This Request for Proposal (RFP) solicits design-build services for a full facility restoration of the Maurice Britt Army Reserve Center in North Little Rock, Arkansas. The scope of work includes repairing failing building systems such as HVAC, plumbing, mechanical, electrical, fire alarm and telecommunications in a 77,871 square foot training building and an 11,480 square foot area maintenance support activity building. Interior repair work includes ceilings, lighting, doors, sprinklers and finishes, as well as asbestos abatement. Exterior work includes site work, lighting and a new military equipment parking area. Accessibility, antiterrorism/force protection, physical security, sustainability and energy measures will also be incorporated. This is a two-phase procurement using best value tradeoff source selection. The Army Corps of Engineers is the contracting agency. Proposals are due June 16, 2020.

View the file

Other files

File Type Posted
W912QR20R0022-0004.pdf PDF
W912QR20R0022-0003.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
W912QR20R0022Specs_Vol1B-0002.pdf PDF
W912QR20R0022Specs_Vol2-0002.pdf PDF
W912QR20R0022Specs_Vol1A-0002.pdf PDF
W912QR20R0022Specs_Vol1D-0002.pdf PDF
W912QR20R0022Specs_Vol1C-0002.pdf PDF
W912QR20R0022Plans-0002.pdf PDF
W912QR20R0022-0001.pdf PDF
W912QR20R0022-0000.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation For Full Facility Restoration Army Reserve Center (ARC), North Little Rock, AR

P2: 447933

Design Build

Specifications - Vol. 1 (A-D) of 2

Certified Final Design Submittal - Phase II

15 May 2020

W912QR20R0022-0002

24 February 2020

W912QR20R0022

ARIMS: 200A

Disposition: Maintain for 15yrs after construction

W912QR20R0022Specs_Vol1-0002

W22W9K00133892

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912QR20R0022 for the Full Facility Restoration of an Army Reserve Center located in North Little Rock, AR is hereby amended as follow s;

1. PLEASE SEE SUMMARY OF CHANGES

1. CONTRACT ID CODE PAGE OF PAGES

1 31

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-May-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20R0022

X 9B. DATED (SEE ITEM 11)

25-Feb-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-May-2020

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912QR20R0022

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMDT 0002 SUMMARY OF CHANGES

SF 1442:

The proposal due date and time has been extended to 16 June 2020 at 2:00PM ET.

SECTION 00 10 00 –

The Price Breakout Schedule has been added in its entirety.

SECTION 00 21 00 –

See Clause 52.236-27 ALT I for site visit details.

SECTION 00 22 00 –

Section 00 22 18 Procedures for Submission & Evaluation of Offers for Phase II has been added in its entirety.

Section 00 73 00

The following wage rates have been added in their entirety;

Building – General Decision Number: AR20200032 01/24/2020 Heavy – General Decision Number: AR20200056 01/03/2020

The following Specification Sections have been replaced in their entirety:

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

00 80 00.00 06 Special Provisions

DIVISION 01 – GENERAL REQUIREMENTS

01 02 00.00 48 Statement of Work

The following are now included:

Drawings Hazardous Material Investigation Report/Project Photographs – Volume 1B Existing Building As-Built Documents Volume 1C and Volume 1D Technical Specifications – Division 03 thru 14 & Division 21 thru 41 – Volume 2

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 03-Apr-2020 02:00 PM to 16-Jun-2020 02:00 PM.

The following have been modified:

PRICE BREAKOUT SCHEDULE

PRICE BREAKOUT SCHEDULE

PROJECT: United States Army Reserve Center

LOCATION: Camp Pike North Little Rock, AR

PROPOSER’S NAME:

BASE PROPOSAL

Item No. Description Unit Amount

0001 Primary Facilities – Training Building job $

0002 Primary Facilities – OMS/AMSA Building job $

0003 Project Site Work job $

0004 Fire Pump & Enclosure job $

0005 Fire Pump Water Storage Tanks job $

0006 Communications Extension to Building 1 job $

0007 ADA Parking Areas and Associated Sidewalk job $

0008 Project Design Fees job $

0009 NPDES Construction Permit Fee job $ 800

Subtotal $

OPTION ITEMS

0010 Option ‘A’ - Operations and Maintenance – Army Reserve (OMAR) Funded Equipment Items job $

0011 Option ‘B’ – “Bona Fide Need" Operations and Maintenance, Army Reserve (OMAR) Funded Equipment Items – Army Reserve Side job $

0012 Option ‘B.1’ – “Bona Fide Need" Operations and Maintenance, Army Reserve (OMAR) Funded Equipment Items - Navy/USMC Side job $

0013 Option ‘C”– Convert DEPMDS area to MEP – aggregate surface job $

0014 Option ‘D’ – Convert DEPMDS area to MEP – pavement job $

0015 Option ‘E’ – West POV parking lot work. job $

0016 Option ‘F’ – East POV parking lot work job $

0017 Option ‘G’ – MEP parking lot work job $

0018 Option ‘H’ – Extend roof warranty 10 years job $

0019 Option ‘I’ – Extend roof warranty 20 years job $

0020 Option ‘J’ – Replace metal wall panels in lieu of repair and repainting. job $

0021 Option ‘K’ – Crane at OMS/AMSA Building job $

TOTAL BASE PROPOSAL + OPTION ITEMS $

Description of Base Proposal Items

(a) Item No. 0001 “Primary Facilities – Training Building” includes all Base Proposal construction work required within a line five feet outside of the Training building, except that work covered by Item No. 0002, 0003, 0004, 0005, 0006, and 0007.

(b) Item No. 0002 “Primary Facilities – OMS/AMSA Building” includes all Base Proposal construction work required within a line five feet outside of the OMS/AMSA building, except that work covered by Item No.

0001, 0003, 0004, 0005, 0006, and 0007.

(c) Item No. 0003 “Project Site Work” includes all Base Proposal work required beyond a line five feet outside the building excluding all site Option work, except that work covered by Item No. 0004, 0005, 0006, and 0007.

(d) Item No. 0004 “Fire Pump & Enclosure”, includes the cost for the Offeror to provide and connect a fire pump and enclosure.

(e) Item No. 0005 “Fire Pump Water Storage Tanks”, includes the cost for the Offeror to provide and connect the fire pump water storage tanks along with their associated concrete foundations.

(f) Item No. 0006 “Communications Extension to building 1” includes all Base Proposal work required beyond a line five feet outside the building necessary to provide communications connectivity to and within Building as described in the documents.

(g) Item No. 0007 “ADA Parking areas and associated sidewalk” includes all Base Proposal work required to provide two accessible parking areas and adjacent sidewalks as shown on Sheet CS101 Key Note 17.

(h) Item No. 0008 “Project Design Fees” includes the fees for the Offeror’s design professionals to complete the Base Proposal design, design for optional items A, B, B.1, and construction documents for the project.

(i) Item No. 0009 “NPDES Construction Permit Fee” includes the fee for the NPDES Construction Permit.

(j) Item No. 0010 “Option ‘A’ - Operations, Maintenance Army Reserve (OMAR) Funded Equipment Items (Items funded at or shortly after the time of construction award) ” includes all work required to furnish and install “OMAR Funded” equipment items which are considered to be permanently attached to the construction.

OMAR funded equipment is to be Contractor provided and Contractor installed (CFCI).

CFCI OMAR Funded Equipment Items for this project consists of:

1. Metal lockers at Training Center Building Army Reserve side rooms 114 and 115. Navy/USMC side rooms 122, 123A.

2. Wire Mesh Caging at Training Center Building Navy/USMC side 103, and 121.

3. Wire mesh caging at OMS/AMSA Building rooms 08, 09, 10, 11, 13, and 14.

This Option can be awarded within 120 calendar days from Notice to Proceed (NTP).

(k) Item No. 0011 “Option ‘B’ “Bona Fide Need” Operations, Maintenance Army Reserve (OMAR) Funded Equipment Items – Army Reserve Side (To be awarded within six months of BOD)” includes all work required to furnish and install “OMAR Funded Equipment Items” which are considered to not be permanently attached to construction. OMAR funded equipment is to be Contractor provided and Contractor installed (CFCI).

CFCI “Bona Fide Need” OMAR Funded Equipment Items for this project consists of:

1. Freestanding metal shelving as per section 01 02 00.00 48 paragraph 6.5.17,18,19 and 20 at

Training Center Building Army Reserve side rooms 126, 129, D3.3.

2. Refrigerator Army Reserve side room Breakroom 238.

3. Undercounter refrigerator Army Reserve side room Lactation 113.

4. Microwave Army reserve side room Lactation 113 and Breakroom 238.

5. Window treatments as per section 01 02 00.00 48 paragraph 6.5.12.

6. Fire extinguishers as per section 01 02 00.00 48 paragraph 6.5.15.

7. Exterior ash/trash at exterior entries to the Army Reserve side (quantity of 3) and AMSA (quantity of 1).

This Option can be awarded within 600 calendar days from Notice to Proceed (NTP).

(l) Item No. 0012 “Option ‘B.1’ “Bona Fide Need” Operations, Maintenance Army Reserve (OMAR) Funded

Equipment Items Navy/USMC Sdie (To be awarded within six months of BOD)” includes all work required to furnish and install “OMAR Funded Equipment Items” which are considered to not be permanently attached to construction. OMAR funded equipment is to be Contractor provided and Contractor installed (CFCI).

CFCI “Bona Fide Need” OMAR Funded Equipment Items for this project consists of:

1. Freestanding metal shelving as per section 01 02 00.00 48 paragraph 6.5.18, and 20. Navy/USMC side Room 111.

2. Window treatments as per section 01 02 00.00 48 paragraph 6.5.12.

3. Fire extinguishers as per section 01 02 00.00 48 paragraph 6.5.15.

4. Exterior ash/trash at exterior entries to the Navy/USMC side (quantity of 3).

5. Refrigerator Navy/USMC side rooms 104 and 239.

This Option can be awarded within 800 calendar days from Notice to Proceed (NTP).

(m) Item No. 0013 “Option ‘C’ – “Convert DEPMDS area to MEP – aggregate surface.”, includes the cost to design and construction to provide roadway resurfacing and extensions, new aggregate surface, and associated site work for a new MEP lot as shown

(n) Item No. 0014 “Option ‘D’ – “Convert DEPMDS area to MEP - pavement “ includes the cost to design and construction for paving within Option C areas as shown.

This Option can be awarded within 120 calendar days from Notice to Proceed (NTP).

Item No. 0015 “Option ‘E’ – “West POV parking lot work” includes the cost for design and construction to resurface the west POV lot and other associated sitework as shown.

(o) Item No. 0016 “Option ‘F’ – “East POV parking lot work” includes the cost for design and construction to resurface the east POV lot and other associated sitework as shown.

(p) Item No. 0017 “Option ‘G’ – “MEP parking lot work” includes the cost for design and construction to resurface the MEP lot and other associated sitework as shown. Note that new fencing, gate, and lighting in this area are included in Line Item 0003.

(q) Item No. 0018 “Option ‘H’ – “Extend roof warranty – 0 years” includes the cost for design and construction to extend existing roof warranty 10 years.

(r) Item No. 0019 “Option ‘I’ – “Extend roof warranty – 20 years” includes the cost for design and construction to extend existing roof warranty 20 years.

(s) Item No. 0020 “Option ‘J’– “Replace metal wall panels in lieu of repair and repainting” includes the cost for the design and construction to replace all metal wall panels on the Training Center and OMS/AMSA buildings. Note this options included deducting the cost of wall panel repair and replacement included in the base proposal.

(t) Item No. 0021 “Option ‘K’– Crane at OMS/AMSA Building” includes the cost to add one hoist to provide two directional lifting coverage for the area shown on the OMS/AMSA floor plan.

SECTION 00 21 00 - INSTRUCTIONS

PROPOSAL SUBMISSION INSTRUCTION

Proposals: ALL SUBMISSIONS TO THIS PROPOSAL ANNOUNCEMENT SHALL BE SUBMITTED ELECTRONICALLY THROUGH DOD SAFE. No paper copies, CD-ROMs or facsimile submissions will be accepted. Electronic Proposal Submission is required through the Army’s Electronic File Sharing Service, DOD SAFE (https://safe.apps.mil). The DOD SAFE Application is used to send large files to individuals that would normally be too large to send via email. There are no user accounts for SAFE. Authentication is handled via email.

Anyone has access to DOD SAFE, and the application is available for use by anyone. The SAFE “Getting Started Guide” has information on how to utilize the system (https://safe.apps.mil/about.php). Instructions for uploading are as follows:

1. Send an email to the Contracting Officer and Contract Specialist to receive the link to drop off your proposal. This will need to be completed five (5) business days prior to proposal due date.

a. Jesse Scharlow, Contract Specialist at jesse.e.scharlow@usace.army.mil

b. Emily Moore, Contracting Officer at emily.a.moore@usace.army.mil

2. You will receive an email with the link to submit your drop-off. The link will be provided no later than two

(2) business days prior to the proposal due date.

3. Short Note to the Recipients: Click the Add Files or Drag and Drop your files. For file description, enter

W912QR20R0022-FIRMNAME.

4. Click Upload button to send documents.

5. Guest users will need to check their email to verify their email address before the recipients will be notified. (Government-issued Common Access Cards (CACs) are not required).

File Size Limitations: Offerors are advised to follow the DOD SAFE instructions for uploading files. DOD SAFE supports delivery up to 8GB. If needed, Offerors are advised to break the files down into smaller sections in order to upload it to the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below.

File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:

W912QR20R0022-FIRMNAME-VOLUME I

W912QR20R0022-FIRMNAME-VOLUME II

Each file name shall begin with the solicitation number followed by the firm’s name and a brief file description.

Please see examples above.

File Organization: Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 10 or larger. Pages shall be letter sized (larger page sizes (such as 11x17 fold-outs, etc.) will be counted as two pages. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in the each section for each factor.

Upload Completion & Deadline: Interested parties shall submit responses no later than the date specified on the solicitation document. The time & date of proposal receipt will be the upload completion / delivery time & date recorded within DOD SAFE site. Do not assume that electronic submission will occur instantaneously. Large files (e.g. 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Offerors are encouraged to keep a copy of the upload confirmation for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 15.208.

Electronic Files: Files shall be in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft Office or Adobe applications. Data submitted in a spreadsheet format shall be readable by MS Excel (all cells and formulas should be unlocked).

Any information, presented in a proposal that the Offeror wants safeguarded from disclosure to other parties must be identified and labeled in accordance with the requirements of Provision “FAR 52.215-1, Instructions to Offerors – Competitive Acquisition (Jan 2017),” subparagraph (e), which is found in 00 21 00 Instructions of the RFP. The Government will endeavor to honor the restrictions against release requested by Offerors, to the extent permitted under United States law and regulations.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit will be conducted on 27 May 2020 at 10:00AM EST.

(c) The address is 8000 Camp Robinson Road, NLR, AR 72118. To gain access to Camp Pike, contractors must first go the main gate for Camp Robinson, located at the corner of Donavan Briley BLVD and Military Road, North Little Rock, AR. After arriving at the main gate, contractors must then go to the visitor center, state the purpose of their visit, and provide security with a list of the visitors associated with the site visit. Drivers must provide a current driver's license, vehicle insurance and vehicle registration. With this information security will issue a pass. Visitors should then follow the attached strip map to Camp Pike.

1) Three people max attendance per offeror.

2) All attendees need to wear face masks.

3) Group will meet in front of building 2 to start the site visit.

4) Group will need to maintain social distancing requirements.

(End of provision)

SECTION 00 22 00 - SUPPLEMENTARY INSTRUCTIONS

00 22 18

SECTION 00 22 18

PROCEDURES FOR SUBMITTAL AND EVALUATION OF OFFERS FOR PHASE TWO

1. Overview.

1.1 The intent of this solicitation is to select one contractor for the Design and Construction of a Full

Facility Restoration (FFR) project to renovate and repair an Army Reserve Center (ARC) located in North Little Rock, AR.

1.2 This is a two-phase procurement and the basis of award is the Best Value Trade-Off Process. Following completion of the evaluation of Phase I, up to a maximum of five (5) most highly qualified offerors will be selected to participate in Phase II. The selected offerors for Phase II will be invited to submit the information described in this Section 00 22 18, Procedures for Submittal and Evaluation of Offers for Phase II, for review and evaluation by the Government. Following completion of the Phase II evaluation, the Contracting Officer will award a firm fixed price contract to the responsible offeror whom the Source Selection Authority determines conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, all factors considered. The Government reserves the right to accept other than the lowest priced offer or to reject all offers. For Phase II submittals, requirements stated in this RFP are minimums.

NOTE: The rating information from Phase I will not be considered in Phase II or in the final selection.

1.3 The target ceiling for contract award is $18,377,000.00 based on the funds made available for this project.

The Government cannot guarantee that additional funds will be available for award. Offerors are under no obligation to approach this ceiling.

2. Submittal of Offers.

2.1 Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals so that a minimum of time and monies will have been expended in preparing information required herein. However, in order to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the offeror's capability for successfully completing the solicited project. For Phase II, requirements stated in this Request for Proposal (RFP) are minimums.

Innovative, creative, or cost-saving proposals that meet or exceed the requirements are encouraged and will be rated accordingly. Proposals should follow in the order of sequence set forth in the RFP. Information provided out of sequence may not be evaluated and may result in the offeror’s disqualification from award.

2.2 Offerors shall submit their proposals electronically in accordance with the Proposal Submission

Instructions in Section 00 21 00 of the solicitation. Please follow the instructions precisely as proposals must complete the upload no later than the time and date specified in Block 13 of Standard Form 1442.

NOTE: The Louisville District is in the Eastern Time Zone.

2.3 The Government is using a two-phase procurement approach for this design/build project. For Phase II, offerors are required to submit a proposal consisting of the information identified in paragraphs 2.4 and 2.5 below. All proposal materials shall be submitted electronically in accordance with the Proposal Submission Instructions in Section 00 21 00 of the solicitation. The sections should parallel the submission requirements identified herein.

2.4 Volume I for Phase II shall be submitted electronically in accordance with the Proposal Submission

Instructions in Section 00 21 00 of the solicitation and include the following information:

Volume I – Factor I: Design Narrative Volume I – Factor II: Schedule Narrative

Volume I – Factor III: Small Business Participation Plan

*NOTE: Failure to place the required submission information under the appropriate tab (factor or sub factor) may result in a lower rating if the evaluators cannot readily find the appropriate information. Any specified page limits will be strictly adhered to and enforced. Information submitted that exceeds the specified limit(s) will not be evaluated.

2.5 Volume II for Phase II shall be submitted electronically in accordance with the Proposal Submission

Instructions in Section 00 21 00 of the solicitation and shall include the following information:

Volume II – Tab A: Standard Form 1442 and Price Breakout Schedule Volume II – Tab B: Joint Venture Agreements Volume II – Tab C: Evidence of Ability to Obtain Bonding and Proof of Financial Ability Volume II – Tab D: Pre-Award Information Volume II – Tab E: Subcontracting Plan

NOTE: Failure to place the required submission information under the appropriate tab may result in a lower rating if the evaluators cannot readily find the appropriate information.

3. Proposal Evaluation Process.

3.1 A Source Selection Evaluation Board (SSEB) comprised of representatives of the Corps of Engineers, User/Customer, and other required personnel will evaluate the proposals. Offerors are advised that the technical evaluation and rating of proposals will be conducted in strict confidence. Technical (Volume I) proposals will be reviewed and rated without knowledge of the price offered. The number and identities of offerors are not revealed to anyone not involved in the evaluation and award process or to other offerors.

Proposals will be evaluated based on the factors described herein, and the basis of award is a Best Value Trade-Off, as stated above.

3.2 The evaluation process for Phase II essentially consists of four parts: proposal compliance review and responsibility review, technical evaluation, price evaluation, and price/technical trade-off analysis.

3.2.1 Proposal Compliance / Responsibility Review: This is an initial review to ensure that all required forms and certifications are complete, that both a technical and price proposal were received, and that the offeror is financially capable of sustaining performance under the contract and is able to obtain the required level of performance and payment bonds from an acceptable surety.

3.2.2 Technical Evaluation: The SSEB will evaluate and rate the Phase II Volume I proposals against the RFP requirements. Factors I and II (Design Narrative, and Schedule Narrative) will be rated using Table 4 below. Factor III – Small Business Participation Plan will be rated using Table 5 below.

3.2.3 Price Evaluation: The SSEB and Contracting Officer/SSA will evaluate price proposals independent of the technical evaluation. The SSEB will not have access to price information until completion of the technical evaluation.

3.2.4 Price/Technical Trade-off Analysis: After all above evaluations are complete, the Contracting Officer/SSA will compare the relative advantages and disadvantages of technical proposals and compare prices. The Source Selection Authority (SSA) will then consider all factors to select the proposal offering the best value to the Government.

4. Proposal Information and Related Evaluation Factors.

4.1 Phase II proposals will be evaluated in accordance with the factors below, listed in relative order of importance. All evaluation factors, other than price, when combined are considered approximately equal to price. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

4.2 Volume I – Factor I: Design Narrative 1st

4.3 Volume I – Factor II: Schedule Narrative 2nd

4.5 Volume I – Factor III: Small Business 3rd

Participation Plan

4.6 Volume II - Price and Pro Forma Information (Sealed Envelope)

Tab A Standard Form 1442 and Price Breakout Schedule Not Rated

Tab B Joint Venture Agreement Not Rated

Tab C Evidence of Ability to Obtain Bonding and Not Rated Proof of Financial Ability

Tab D Pre-Award Information Not Rated

Tab E Subcontracting Plan Acceptable / Unacceptable

4.7 Ratings

Evaluators will apply the rating for the definition that most closely matches the evaluation.

TABLE 4

Technical / Risk Assessment Ratings Adjectival Rating Description

Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.

Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.

Acceptable

Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.

Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Unacceptable Proposal does not meet the requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.

TABLE 5

Small Business Ratings

Rating Description

Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the small business objectives.

Unacceptable Proposal does not meet the small business objectives.

4.8 Definitions

1. Deficiency. A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.

2. Strength. An aspect of an offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

3. Significant Strength. An aspect of an offeror’s proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.

4. Weakness. A flaw in the proposal that increases the risk of unsuccessful contract performance. See

FAR 15.001.

5. Significant Weakness. A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.

6. Uncertainty. Any aspect of a non-cost/price factor proposal for which the intent of the offeror is unclear (e.g., more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission, or mistake).

7. Clarification. Limited exchanges between the Government and offerors that may occur when award without discussions is contemplated. See FAR 15.306(a)(1).

8. Adverse Past Performance. Past performance information that supports a less than satisfactory rating on any evaluation. Adverse past performance that must be addressed with Offerors includes unfavorable comments received from sources such as those received from respondents from past performance questionnaires or interviews that have not been finalized within a formal rating system.

5. Volume I – Factor I: Design Narrative

5.1 Submission Requirements:

5.1.1 Provide a clear and concise narrative describing your proposed design process for this project, especially with regard to sequencing of work within a renovation. Proposed narratives shall also address the design process (submittal reviews, fast-track (if utilized), etc.) and logic/rationale for the following building systems:

Mechanical Electrical Plumbing Fire Protection

NOTE: There is a limit of eight (8) single sided, 8.5” x 11” pages, using a minimum font size of 11 and a minimum margin of one-half inch on all sides, for the Design Narrative factor.

5.2 Evaluation Criteria:

5.2.1 The Design Narrative will be evaluated based on the offeror’s understanding of the USACE design / build process. Projects that demonstrate a complete understanding for the design of this project’s requirements may be viewed more favorably by the Government.

6. Volume I – Factor II: Schedule Narrative

6.1 Submission Requirements:

Based on the project budget and scope, provide a schedule narrative describing the construction sequence / process for successful completion of each phase of the project (Design, Construction, Commissioning and Close-Out) within the duration shown in FAR 52.211-10. Offerors may propose a shorter duration for completion, but Government review times shall not be shortened. The Schedule Narrative shall address the major construction milestones and tasks indicated below:

Design Phase / Packages Construction Phasing Fast Tracking (if utilized) Pre-Construction Submittals and Review Long Lead Items Commissioning with critical submittals Red Zone Meeting

As-Builts Closeout

NOTE: There is a page limit of ten (10) single sided, 8.5” x 11” pages, using a minimum font size of 11 and a minimum margin of one-half inch on all sides for this factor.

6.2 Evaluation Criteria:

The narrative will be evaluated based on the understanding of events identified in paragraph 6.1 above and the offeror’s capability to complete the schedule within the contract duration. Narratives that demonstrate a clear understanding of the schedule impacts of the major milestones and tasks and provide a thorough approach for successfully completing the contract within the contract duration may be rated more favorably by the SSEB. Schedules offering duration less than that shown in 52.211-10 may receive a higher rating if the proposed schedule is shown to be realistic and achievable while still addressing the major milestones and tasks required without reducing Government Review time.

NOTE: The SSEB will evaluate the offeror’s schedule narrative using calendar days, not dates. The Government reserves the right to accept or decline a proposed shorter duration as part of the contract award. Should the Government accept the proposed shorter duration, the contract completion stated in 52.211-10 will be replaced with the offeror’s proposed completion duration.

7.0 Volume I – Factor III: Small Business Participation Plan

7.1 Submission Requirements

ALL OFFERORS ARE REQUIRED TO SUBMIT A SMALL BUSINESS PARTICIPATION PLAN. The Small Business Participation Plan shall be based on the offeror’s best effort and is required to address each of the following areas individually:

The extent to which the small business programs listed in FAR 19 (small business, small disadvantaged business, woman-owned small business, HubZone, service disabled veteran owned small business, etc.) are specifically identified in the Small Business Participation Plan;

The extent of participation of such firms in terms of the value of the total acquisition in %’s for the base year and for each individual option year; the extent of commitment to use such firms (for example, enforceable commitments, i.e., teaming agreements signed, are to be considered more heavily than non-enforceable ones);

The complexity and variety of the work small firms are to perform on this acquisition;

The practicality of the Small Business Participation Plan, i.e., aggressive goals.

The Small Business Participation Plan shall be organized as follows:

(1) Prime Contractor type of business (check all that apply):

( ) Large ( ) Small (also check type of small business) ( ) Small Non-Disadvantaged Business ( ) Small Disadvantaged Business ( ) Woman-Owned Small Business ( ) HUBZone Small Business ( ) Veteran Owned Small Business ( ) Service Disabled, Veteran Owned Small Business

(2) Percentage of your participation as a prime contractor: __________________ %

NOTE: Small Business primes’ self-performance counts as Small Business Participation, and small business primes may achieve small business participation goals through their own performance/participation as a prime and/or through subcontracting to other small businesses.

(3) Percentage of total contract value of subcontracts planned for:

% of Total Contract Value

Large % Total Small % Small Non-Disadvantaged % Small Disadvantaged % Small Woman Owned % Small HUB Zone % Small Veteran Owned % Small Service Disabled Veteran Owned %

Each percentage above shall be accompanied by detailed supporting documentation regarding individual commitments.

NOTE: The sum of the percentages of Small Non-Disadvantaged and Small Disadvantaged should equal the entries for the Total Small; however, the sum of all of the percentages need not equal 100% since the prime is not included and individual subcontractors may be counted towards more than one category.

(4) List principal supplies/services (be specific) to be subcontracted to:

Name of Company

Type of Service/Supply

Large Small Non-Disadvantaged Small Disadvantaged Small Woman Owned Small HUB Zone Small Veteran Owned Small Service Disabled Veteran Owned

(5) Prior Performance Information: Provide any information substantiating the offeror’s track record of utilizing small business on past contracts.

(6) For Large and Small Businesses provide descriptive information for all small business categories. Any information concerning long-term relationships with Small Business subcontractors, such as mentor-protégé relationships, should be provided.

(7) Extent of Commitment: Provide documentation regarding enforceable commitments to utilize any small business category as defined in FAR Part 19 as subcontractors.

(8) Small Business Subcontracting Plan: Each Large Business Offeror shall provide a Small Business Subcontracting Plan that contains all of the elements required by FAR Clause 52.219-9. This Plan shall be submitted separately from the Small Business Participation information required above which applies to both Large and Small Businesses. The Subcontracting Plan is not a requirement for evaluation in source selection but rather a requirement for award to a Large Business. The approved Small Business Subcontracting Plan will be incorporated into any resultant contract(s).

7.2 Evaluation Criteria:

ALL OFFERORS ARE REQUIRED TO SUBMIT A SMALL BUSINESS PARTICIPATION PLAN.

The Small Business Participation Plan will be evaluated based on the offeror’s best efforts, the level of small business commitment that is being demonstrated for the proposed acquisition, and the prior level of commitment to utilizing small businesses in performance of prior contracts. The Small Business Participation Plan must meet the minimum Total Small Business Participation goal of Twenty percent (20%) of the total contract value (through collective small business participation from any type of small business or sub-category small business).

Pursuant to DFARS PGI 215.304(c), the following elements will be considered in evaluating an offeror’s Participation Plan:

The extent to which such firms, as defined in FAR Part 19, are specifically identified in plans;

The extent of commitment to use such firms (enforceable commitments will be weighted more heavily than non-enforceable ones);

The complexity and variety of the work such firms are to perform;

The realism of the plans;

Past performance of offerors in complying with the requirements of the Subcontracting Plan Goals for such firms and monetary targets for participation;

The extent of participation of such firms in terms of the proposed subcontracted value; and The extent to which the offeror provides detailed explanations/documentation supporting the proposed participation percentages, or lack thereof. The Department of Defense (DOD) has established small business goals to help ensure small business receives a fair proportion of DOD awards.

8.0 Volume II - Price and Proforma Information

8.1 Tab A - Standard Form 1442 and Proposal Price Breakout Schedule.

8.1.1 Submission Requirements:

The offeror shall complete and submit Standard Form 1442 and Section 00 10 00, Proposal Price Breakout Schedule. Both of these forms are included in Section 00 10 00 of this solicitation.

8.1.2 Evaluation Criteria:

The price will be evaluated on base proposal plus all options. The price will be evaluated for fairness and reasonableness through the use of a price analysis. Price will also be checked for unbalancing of line items.

Offerors are cautioned to distribute costs appropriately.

8.2 Tab B – Joint Venture Agreements

8.2.1 Submission Requirements:

If more than one contractor is listed in Block 14, or the offeror listed in Block 14 is a joint venture (JV), then a signed JV agreement must be submitted with the proposal and the offeror shall be registered in the System for Award Management (SAM) as a legal entity separate from the individual joint venture members. However, each member of the JV must submit its own Unique Entity Identifier (formally DUNS number) with the proposal.

Small business offerors (e.g., 8(a), HUBZone, SDVOSB) submitting a proposal as a JV or Mentor-Protégé shall submit evidence from the offeror's SBA Servicing Agency that the offeror has notified and discussed the proposed joint venture for this specific project with the appropriate SBA Representative or Business Opportunity Specialist. Joint Venture agreements and approved 8(a) Mentor-Protégé agreements must be submitted with the proposal.

8.2.2 Evaluation Criteria:

This information will be used for the purpose of completing the Pre-Award Survey and will not be rated.

Joint Venture Agreements and Mentor-Protégé agreements must comply with the relevant regulations in Title 13 of the Code of Federal Regulations in order for an offeror to be eligible for any small business-related price preference.

8.3 Tab C – Evidence of Ability to Obtain Bonding and Proof of Financial Ability

8.3.1 Submission Requirements:

A. Financial Capability. Submit Proof of Financial Ability (Most recent financial statement covering assets and liabilities). Include the name, address, and telephone number of offeror's banking institution. If the offeror is a joint venture, submit this information for all joint venture members.

B. Bonding Capability. Submit information showing offeror's ability to be bonded for this project. Include the name, address, and telephone number of the offeror's bonding company.

8.3.2 Evaluation Criteria:

This information will be used for the purpose of completing the Pre-Award Survey and will not be rated.

See FAR Part 28 for information related to bonds.

8.4 Tab D – Pre-Award Information

8.4.1 Submission Requirements:

A. The offeror shall submit one completed copy of Section 00 45 00, Representations and Certification.

B. The offeror shall submit the following information:

a) Number of years the firm has been in business

b) Name, address, and telephone numbers of two credit/trade references

c) A list of present commitments, including the dollar value

If the offeror is a joint venture, submit this information for all joint venture members.

8.4.2 Evaluation Criteria:

This information will be used for the purpose of completing the Pre-Award Survey and will not be rated.

8.5 Tab E - Subcontracting Plan

8.5.1 Submission Requirements:

Large business offerors shall submit a Subcontracting Plan in accordance with FAR Clauses 52.219-8 and 52.219-9 DEV. To be acceptable, plans must adequately address the required statutory elements and provide sufficient information to enable the Contracting Officer to answer affirmatively questions A through H of Appendix DD, Part 2, AFARS 5119.705. The offeror may use the attached sample sub-contracting plan as a starting point. Percentage goals apply to the total amount being subcontracted.

8.5.2 Evaluation Criteria:

Submitted information will be evaluated for acceptability in accordance with AFARS 5119.705. To be acceptable, subcontracting plans must:

(a) Adequately address the required statutory elements.

(b) Provide sufficient information to enable the Contracting Officer to answer affirmatively questions A through H of Appendix DD (AFARS 5119.705), a copy of which is attached.

(c) To be acceptable, subcontracting plans must meet all of the requirements outlined in Appendix DD, Part 3, AFARS 5119.705. If discussions with offerors are necessary, those areas where the plan is deficient will be reviewed with each offeror with the goal of correcting deficiencies.

AFARS -- Appendix DD Subcontracting Plan Evaluation Guide

Part 1 – Introduction

DD-100 Purpose.

The guide provides a methodology for uniform and consistent evaluation of subcontracting plans within the Army. It is designed to facilitate compliance with the mandates of 15 U.S.C. § 637(d) to increase opportunities for small and small disadvantaged businesses.

DD-101 Applicability.

In accordance with requirements of FAR 19.705-4, DFARS 219.705-4 and AFARS 5119.705-4, the contracting officer shall use this guide to review all subcontracting plans (except those for commercial items), including those submitted in response to the provisions in FAR 19.705-2(d) and (e). When the contract will require subcontracting plans, use the clauses designated by FAR 19.708(b)(1) and (2) and DFARS 219.708(b)(1)(A) in the solicitation. A copy of the completed evaluation shall be included in the contract file.

DD-102 Goals.

Contracting officers must place special emphasis on negotiating subcontracting goals that are realistic, challenging and attainable. The plan must express goals in terms of percentages of total planned subcontracting dollars and must be comparable to the dollar commitments in the small business participation plan. In accordance with FAR 19.705- 4(d), the contracting officer must review enough evidence to determine that the:

1. Offeror can meet subcontracting plan goals;

2. Offeror’s goals are consistent with their cost or pricing data or information other than cost or pricing data;

3. Offeror will honor the terms of subcontract agreements (i.e., timely payments of amounts owed, use of firms cited in proposal, etc.); and

4. Offeror’s make or buy policy or program does not conflict with the proposed subcontracting plan and is in the Government’s best interest.

5. Plan includes the contractor’s commitment to adopt and comply with its requirements and goals for small business utilization.

DD-103 Evaluation Rating.

Either the contracting officer, the small business representative, or both, shall evaluate and rate the subcontracting plan as “acceptable” or “unacceptable,” in the context of the particular procurement. For instance, in smaller dollar value contracts, or contracts for uniquely manufactured items, it might be impracticable or not cost effective for offerors to take the type of actions that might be appropriate in contracts for larger dollar values or commercial components. To receive an “Acceptable” rating, the contractor must satisfy all objectives in Part 2 and meet each statutory subcontracting plan requirement outlined in Part 3. Failure to receive a subcontracting plan rating of acceptable could jeopardize the offeror’s selection for contract award. The contracting officer must document the decisions in the contract file.

DD-104 Modification of Guide.

Pursuant to AFARS 5101.403, only principal assistants responsible for contracting may approve individual deviations to this evaluation guide. This approval authority may not be further delegated.

DD-105 Use of Preaward Surveys.

For contracts administered by the Defense Contract Management Agency, obtain information needed to assess contractor compliance with subcontracting plans in current and previous contracts by requesting a preaward survey in accordance with FAR 9.106, DFARS 209.106 and DFARS PGI 209.106.

Part 2 – Rating System

DD-201 Acceptable Plans.

Objective: The subcontracting plan meets all of the requirements outlined in Part 3. The offeror has provided details that demonstrate an acceptable approach to assisting, promoting and utilizing small businesses, small disadvantaged businesses, women-owned small businesses, historically underutilized business zone small businesses, veteran-owned small businesses, service disabled veteran-owned small businesses and, for Defense Research Programs, historically black colleges and universities and minority serving institutions. The offeror has demonstrated an ability to meet prior subcontracting plan goals and honor the terms of subcontract agreements. Offeror has outlined an approach utilizing mentor protégé firms, joint venture teams, or other partners. The subcontracting goals are realistic, challenging, and attainable. Clarifications and minor rework of the submission may be required to correct slight omissions that do not prejudice other offers.

DD-202 Unacceptable Plans.

Objective: The subcontracting plan fails to meet a requirement outlined in Part 3. The offeror has not provided an acceptable approach to assisting, promoting, and utilizing small businesses. The offeror has a history of failing to honor subcontract agreements. The offeror did not discuss the establishment of mentor protégé relationships, teaming, or joint venture agreements with other firms. Ensure the proposed subcontracting goals are attainable in light of the contractor’s past performance in meeting subcontracting goals. Proposed subcontracting goals reflect less than a good faith effort. Substantial rework of the document is required to correct omissions and establish realistic, challenging, and attainable goals. Failure to receive a rating of acceptable may jeopardize offeror’s eligibility for contract award. See FAR 19.702(a)(1).

Part 3 – Subcontracting Plan Requirements

DD-301 Requirements.

If any of the following are answered “NO”, the plan is not acceptable, and the offeror must revise it before contract award. Does the plan:

1. Contain a policy statement or evidence of internal guidance to company buyers that commits to complying with the Small Business Act (Public Law 99-661, Section 1207 and Public Law 100-180)?

2. Identify separate percentage goals for utilizing small businesses (including Alaska Native Corporations (ANCs) and Indian tribes), veteran-owned small businesses (VOSB), service-disabled veteran-owned small businesses (SDVOSB), historically underutilized business zone small businesses (HUBZone), small disadvantaged businesses (SDB), women-owned small businesses (WOSB), and, for Defense Research Programs, historically black colleges and universities and minority serving institutions where applicable?

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .