W912QR20R0069_SPECS_VOL2-0000.pdf
PDF 5 MB Posted
- Solicitation number
- W912QR20R0069
About this file
This solicitation is for the addition and alteration of an aircraft maintenance hangar at Grissom Air Reserve Base in Indiana. The estimated construction cost is between $10 million and $25 million. This is a single-phase Design-Bid-Build project requiring HUBZone price preference. The Department of the Army Corps of Engineers is the contracting agency. Technical inquiries and questions relating to proposal procedures or bonds must be submitted through Bidder Inquiry on ProjNet. No contract award will be made until appropriated funds are available.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912QR20R0069_SPECS-0002.pdf | ||
| W912QR20R0069_SPECS-0001.pdf | ||
| Sign in Sheet.pdf | ||
| W912QR20R0069_PLANS_VOL1-0000.pdf | ||
| W912QR20R0069_SPECS_VOL1-0000.pdf | ||
| W912QR20R0069_PLANS_VOL2-0000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Hangar 437 Addition/Alteration Grissom Air Reserve Base
P2: 472303
Design-Bid-Build
Specifications - Volume 2 of 2 Certified Final Design Submittal
10 July 2020
W912QR20R0069
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR20R0069_SPECS_VOL2-0000
Hangar 437 Addition/Alteration
Grissom Air Reserve Base Indiana
Certified Final Submittal
May 2020
Burns & McDonnell 9400 Ward Parkway
Kansas City, MO 64114
CERTIFICATION PAGE
CIVIL STRUCTURAL ARCHITECTURAL
MECHANICAL FIRE PROTECTION ELECTRICAL
PROFESSIONAL
NO. 33672
E
N
G
I N
E
R
R
G
I
S T
E
R
D
G
O
R G
I
A
J
A
S
O
N
T
S
H
E
P
H
E
R
D
05-01-2020
W912QR20R0069_SPECS_VOL2-0000
ebeho Stamp
P2#472303 - Add/Alter Aircraft Maintenance Hangar, Fac 437 Grissom, Air Reserve Base
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 00.00 06 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 32 01.00 10 PROJECT SCHEDULE
01 33 00.00 06 SUBMITTAL PROCEDURES
01 33 29.00 06 SUSTAINABILITY REPORTING
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 46 00.00 06 TOTAL BUILDING COMMISSIONING (CONTRACTOR CxA)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 82 00 ASBESTOS REMEDIATION
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 39 00.00 10 CONCRETE CURING
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
04 72 00 CAST STONE MASONRY
DIVISION 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AND AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 11 13 BITUMINOUS DAMPPROOFING
07 21 13 BOARD AND BLOCK INSULATION
PROJECT TABLE OF CONTENTS Page 1
07 21 16 MINERAL FIBER BLANKET INSULATION
07 21 19 SPRAYED POLYURETHANE FOAM INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIER
07 42 13 METAL WALL PANELS
07 42 63 FABRICATED WALL PANEL ASSEMBLIES
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00.00 06 JOINT SEALANTS
07 95 00 EXPANSION CONTROL
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 33 23 OVERHEAD COILING DOORS
08 34 16.10 STEEL SLIDING HANGAR DOORS
08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES
08 45 23 INSULATED TRANSLUCENT FIBERGLASS SANDWICH PANEL WALL
SYSTEM
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 67 23.13 STANDARD RESINOUS FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
DIVISION 11 - EQUIPMENT
11 01 50 RIGID RAIL FALL PROTECTION SYSTEMS
DIVISION 21 - FIRE SUPPRESSION
21 13 18.00 10 PREACTION AND DELUGE SPRINKLER SYSTEMS, FIRE PROTECTION
21 13 25.00 10 HIGH EXPANSION FOAM (HI EX. HEF) FIRE PROTECTION SYSTEM
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93.00 06 TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 23 00 REFRIGERANT PIPING
23 31 13.00 40 METAL DUCTS
23 54 16.00 10 HEATING SYSTEM; GAS-FIRED HEATERS
PROJECT TABLE OF CONTENTS Page 2
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 82 46.00 40 ELECTRIC UNIT HEATERS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 36 23.00 20 MANUAL TRANSFER SWITCHES
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00.00 06 EARTHWORK
31 05 19 GEOTEXTILE
31 11 00 CLEARING AND GRUBBING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 AGGREGATE BASE COURSES
32 11 23.23 BASE COURSE DRAINAGE LAYERS
32 13 13.06 06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY
PAVEMENTS
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 17 23 PAVEMENT MARKINGS
32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 46 16 SUBDRAINAGE PIPING
33 51 15 NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 3
SECTION 09 67 23.13
STANDARD RESINOUS FLOORING
11/15
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this Specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C307 (2003; R 2012) Tensile Strength of Chemical-Resistant Mortar, Grouts, and Monolithic Surfacings
ASTM C413 (2011; R 2012) Absorption of Chemical-Resistant Mortars, Grouts, and Monolithic Surfacings and Polymer Concretes
ASTM C579 (2001; R 2012) Compressive Strength of Chemical-Resistant Mortars, Grouts, Monolithic Surfacings, and Polymer Concretes
ASTM C580 (2002; R 2012) Flexural Strength and Modulus of Elasticity of Chemical-Resistant Mortars, Grouts, Monolithic Surfacings, and Polymer Concretes
ASTM D2240 (2015; E 2017) Standard Test Method for Rubber Property - Durometer Hardness
ASTM D4060 (2014) Abrasion Resistance of Organic Coatings by the Taber Abraser
ASTM D4541 (2017) Standard Test Method for Pull-Off Strength of Coatings Using Portable Adhesion Testers
ASTM D635 (2014) Standard Test Method for Rate of Burning and/or Extent and Time of Burning of Self-Supporting Plastics in a Horizontal Position
ASTM D638 (2014) Standard Test Method for Tensile Properties of Plastics
ASTM D695 (2010) Standard Test Method for Compressive Properties of Rigid Plastics
ASTM F2170 (2018) Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes
SECTION 09 67 23.13 Page 1
INTERNATIONAL CONCRETE REPAIR INSTITUTE (ICRI)
ICRI 310.2R (2013) Selecting and Specifying Concrete Surface Preparation for Sealers, Coatings, Polymer Overlays, and Concrete Repair
1.2 ADMINISTRATIVE REQUIREMENTS
1.2.1 Product Data
Within 30 days of contract award, submit manufacturer's catalog data for the following items:
a. Epoxy-Resin Binder/Matrix.
b. Cured Epoxy Binder.
c. Aggregate.
d. Surface Sealing Coat.
1.2.2 Design Mix Data
Within 30 days of Contract Award, submit design mix data for the following items, including a complete list of ingredients and admixtures:
a. Epoxy-Resin Binder/Matrix.
b. Cured Epoxy Binder.
c. Surface Sealing Coat.
Ensure applicable test reports verify the mix has been successfully tested and meets design requirements.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that reviews the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29.00 06 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00.00 06 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Installation Drawings; G
Fabrication Drawings; G
SD-03 Product Data
Manufacturer's Catalog Data; G
VOC Content; G, S
SD-04 Samples
SECTION 09 67 23.13 Page 2
Hardboard and Mounted Epoxy Flooring and Wall Coating System; G
Metal Trim Accessory; G
Floor Topping; G
SD-05 Design Data
Design Mix Data; G
SD-07 Certificates
Listing of Product Installations; G
Referenced Standards Certificates; G
SD-11 Closeout Submittals
Warranty; G
1.4 DELIVERY, STORAGE, AND HANDLING
Protect materials from weather, soil, and damage during delivery, storage, and construction. Deliver materials in original packages, containers, or bundles bearing brand name and name of material.
Maintain materials used in the installation of floor topping at a temperature between 65 and 85 degrees F.
1.5 QUALITY CONTROL
Prior to commencement of work, submit referenced standards certificates for the following, showing conformance with the referenced standards contained in this Section:
a. Epoxy-Resin Binder/Matrix.
b. Cured Epoxy Binder.
c. Aggregate.
d. Surface Sealing Coat.
1.5.1 Qualifications
Submit a listing of product installations for heavy duty epoxy flooring including identification of at least 5 units, similar to those proposed for use, that have been in successful service for a minimum period of 5 years. Identify purchaser, address of installation, service organization, and date of installation.
Ensure floor system applicators are experienced in the application of troweled aggregate thin-set floor topping.
1.5.2 Sampling
Submit hardboard mounted epoxy flooring samples not less than 12-inches square for each required color.
SECTION 09 67 23.13 Page 3
Provide panels showing nominal thickness of finished toppings, color, and texture of finished surfaces. Finished floor toppings and the approved samples are to match in color and texture.
1.6 WARRANTY
Submit a 2 year written warranty for all materials and installation work.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Submit Installation Drawings for heavy duty epoxy flooring systems clearly designating the areas of application and the installation plan. Include in the installation plan, methods to control sand and dust if sand blasting is required.
Submit Fabrication Drawings for heavy duty epoxy flooring systems consisting of fabrication and assembly details to be performed in the factory.
2.2 SYSTEM
EF-1: Double Broadcast Decorative Epoxy Quartz with ultra clear epoxy topcoat and ultra clear aliphatic polyester urethane final finish.
a. System Components: Manufacturer's standard components which are compatible with each other as follows:
(1) Base Coat: Four-component, troweled mortar base consisting of epoxy resin, curing agent, and finely graded silica aggregate.
(2) Second Coat: Three-component, free flowing epoxy formulation consisting of resin, curing agent, pigment and fine aggregate.
(3) Aggregate Coat: Colored quartz broadcast aggregate.
(4) Final Coat: Two Component, high-performance, UV-resistant, clear epoxy sealer. Final coat shall be applied at a thickness to produce a standard texture.
(5) Waterproofing: Provide manufacturer's standard waterproofing membrane system installed per manufacturer's instruction.
Waterproofing membrane is required in shower areas.
b. Performance Requirements:
(1) Resinous flooring shall withstand chemical attack by agents provided in writing by Owner, in temperatures and concentrations stated therein.
(2) Resinous flooring shall withstand normal use in commercial kitchen.
(3) Physical/Chemical Characteristics:
(a) Compressive Strength: 12,400 psi after 7 days ( ASTM C579).
(b) Tensile Strength: 2,200 psi ( ASTM C307).
SECTION 09 67 23.13 Page 4
(c) Flexural Strength: 4,800 psi ( ASTM C580).
(d) Hardness: 85-90 ( ASTM D2240/Shore D Durometer).
(e) Bond Strength: >400 psi (100 percent concrete failure per
ASTM D4541).
(f) Abrasion Resistance: 0.04 gm max weight loss ( ASTM D4060, Taber Abrader).
(g) Flammability: Self extinguishing ( ASTM D635) Extent of burning 0.25 inches max.
(h) Water Absorption: 0.1 percent ( ASTM C413).
(i) Heat Resistance Limitation: 140 degrees F/60 degrees C (For continuous exposure) 200 degrees F/93 degrees C (For intermittent spills).
(j) All products must be 100 percent solids with zero VOCs.
(k) Final finish coat must be ultra clear and UV stable.
EF-2: Seamless Shower, integrated system for floors, walls and ceilings consisting of multi-layer, impact resistant, light stable, flexible urethane wall system for harsh environments. System to be installed with integrated chopped strand fiberglass or fiberglass engineering fabric.
a. System Components: Manufacturer's standard components which are compatible with each other as follows:
(1) Basecoat: Provide a two component urethane membrane.
(2) First Topcoat: Provide a two-component waterborne, aliphatic, polyurethane coating.
(3) Second Topcoat: Provide a two-component waterborne, aliphatic, polyurethane coating.
(4) Antimicrobial: Provide an antimicrobial, organic thione compound that acts as a permanent bacteriostat or fungistat against broad range of gram-positive and gram-negative bacteria and fungi.
Antimicrobial compound shall be EPA registered and contain no heavy metals.
(5) Waterproofing Membrane: Provide manufacturer's standard waterproofing membrane system installed per manufacturer's instruction. Waterproofing membrane is required in shower areas at walls, ceilings and shower floors.
b. System Characteristics/Performance Requirements:
(1) Color and Pattern: As selected by Owner from manufacturer's full range. See color schedule.
(b) Wearing Floor Surface: Textured for slip-resistance.
(c) Cove Base: 2 inch Cant-styled.
SECTION 09 67 23.13 Page 5
(d) System Thickness: Walls: 60 mils minimum. Floors: 1/8 inch minimum.
(e) VOCs: In compliance with EQ 4.2, less than 100 g/1.
(f) Compressive Strength Minimum: 11,700 psi ( ASTM D695-10).
(g) Tensile Strength Minimum: 3,900 psi ( ASTM D638-10).
(h) Hardness minimum: 83-88 ( ASTM D2240/Shore D Durometer).
(i) Abrasion Resistance Minimum: 0.03 gm/1000 revolutions ( ASTM D4060 Taber Abrader).
(j) High or Low Solids solvent based and all water based systems excluded.
2.3 ACCESSORY MATERIALS
a. Patching and Fill Material: Resinous product of resinous flooring manufacturer.
b. Joint Sealants: Formulated by resinous flooring manufacturer for type of service and joint condition indicated.
c. Metal Edge Trim Profile: Provide stainless-steel metal trim to finish the top of the integral cove base. Basis of Design product of Schluter Jolly profile.
Color: As specified in the Drawings.
PART 3 EXECUTION
3.1 PREPARATION
Prior to applying resinous flooring material, inspect substrate and immediately report any unsatisfactory conditions that exist and repair.
Moisture testing of concrete shall be conducted according the manufacturer's recommendations. If test results are above acceptable limits, Contractor shall include manufacturer's recommended moisture vapor reducer treatment.
3.1.1 Safety Precautions
Prior to application in confined spaces of toppings and coatings containing flammable or toxic properties, institute safety precautions recommended by the manufacturer of the product.
Erect "NO SMOKING" signs, and prohibit smoking or use of spark- or flame-producing devices within 50 feet of any mixing or placing operation involving flammable materials.
Provide personnel required to handle, mix, or apply toppings containing toxic or flammable properties with such items of personal protective equipment and apparel for eye, skin, and respiratory protection as are recommended by the manufacturer of the product. Ensure all personnel are trained in the appropriate use and wearing of personal protection
SECTION 09 67 23.13 Page 6 equipment.
3.1.2 Protection of Adjacent Surfaces
In addition to the protection of adjacent surfaces during installation, provide areas used to store and mix materials with a protective covering under the materials. After application of the sealer coats, protect finished flooring during the remainder of the construction period. In areas of expected minimum or moderate traffic, cover floors with a 30-30-30 waterproof kraft paper, with strips taped together and edges secured to prevent roll-up. Place vegetable fiberboard, plywood, or other suitable material that does not mar the flooring over the paper to protect areas used as passages by workmen and areas subject to floor damage because of subsequent building operations. Upon completion of construction, remove the protection, clean flooring and, where necessary, repair, reseal, or both, at no additional cost to the Government.
3.1.3 Concrete Subfloor
3.1.3.1 New Concrete Floors
Do not commence installation of floor topping until concrete has cured a minimum of 28 calendar days. Verify concrete floor is straight, properly sloped, and has type finish as required by flooring manufacturer. Ensure concrete is moist cured with burlap or polyethylene. Prior to applying the prime coat, clean concrete surface by an approved method.
3.1.4 Mixing Of Materials
Select job mix proportions on the trial batch proportions used to prepare the floor topping samples as submitted and approved.
Use mechanical equipment for mixing of materials in accordance with the manufacturer's instructions.
Use rotating paddle-type masonry mortar mixers for pre-blending the sizes and color pigment, if any, of the aggregate and addition of the mixed epoxy resin binder. Ensure mixing times are as recommended by the materials supplier(s), provided mixing times result in homogeneous mixtures. Limit quantity of material mixed at one time to that which can be applied and finished within the working life of the mixtures. Verify temperature of materials at the time of mixing are between 65 and 85 degrees F.
3.2 EXAMINATION
a. Verification: Verify that all substrate and environmental conditions are in compliance with requirements discussed during Pre-Installation Conference.
b. Mandatory Testing of Floor Slabs:
(1) Prior to the installation of flooring, it is mandatory that all surfaces are tested for moisture content, pH, and alkalinity levels that would be detrimental to the adhesion of coating materials. For tests to be accurate, temperatures and humidity levels should be stabilized for a minimum of 72 hours. NOTE:
TESTING PERFORMED BY ANY METHOD IN UNCONDITIONED SPACES WILL NOT
YIELD CONSISTENT RESULTS.
SECTION 09 67 23.13 Page 7
(2) Employ a radio frequency moisture meter to determine that residual un-combined moisture content of concrete slab is less than five
(5) percent by weight. Conduct ASTM F2170 to record the Relative Humidity. Do not apply high performance floor coatings to floor slabs that exceed 85 percent RH content per ASTM F2170 unless otherwise approved by the material manufacturer, or unless treated using manufacturer's approved moisture vapor barrier system, at Contractor's expense. Install moisture vapor barrier system per manufacturer's written instruction.
c. Testing Activities During Resinous Coating Application:
(1) Material Sampling: Owner's representative may at any time and any number of times during resinous coating application require an independent testing agency, hired by GC with Owner's approval, to collect material samples for testing for compliance with requirements.
(a) Material samples will be taken, identified, sealed, and certified in presence of installer.
(b) Testing agency will test samples for compliance with requirements at the cost to the Owner, using applicable referenced testing procedures in addition to testing procedures listed in manufacturer's product data.
(2) If test results show applied materials do not comply with specified requirements, installer shall correct all deficiencies of coating system in a method and manner acceptable to the manufacturer's recommendations.
3.3 PREPARATION
a. General: Prepare and clean substrates in accordance with manufacturer's written instructions for substrate indicated. Provide clean, dry, and neutral pH substrate for resinous floor/wall application.
b. Concrete Floors: Provide sound concrete surfaces free of laitance, glaze, efflorescence, curing compounds, form-release agents, dust, dirt, grease, oil, and other contaminants incompatible with resinous flooring. Floor slabs shall be prepared as follows:
(1) Mechanically remove all finishes, mastics, adhesives and other compounds down to sound substrate. Demolition shall be in accordance with manufacturer's recommendations and written procedures. (Note: If during the demolition a setting bed is found beneath the existing flooring materials, manufacturer will provide written recommendation whether to remove it or leave it in place. If removal is required, installer will provide a change order to replace the setting bed with manufacturer's recommended material to provide proper sloping for drainage and to ensure proper adhesion of the specified coating system.)
(2) Profile sound surfaces for proper adhesion. For thin-film coatings and floors under 1,000 sf or with limited access:
Diamond grind to expose concrete matrix and profile concrete floor surfaces to a classification of CSP2 ( ICRI 310.2R -2013).
SECTION 09 67 23.13 Page 8
(3) For all other floor systems: Shot blast all concrete floor surfaces to a classification of CSP5 ( ICRI 310.2R -2013).
(4) Visually inspect shot blasted or grinded surfaces to make sure that profiled surfaces are free of contaminants. Areas that are stained or visually contaminated shall be treated with a 15 percent by volume solution of aqueous trisodium phosphate (TSP) or other de-greasing agent as recommended by the coatings manufacturer. Rinse and dry all floor surfaces scheduled to receive high performance floor system finish prior to commencement of resinous flooring application.
(5) Remove and legally dispose of all debris and contaminants produced by the demolition and surface preparation process. Steel media resulting from the shot blasted floor slab surface shall be removed from cracks, slab edges, construction joints, and corners by magnets, magnetic broom, air blast, vacuum, or stiff bristle broom.
3.4 APPLICATION
3.4.1 Areas of Application
Anchor plates set with the top surface at or above the finished epoxy floor level do not require coverage with this flooring material. Extend flooring under equipment, except when the equipment base is indicated to be flush against the structural floor. Cover and/or mask surfaces not to receive the epoxy floor topping, such as equipment or cabinets installed prior to surface-preparation efforts and adjacent to the flooring installation.
3.4.2 Application of Base Coat and Troweling
Combine the epoxy binder components A and B in the proportions specified by the manufacturer to form a clear compatible system immediately on mixing. Cure combined components to a clear film possessing a glossy, non-greasy surface at relative humidities less than 80 percent, having the following properties after curing 24 hours at 77 degrees F, followed by 24 hours at 125 degrees F.
Ensure prepared subfloor surface is dry and at a temperature of not less than 60 degrees F when application of the floor topping is initiated.
Immediately prior to application of the prime/scratch coat on the prepared surface, remove dust or other loose particles by blowing with compressed air or vacuum cleaned. Use only an air compressor equipped with an efficient oil-water trap to prevent oil contamination or wetting of surface.
Apply a thin roller coat of the epoxy binder specified to the prepared subfloor as a prime coat. As an aid to placing, compacting, and finishing the floor topping, form a scratch coat by sprinkling a minimum quantity of the walnut shell aggregate on the prime coat surface immediately following the prime coat application. Prior to application of the prime/scratch coat, fill cracks in the concrete, and make provisions to keep control or expansion joints open.
Place the floor topping prior to final gelling of the prime/scratch coat.
Immediately after the materials are mixed as specified, dump the mixture
SECTION 09 67 23.13 Page 9 in the placement area and spread to prolong troweling life. Screed or rough trowel placed materials to the specified thickness and then compact by the use of a smooth roller prior to finish troweling to a nominal thickness of 3/16 inch plus or minus 1/16 inch. Ensure all finished surfaces are free of ridges, hollows (bird-baths), trowel marks, and smoothness varies no more than 1/8 inch when tested with an 8-foot straightedge. Make provisions to maintain the work areas in a relatively dust-free environment during curing of the topping.
3.4.3 Sealer Coat
After the floor topping has set firmly (approximately 6 to 16 hours depending on subfloor temperature) in a relatively dust-free environment, apply two thin coats of the sealer coat, by means of brush, roller, squeegee, or notched trowel to provide a pore-free, easy-to-clean surface. At the time of sealer application, ensure the surface is dust-free. Depending on relative humidity, allow the applied sealer to cure to a tack-free condition in 2 to 4 hours. Do not apply second coat until after the initial coat has cured to a tack-free, hard film.
Maintain topping areas in a relatively dust-free environment during curing of the sealer coats.
3.4.4 Integral Cove Base
Provide a 4 inch high cove base to all wall surfaces as indicated on the Drawings. Install so as to provide a 1/2 inch radius at the juncture of the floor and the wall. Provide stainless-steel metal edge trim at the top.
3.5 CURING
a. Cure resinous flooring components according to manufacturer's written instructions. Prevent contamination during curing processes.
(1) Temperatures shall be maintained at 70 degree F - 80 degree F if at all possible.
(2) Water leaks must be prevented as they will compromise epoxy components ability to set properly - water drips may compromise or stain finishes.
(3) Steam or any airborne contamination will adversely affect curing.
3.6 FIELD QUALITY CONTROL
3.6.1 Repairing
Remove and replace damaged or unacceptable portions of completed work with new work to match adjacent surfaces at no additional cost to the Government.
3.7 ADJUSTING AND CLEANING
Clean surfaces of the new work, and adjacent surfaces soiled as a result
SECTION 09 67 23.13 Page 10 of the work. Remove all equipment, surplus materials, and rubbish associated with the work from the Site.
3.7.1 Cleaning
a. Work area shall be left clean with all trash, equipment, and leftovers removed.
b. Floor and walls may be cleaned prior to final inspection, providing complete curing has taken place. Refer to Product Data Sheets for curing information for each product. Generally, non-chlorinated detergents should be used for the first month after curing is complete.
c. For optimum coating performance and cleanability, manufacturer recommends the use of liquid soaps to prevent caking on epoxy surfaces caused by bar soaps.
3.7.2 Protection
Protection from damage and wear during the construction process is recommended. Comply with manufacturer's recommendations for protective materials and their method of application. Remove temporary protection prior to final inspection. Protection from welding, impact from heavy tools and other abuse is anticipated, the Contractor doing the work shall take extra care in protecting the floor with impact resistance and if necessary, flame resistant coverings. Removal of any temporary or protective material is not the responsibility of the Installer.
-- End of Section --
SECTION 09 67 23.13 Page 11
SECTION 09 90 00
PAINTS AND COATINGS
05/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this Specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)
ACGIH 0100Doc (2005) Documentation of the Threshold Limit Values and Biological Exposure Indices
ASME INTERNATIONAL (ASME)
ASME A13.1 (2015) Scheme for the Identification of Piping Systems
ASTM INTERNATIONAL (ASTM)
ASTM D 4263 (1983; R 2005) Indicating Moisture in Concrete by the Plastic Sheet Method
ASTM D 4444 (2008) Use and Calibration of Hand-Held Moisture Meters
ASTM D 523 (2008) Standard Test Method for Specular Gloss
ASTM D 6386 (2010) Standard Practice for Preparation of Zinc (Hot-Dip Galvanized) Coated Iron and Steel Product and Hardware Surfaces for Painting
ASTM E 2129 (2005) Standard Practice for Data Collection for Sustainability Assessment of Building Products
ASTM F 1869 (2016) Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride
MASTER PAINTERS INSTITUTE (MPI)
MPI 101 (2012) Primer, Epoxy, Anti-Corrosive, for Metal
MPI 107 (2012) Primer, Rust-Inhibitive, Water Based
MPI 108 (2012) Epoxy, High Build, Low Gloss
MPI 11 (2012) Latex, Exterior Semi-Gloss, MPI
SECTION 09 90 00 Page 1
Gloss Level 5
MPI 140 (Oct 2009) Interior High Performance Latex, MPI Gloss Level 4
MPI 163 (2012) Light Industrial Coating, Exterior, Water Based, Semi-Gloss (MPI Gloss Level 5)
MPI 21 (2012) Heat Resistant Coating, (Up to 205°C/402°F), MPI Gloss Level 6
MPI 23 (2012) Primer, Metal, Surface Tolerant
MPI 39 (2012) Primer, Latex, for Interior Wood
MPI 4 (2012) Interior/Exterior Latex Block Filler
MPI 50 (2012) Primer Sealer, Latex, Interior
MPI 79 (2012) Primer, Alkyd, Anti-Corrosive for Metal
MPI 8 (2012) Alkyd, Exterior Flat (MPI Gloss Level I)
MPI 94 (2012) Alkyd, Exterior, Semi-Gloss (MPI Gloss Level 5)
MPI 95 (2012) Primer, Quick Dry, for Aluminum
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SP-01 (2000) Environmentally Preferable Product Specification for Architectural and Anti-Corrosive Paints
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC PA 1 (2016) Shop, Field, and Maintenance Coating of Metals
SSPC PA Guide 3 (1982; E 1995) A Guide to Safety in Paint Application
SSPC SP 1 (2015) Solvent Cleaning
SSPC SP 10/NACE No. 2 (2007) Near-White Blast Cleaning
SSPC SP 12/NACE No.5 (2002) Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating
SSPC SP 2 (1982; E 2000; E 2004) Hand Tool Cleaning
SSPC SP 3 (1982; E 2004) Power Tool Cleaning
SSPC SP 6/NACE No.3 (2007) Commercial Blast Cleaning
SSPC SP 7/NACE No.4 (2007) Brush-Off Blast Cleaning
SECTION 09 90 00 Page 2
SSPC VIS 1 (2002; E 2004) Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning
SSPC VIS 3 (2004) Guide and Reference Photographs for Steel Surfaces Prepared by Hand and Power Tool Cleaning
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. DEPARTMENT OF DEFENSE (DOD)
MIL-STD-101 (2014; Rev C) Color Code for Pipelines and for Compressed Gas Cylinders
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
FED-STD-313 (2014; Rev E) Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.1000 Air Contaminants
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29.00 06 SUSTAINABILITY REPORTING. The following shall be submitted in accordance with Section 01 33 00.00 06 SUBMITTAL PROCEDURES:
The current MPI, "Approved Product List" which lists paint by brand, label, product name and product code as of the date of Contract Award, will be used to determine compliance with the submittal requirements of this Specification. The Contractor may choose to use a subsequent MPI "Approved Product List", however, only one list may be used for the entire Contract and each coating system is to be from a single manufacturer. All coats on a particular substrate must be from a single manufacturer. No variation from the MPI Approved Products List is acceptable.
Samples of specified materials may be taken and tested for compliance with Specification Requirements.
In keeping with the intent of Executive Order 13101, "Greening the Government through Waste Prevention, Recycling, and Federal Acquisition", products certified by SCS as meeting SCS SP-01 shall be given preferential consideration over registered products. Products that are registered shall be given preferential consideration over products not carrying any EPP designation.
SD-02 Shop Drawings
SECTION 09 90 00 Page 3
Piping Identification
Submit Color Stencil Codes
SD-03 Product Data
Certification
Local/Regional Materials; S
Submit documentation indicating distance between manufacturing facility and the Project Site. Indicate distance of raw material origin from the Project Site. Indicate relative dollar value of local/regional materials to total dollar value of products included in Project.
Environmental Data
Materials; S
Submit documentation indicating percentage of post-industrial and post-consumer recycled content per unit of product. Indicate relative dollar value of recycled content products to total dollar value of products included in Project.
Coating; G
Manufacturer's Technical Data Sheets ; S
Indicate VOC content.
SD-04 Samples
Color; G
Submit manufacturer's samples of paint colors. Cross reference color samples to color scheme as indicated.
SD-07 Certificates
Applicator's Qualifications
Qualification Testing Laboratory for Coatings; G
SD-08 Manufacturer's Instructions
Application Instructions
Mixing
Detailed mixing instructions, minimum and maximum application temperature and humidity, potlife, and curing and drying times between coats.
Manufacturer's Material Safety Data Sheets
Submit manufacturer's Material Safety Data Sheets for coatings, solvents, and other potentially hazardous materials, as defined in
SECTION 09 90 00 Page 4
FED-STD-313 .
SD-10 Operation and Maintenance Data
Coatings; G
Preprinted cleaning and maintenance instructions for all coating systems shall be provided.
SD-11 Closeout Submittals
Local/Regional Materials; S
LEED documentation relative to local/regional materials credit in accordance with LEED Reference Guide. Include in LEED Documentation Notebook.
Materials; S
LEED documentation relative to recycled content credit in accordance with LEED Reference Guide. Include in LEED Documentation Notebook.
LEED documentation relative to low emitting materials credit in accordance with LEED Reference Guide. Include in LEED Documentation Notebook.
1.3 NOT USED
1.4 QUALITY ASSURANCE
1.4.1 Field Samples and Tests
The Contracting Officer may choose up to two coatings that have been delivered to the Site to be tested at no cost to the Government. Take samples of each chosen product as specified in the Paragraph "Sampling Procedures." Test each chosen product as specified in the Paragraph "Testing Procedure." Products which do not conform, shall be removed from the Job Site and replaced with new products that conform to the referenced Specification. Testing of replacement products that failed initial testing shall be at no cost to the Government.
1.4.1.1 Sampling Procedure
The Contracting Officer will select paint at random from the products that have been delivered to the Job Site for sample testing. The Contractor shall provide 1 quart samples of the selected paint materials. The samples shall be taken in the presence of the Contracting Officer, and labeled, identifying each sample. Provide labels in accordance with the Paragraph "Packaging, Labeling, and Storage" of this Specification.
1.4.1.2 Testing Procedure
Provide Batch Quality Conformance Testing for specified products, as defined by and performed by MPI. As an alternative to Batch Quality Conformance Testing, the Contractor may provide Qualification Testing for specified products above to the appropriate MPI product specification, using the third-party laboratory approved under the Paragraph "Qualification Testing" laboratory for coatings. The qualification
SECTION 09 90 00 Page 5 testing lab report shall include the backup data and summary of the test results. The summary shall list all of the reference specification requirements and the result of each test. The summary shall clearly indicate whether the tested paint meets each test requirement. Note that Qualification Testing may take 4 to 6 weeks to perform, due to the extent of testing required.
Submit name, address, telephone number, FAX number, and e-mail address of the independent third party laboratory selected to perform testing of coating samples for compliance with Specification Requirements. Submit documentation that laboratory is regularly engaged in testing of paint samples for conformance with Specifications, and that employees performing testing are qualified. If the Contractor chooses MPI to perform the Batch Quality Conformance testing, the above submittal information is not required, only a letter is required from the Contractor stating that MPI will perform the testing.
1.5 REGULATORY REQUIREMENTS
1.5.1 Environmental Protection
In addition to requirements specified elsewhere for environmental protection, provide coating materials that conform to the restrictions of the local Air Pollution Control District and regional jurisdiction.
Notify Contracting Officer of any paint specified herein which fails to conform.
1.5.2 Lead Content
Do not use coatings having a lead content over 0.06 percent by weight of nonvolatile content.
1.5.3 Chromate Content
Do not use coatings containing zinc-chromate or strontium-chromate.
1.5.4 Asbestos Content
Materials shall not contain asbestos.
1.5.5 Mercury Content
Materials shall not contain mercury or mercury compounds.
1.5.6 Silica
Abrasive blast media shall not contain free crystalline silica.
1.5.7 Human Carcinogens
Materials shall not contain ACGIH 0100Doc and ACGIH 0100Doc confirmed human carcinogens (A1) or suspected human carcinogens (A2).
1.6 PACKAGING, LABELING, AND STORAGE
Paints shall be in sealed containers that legibly show the Contract Specification number, designation name, formula or specification number, batch number, color, quantity, date of manufacture, manufacturer's formulation number, manufacturer's directions including any warnings and
SECTION 09 90 00 Page 6 special precautions, and name and address of manufacturer. Pigmented paints shall be furnished in containers not larger than 5 gallons. Paints and thinners shall be stored in accordance with the manufacturer's written directions, and as a minimum, stored off the ground, under cover, with sufficient ventilation to prevent the buildup of flammable vapors, and at temperatures between 40 to 95 degrees F. Do not store paint products with materials that have a high capacity to adsorb VOC emissions. Do not store paint, polyurethane, varnish, or wood stain products in occupied spaces.
1.7 SAFETY AND HEALTH
Apply coating materials using safety methods and equipment in accordance with the following:
Work shall comply with applicable Federal, State, and local laws and regulations, and with the ACCIDENT PREVENTION PLAN, including the Activity Hazard Analysis as specified in Section 01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS and in Appendix A of EM 385-1-1 . The Activity Hazard Analysis shall include analyses of the potential impact of painting operations on painting personnel and on others involved in and adjacent to the work zone.
1.7.1 Safety Methods Used During Coating Application
Comply with the requirements of SSPC PA Guide 3 .
1.7.2 Toxic Materials
To protect personnel from overexposure to toxic materials, conform to the most stringent guidance of:
a. The applicable manufacturer's Material Safety Data Sheets (MSDS) or local regulation.
b. 29 CFR 1910.1000 .
c. ACGIH 0100Doc , threshold limit values.
1.8 ENVIRONMENTAL CONDITIONS
Comply, at minimum, with manufacturer recommendations for space ventilation during and after installation. Isolate area of application from rest of building when applying high-emission paints or coatings.
1.8.1 Coatings
Do not apply coating when air or substrate conditions are:
a. Less than 5 degrees F above dew point;
b. Below 50 degrees F or over 95 degrees F, unless specifically pre-approved by the Contracting Officer and the product manufacturer.
Under no circumstances shall application conditions exceed manufacturer recommendations.
1.8.2 Post-Application
Vacate space for as long as possible after application. Wait a minimum of 48 hours before occupying freshly painted rooms. Maintain one of the
SECTION 09 90 00 Page 7 following ventilation conditions during the curing period, or for 72 hours after application:
a. Supply 100 percent outside air 24 hours a day.
b. Supply airflow at a rate of 6 air changes per hour, when outside temperatures are between 55 degrees F and 85 degrees F and humidity is between 30 percent and 60 percent.
c. Supply airflow at a rate of 1.5 air changes per hour, when outside air conditions are not within the range stipulated above.
1.9 SUSTAINABLE DESIGN REQUIREMENTS
1.9.1 Low-Emitting Materials
See Section 01 33 29.00 06 SUSTAINABILITY REPORTING for VOC limits (g/L) for paints and coatings applied inside the building weatherproofing system.
1.9.2 Local/Regional Materials
See Section 01 33 29.00 06 SUSTAINABILITY REPORTING for cumulative total local material requirements. Paint and coating materials may be locally available.
1.9.3 Environmental Data
Submit Table 1 of ASTM E 2129 for the following products: Painting and coating products with VOC content greater than 250 grams per liter.
1.10 SCHEDULING
Allow paint installations to cure prior to the installation of materials that adsorb VOCs.
1.11 COLOR SELECTION
Colors of finish coats shall be as indicated or specified. Where not indicated or specified, colors shall be selected by the Contracting Officer. Manufacturers' names and color identification are used for the purpose of color identification only. Named products are acceptable for use only if they conform to specified requirements. Products of other manufacturers are acceptable if the colors approximate colors indicated and the product conforms to specified requirements.
Tint each coat progressively darker to enable confirmation of the number of coats.
Color, texture, and pattern of wall coating systems shall be in accordance with the Drawings.
1.12 LOCATION AND SURFACE TYPE TO BE PAINTED
1.12.1 Painting Included
Where a space or surface is indicated to be painted, include the following unless indicated otherwise.
a. Surfaces behind portable objects and surface mounted articles readily
SECTION 09 90 00 Page 8 detachable by removal of fasteners, such as screws and bolts.
b. New factory finished surfaces that require identification or color coding and factory finished surfaces that are damaged during performance of the work.
c. Existing coated surfaces that are damaged during performance of the work.
1.12.1.1 Exterior Painting
Includes new surfaces of the buildings and appurtenances. Also included are existing coated surfaces made bare by cleaning operations.
1.12.1.2 Interior Painting
Includes new surfaces of the buildings and appurtenances as indicated and existing coated surfaces made bare by cleaning operations. Where a space or surface is indicated to be painted, include the following items, unless indicated otherwise.
a. Exposed columns, girders, beams, joists, and metal deck; and
b. Other contiguous surfaces.
1.12.2 Painting Excluded
Do not paint the following unless indicated otherwise.
a. Surfaces concealed and made inaccessible by panelboards, fixed ductwork, machinery, and equipment fixed in place.
b. Surfaces in concealed spaces. Concealed spaces are defined as enclosed spaces above suspended ceilings, furred spaces, attic spaces, crawl spaces, elevator shafts and chases.
c. Steel to be embedded in concrete.
d. Copper, stainless steel, aluminum, brass, and lead except existing coated surfaces.
e. Hardware, fittings, and other factory finished items.
1.12.3 Mechanical and Electrical Painting
Includes field coating of interior and exterior new surfaces.
a. Where a space or surface is indicated to be painted, include the following items unless indicated otherwise.
(1) Exposed piping, conduit, and ductwork;
(2) Supports, hangers, air grilles, and registers;
(3) Miscellaneous metalwork and insulation coverings.
(4) Exterior mechanical, fire water piping (exposed pipes, not covered with insulation).
SECTION 09 90 00 Page 9
b. Do not paint the following, unless indicated otherwise:
(1) New zinc-coated, aluminum, and copper surfaces under insulation.
(2) New aluminum jacket on piping.
(3) New interior ferrous piping under insulation.
1.12.3.1 Fire Extinguishing Sprinkler Systems
Clean, pretreat, prime, and paint new fire extinguishing sprinkler systems including valves, piping, conduit, hangers, supports, miscellaneous metalwork, and accessories. Apply coatings to clean, dry surfaces, using clean brushes. Clean the surfaces to remove dust, dirt, rust, and loose mill scale. Immediately after cleaning, provide the metal surfaces with one coat primer per schedules. Shield sprinkler heads with protective covering while painting is in progress. Upon completion of painting, remove protective covering from sprinkler heads. Remove sprinkler heads which have been painted and replace with new sprinkler heads. Provide primed surfaces with the following:
a. Piping in Unfinished Areas: Provide primed surfaces with one coat of red alkyd gloss enamel applied to a minimum dry film thickness of 1.0 mil in attic spaces, spaces above suspended ceilings, pipe chases, mechanical equipment room, and spaces where walls or ceiling are not painted or not constructed of a prefinished material.
b. Piping in Finished Areas: Provide primed surfaces with two coats of paint to match adjacent surfaces, except provide valves and operating accessories with one coat of red alkyd gloss enamel applied to a minimum dry film thickness of 1.0 mil. Provide piping with 2 inch wide red enamel bands or self-adhering red plastic bands spaced at maximum of 20 foot intervals throughout the piping systems.
1.12.4 Exterior Painting of Site Work Items
Field coat the following items:
New Surfaces
a. Bollards
b. Steel Lintels at Doors, Windows Louvers, etc. (all exposed Lintels)
c. Mechanical/Fire Piping, i.e., Risers, Backflow Preventers, including Valves, Fittings, etc.
1.12.5 Definitions and Abbreviations
1.12.5.1 Qualification Testing
Qualification testing is the performance of all test requirements listed in the Product Specification. This testing is accomplished by MPI to qualify each product for the MPI Approved Product List, and may also be accomplished by Contractor's third party testing lab if an alternative to Batch Quality Conformance Testing by MPI is desired.
SECTION 09 90 00 Page 10
1.12.5.2 Batch Quality Conformance Testing
Batch quality conformance testing determines that the product provided is the same as the product qualified to the appropriate Product Specification. This testing shall only be accomplished by MPI testing lab.
1.12.5.3 Coating
A film or thin layer applied to a base material called a substrate. A coating may be a metal, alloy, paint, or solid/liquid suspensions on various substrates (metals, plastics, wood, paper, leather, cloth, etc.).
They may be applied by electrolysis, vapor deposition, vacuum, or mechanical means such as brushing, spraying, calendaring, and roller coating. A coating may be applied for aesthetic or protective purposes or both. The term "coating" as used herein includes emulsions, enamels, stains, varnishes, sealers, epoxies, and other coatings, whether used as primer, intermediate, or finish coat. The terms paint and coating are used interchangeably.
1.12.5.4 DFT or dft
Dry film thickness, the film thickness of the fully cured, dry paint or coating.
1.12.5.5 DSD
Degree of Surface Degradation, the MPI system of defining degree of surface degradation. Five (5) levels are generically defined under the Assessment sections in the MPI Maintenance Repainting Manual.
1.12.5.6 EPP
Environmentally Preferred Products, a standard for determining environmental preferability in support of Executive Order 13101.
1.12.5.7 EXT
MPI short term designation for an exterior coating system.
1.12.5.8 INT
MPI short term designation for an interior coating system.
1.12.5.9 micron / microns
The metric measurement for 0.001 mm or one/one-thousandth of a millimeter.
1.12.5.10 mil / mils
The English measurement for 0.001 in or one/one-thousandth of an inch, equal to 25.4 microns or 0.0254 mm.
1.12.5.11 mm
The metric measurement for millimeter, 0.001 meter or one/one-thousandth of a meter.
SECTION 09 90 00 Page 11
1.12.5.12 MPI Gloss Levels
MPI system of defining gloss. Seven (7) gloss levels (G1 to G7) are generically defined under the Evaluation sections of the MPI Manuals.
Traditionally, Flat refers to G1/G2, Eggshell refers to G3, Semi-gloss refers to G5, and Gloss refers to G6.
Gloss levels are defined by MPI as follows:
Gloss Description Units Units Level at 60 degrees at 85 degrees
G1 Matte or Flat 0 to 5 10 max G2 Velvet 0 to 10 10 to 35 G3 Eggshell 10 to 25 10 to 35 G4 Satin 20 to 35 35 min G5 Semi-Gloss 35 to 70 G6 Gloss 70 to 85 G7 High Gloss
Gloss is tested in accordance with ASTM D 523 . Historically, the Government has used Flat (G1 / G2), Eggshell (G3), Semi-Gloss (G5), and Gloss (G6).
1.12.5.13 MPI System Number
The MPI coating system number in each Division found in either the MPI Architectural Painting Specification Manual or the Maintenance Repainting Manual and defined as an exterior (EXT/REX) or interior system (INT/RIN).
The Division number follows the CSI Master Format.
1.12.5.14 Paint
See Coating definition.
PART 2 PRODUCTS
2.1 MATERIALS
Conform to the Coating Specifications and standards referenced in PART 3.
Submit manufacturer's technical data sheets for specified coatings and solvents. Comply with applicable regulations regarding toxic and hazardous materials.
PART 3 EXECUTION
3.1 PROTECTION…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .