This document outlines a federal contract opportunity for the renovation of Building 4828 located at Seymour Johnson Air Force Base in North Carolina. The U.S. Army Corps of Engineers seeks to convert the existing 10,333 square foot maintenance hangar into an Alternate Mission Equipment storage building through a design-bid-build project. Interior renovations will immobilize the hangar doors, add vehicle and pedestrian doors, and coat floors with non-slip paint to accommodate storage of air transport equipment, seat pallets, engines, and vehicles. Exterior work will replace siding and roofing and provide positive site drainage. Renovations must comply with antiterrorism and force protection standards as well as Air Force and high-performance green building objectives. The contract duration is 547 calendar days from the notice to proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912QR20R0067-0001.pdf | ||
| W912QR20R0067FFE-0000.pdf | ||
| W912QR20R0067Plans-0000.pdf | ||
| W912QR20R0067Specs-0000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation Number W912QR20R0067 for the Design/Bid/Build Renovation of Building 4828 into the ADAL Facility Alternate Mission Equipment
(AME) Storage located at Seymour Johnson AFB, NC is hereby amended as follow s:
SEE SUMMARY OF CHANGE
1. CONTRACT ID CODE PAGE OF PAGES
1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912QR20R0067
X 9B. DATED (SEE ITEM 11)
24-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Aug-2020
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
SUMMARY OF CHANGES - AMDT 0002
a. This Amendment shall be acknowledged with submitted proposal
b. Proposal Submission Instructions:
- Send an email to Morgan Strong, Contracting Officer at morgan.k.strong@usace.army.mil to receive the link to drop off your proposal.
c. The following Specification are hereby edited:
- Section 03 30 53 “MISCELLANEOUS CAST-IN-PLACE CONCRETE” is hereby edited.
d. The following existing facility drawings are being provided for reference only and are not for construction purposes.
- Sheet AW-39-01-13_9OF45 Thru Sheet AW-39-01-13-28OF45
- Sheet VKAG 92-3101_S-1 Thru Sheet VKAG 92-3101_S-11
e. General Decision Number NC20200041, Mod 0, dated 01/03/2020 is hereby replaced in its entirety with
General Decision Number NC20200041, Mod 1, dated 08/14/2020.
f. The Site Visit Rosters, dated 04 August 2020 and 12 August 2020, are hereby incorporated.
g. The due date and time is not extended as result of this amendment, and remains Monday, 24 August 2020 at 10:00AM Eastern.
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
WAGE RATES
"General Decision Number: NC20200041 08/14/2020
Superseded General Decision Number: NC20190041
State: North Carolina
Construction Type: Building
County: Wayne County in North Carolina.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of
$10.80 for calendar year 2020 applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020.
If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The
EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the
EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication
Date 0 01/03/2020
1 08/14/2020
* IRON0848-005 07/01/2020
Rates
Fringes
IRONWORKER, STRUCTURAL............. $ 26.00 15.80
* PLUM0421-003 07/01/2019
PIPEFITTER. .............................................. $ 28.50 12.41
SUNC2011-022 08/24/2011
BRICKLAYER. .......................................... $ 19.00 0.00
CARPENTER, Excludes Drywall
Hanging, and Form Work. .......................... $
16.11
4.20 http://www.dol.gov/whd/govcontracts
CEMENT MASON/CONCRETE
FINISHER...$
15.50 0.00
DRYWALL HANGER. .............................. $ 13.83 0.00
ELECTRICIAN. ......................................... $ 18.31 3.06
FORM WORKER. ...................................... $ 12.43 1.80
HVAC MECHANIC (HVAC Duct
Installation Only). ....................................... $
19.69
2.25
LABORER: Common or General. .............. $ 10.20 0.00
LABORER: Landscape & Irrigation. ....... $
9.13
0.28
LABORER: Pipelayer. ............................... $ 13.35 2.80
LABORER: Mason
Tender-Brick/Cement/Concrete. ................ $
12.00
0.00
OPERATOR:
Backhoe/Excavator/Trackhoe. ................... $
18.23
2.16
OPERATOR: Bulldozer. ............................. $ 16.00 1.87
OPERATOR: Crane. ................................... $ 19.77 4.48
OPERATOR: Forklift. ................................ $ 13.86 0.00
OPERATOR: Grader/Blade. ....................... $ 15.72 1.49
OPERATOR: Loader. ................................. $ 16.17 0.25
PAINTER: Brush, Roller and Spray. ....... $
12.35
0.00
PLUMBER. ................................................. $ 19.70 2.34
ROOFER. .................................................... $ 11.06 1.26
SHEET METAL WORKER, Excludes
HVAC Duct Installation.............................. $
15.81
1.40
TRUCK DRIVER. ...................................... $ 13.38 1.48
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal
Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017.
If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate
(current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey.
Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers http://www.dol.gov/whd/govcontracts
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage
Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and
Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
W912QR20R0067
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W. Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
========== END OF GENERAL DECISION"
(End of Summary of Changes)
P2# 470828 - ADAL KC-46A B4828
Seymour Johnson AFB, NC
SECTION 03 30 53
MISCELLANEOUS CAST-IN-PLACE CONCRETE
05/14
AMENDMENT 002
PART 1 GENERAL
1.1 SUMMARY
Perform all work in accordance with ACI 318 .
1.2 UNIT PRICES
1.2.1 Concrete Payment
Payment will cover all costs associated with manufacturing, furnishing, delivering, placing, finishing, and curing of concrete for the various items of the schedule, including the cost of all formwork. Payment for concrete, for which payment is made as a lump sum, is to be included in this unit price payment item. Payment for grout, preformed expansion joints, field-molded sealants, waterstops, reinforcing steel bars or wire reinforcement is to be included in this unit price payment item.
1.2.2 Measurement
Concrete will be measured for payment on the basis of the actual volume of concrete within the pay lines of the structures as indicated. Measurement of concrete placed against the sides of any excavation without the use of intervening forms will be made only within the pay lines of the structure. No deductions will be made for rounded or beveled edge, for space occupied by metal work, for electrical conduits or timber, or for voids or embedded items that are either less than 5 cubic feet in volume or 1 square foot in cross section.
1.2.3 Unit of Measure
Unit of measure: cubic yard.
1.3 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE (ACI)
ACI 117 (2010; Errata 2011) Specifications for Tolerances for Concrete Construction and Materials and Commentary
ACI 301 (2016) Specifications for Structural Concrete
ACI 302.1R (2015) Guide for Concrete Floor and Slab Construction
ACI 304R (2000; R 2009) Guide for Measuring, SECTION 03 30 53 Page 1
AMENDMENT 002
Mixing, Transporting, and Placing Concrete
ACI 305R (2010) Guide to Hot Weather Concreting
ACI 306R (2016) Guide to Cold Weather Concreting
ACI 318 (2014; Errata 1-2 2014; Errata 3-5 2015;
Errata 6 2016; Errata 7-9 2017) Building Code Requirements for Structural Concrete (ACI 318-14) and Commentary (ACI 318R-14)
ACI 347R (2014; Errata 1 2017) Guide to Formwork for Concrete
ACI SP-66 (2004) ACI Detailing Manual
ASTM INTERNATIONAL (ASTM)
ASTM A1064/A1064M (2017) Standard Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete
ASTM A615/A615M (2016) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement
ASTM C1064/C1064M (2017) Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
ASTM C1260 (2014) Standard Test Method for Potential Alkali Reactivity of Aggregates (Mortar-Bar Method)
ASTM C143/C143M (2015) Standard Test Method for Slump of Hydraulic-Cement Concrete
ASTM C150/C150M (2018) Standard Specification for Portland Cement
ASTM C1567 (2013) Standard Test Method for Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)
ASTM C1602/C1602M (2012) Standard Specification for Mixing Water Used in Production of Hydraulic Cement Concrete
ASTM C172/C172M (2017) Standard Practice for Sampling Freshly Mixed Concrete
ASTM C173/C173M (2016) Standard Test Method for Air Content of Freshly Mixed Concrete by the Volumetric Method
ASTM C231/C231M (2017a) Standard Test Method for Air Content of Freshly Mixed Concrete by the
SECTION 03 30 53 Page 2
Pressure Method
ASTM C260/C260M (2010a; R 2016) Standard Specification for Air-Entraining Admixtures for Concrete
ASTM C309 (2011) Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete
ASTM C31/C31M (2018b) Standard Practice for Making and Curing Concrete Test Specimens in the Field
ASTM C33/C33M (2018) Standard Specification for Concrete Aggregates
ASTM C39/C39M (2018) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
ASTM C494/C494M (2017) Standard Specification for Chemical Admixtures for Concrete
ASTM C618 (2017a) Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete
ASTM C685/C685M (2017) Standard Specification for Concrete Made by Volumetric Batching and Continuous Mixing
ASTM C920 (2018) Standard Specification for Elastomeric Joint Sealants
ASTM C94/C94M (2017a) Standard Specification for Ready-Mixed Concrete
ASTM D1752 (2018) Standard Specification for Preformed Sponge Rubber, Cork and Recycled PVC Expansion Joint Fillers for Concrete Paving and Structural Construction
ASTM D412 (2016) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension
ASTM D471 (2016a) Standard Test Method for Rubber Property - Effect of Liquids
ASTM D75/D75M (2014) Standard Practice for Sampling Aggregates
ASTM D98 (2015) Calcium Chloride
ASTM E1155 (2014) Standard Test Method for Determining Floor Flatness and Floor Levelness Numbers
ASTM E1155M (2014) Standard Test Method for Determining Floor Flatness and Floor
SECTION 03 30 53 Page 3
Levelness Numbers (Metric)
ASTM E1643 (2018a) Standard Practice for Selection, Design, Installation, and Inspection of Water Vapor Retarders Used in Contact with Earth or Granular Fill Under Concrete Slabs
ASTM E1745 (2017) Standard Specification for Water Vapor Retarders Used in Contact with Soil or Granular Fill under Concrete Slabs
ASTM E1993/E1993M (1998; R 2013; E 2013) Standard Specification for Bituminous Water Vapor Retarders Used in Contact with Soil or Granular Fill Under Concrete Slabs
ASTM D2047 (2017) Standard Test Method for Static Coefficient of Friction of Polish-Coated Floor Surfaces as Measured by the James Machine
ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials
U.S. ARMY CORPS OF ENGINEERS (USACE)
COE CRD-C 513 (1974) Corps of Engineers Specifications for Rubber Waterstops
COE CRD-C 572 (1974) Corps of Engineers Specifications for Polyvinylchloride Waterstops
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 247 Comprehensive Procurement Guideline for Products Containing Recovered Materials
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00.00 06
SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Installation Drawings; G
SD-03 Product Data
Air-Entraining Admixture Accelerating Admixture Water-Reducing or Retarding Admixture Curing Materials Expansion Joint Filler Strips, Premolded Joint Sealants - Field Molded Sealants Waterstops Chemical Floor Hardener Conveying and Placing Concrete
SECTION 03 30 53 Page 4
Formwork Mix Design Data; G Ready-Mix Concrete Curing Compound Mechanical Reinforcing Bar Connectors
SD-06 Test Reports
Aggregates Concrete Mixture Proportions; G Measurement of Floor Tolerances Compressive Strength Testing; G Slump; G Air Content Water
SD-07 Certificates
Cementitious Materials Aggregates Delivery Tickets
SD-08 Manufacturer's Instructions
Chemical Floor Hardener Curing Compound
1.5 QUALITY ASSURANCE
Indicate specific locations of Concrete Placement, Forms, Steel Reinforcement, Accessories, Expansion Joints, Construction Joints, Contraction Joints, and Control Joints on installation drawings and include, but not be limited to, square feet of concrete placements, thicknesses and widths, plan dimensions, and arrangement of cast-in-place concrete section.
1.5.1 Flatness and Levelness of Floor Slabs
Conduct floor flatness and levelness test, (FF and FL respectively), on floor slabs in accordance with the provisions set forth in ASTM E1155M or ASTM E1155. Make floor tolerance measurements by the approved laboratory and inspection service within 24 hours after completion of final troweling operation and before forms and shores have been removed. Provide results of floor tolerance tests, including formal notice of acceptance or rejection of the work, to the Contracting Officer within 24 hours after data collection.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
The Government retains the option to sample and test joint sealer, joint filler material, waterstop, aggregates and concrete to determine compliance with the specifications. Provide facilities and labor as may be necessary to assist the Government in procurement of representative test samples. Obtain samples of aggregates at the point of batching in accordance with ASTM D75/D75M. Sample concrete in accordance with ASTM C172/C172M. Determine slump and air content in accordance with ASTM C143/C143M and ASTM C231/C231M, respectively, when cylinders are
SECTION 03 30 53 Page 5 molded. Prepare, cure, and transport compression test specimens in accordance with ASTM C31/C31M. Test compression test specimens in accordance with ASTM C39/C39M. Take samples for strength tests not less than once each shift in which concrete is produced from each strength of concrete required. Provide a minimum of five specimens from each sample;
two to be tested at 28 days (90 days if pozzolan is used) for acceptance, two will be tested at 7 days for information and one held in reserve.
2.1.1 Strength
Acceptance test results are the average strengths of two specimens tested at 28 days (90 days if pozzolan is used). The strength of the concrete is considered satisfactory so long as the average of three consecutive acceptance test results equal or exceed the specified compressive strength, f'c, but not more than 20 percent, and no individual acceptance test result falls below f'c by more than 500 psi.
2.1.2 Construction Tolerances
Apply a Class "C" finish to all surfaces except those specified to receive a Class "D" finish. Apply a Class "D" finish to all post-construction surfaces which will be permanently concealed. Surface requirements for the classes of finish required are as specified in ACI 117 .
2.1.3 Concrete Mixture Proportions
Concrete mixture proportions are the responsibility of the Contractor.
Mixture proportions must include the dry weights of cementitious material(s); the nominal maximum size of the coarse aggregate; the specific gravities, absorptions, and saturated surface-dry weights of fine and coarse aggregates; the quantities, types, and names of admixtures; and quantity of water per yard of concrete. Provide materials included in the mixture proportions of the same type and from the same source as will be used on the project. The specified compressive strength f'c is 4,000 psi at 28 days (90 days if pozzolan is used). The maximum nominal size coarse aggregate is 1-1/2 inch, in accordance with ACI 304R . The air content must be between 4.5 and 7.5 percent with a slump between 2 and 5 inches.
The maximum water-cementitious material ratio is 0.50 . Submit the applicable test reports and mixture proportions that will produce concrete of the quality required, ten days prior to placement of concrete.
2.2 MATERIALS
Submit manufacturer's literature from suppliers which demonstrates compliance with applicable specifications for the specified materials.
2.2.1 Cementitious Materials
Submit Manufacturer's certificates of compliance, accompanied by mill test reports, attesting that the concrete materials meet the requirements of the specifications in accordance with the Special Clause "CERTIFICATES OF COMPLIANCE". Also, certificates for all material conforming to EPA's Comprehensive Procurement Guidelines (CPG), in accordance with 40 CFR 247 .
Provide cementitious materials that conform to the appropriate specifications listed:
2.2.1.1 Portland Cement
ASTM C150/C150M, Type II, low alkali with tri-calcium aluminates (C3A)
SECTION 03 30 53 Page 6 content less than 10 percent and a maximum cement-alkali content of 0.80 percent Na2Oe (sodium oxide) equivalent.
2.2.1.2 Pozzolan
Provide pozzolan that conforms to ASTM C618, Class F, including requirements of Tables 1A and 2A.
2.2.2 Aggregates
For fine and coarse aggregates meet the quality and grading requirements of ASTM C33/C33M and test and evaluate for alkali-aggregate reactivity in accordance with ASTM C1260. Perform evaluation of fine and coarse aggregates separately and in combination, matching the proposed mix design proportioning. All results of the separate and combination testing must have a measured expansion less than 0.08 percent at 28 days after casting. If the test data indicates an expansion of 0.08 percent or greater, reject the aggregate(s) or perform additional testing using ASTM C1260 and ASTM C1567. Perform the additional testing using ASTM C1260 and ASTM C1567 using the low alkali portland cement in combination with ground granulated blast furnace (GGBF) slag, or Class F fly ash. Use GGBF slag in the range of 40 to 50 percent of the total cementitious material by mass. Use Class F fly ash in the range of 25 to 40 percent of the total cementitious material by mass. Submit certificates of compliance and test reports for aggregates showing the material(s) meets the quality and grading requirements of the specifications under which it is furnished.
2.2.3 Admixtures
Provide admixtures, when required or approved, in compliance with the appropriate specification listed. Retest chemical admixtures that have been in storage at the project site, for longer than 6 months or that have been subjected to freezing, at the expense of the Contractor at the request of the Contracting Officer and will be rejected if test results are not satisfactory.
2.2.3.1 Air-Entraining Admixture
Provide air-entraining admixture that meets the requirements of
ASTM C260/C260M.
2.2.3.2 Accelerating Admixture
Provide calcium chloride meeting the requirements of ASTM D98. Other accelerators must meet the requirements of ASTM C494/C494M, Type C or E.
2.2.3.3 Water-Reducing or Retarding Admixture
Provide water-reducing or retarding admixture meeting the requirements of ASTM C494/C494M, Type A, B, or D. High-range water reducing admixture Type F may be used only when approved, approval being contingent upon particular placement requirements as described in the Contractor's Quality Control Plan.
2.2.4 Water
Mixing and curing water in compliance with the requirements of ASTM C1602/C1602M ; potable, and free of injurious amounts of oil, acid, salt, or alkali. Submit test report showing water complies with
SECTION 03 30 53 Page 7
ASTM C1602/C1602M .
2.2.5 Reinforcing Steel
Provide reinforcing bars conforming to the requirements of ASTM A615/A615M , Grade 60, deformed. Provide welded steel wire reinforcement conforming to the requirements of ASTM A1064/A1064M . Detail reinforcement not indicated in accordance with ACI 301 and ACI SP-66 . Provide mechanical reinforcing bar connectors in accordance with ACI 301 and provide 125 percent minimum yield strength of the reinforcement bar.
2.2.6 Expansion Joint Filler Strips, Premolded
Expansion joint filler strips, premolded of sponge rubber conforming to ASTM D1752, Type I.
2.2.7 Joint Sealants - Field Molded Sealants
Conform to ASTM C920, Type M, Grade NS, Class 25, use NT for vertical joints and Type M, Grade P, Class 25, use T for horizontal joints.
Provide polyethylene tape, coated paper, metal foil, or similar type bond breaker materials. The backup material needs to be compressible, nonshrink, nonreactive with the sealant, and a nonabsorptive material such as extruded butyl or polychloroprene foam rubber. Immediately prior to installation of field-molded sealants, clean the joint of all debris and further cleaned using water, chemical solvents, or other means as recommended by the sealant manufacturer or directed.
2.2.8 Formwork
Design and engineer the formwork as well as its construction in accordance with ACI 301 Section 2 and 5 and ACI 347R . Fabricate of wood, steel, or other approved material. Submit formwork design prior to the first concrete placement.
2.2.9 Form Coatings
Provide form coating in accordance with ACI 301 .
2.2.10 Vapor Retarder
ASTM E1745 Class A polyethylene sheeting, minimum 10 mil thickness or ASTM E1993/E1993M bituminous membrane or other equivalent material with a maximum permeance rating of 0.01 perms per ASTM E96/E96M.
Consider plastic vapor retarders and adhesives with a high recycled content, low toxicity low VOC (Volatile Organic Compounds) levels.
2.2.11 Curing Materials
Provide curing materials in accordance with ACI 301 , Section 5.
2.3 READY-MIX CONCRETE
Provide ready-mix concrete with mix design data conforming to ACI 301 Part
2. Submit delivery tickets in accordance with ASTM C94/C94M for each ready-mix concrete delivery, include the following additional information: .
a. Type and brand cement
SECTION 03 30 53 Page 8
b. Cement content in 94-pound bags per cubic yard of concrete
c. Maximum size of aggregate
d. Amount and brand name of admixture
e. Total water content expressed by water cementitious material ratio
2.4 ACCESSORIES
2.4.1 Waterstops
2.4.1.1 PVC Waterstop
Polyvinylchloride waterstops conforming to COE CRD-C 572 .
2.4.1.2 Rubber Waterstop
Rubber waterstops conforming to COE CRD-C 513 .
2.4.1.3 Thermoplastic Elastomeric Rubber Waterstop
Thermoplastic elastomeric rubber waterstops conforming to ASTM D471.
2.4.1.4 Hydrophilic Waterstop
Swellable strip type compound of polymer modified chloroprene rubber that swells upon contact with water conforming to ASTM D412 as follows:
Tensile strength 420 psi minimum; ultimate elongation 600 percent minimum. Minimum hardness of 50 on the type A durometer and the volumetric expansion ratio in distilled water at 70 degrees F; 3 to 1 minimum.
2.4.2 Chemical Floor Hardener
Provide hardener which is a colorless aqueous solution containing a blend of inorganic silicate or siliconate material and proprietary components combined with a wetting agent; that penetrates, hardens, and densifies concrete surfaces. Submit manufactures instructions for placement of liquid chemical floor hardener.
2.4.3 Curing Compound
Provide curing compound conforming to ASTM C309. Submit manufactures instructions for placing curing compound.
AMENDMENT 002******************************************************
2.4.4 SURFACE SEALER
Surface sealer shall be methyl methacrylate polymer acrylic emulsion, clear color. Sealer shall meet or exceeds slip resistance standards (when properly maintained) established by CSPA and UL as tested in accordance with ASTM D2047. Sealer shall be a minimum of 25 percent solid.
********************************************************AMENDMENT 002
PART 3 EXECUTION
3.1 PREPARATION
Prepare construction joints to expose coarse aggregate. The surface must
SECTION 03 30 53 Page 9 be clean, damp, and free of laitance. Construct ramps and walkways, as necessary, to allow safe and expeditious access for concrete and workmen.
Remove snow, ice, standing or flowing water, loose particles, debris, and foreign matter. Satisfactorily compact earth foundations. Make spare vibrators available. Placement cannot begin until the entire preparation has been accepted by the Government.
3.1.1 Embedded Items
Secure reinforcement in place after joints, anchors, and other embedded items have been positioned. Arrange internal ties so that when the forms are removed the metal part of the tie is not less than 2 inches from concrete surfaces permanently exposed to view or exposed to water on the finished structures. Prepare embedded items so they are be free of oil and other foreign matters such as loose coatings or rust, paint, and scale. The embedding of wood in concrete is permitted only when specifically authorized or directed. Provide all equipment needed to place, consolidate, protect, and cure the concrete at the placement site and in good operating condition.
3.1.2 Formwork Installation
Forms must be properly aligned, adequately supported, and mortar-tight.
Provide smooth form surfaces, free from irregularities, dents, sags, or holes when used for permanently exposed faces. Chamfer all exposed joints and edges , unless otherwise indicated.
3.1.3 Vapor Retarder Installation
Install in accordance with ASTM E1643. Apply vapor retarder over gravel fill. Lap edges not less than 12 inches. Seal all joints with pressure-sensitive adhesive not less than 2 inches wide. Protect the vapor barrier at all times to prevent injury or displacement prior to and during concrete placement.
3.1.4 Production of Concrete
3.1.4.1 Ready-Mixed Concrete
Provide ready-mixed concrete conforming to ASTM C94/C94M except as otherwise specified.
3.1.4.2 Concrete Made by Volumetric Batching and Continuous Mixing
Conform to ASTM C685/C685M.
3.1.5 Waterstops
Install and splice waterstops as directed by the manufacturer.
3.2 CONVEYING AND PLACING CONCRETE
Convey and place concrete in accordance with ACI 301 , Section 5.
3.2.1 Cold-Weather Requirements
Place concrete in cold weather in accordance with ACI 306R
SECTION 03 30 53 Page 10
3.2.2 Hot-Weather Requirements
Place concrete in hot weather in accordance with ACI 305R
3.3 FINISHING
3.3.1 Temperature Requirement
Do not finish or repair concrete when either the concrete or the ambient temperature is below 50 degrees F.
3.3.2 Finishing Formed Surfaces
Remove all fins and loose materials , and surface defects including filling of tie holes. Repair all honeycomb areas and other defects.
Remove all unsound concrete from areas to be repaired. Ream or chip surface defects greater than 1/2 inch in diameter and holes left by removal of tie rods in all surfaces not to receive additional concrete and fill with dry-pack mortar. Brush-coat the prepared area with an approved epoxy resin or latex bonding compound or with a neat cement grout after dampening and filling with mortar or concrete. Use a blend of portland cement and white cement in mortar or concrete for repairs to all surfaces permanently exposed to view shall be so that the final color when cured is the same as adjacent concrete.
3.3.3 Finishing Unformed Surfaces
Finish unformed surfaces in accordance with ACI 301 , Section 5.
Provide hard trowel finish at all locations, unless a different finish is required per the floor finish material manufacturer.
3.3.3.1 Flat Floor Finishes
In accordance with ACI 302.1R , construct in accordance with one of the methods recommended in Table 7.15.3, "Typical Composite FF/FL Values for Various Construction Methods." ACI 117 for tolerances tested by ASTM E1155M or ASTM E1155. These requirements are based upon the latest FF/FL method.
3.3.3.1.1 Floor Slabs
Conform floor slabs on grade to the following ACI F-number requirements unless noted otherwise:
Specified Overall Values FF30/FL23 minimum
Minimum Local Values FF17/FL15 minimum
3.3.3.1.2 Subject to Vehicular Traffic
Floor slabs on grade subject to vehicular traffic or receiving thin-set flooring shall conform to the following ACI F-number requirements:
Specified Overall Values FF35/FL25 minimum
Minimum Local Values FF25/FL17 minimum
SECTION 03 30 53 Page 11
3.3.3.2 Measurement of Floor Tolerances
Test floor slabs within 24 hours of the final troweling. Submit test results to Contracting Officer within 12 hours after collecting data.
Floor flatness inspector mustl provide a tolerance report which includes:
a. Name of Project
b. Name of Contractor
c. Date of Data Collection
d. Date of Tolerance Report
e. A Key Plan Showing Location of Data Collected
f. Results Required by ASTM E1155M ASTM E1155
3.3.3.3 Expansion and Contraction Joints
Make expansion and contraction joints in accordance with the details shown or as otherwise specified. Provide 1/2 inch thick transverse expansion joints where new work abuts an existing concrete. Provide expansion joints at a maximum spacing of 30 feet on center in sidewalks unless otherwise indicated. Provide contraction joints at a maximum spacing of 6 linear feet in sidewalks and at a maximum spacing of 15 feet in slabs, unless otherwise indicated. Cut contraction joints at a minimum of 1 inch(es) deep with a jointing tool after the surface has been finished.
3.4 CURING AND PROTECTION
Cure and protect in accordance with ACI 301 , Section 5.
3.5 FORM WORK
Provide form work in accordance with ACI 301 , Section 2 and Section 5.
3.5.1 Removal of Forms
Remove forms in accordance with ACI 301 , Section 2.
3.6 STEEL REINFORCING
Reinforcement must be free from loose, flaky rust and scale, and free from oil, grease, or other coating which might destroy or reduce the reinforcement's bond with the concrete.
3.6.1 Fabrication
Shop fabricate steel reinforcement in accordance with ACI 318 and ACI SP-66 .
Provide shop details and bending in accordance with ACI 318 and ACI SP-66 .
3.6.2 Splicing
Perform splices in accordance with ACI 318 and ACI SP-66 .
3.6.3 Supports
Secure reinforcement in place by the use of metal or concrete supports, SECTION 03 30 53 Page 12 spacers, or ties.
3.7 EMBEDDED ITEMS
Before placing concrete, take care to determine that all embedded items are firmly and securely fastened in place. Provide embedded items free of oil and other foreign matter, such as loose coatings of rust, paint and scale. Embedding of wood in concrete is permitted only when specifically authorized or directed.
3.8 CHEMICAL FLOOR HARDENER
Apply Chemical Floor Hardener where indicated, after curing and drying concrete surface. Dilute liquid hardener with water and apply in three coats. First coat is one-third strength, second coat one-half strength, and third coat two-thirds strength. Apply each coat evenly and allow it to dry 24 hours before applying next coat. Apply proprietary chemical hardeners in accordance with manufacturer's printed directions.
3.9 TESTING AND INSPECTING
Report the results of all tests and inspections conducted at the project site informally at the end of each shift. Submit written reports weekly.
Deliver within three days after the end of each weekly reporting period.
See Section 01 45 04.10 06 CONTRACTOR QUALITY CONTROL.
3.9.1 Field Testing Technicians
The individuals who sample and test concrete must have demonstrated a knowledge and ability to perform the necessary test procedures equivalent to the ACI minimum guidelines for certification of Concrete Field Testing Technicians, Grade I.
3.9.2 Preparations for Placing
Inspect foundation or construction joints, forms, and embedded items in sufficient time prior to each concrete placement to certify that it is ready to receive concrete.
3.9.3 Sampling and Testing
a. Obtain samples and test concrete for quality control during placement. Sample fresh concrete for testing in accordance with ASTM C172/C172M. Make six test cylinders.
b. Test concrete for compressive strength at 7 and 28 days for each design mix and for every 100 cubic yards of concrete. Test two cylinders at 7 days; two cylinders at 28 days; and hold two cylinders in reserve. Conform test specimens to ASTM C31/C31M. Perform compressive strength testing conforming to ASTM C39/C39M.
c. Test slump at the site of discharge for each design mix in accordance with ASTM C143/C143M. Check slump twice during each shift that concrete is produced for each strength of concrete required.
d. Test air content for air-entrained concrete in accordance with ASTM C231/C231M. Test concrete using lightweight or extremely porous aggregates in accordance with ASTM C173/C173M. Check air content at least twice during each shift that concrete is placed for each
SECTION 03 30 53 Page 13 strength of concrete required.
e. Determine temperature of concrete at time of placement in accordance with ASTM C1064/C1064M . Check concrete temperature at least twice during each shift that concrete is placed for each strength of concrete required.
3.9.4 Action Required
3.9.4.1 Placing
Do not begin placement until the availability of an adequate number of acceptable vibrators, which are in working order and have competent operators, has been verified. Discontinue placing if any lift is inadequately consolidated.
3.9.4.2 Air Content
Whenever an air content test result is outside the specification limits, adjust the dosage of the air-entrainment admixture prior to delivery of concrete to forms.
3.9.4.3 Slump
Whenever a slump test result is outside the specification limits, adjust the batch weights of water and fine aggregate prior to delivery of concrete to the forms. Make the adjustments so that the water-cementitious material ratio does not exceed that specified in the submitted concrete mixture proportion and the required concrete strength is still met.
AMENDMENT 002*****************************************************
3.10 SURFACE SEALER FINISH
Provide surface sealer to all concrete floor areas not scheduled to receive other finished materials. This includes existing finished surfaces such as previously epoxy, painted or other coated or uncoated or new concrete floor surfaces. Apply product in accordance with manufacturer’s instructions.
3.10.1 Surface Preparation
Remove existing floor covering at all areas scheduled to receive surface sealer finish. Shot blast or grind entire surface floor where indicated to receive surface sealer finish to produce a level of coarseness equal to ICRI 03732 CSP 2 or 3. Overlap each pass of shot blasting by 1/4 inches to 1/2 inches. Add new shot to shot blasting equipment prior to blasting.
Prepare surfaces inaccessible to shot blasting, base of perimeter walls and under secured equipment, using diamond disk grinding or grinding and/or light scarification to produce a level of coarseness equal to ICRI 03732 CSP 2 or 3. Resulting surfaces shall appear clean and contain the appropriate level of surface coarseness. If the resulting level of cleanliness cannot be determined, place numerous drops of water on surfaces that appear contaminated. If the water drops soak into concrete, the surfaces are free of hydrocarbon contamination (oils, grease, skydrol). If the water drops bead up and do not flatten out, surfaces require additional degreasing as detailed in the Article entitled "DEGREASING." Sweep, vacuum, and run a high powered magnet over all surfaces to be coated, including joints where shot blast was used
SECTION 03 30 53 Page 14
3.10.2 Degreasing
Degrease entire floor other than new concrete by scrubbing. Using a solution of hot potable water, 120 degrees F to 170 degrees F, and a concentrated water-based alkaline degreaser. Perform two complete degreasing cycles on the entire floor surface. Allow solution to soak into surfaces prior to scrubbing and remove using hot potable water under a minimum of 4,000 psi. Rinsing is complete when the rinse water appears clear. If the industrial detergent is not biodegradable, collect all rinse water and dispose as hazardous waste. Squeegees and shop vacuums may be used to collect pooling rinse water. Fans may be used to aid drying of floor surfaces.
3.10.2.1 Application of Surface Sealer
After cleaning, exterior exposed architectural concrete surfaces indicated shall be given one coat of surface sealer, by mop applied unless otherwise approved. Adjacent surfaces shall be protected to prevent damage from the surface sealer.
*****************************************************AMENDMENT 002
-- End of Section --
SECTION 03 30 53 Page 15
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 03 30 53 Page 16
| SF30 |
| SUMMARY OF CHANGES |
| 00 73 00 |
| General Decision Number: NC20200041 08/14/2020 |
| Site Visit Roster 08/04/2020 |
| Site Visit Roster 08/12/2020 |
| 03 30 53 |
| AW-39-01-13_Combined.pdf |
| AW-39-01-13_9OF45 |
| AW-39-01-13_10OF45 |
| AW-39-01-13_11OF45 |
| AW-39-01-13_12OF45 |
| AW-39-01-13_13OF45 |
| AW-39-01-13_14OF45 |
| AW-39-01-13_15OF45 |
| AW-39-01-13_16OF45 |
| AW-39-01-13_17OF45 |
| AW-39-01-13_18OF45 |
| AW-39-01-13_19OF45 |
| AW-39-01-13_20OF45 |
| AW-39-01-13_21OF45 |
| AW-39-01-13_22OF45 |
| AW-39-01-13_23OF45 |
| AW-39-01-13_24OF45 |
| AW-39-01-13_25OF45 |
| AW-39-01-13_26OF45 |
| AW-39-01-13_28OF45 |
| VKAG 92-3101_Combined.pdf |
| VKAG 92-3101_S-1 |
| VKAG 92-3101_S-2 |
| VKAG 92-3101_S-3 |
| VKAG 92-3101_S-4 |
| VKAG 92-3101_S-5 |
| VKAG 92-3101_S-6 |
| VKAG 92-3101_S-7 |
| VKAG 92-3101_S-8 |
| VKAG 92-3101_S-9 |
| VKAG 92-3101_S-10 |
| VKAG 92-3101_S-11 |
File details come from the government source that posted it. Updated .