W912QR21Q0085 Amendment 0001.pdf

PDF 474 KB Posted

Attached to
Green River Area Dock Removal IDIQ Federal contract opportunity
Solicitation number
W912QR21Q0085
Issued by
Department of the Army Corps of Engineers Engineering District Louisville

View the file

Other files for this federal contract opportunity

Other files attached to Green River Area Dock Removal IDIQ, newest first.
File Type Posted
W912QR21Q0085.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIVIL/OPS/ENVIRONMENTAL BR

ATTN: KARI SMITH

600 DR M L KING JR PL RM 821

LOUISVILLE KY 40202-2230

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912QR21Q0085 to provide Dock Removal Services in the Green River Area is hereby amended as follows:

a. The Price Breakout Schedule is hereby incorporated in this solicitation.

b. All Amendments must be acknowledged.

e. All Other terms and conditions reamain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR21Q0085

X 9B. DATED (SEE ITEM 11)

18-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0001

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Aug-2021

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE 964960

FACILITY CODECODE

EMAIL:TEL:

X 1

Price Breakout Schedule

Base Year – Date of Award to 16 September 2022

Item Description U/I Est. Qty Unit Price Amount

0001 Wooden Dock Removal– Interior Dock, requirements listed in section C-15.2 (b)

EA 8

0002 Wooden Dock Removal – End Dock requirements listed in section C-15.2 (b)

EA 4

0003 Metal Dock Removal – Interior Dock requirements listed in section C-15.2 (b)

EA 2

0004 Metal Dock Removal – End Dock requirements listed in section C-15.2 (b)

EA 2

0005 Unattached Metal or Wood Dock Section Removal (Finger, Main, or Walkway) requirements listed in section C-15.2 (b)

Per Dock Section

0005 Wooden Staircase Removal requirements listed in section C-15.2 (c)

Per Running Linear Foot

1,000

0007 Metal Staircase Removal requirements listed in section C-15.2 (c)

Per Running Linear Foot

0008 Timber Lined Pathway Removal requirements listed in section C-15.2 (c)

Per Running Linear Foot

Total for Base Year – Date of Award to 16 September 2022: $

Option Year 1 – 17 September 2022 to 16 September 2023

Item Description U/I Est.

Qt

Unit Price Amount

0001 Wooden Dock Removal– Interior Dock, requirements listed in section C-15.2 (b)

EA 8

0002 Wooden Dock Removal – End Dock requirements listed in section C-15.2 (b)

EA 4

0003 Metal Dock Removal – Interior Dock requirements listed in section C-15.2 (b)

EA 2

0004 Metal Dock Removal – End Dock requirements listed in section C-15.2 (b)

EA 2

0005 Unattached Metal or Wood Dock Section Removal (Finger, Main, or Walkway) requirements listed in section C-15.2 (b)

Per Dock Section

0006 Wooden Staircase Removal requirements listed in section C-15.2 (c)

Per Running

Linear Foot

0007 Metal Staircase Removal requirements listed in section C-15.2 (c)

Per Running

Linear Foot

0008 Timber Lined Pathway Removal requirements listed in section C-15.2 (c)

Per Running

Linear Foot

Total Option Year 1 – 17 September 2022 to 16 September 2023: $

Option Year 2 – 17 September 2023 to 16 September 2024

Item Description U/I Est. Qty Unit Price Amount

0001 Wooden Dock Removal– Interior Dock, requirements listed in section C-15.2 (b)

EA 6

0002 Wooden Dock Removal – End Dock requirements listed in section C-15.2 (b)

EA 3

0003 Metal Dock Removal – Interior Dock requirements listed in section C-15.2 (b)

EA 2

0004 Metal Dock Removal – End Dock requirements listed in section C-15.2 (b)

EA 2

0005 Unattached Metal or Wood Dock Section Removal (Finger, Main, or Walkway) requirements listed in section C-15.2 (b)

Per Dock Section

0006 Wooden Staircase Removal requirements listed in section C-15.2 (c)

Per Running Linear Foot

0007 Metal Staircase Removal requirements listed in section C-15.2 (c)

Per Running Linear Foot

0008 Timber Lined Pathway Removal requirements listed in section C-15.2 (c)

Per Running Linear Foot

Total option Year 2 – 17 September 2023 to 16 September 2024: $

Total (base plus option years) $____________

File details come from the government source that posted it. Updated .