CIVIL/OPS/ENVIRONMENTAL BR
ATTN: MARCEL D HULL
600 DR M L KING JR PL RM 821
LOUISVILL KY 40202-2236
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR20R0003 for the Crane SUBBEC Bldg. 3287 Interior Laboratory Renovations Project is hereby amended as folow s:
SEE ATTACHED SUMMARY OF CHANGES AMDT 0002
1. CONTRACT ID CODE PAGE OF PAGES
1 61
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20R0003
X 9B. DATED (SEE ITEM 11)
16-Mar-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3.EFFECTIVE DATE
23-Apr-2020
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE 964860
FACILITY CODECODE
EMAIL:TEL:
W912QR20R0003-0002
W912QR20R0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMDT 0002 SUMMARY OF CHANGES
A. The following PLAN SHEETS have been replaced in their entirety:
1. Sheet A-110 – Composite Floor Plan
2. Sheet A-111 – Partial Floor Plan
3. Sheet A-570 – Rooftop Metal Walkway System
4. Sheet A-580 – Enlarged Plan
5. Sheet E-110 – Composite Electrical Plan
6. Sheet E-501 – Typical Encase Ductbank
7. Sheet G-003 – Phasing Plan
8. Sheet S-110 – Floor Slab Plan
9. Sheet S-116 – Enlarged Elevated Platform Framing Plan
10. Sheet S-300 – Foundation Section
B. All other terms and conditions remain unchanged.
C. The proposal due date has been extended to 27 April 2020 at 12:00 PM (Noon) Eastern Time (ET).
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 23-Apr-2020 02:00 PM to 27-Apr-2020 12:00 PM.
(End of Summary of Changes)
W O
R K
A
I S
L E
W O
S
L E
EWC
EWC
VENDING
REF.
LEAD - ACID LAB
POWER SUPPLY
NETWORK SERVER
CONTROL ROOM
CORRIDOR
SECURE PROCESSING
MEN
WOMEN
LUNCH ROOM
TELEPHONE RM.
SHOWER
JANITOR
SHOWER
BATTERY STORAGE & CONDITIONING AREA
RECEIVING
BULK STORE
MECHANICAL ROOM
ELEC. ROOM
CORRIDOR
DISSECTION AREA
Cab Cab CabCab Cab Cab Cab Cab Cab Cab Cab
Cab Cab Cab Cab Cab CabCab Cab Cab Cab
SUBBEC
CALIBRATION ROOM
SUBMARINE BATTERY EVALUATION
A B C D E F G
W O
S
L E
W O
S
L E
EWC
EWC
VENDING
REF.
LEAD - ACID LAB
POWER SUPPLY
NETWORK SERVER
CONTROL ROOM
CORRIDOR
SECURE PROCESSING
MEN
WOMEN
LUNCH ROOM
TELEPHONE RM.
SHOWER
JANITOR
SHOWER
BATTERY STORAGE & CONDITIONING AREA
RECEIVING
BULK STORE
MECHANICAL ROOM
ELEC. ROOM
CORRIDOR
DISSECTION AREA
P H
A S
I N
G
P
L A
N
U S
A
R M
Y
C
O R
P S
F
E
N G
I N
E E
R S
M A
R C
H
S U
B B
G d w g
G-003
W Q
R D
K
B L A
N F
O R
D
J C
O R
N E
L I U
S
M
B A
R N
E T
T
M A
S O
N
H
N
G E
R
A N
S I
D
CERTIFIED FINAL SUBMITTAL
C R
A N
E
N
A V
A L
S
U P
P O
T
C T
I V
I T
Y
N
S A
C R
A N
E
I N
D I A
N A
B L D
G
S
U B
B E
C
P
R O
J E
C T
P
L O
U I S
V I L L E
D
S
T R
I C
T
L O
U I S
V I L L E
K
E N
T U
C K
Y
D
R
M
A R
T
U
T H
N
G
P
L
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
F I L E
N A
M E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
US Army Corps of Engineers
C A
T E
G O
Y
D
E
D E
S C
R I P
T I O
N
P P r o j e c t s
C
A D
B
I M
S h e e t s
G e n S
U B
B
G d w g p r p m
PW7549
A M
E N
D M
E N
T
A M
E N
D M
E N
T
CONSTRUCTION PHASING NOTES
1. THE BUILDING WILL BE OCCUPIED DURING CONSTRUCTION.
2. PHASING IS ESTABLISHED TO MINIMIZE DOWNTIME OF ROOM 023, WHICH WILL
BE PARTIALLY OCCUPIED THROUGHOUT CONSTRUCTION. ROOM 024, IS
UNOCCUPIED. THE OCCUPANTS OF ROOM 027, AND ROOM 026 WILL BE
TEMPORARILY RELOCATED DURING CONSTRUCTION.
3. ALL EXISTING EQUIPMENT TO REMAIN IN PLACE. COVER AND PROTECT
EXISTING EQUIPMENT THAT COULD BE EXPOSED TO DUST AND DEBRIS
INCLUDING WRAPPING CRANE RAILS. CONTRACTOR IS REQUIRED TO
PROTECT ALL EQUIPMENT FROM DEMO OR NEW WORK ACTIVITIES.
4. CONTRACTOR SHALL SUBMIT A DEMOLITION PLAN FOR GOVERNMENT REVIEW
AND APPROVAL A MINIMUM OF TWO WEEKS BEFORE BEGINNING OF
DEMOLITION WORK.
5. CONTRACTORS WILL NOT BE ALLOWED ABOVE ENERGIZED EQUIPMENT.
6. OVERHEAD WORK, INCLUDING BUT NOT LIMITED TO, DUCT REMOVAL AND
INSTALLATION, PIPING REMOVAL AND INSTALLATION, AND STRUCTURAL
DEMOLITION AND INSTALLATION OF RTU SUPPORTS AND PLATFORM,TO BE
COMPLETED BEFORE CONCRETE REMOVAL.
7. CONTRACTOR HAS THE OPTION TO FURTHER SPLIT THE CURRENT PHASES
(I.E. PHASE 1A, PHASE 1B, ETC.) TO MAINTAIN FEASIBILITY OF CONSTRUCTION.
8. GOVERNMENT SHALL BE NOTIFIED 30 DAYS IN ADVANCE OF EACH PHASE IN
ORDER FOR THE GOVERNMENT TO DISCONNECT UTILITIES FROM EQUIPMENT
PRIOR TO THE START OF NEXT PHASE.
9. THE ENTIRE CHILLED WATER AND STEAM SYSTEM WILL BE DOWN TO ENTIRE
BUILDING AS A RESULT OF THIS WORK. CONTRACTOR SHALL PROVIDE A 30
DAY WRITTEN NOTICE TO THE GOVERNMENT PRIOR TO SYSTEM SHUTDOWN.
OUTAGE SHALL BE MINIMIZED TO THE MOST PRACTICABLE DURATION TO
PERFORM THE WORK BUT SHALL BE NO LONGER THAN 30 DAYS IN DURATION
UNLESS APPROVED BY THE CONTRACTING OFFICER. CONTRACTOR SHALL
PROVIDE PROPOSED SCHEDULE FOR APPROVAL.
10. LIGHTING SHALL BE MAINTAINED OUTSIDE OF CURRENT PHASE LIMITS AT ALL
TIMES.
11. IT IS NOT NECESSARY TO COMPLETE EACH PHASE BEFORE BEGINNING
ANOTHER PHASE; HOWEVER, ALL OVERHEAD WORK MUST BE COMPLETED
PRIOR TO ANY OTHER WORK THAT IS PERFORMED. SEE NOTE 6.
12. SITE AND ROOFTOP WORK CAN BE ACCOMPLISHED DURING ANY PHASE.
COORDINATE EQUIPMENT AND CRANE ACCESS WITH GOVERNMENT.
KEY PLAN
8' 4' 0 8' 16' 24'
GRAPHIC SCALE:
"=1'-0"
N
SCALE: 1/8" = 1'-0"
PHASING PLAN
SHEET KEYNOTES
1. TEMPORARY BARRIER VISQUEEN OR EQUIVALENT POLYETHYLENE
PLASTIC SHEATHING BETWEEN CONSTRUCTION AREA AND ACTIVE
WORK SPACES. BARRIER SHALL BE CONTINUOUS FROM FLOOR TO
STEEL DECK OR PROVIDE TEMPORARY CEILING.
2. PRIMARY ACCESS FOR CONSTRUCTION WORKERS.
3. EXISTING RAISED FLOOR OR TRENCH COVER EDGE.
4. CURRENTLY WASTE TREATMENT ROOM.
5. CURRENTLY BATTERY REPAIR ROOM.
LEGEND
PHASE (PRIORITY) ONE
PHASE TWO
PHASE THREE
PHASE FOUR - OPTION 1
W
2Q R
R
Pl an s-
W912QR20R0003-0002
AutoCAD SHX Text
WASHING AREA
AutoCAD SHX Text
WASHING AREA
Cab Cab CabCab Cab Cab Cab Cab Cab Cab Cab
Cab Cab Cab Cab Cab CabCab Cab Cab Cab
A B C D E F G JH K
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
F I L E
N A
M E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
US Army Corps of Engineers
C A
T E
G O
D
E
D E
S C
R I P
T I O
N
P P r o j e c t s
C
A D
B
I M
S h e e t s
A r c h
S
U B
B
A d r p m
PW7549
COMPOSITE FLOOR PLAN - NEW WORK
INDICATES EXISTING ITEMS
MODEL 9300 HIGH VOLTAGE
BATTERY TEST SYSTEM 28" X 39"
(N.I.C)
GENERAL SHEET NOTES
1. REFER TO PARTIAL PLAN A-111 FOR DIMENSIONS AND NOTES.
2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO PERFORMING NEW CONSTRUCTION.
3. CONTRACTOR SHALL PATCH, REPAIR, AND PAINT, AS
NECESSARY, ALL UNUSED OPENINGS OR AREAS DAMAGED
DURING DEMOLITION IN PREPARATION FOR NEW
CONSTRUCTION.
4. COORDINATE ALL NEW STRUCTURAL, MECHANICAL, AND
ELECTRICAL COMPONENTS PRIOR TO CONSTRUCTION.
REFER TO ALL STRUCTURAL, MECHANICAL, AND ELECTRICAL.
5. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING SAFETY
AND CLEANLINESS. DUST IS TO BE SWEPT UP AND DEBRIS IS
TO BE REMOVED AT THE END OF EACH DAY.
6. VERIFY ALL SURROUNDINGS AND CONCEALED ITEMS PRIOR
TO CONSTRUCTION. ALL ITEMS DAMAGED DURING
CONSTRUCTION THAT ARE TO REMAIN WILL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO REPAIR OR
REPLACE TO THE ORIGINAL STATE.
LEGEND
C O
M P
O S
I T
E
F
L O
A
N
N
E W
W O
R K
M A
R C
H
S U
B B
A d w g
A-110
W Q
R D
K
B
L A
N F
O R
D
J
C
O R
N E
L I U
S
M
B
A R
N E
T T
M A
S O
N
G E
R
A N
S I
D
CERTIFIED FINAL SUBMITTAL
C R
A N
E
N
A V
A L
S
U P
P O
T
I V
I T
Y
N
S A
C R
A N
E
I N
D I A
N A
B L D
G
S
U B
B E
C
P
R O
J E
C T
P
L O
U I S
V I L
S
T R
I C
T
L O
U I S
V I L L E
K
E N
T U
C K
Y
D
R
M
A R
T
T H
N
G
P
L
EXISTING RAISED FLOORING OR TRENCH COVER
NEW CONCRETE SLAB
A M
E N
D M
E N
T
W
2Q R
R
Pl an s-
W912QR20R0003-0002
AutoCAD SHX Text 16'
AutoCAD SHX Text 8'
AutoCAD SHX Text
AutoCAD SHX Text 16'
AutoCAD SHX Text 32'
AutoCAD SHX Text 48'
AutoCAD SHX Text
GRAPHIC SCALE: "=1'-0"116"=1'-0"
AutoCAD SHX Text
SCALE: 1/16" = 1'-0"
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text A-111
AutoCAD SHX Text Cab
AutoCAD SHX Text
S
L E
W O
S
L E
EWC
EWC
VENDING
REF.
LEAD - ACID LAB
POWER SUPPLY
NETWORK SERVER
CONTROL ROOM
CORRIDOR
SECURE PROCESSING
MEN
WOMEN
LUNCH ROOM
TELEPHONE RM.
SHOWER
JANITOR
SHOWER
BATTERY STORAGE & CONDITIONING AREA
RECEIVING
BULK STORE
MECHANICAL ROOM
ELEC. ROOM
CORRIDOR
DISSECTION AREA
Cab Cab CabCab CabCab Cab Cab Cab Cab Cab
Cab Cab Cab Cab Cab CabCab Cab Cab Cab
SUBBEC
CALIBRATION ROOM
SUBMARINE BATTERY EVALUATION
5'-2"
4'-0" 5'-0" 8'-0"
20'-4
2'-4"
21'-8"
2'-0"
4'-4"
W O
S
L E
W O
S
L E
EWC
EWC
VENDING
REF.
LEAD - ACID LAB
POWER SUPPLY
NETWORK SERVER
CONTROL ROOM
CORRIDOR
SECURE PROCESSING
MEN
WOMEN
LUNCH ROOM
TELEPHONE RM.
SHOWER
JANITOR
SHOWER
BATTERY STORAGE & CONDITIONING AREA
RECEIVING
BULK STORE
MECHANICAL ROOM
ELEC. ROOM
CORRIDOR
DISSECTION AREA
A B C D E F G
INDICATES EXISTING ITEMS
PARTIAL FLOOR PLAN - NEW WORK
MODEL 9300 HIGH VOLTAGE BATTERY TEST SYSTEM
28" X 39" (N.I.C)
GENERAL SHEET NOTES
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO PERFORMING NEW CONSTRUCTION.
2. CONTRACTOR SHALL PATCH, REPAIR, AND PAINT, AS
NECESSARY, ALL UNUSED OPENINGS OR AREAS DAMAGED
DURING DEMOLITION IN PREPARATION FOR NEW
CONSTRUCTION.
3. COORDINATE ALL NEW STRUCTURAL, MECHANICAL, AND
ELECTRICAL COMPONENTS PRIOR TO CONSTRUCTION.
REFER TO STRUCTURAL, MECHANICAL, AND ELECTRICAL.
4. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING SAFETY
AND CLEANLINESS. DUST IS TO BE SWEPT UP AND DEBRIS IS
TO BE REMOVED AT THE END OF EACH DAY.
5. VERIFY ALL SURROUNDINGS AND CONCEALED ITEMS PRIOR
TO CONSTRUCTION. ALL ITEMS DAMAGED DURING
CONSTRUCTION THAT ARE TO REMAIN WILL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO REPAIR OR
REPLACE TO THE ORIGINAL STATE.
6. FIELD VERIFY ALL DIMENSIONS.
SHEET KEYNOTES
LEGEND
1. BATTERY STRINGS PROTECTED BY PLEXI-GLASS. REFER TO
ELECTRICAL DRAWINGS.
2. RELOCATED 40 CELL TEST STATION. N.I.C.
3. NEW CONCRETE SLAB AND TRENCHES. REFER TO
STRUCTURAL AND ELECTRICAL DRAWINGS.
4. TRENCH AND METAL GRATE COVER. REFER TO STRUCTURAL.
5. TRENCH AND FIBERGLASS REINFORCED PLASTIC TRENCH
COVERS. REFER TO STRUCTURAL AND ELECTRICAL.
6. PAINT WALLS AND CEILING IN THE SUBBEC ROOM. REFER
TO FINISH SCHEDULE.
7. PROVIDE EPOXY COATING ON CONCRETE FLOOR SLAB
BETWEEN COLUMN LINES 1 AND 3 AND C AND D.5 (RAISED
FLOORING EDGE).. REFER TO A-610.
8. REPLACE ALL WEATHER STRIPPING AND RESEAL ENTIRE
PERIMETER INCLUDING THRESHOLD OF PERSONNEL DOOR.
9. DRAIN PIPE FROM TRENCH TO SUMP. REFER TO PLUMBING..
10. REPLACE SUMP PUMP IN EXISTING SUMP PIT. REFER TO
MECHANICAL DRAWINGS.
11. EXISTING COLUMN.
12. MECHANICAL PLATFORM AND ASSOCIATED RAILING, ABOVE.
PATCH, REPAIR, AND PAINT WALL AS NECESSARY. REFER TO
STRUCTURAL DRAWINGS AND SHEET A-580 FOR DETAILS.
13. PAINT INTERIOR SIDES OF PERSONNEL DOOR AND DOOR
FRAME. PAINT BOTH SIDES OF INTERIOR DOOR AND INTERIOR
OF EXTERIOR DOOR.
14. WALL MOUNTED LADDER INCLUDING FALL ARREST SYSTEM.
REFER TO SHEET A-580.
KEY PLAN
P A
R T
I A
L
F
L O
A
N
N
E W
W O
R K
M A
R C
H
S U
B B
A d w g
A-111
W Q
R D
K
B
L A
N F
O R
D
J
C
O R
N E
L I U
S
M
B
A R
N E
T T
M A
S O
N
G E
R
A N
S I
D
CERTIFIED FINAL SUBMITTAL
C R
A N
E
N
A V
A L
S
U P
P O
T
I V
I T
Y
N
S A
C R
A N
E
I N
D I A
N A
B L D
G
S
U B
B E
C
P
R O
J E
C T
P
L O
U I S
V I L
S
T R
I C
T
L O
U I S
V I L L E
K
E N
T U
C K
Y
D
R
M
A R
T
T H
N
G
P
L
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
F I L E
N A
M E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
US Army Corps of Engineers
C A
T E
G O
D
E
D E
S C
R I P
T I O
N
P P r o j e c t s
C
A D
B
I M
S h e e t s
A r c h
S
U B
B
A d r p m
PW7549
EXISTING RAISED FLOORING OR TRENCH COVER
NEW CONCRETE SLAB
A M
E N
D M
E N
T
A M
E N
D M
E N
T
W
2Q R
R
Pl an s-
W912QR20R0003-0002
AutoCAD SHX Text
WASHING AREA
AutoCAD SHX Text
WASHING AREA
AutoCAD SHX Text 8'
AutoCAD SHX Text 4'
AutoCAD SHX Text
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 24'
AutoCAD SHX Text
GRAPHIC SCALE: "=1'-0" 18"=1'-0"
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text N
AutoCAD SHX Text Cab
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TYP.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
PIPE PENETRATION DETAIL
NOT TO SCALE
A-570
S
L
O
W
N
STAINLESS STEEL
DRAWBAND
SET SECUREMENT RING
IN CONTINUOUS BEAD
OF SEALANT
MECHANICAL PIPE
SEALANT BEAD BETWEEN
PIPE AND FLASHING
TOOLED FOR RUNOFF
PREFORMED PENETRATION
FLASHINGS
GASKETED FASTENERS
SECURE FLASHING
COLLAR FLANGE TO
ROOF PANEL AND NOT TO
DECK SO PANEL IS NOT
FIXED AT PENETRATION
SCALE:
MOUNTING CURB DETAIL
NOT TO SCALE
A-570
HIGH-DOMED, CAPPED,
GASKETED FASTENERS
APPROX. 18" O.C. OR AS
SPECIFIED BY CURB MANUFACTURER.
WOOD NAILER
SEALING MATERIAL
M
I N
F
L A
S H
I N
G
H E
I G
H T
EXISTING ROOF SYSTEM.
2" INSULATED CURB
PER MANUFACTURER.
RIBS TO RIB ROOF UNIT MOUNTING CURB
FABRICATED OF WELDING ALUMINUM INCLUDING
INTEGRAL, PRE-FORMED CRICKET.
TOP OF CURB TO BE LEVEL.
PROVIDE INSULATED, WATERTIGHT
METAL UMBRELLA AROUND PIPES.
SCALE:
CURB DETAIL
NOT TO SCALE
A-570
S
L
O
W
N
METAL ROOF
PROVIDE INSULATED
WATERTIGHT METAL
UMBRELLA AROUND
PIPES
TOP OF CURB TO BE LEVEL
MECHANICAL UNIT ON TOP
OF CURB. REFER TO MECHANICAL
DRAWINGS.
2" INSULATED CURB, PER
VENT MANUFACTURER
ROOFING MANUFACTURER'S
STANDARD RIB TO RIB ROOF
CURB. FABRICATED OF
WELDED ALUMINUM FINISH
TO MATCH ROOF.
INTEGRAL, PRE-FORMED CRICKET.
NOTES:
1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS.
2. THE ROOFTOP WALKWAY SYSTEMS INCLUDING BUT NOT LIMITED TO GUARD RAILING AND WALKWAYS SHALL
BE GALVANIZED STEEL.
3. REFER TO MECHANICAL DRAWINGS FOR MECHANICAL UNIT INFORMATION.
4. PLATFORM AND GUARD RAIL MOUNTING SHALL BE DESIGNED BY THE WALKWAY SYSTEM MANUFACTURER
AND MEET ALL OSHA REQUIREMENTS.
5. WALKWAY SYSTEM SHALL BE POSITIVELY MOUNTED TO THE EXISTING METAL ROOF.
6. THE WALKWAY SYSTEM MUST BE ABLE TO SUPPORT A LATERAL LOAD OF AT LEAST 200 POUNDS.
7. WALKWAY SYSTEM MUST COMFORM TO OSHA - OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION.
SUPPORT PLATE SPACING
6'-0" MAX.
24" O/C
TYP.
HOLD DOWN CLAMP FASTENED
DIRECTLY TO SUPPORT PLATE
(TYP. OF ALL)
SDST FASTENERS
TEE
CROSS
VERTICAL POSTS 42"
PLUG
ELBOW
FLANGE BASE W/BOLTS, FLAT
WASHERS AND SELF-LOCKING
NUTS
SUPPORT PLATE
BOLT
FLAT WASHER
CLAMP
SCALE:
ROOFTOP METAL WALKWAY SYSTEM
NOT TO SCALE
A-570
EXISTING ROOF SYSTEM.
EXISTING PRE-FINISHED STANDING SEAM
METAL ROOF BEYOND
R-20 INSULATION (MINIMUM)
SCALE:
ROOF INFILL DETAIL
NOT TO SCALE
A-570
CUT EDGE SEALANT
METAL ROOFING FABRICATED TO
COORDINATE WITH EXISTING STANDING
SEAMS AND PROVIDE WEATHER TIGHT
SEAL.
EXISTING ROOF
EXISTING ROOF
PROVIDE STEEL
PURLINS, SIMILAR
TO EXISTING FOR ALL
4 SIDES OF EXISTING
OPENING IF NECESSARY
METAL FABRICATED TO
COORDINATE PROFILE AND
COLOR WITH EXISTING INTERIOR
LINER PANEL FASTEN TO
PURLINS AND SEAL JOINTS.
R O
T
A I L
S
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
M A
R C
H
S U
B B
A d w g
A-570
W Q
R D
K
B
L A
N F
O R
D
J
C
O R
N E
L I U
S
M
B
A R
N E
T T
M A
S O
N
G E
R
A N
S I
D
CERTIFIED FINAL SUBMITTAL
C R
A N
E
N
A V
A L
S
U P
P O
T
I V
I T
Y
N
S A
C R
A N
E
I N
D I A
N A
B L D
G
S
U B
B E
C
P
R O
J E
C T
P
L O
U I S
V I L
S
T R
I C
T
L O
U I S
V I L L E
K
E N
T U
C K
Y
D
R
M
A R
T
T H
N
G
P
L
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
F I L E
N A
M E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
US Army Corps of Engineers
C A
T E
G O
D
E
D E
S C
R I P
T I O
N
P P r o j e c t s
C
A D
B
I M
S h e e t s
A r c h
S
U B
B
A d r p m
PW7549
A M
E N
D M
E N
T
A M
E N
D M
E N
T
W
2Q R
R
Pl an s-
A-580
16"
WALL
SCALE: 1"=1'-0"
ENLARGED PLAN
LADDER
SELF-CLOSING
SAFETY GATE
A-580
A-580
GUARD RAIL
A-580
A-580
" STEEL PIPE
GUARD RAILING
FIBERGLASS, NON-CONDUCTIVE
DECKING. REFER TO
STRUCTURAL DRAWINGS.
SCALE: 1"=1'-0"
RAILING ELEVATION
SCALE: 1"=1'-0"
SAFETY GATE
WALL
" STEEL PIPE
GUARD RAILING
FIBERGLASS,
NON-CONDUCTIVE
DECKING. REFER TO
STRUCTURAL DRAWINGS.
SELF-CLOSING
SAFETY GATE
A-580
WALL
" STEEL POST
31"
CHANNEL. REFER TO STRUCTURAL DRAWINGS.
1 1/2" STEEL PIPE WELDED
TO CHANNEL. REFER TO STRUCTURAL
DRAWINGS.
MINIMUM 18 ga METAL
TOE BOARD WELDED
TO STEEL RAILING
MINIMUM 18 ga METAL
TOE BOARD WELDED
TO STEEL RAILING
MINIMUM 18 ga METAL
TOE BOARD WELDED
TO STEEL RAILING
MINIMUM 18 ga METAL
TOE BOARD WELDED
TO STEEL RAILING
FRONT ELEVATION SIDE ELEVATION
A-580
16"
A-580
7" MIN.
M
I N
I M
U M
M
A X
I M
U M
A-580
FALL ARRESTER
VERTICAL RAIL
VERTICAL RAIL
END-STOP
VERTICAL RAIL
VERTICAL RAIL
VERTICAL RAIL
RUNG CLAMP
VERTICAL RAIL
RUNG CLAMP
VERTICAL RAIL
RUNG CLAMP
3/16"
STEEL WALL
BRACKET
3/16"
STEEL WALL
BRACKET
TYP. STEEL SERRATED
RUNGS 1 1/4"
3/16"
STEEL WALL
BRACKET
A-580
CONCRETE SLAB
O V
E R
A L
L
L
A D
D E
R
H
E I G
H T
7"
C L
E A
R
M
A X
I M
U M
STEEL
TUBULAR
LADDER
3/16 " STEEL OFF
FLOOR BRACKET
UPRIGHT, G-90, 16
GAUGE, INSET CHANNEL
VERTICAL RAIL
EXTENSION ABOVE
LADDER
TOP OF
PLATFORM
SCALE: 1 1/2"=1'-0"
RAILING DETAIL
SCALE: NOT TO SCALE SCALE: NOT TO SCALE
SCALE: NOT TO SCALE
OFF FLOOR SUPPORT
" MAX
16'
R
E F
S
T R
U C
T U
R A
L
D
R A
W I N
G S
M
A X
STEEL FRAMING. REFER TO
STRUCTURAL DRAWINGS.
STEEL FRAMING REFER
TO STRUCTURAL
DRAWINGS.
FIBERGLASS, NON-CONDUCTIVE DECKING.
REFER TO STRUCTURAL DRAWINGS.
GUARD RAILING, BEYOND
TOE BOARD, BEYOND
5' 4"
COORDINATE LENGTH OF RAILING WITH LENGTH OF
PLATFORM. REFER TO SHEET S-116.
M I S
C E
L L
A N
E O
T
A I L
S
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
M A
R C
H
S U
B B
A d w g
A-580
W Q
R D
K
B
L A
N F
O R
D
J
C
O R
N E
L I U
S
M
B
A R
N E
T T
M A
S O
N
G E
R
A N
S I
D
CERTIFIED FINAL SUBMITTAL
C R
A N
E
N
A V
A L
S
U P
P O
T
I V
I T
Y
N
S A
C R
A N
E
I N
D I A
N A
B L D
G
S
U B
B E
C
P
R O
J E
C T
P
L O
U I S
V I L
S
T R
I C
T
L O
U I S
V I L L E
K
E N
T U
C K
Y
D
R
M
A R
T
T H
N
G
P
L
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
F I L E
N A
M E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
US Army Corps of Engineers
C A
T E
G O
D
E
D E
S C
R I P
T I O
N
P P r o j e c t s
C
A D
B
I M
S h e e t s
A r c h
S
U B
B
A d r p m
PW7549
GENERAL SHEET NOTES
1. THE LADDER SYSTEMS, GUARD RAILING, GATE, AND
PLATFORM SHALL BE SHOP PRIMED AND PAINTED STEEL.
2. REFER TO STRUCTURAL DRAWINGS FOR CONCRETE SLAB
ELEVATIONS.
3. LADDER MOUNTING SHALL BE DESIGNED BY THE LADDER
MANUFACTURER AND MEET ALL OSHA REQUIREMENTS.
4. LADDER SHALL BE POSITIVELY MOUNTED TO THE EXISTING
WALL.
5. EACH STEP OR RUNG MUST BE ABLE TO SUPPORT A LOAD
OF AT LEAST 250 POUNDS APPLIED IN THE MIDDLE OF THE
STEP OR RUNG.
6. LADDER MUST CONFORM TO ANSI A14.3 SAFETY CODE FOR
FIXED LADDERS AND OSHA FIXED LADDERS 1910..
GRAPHIC SCALE: 1"=1'-0"
1' 2' 3'06"1'
2'1'06"1'
GRAPHIC SCALE: 1
"=1'-0"
A M
E N
D M
E N
T
A M
E N
D M
E N
T
W
2Q R
R
Pl an s-
A B C D E F G JH K
A B C D E F G JH K
'SWG-S'
'PPS'
SUBBEC
CALIBRATION ROOM
SUBMARINE BATTERY EVALUATION
CAB CAB CAB CAB CAB CAB CAB CABCAB
CAB CAB
CABCABCABCABCABCABCABCABCABCAB
B+
B+
B+
B+
B+
B+
B+
B+
B+
B+
B+
B+
B+
B+
B+
B+
B+
B+
B+
B+
B+
B+
B+
B+
B+
B+
B+
B+
B-
B-
B-
B-
B-
B-
B-
B-
B-
B-
B-
B-
B-
B-
B-
B-
B-
B-
B-
B-
B-
B-
B-
B-
B-
B-
B-
B-
CELL
TEST
AREA
C N
T R
C A
B
CRAC
CRAC
CRAC
R
P
CONTROL ROOM
TELPHONE ROOM
ELECTRICAL ROOM
A B C D E F G JH K
SCALE: 1/8" = 1'-0"
COMPOSITE ELECTRICAL PLAN
E-410
E-411
E-412
C O
M P
O S
I T
E
E
L E
C T
R I C
A
N
M A
R C
H
S U
B B
E d w g
E-110
W Q
R D
D
P
E C
K I N
P A
U G
H
C
F
A R
L E
Y
J
W
E D
E L
M A
S O
N
G E
R
A N
S I
D
CERTIFIED FINAL SUBMITTAL
C R
A N
E
N
A V
A L
S
U P
P O
T
I V
I T
Y
N
S A
C R
A N
E
I N
D I A
N A
B L D
G
S
U B
B E
C
P
R O
J E
C T
P
L O
U I S
V I L
S
T R
I C
T
L O
U I S
V I L L E
K
E N
T U
C K
Y
D
R
M
A R
T
T H
N
G
P
L
EXISTING PANEL
RP7
EXISTING DATA
TERMINATION RACK
COMMUNICATIONS
TERMINAL BOARD
AND TMGB
EXISTING TRENCH / RAISED FLOOR.
REFER TO E-110.
8' 4' 0 8' 16' 24'
GRAPHIC SCALE:
"=1'-0"
N
DRAWING GRAPHICS
KEY PLAN
FIRE ALARM CONTROL PANEL.
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
F I L E
N A
M E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
US Army Corps of Engineers
C A
T E
G O
D
E
D E
S C
R I P
T I O
N
P P r o j e c t s
C
A D
B
I M
S h e e t s E l e c S
U B
B E d r a m
PW7549
SHEET KEYNOTES
1. RELOCATE OR REPLACE EXISTING CONDUITS AND
ASSOCIATED WIRE AS REQUIRED FOR INSTALLATION OF
NEW PLATFORM AND ASSOCIATED BRACING. (REFER TO
PHOTO ON SHEET E-501 FOR ADDITIONAL INFORMATION)
A M
E N
D M
E N
T
W
2Q R
R
Pl an s-
E C
T R
I C
T
A I L
S
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
M A
R C
H
S U
B B
E d w g
E-501
W Q
R D
D
P
E C
K I N
P A
U G
H
C
F
A R
L E
Y
J
W
E D
E L
M A
S O
N
G E
R
A N
S I
D
CERTIFIED FINAL SUBMITTAL
C R
A N
E
N
A V
A L
S
U P
P O
T
I V
I T
Y
N
S A
C R
A N
E
I N
D I A
N A
B L D
G
S
U B
B E
C
P
R O
J E
C T
P
L O
U I S
V I L
S
T R
I C
T
L O
U I S
V I L L E
K
E N
T U
C K
Y
D
R
M
A R
T
T H
N
G
P
L
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
F I L E
N A
M E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
US Army Corps of Engineers
C A
T E
G O
D
E
D E
S C
R I P
T I O
N
P P r o j e c t s
C
A D
B
I M
S h e e t s E l e c S
U B
B E d r a m
PW7549
N O
SURFACE MUST BE CUT, PATCHED
AND OTHERWISE REPAIRED TO
MATCH EXISTING SURFACE.
12" WIDE FOIL BACKED
MARKING TAPE
COMPACT SOIL
IN 6" LAYERS
N O
SURFACE MUST BE CUT, PATCHED
AND OTHERWISE REPAIRED TO
MATCH EXISTING SURFACE.
12" WIDE FOIL BACKED
MARKING TAPE
COMPACT SOIL
IN 6" LAYERS
NOTE 8
NOTE 2
(TYP)
NOTE 6 (TYP)
NOTE 3 NOTE 3
3"
MIN
3"
MIN
7 1/2"
NOTE 4
N O
M I N
M I N
M I N
N O
M I N
3"
MIN
3"
MIN
7 1/2"
NOTE 4
NOTE 8
NOTE 5
(TYP)
NOTE 7
BACKFILL USING SATISFACTORY
MATERIAL IN ACCORDANCE
WITH SPECIFICATIONS
BACKFILL USING SATISFACTORY
MATERIAL IN ACCORDANCE
WITH SPECIFICATIONS
TYPICAL CONCRETE ENCASED DUCTBANKTYPICAL SAND ENCASED DUCTBANK
TYPICAL ENCASE DUCTBANK
1. TOP OF DUCTBANK SHALL BE A MINIMUM OF 48" BELOW
FINISHED GRADE UNLESS OTHERWISE NOTED.
2. PROVIDE SCHEDULE 40 PVC CONDUITS FOR SAND
ENCASED DUCT BANK. REFER TO ELECTRICAL PLAN(S)
FOR QUANTITY AND SIZE OF CONDUITS.
3. PROVIDE TWO (2) 4" 3-CELL MAXCELL INNERDUCTS IN
EACH COMMUNICATIONS CONDUIT.
4. PROVIDE A MINIMUM OF 12" BETWEEN COMMUNICATION
AND ELECTRICAL POWER DUCTS.
5. PROVIDE EB TYPE CONDUIT OR BETTER FOR CONCRETE
ENCASED DUCT BANK. REFER TO ELECTRICAL PLAN(S)
FOR QUANTITY AND SIZE OF CONDUITS.
6. PROVIDE PULL WIRE IN ALL UNUSED CONDUITS, AND
SEAL TO PREVENT WATER PENETRATION.
7. EACH LENGTH OF CONCRETE DUCTBANK ENCASEMENT
SHALL BE INSTALLED IN ONE CONTINUOUS POUR. IF
MULTIPLE POURS ARE REQUIRED, CONTRACTOR SHALL
PROVIDE A CONSTRUCTION JOINT DETAIL FOR
CONTRACTING OFFICER REVIEW AND ACCEPTANCE
PRIOR TO INSTALLATION.
8. SLOPE EARTH EXCAVATION AT A MINIMUM RATE OF TWO
HORIZONTAL TO ONE VERTICAL OR AS RECOMMENDED
BY THE GEOTECHNICAL ENGINEER.
NOT TO SCALE
DETAIL
E-001
NOTE 6 (TYP)
DUCTBANK NOTES
PHOTO
CONDUIT RELOCATION CLARIFICATION
A M
E N
D M
E N
T
1. FOR HVAC CONTROLS (TOP CONDUIT) - PROVIDE A NEW
CONDUIT ALONG THE TOP OF THE CMU WALL FROM THE
EXISTING 4"SQUARE JUNCTION BOX LOCATED
APPROXIMATELY 18 FEET TO THE SOUTH OF THE EXISTING
JUNCTION BOX (BOX NEXT TO DUCT WITH FLEXIBLE CONDUIT
TO HVAC CONTROLLER). PULL NEW CABLE FROM THE SOUTH
J-BOX THROUGH THE EXISTING J-BOX TO THE CONTROLLER
AND RECONNECT. REMOVE EXISTING CONDUIT AND PLUG
HOLES IN BOXES.
2. FOR ELECTRICAL CONDUIT (BOTTOM CONDUIT) - PROVIDE A
NEW CONDUIT AT THE SAME LOWER ELEVATION AS THE
EXISTING CONDUIT, FROM THE EXISTING 4" JUNCTION BOX
(BOX NEXT TO FIRE ALARM STROBE) TO THE EXISTING PULL
BOX LOCATED APPROXIMATELY 26 FEET TO THE SOUTH.
AFTER CLEARING THE PLATFORM LOCATION, RUN THE
CONDUIT UP THE WALL TO APPROXIMATELY THE SAME
ELEVATION OF THE EXISTING CONDUIT TO RUN BEHIND THE
DRAIN PIPE, THEN RUN SOUTH INTO THE EXISTING PULL BOX.
PULL NEW CABLE FROM THE PULL BOX AND RECONNECT.
REMOVE EXISTING CONDUIT AND PLUG HOLES IN BOXES.
CONDUIT RELOCATION NOTES
W
2Q R
R
Pl an s-
A B C D E F
" WIDE REVEAL TRENCH
DRAIN SYSTEM w/ HEAVY
DUTY FRAME ASSEMBLY.
LOCATE CENTERLINE OF
DRAIN w/ CENTERLINE OF
OVERHEAD DOOR
SUMP GRATING SUPPORT
FRAME AND GRATING TO BE
REINSTALLED TO FLUSH
CONDITION w/ NEW CONC SLAB
19'-0" 20'-0" 25'-0" 25'-0" 25'-0"
33'-7"
11"
7'-8
2'-7"
34'-0
10'-0
3'-11
9'-8
8'-10
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
F I L E
N A
M E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
US Army Corps of Engineers
C A
T E
G O
D
E
D E
S C
R I P
T I O
N
P P r o j e c t s
C
A D
B
I M
S h e e t s S t r u c S
U B
B S d r a m
PW7549
A M
E N
D M
E N
T
A M
E N
D M
E N
T
SCALE: 1/8" = 1'-0"
FLOOR SLAB PLAN - NEW WORK
N
8' 4' 0 8' 16' 24'
GRAPHIC SCALE:
"=1'-0"
GENERAL SHEET NOTES
1. REFER TO S-001 FOR GENERAL STRUCTURAL NOTES.
2. REFER TO S-300 FOR TYPICAL DETAILS.
3. CONTRACTOR SHALL PLACE BACK AND COMPACT
ACCEPTABLE FILL MATERIAL AT EXCAVATED AREAS
AFTER TRENCH INSTALLATIONS ARE COMPLETE.
F L O
A
B
P
L A
N
N
R
K
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
M A
R C
H
S U
B B
S d w g
S-110
W Q
R D
M
T
H O
M P
S O
N
B
R
E N
N E
R
D
D
I C
K E
Y
M A
S O
N
G E
R
A N
S I
D
CERTIFIED FINAL SUBMITTAL
C R
A N
E
N
A V
A L
S
U P
P O
T
I V
I T
Y
N
S A
C R
A N
E
I N
D I A
N A
B L D
G
S
U B
B E
C
P
R O
J E
C T
P
L O
U I S
V I L
S
T R
I C
T
L O
U I S
V I L L E
K
E N
T U
C K
Y
D
R
M
A R
T
T H
N
G
P
L
LEGEND
INDICATES EXTENTS OF 4" CONC SLAB w/ #4@12" OC, EW, ON VAPOR BARRIER, ON 4" GRAVEL SUB-BASE.
A
S-300
B
S-300
F
S-300
D
S-300
D
S-300
C
S-300
KEY PLAN
E
S-300
E
S-300
SIM
F
S-300
W
2Q R
R
Pl an s-x
C x
C x
ANGLE FRAME
SEE A/S-350
ANGLE FRAME
SEE A/S-350
ANGLE FRAME
SEE A/S-350
ANGLE FRAME
SEE A/S-350
ELEVATED
PLATFORM
EXISTING
DUCT WORK
LADDER, REFER
TO ARCH
2'-4" MIN. FIELD VERIFY TO MISS DUCT WORK2'-4"
L O
C A
R
P
P O
S
O U
D
E
O
F
D
U C
T
EXIST. CMU WALL
5'-4"±FIELD DETERMINE
FIELD DETERMINE FINAL LENGTH
OF PLATFORM AND LOCATION OF
LADDER SO AS NOT TO INTERFERE WITH
EXISTING CONDUITS NOT INDICATED TO BE
RELOCATED PER ELECTRICAL DRAWINGS
E F 25'-0"
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
F I L E
N A
M E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
US Army Corps of Engineers
C A
T E
G O
D
E
D E
S C
R I P
T I O
N
P P r o j e c t s
C
A D
B
I M
S h e e t s S t r u c S
U B
B S d r a m
PW7549
A M
E N
D M
E N
T
A M
E N
D M
E N
T
SCALE: 1/2" = 1'-0"
ENLARGED ELEVATED PLATFORM FRAMING PLAN
N
2' 1' 0 2' 4' 6'
GRAPHIC SCALE:
"=1'-0"
GENERAL SHEET NOTES
1. REFER TO S-001 FOR GENERAL STRUCTURAL NOTES.
2. REFER TO S-300 FOR TYPICAL DETAILS.
3. CONTRACTOR SHALL RELOCATE ALL ELEC. CONDUITS,
JUNCTION BOXES, ETC. FOR INSTALLATION OF NEW
PLATFORM - VERIFY/COORDINATE NEW LOCATION OF
CONDUITS, ETC. w/ OWNER.
E N
L A
R G
E
V A
T E
D
P L A
T F
O R
M
F
R A
M I N
G
P
L A
N
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
M A
R C
H
S U
B B
S d w g
S-116
W Q
R D
X
X
X X
X X
X
X
X X
X X
X
X
X X
X X
M A
S O
N
G E
R
A N
S I
D
CERTIFIED FINAL SUBMITTAL
C R
A N
E
N
A V
A L
S
U P
P O
T
I V
I T
Y
N
S A
C R
A N
E
I N
D I A
N A
B L D
G
S
U B
B E
C
P
R O
J E
C T
P
L O
U I S
V I L
S
T R
I C
T
L O
U I S
V I L L E
K
E N
T U
C K
Y
D
R
M
A R
T
T H
N
G
P
L
LEGEND
INDICATES SPAN DIRECTION OF 1 18 " FIBERGLASS
NON-CONDUCTIVE DECKING w/ NON-SLIP SURFACE AND
FASTENERS
A
S-350
S-115
W
2Q R
R
Pl an s-
EXIST CONC
SLAB
PREFABRICATED CONC
TRENCH AND NON-CONDUCTIVE LID
1'-8"
EXIST CONC
SLAB
PREFABRICATED CONC
TRENCH AND NON-CONDUCTIVE LID
1'-4
CONC SLAB,
SEE PLAN
EXIST GARAGE
DOOR AND FRAME
EXIST FOUNDATION
TRENCH,
SEE PLAN
6" SUB-BASE
1'-0"
CONC SLAB,
SEE PLAN
EXIST EXTERIOR
WALL
EXIST FOUNDATION
6" SUB-BASE
1'-0"
3" SAND
7"
EXIST FTG
TO FTG
78'-0"
TO CONC
80'-1"
EXIST CONC
SLAB
PREFABRICATED CONC
TRENCH AND NON-CONDUCTIVE LID
1'-8"
3" SAND
EXIST WALL
FOUNDATION
TO CONC
80'-1"
CONC SLAB,
SEE PLAN
1/2" EXP JT MAT'L
AND CAULKING
2'-7"
CUSTOM PRE-FAB TRENCH - SEE
SHEET E-503 FOR MINIMUM
INTERIOR DIMENSIONS AND
CLEARANCES - TRENCH AND
NON-CONDUCTIVE LID TO BE
RATED FOR H20 LOADING
EXIST CONC
SLAB
PREFABRICATED CONC
TRENCH AND NON-CONDUCTIVE LID
1'-8"
TO FTG
78'-0"
TO CONC
80'-1"
2'-7"
CUSTOM PRE-FAB TRENCH - SEE
SHEET E-503 FOR MINIMUM
INTERIOR DIMENSIONS AND
CLEARANCES - TRENCH AND
NON-CONDUCTIVE LID TO BE
RATED FOR H20 LOADING
3" SAND
CUSTOM PRE-FAB TRENCH - SEE
SHEET E-503 FOR MINIMUM
INTERIOR DIMENSIONS AND
CLEARANCES - TRENCH AND
NON-CONDUCTIVE LID TO BE
RATED FOR H20 LOADING
1/2" EXP JT MAT'L
AND CAULKING
1/2" EXP JT MAT'L
AND CAULKING
1/2" EXP JT MAT'L
AND CAULKING
1/2" EXP JT MAT'L
AND CAULKING
1/2" EXP JT MAT'L
AND CAULKING
CUSTOM PRE-FAB TRENCH - SEE
SHEET E-503 FOR MINIMUM
INTERIOR DIMENSIONS AND
CLEARANCES - TRENCH AND
NON-CONDUCTIVE LID TO BE
RATED FOR H20 LOADING
2'-7"
F O
U N
D A
T I O
N
S
E C
T I O
N S
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
M A
R C
H
S U
B B
S d w g
S-300
W Q
R D
M
T
H O
M P
S O
N
B
R
E N
N E
R
D
D
I C
K E
Y
M A
S O
N
G E
R
A N
S I
D
CERTIFIED FINAL SUBMITTAL
C R
A N
E
N
A V
A L
S
U P
P O
T
I V
I T
Y
N
S A
C R
A N
E
I N
D I A
N A
B L D
G
S
U B
B E
C
P
R O
J E
C T
P
L O
U I S
V I L
S
T R
I C
T
L O
U I S
V I L L E
K
E N
T U
C K
Y
D
R
M
A R
T
T H
N
G
P
L
4'3'2'1'06"1'
GRAPHIC SCALE:
"=1'-0"
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
F I L E
N A
M E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
US Army Corps of Engineers
C A
T E
G O
D
E
D E
S C
R I P
T I O
N
P P r o j e c t s
C
A D
B
I M
S h e e t s S t r u c S
U B
B S d r a m
PW7549
A M
E N
D M
E N
T
A M
E N
D M
E N
T
SCALE: 3/4" = 1'-0"
SECTION
A
S-110
SCALE: 3/4" = 1'-0"
SECTION
B
S-110
SCALE: 3/4" = 1'-0"
SECTION
C
S-110
SCALE: 3/4" = 1'-0"
SECTION
D
S-110
SCALE: 3/4" = 1'-0"
SECTION
E
S-110
SCALE: 3/4" = 1'-0"
SECTION
F
S-110
W
2Q R
R
Pl an s-
| SF30 |
| SUMMARY OF CHANGES |
| G-003 |
| A-110 |
| A-111 |
| A-570 |
| A-580 |
| E-110 |
| E-501 |
| S-110 |
| S-116 |
| S-300 |
File details come from the government source that posted it. Updated .