. Porcelain wall tile will be used on wet walls in all restrooms. New and existing masonry walls are to be cleaned and prepared to receive eggshell finish paint finish. All 90-degree corners shall receive corner guards. G.C. to review all design options.
5.3.2 Floors
Sealed concrete with vinyl wall base will be used throughout both buildings. Polished concrete will be used in open and private offices as well as classroom/break area and restrooms. TR and TER rooms will receive static dissipative tile. Loose lay walk-off mats will be at lobby.
5.3.3 Ceilings
Warehouse and maintenance bays will be exposed metal structure and will receive painted dryfall. Offices will have acoustical ceiling tiles. Shower and janitor closet will be painted moisture resistant gypsum board.
POINT OF CONTACT
CERTIFIED FINAL DESIGN SUBMITTAL
ARMY RESERVE ECS
GAINESVILLE, FLORIDA
Contract #W912QR-17-0029
PN: 082197
FY 2021
POND PROJECT NUMBER: 1200182
INTERIOR FINISH BOARDS
CERTIFIED FINAL DESIGN SUBMITTAL
ARMY RESERVE ECS
GAINESVILLE, FLORIDA
Contract #W912QR-17-0029
PN:, P2#
FY 2020
POND PROJECT NUMBER: 1200182
1301 Gervais St Suite 1300, Columbia SC 2920112/14/2020
NOTE: CONTRACTORS ARE FREE TO USE ANY PRODUCT WHICH MEETS THE
GOVERNMENT'S MINIMUM REQUIREMENTS AND NOT IN CONFLICT WITH
OTHER CONTRACT PROVISIONS. UNLESS INDICATED OTHERWISE ON THE
PLANS OR SPECIFICATIONS (E.G. SOLE-SOURCE), ALL LISTED
MANUFACTURERS ARE THE BASIS OF DESIGN. FOR THESE BASIS OF DESIGN
PRODUCTS, OTHER MANUFACTURERS MAY BE SUBSTITUTED AS LONG AS
THE STANDARD OF QUALITY AND CHARACTERISTICS OF THE SUBSTITUTED
MANUFACTURER MEET OR EXCEED THE STANDARD OF QUALITY AND
CHARACTERISTICS OF THE BASIS OF DESIGN.
EXTERIOR FINISH BOARDS
CERTIFIED FINAL DESIGN SUBMITTAL
ARMY RESERVE ECS
GAINESVILLE, FLORIDA
Contract #W912QR-17-0029
PN: 082197
FY 2021
POND PROJECT NUMBER: 1200182
1301 Gervais St Suite 1300, Columbia SC 2920112/14/2020
NOTE: CONTRACTORS ARE FREE TO USE ANY PRODUCT WHICH MEETS THE
GOVERNMENT'S MINIMUM REQUIREMENTS AND NOT IN CONFLICT WITH
OTHER CONTRACT PROVISIONS. UNLESS INDICATED OTHERWISE ON THE
PLANS OR SPECIFICATIONS (E.G. SOLE-SOURCE), ALL LISTED
MANUFACTURERS ARE THE BASIS OF DESIGN. FOR THESE BASIS OF DESIGN
PRODUCTS, OTHER MANUFACTURERS MAY BE SUBSTITUTED AS LONG AS
THE STANDARD OF QUALITY AND CHARACTERISTICS OF THE SUBSTITUTED
MANUFACTURER MEET OR EXCEED THE STANDARD OF QUALITY AND
CHARACTERISTICS OF THE BASIS OF DESIGN.
| Cover |
| 00. Table of Contents |
| 01. Design Narrative |
| Design Narrative pg1 |
| Design Narrative pg2 |
| 02. Point of Contact |
| Point of Contact pg1 |
| 03. Interior Finish Boards |
| Interior Finish Board #1 |
| Interior Finish Board #2 |
| Interior Finish Board #3 |
| Interior Finish Board #4 |
| Interior Finish Board #5 |
| Interior Finish Board #6 |
| Interior Finish Board #7 |
| Interior Finish Board #8 |
| 04. Exterior Finish Boards |
| Exterior Finish Boards #1 |
| Exterior Finish Boards #2 |
| Exterior Finish Boards #3 |
File details come from the government source that posted it. Updated .