W912QR20B0023Specs-0002.pdf
PDF 2 MB Posted
- Attached to
- Panama City ARC Addition
- Solicitation number
- W912QR20B0023
About this file
This federal solicitation is for the Panama City ARC Addition project with an estimated construction cost range between $1,000,000 to $5,000,000. The project scope involves construction of a 5,032 square foot one-story ARC Training Building Addition to the existing 100-member Panama City Army Reserve Center and a new Organizational Storage Building. The solicitation is 100% set aside for small business and funds are not presently available, with no contract award until appropriated funds are made available. Bidders must comply with CCR/ORCA requirements through SAM and technical inquiries are to be submitted via Bidder Inquiry in ProjNet.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract.docx | DOCX document | |
| W912QR20B0023Plans-0002.pdf | ||
| W912QR20B0023Plans-0001.pdf | ||
| Sign In Reserves.pdf | ||
| W912QR20B0023Specs-0001.pdf | ||
| W912QR20B0023Plans-0000.pdf | ||
| W912QR20B0023Specs_Vol2-0000.pdf | ||
| W912QR20B0023Specs_Vol1-0000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR20B0032 for Panama City ARC Addition at Panama City, Florida is hereby amended as follow s:
See Continuation Page
1. CONTRACT ID CODE PAGE OF PAGES
1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20B0023
X 9B. DATED (SEE ITEM 11)
31-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0002
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3.EFFECTIVE DATE
26-Aug-2020
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QR20B0023-0002
W912QR20B0023
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
1. Revisions to Drawings
1) CG100 – GRADING SITE PLAN (BASE BID)
a. Removed keynote 2. Removed Bid Option 1 items in drawing.
2) CS100 – CIVIL SITE PLAN (BASE BID)
a. Added keynote 19 to reference Detail C6/C-501.
3) S-001 – STRUCTURAL GENERAL NOTES
a. Added note “F” under “Foundations” to specify the minimum thickness of gravel layer to be placed under the slab on grade at various locations.
4) S-303 – STRUCTURAL SECTIONS
a. Detail E8: updated grouted area and steel lintel length to match Detail D4/S-303
5) A-102 – FLOOR PLANS
a. Detail B7: Revised wall type P23 to P23A in UHS Building
b. Detail B7: Added metal shelving layout in UHS Building
c. Floor Plan Keynote 110.12 added
6) A-501 – PARTITION AND DETAILS
a. Added new partition type P23A
7) A-503 – DETAILS
a. Detail A4: Added 24” dimension.
8) A-504 – DOOR DETAILS
a. Added new PEMB Metal Jamb and Header details A9 and F9.
9) A-601 – DOOR SCHEDULE
a. Note #5 added to identify sound control doors.
b. Door Schedule revised for PEMB Metal Jamb and Headers at doors 140B and 141B to identify new details on A-301
c. Door Schedule revised for detail call-outs at PEMB exterior doors 140A and 141A.
10) I-101 – FINISH FLOOR PLAN
a. Revised window treatment tag to RS and legend to reflect RS – Roller Shade.
11) I-601 – FINISH SCHEDULE AND LEGEND
a. Revised finish legend from MB-100 to RS-100 matching Spec Section 12 24 13 ROLLER
WINDOW SHADES
12) ED101 – EXISTING ARC – DEMOLITION PLAN
a. Revised note to turn over salvaged access control keypad to owner.
13) 1T103 – ARC ADDITION – SECURITY AND ACCESS CONTROL PLAN
a. Revised general note 1: To clarify scope of contractor
2. Revisions to Specifications
1) TABLE OF CONTENTS (TOC)
a. Removed Section 07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
b. Added Section 08 14 00 WOOD DOORS
c. Removed Section 08 34 59 VAULT DOORS & DAY GATES
d. Removed Section 08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
e. Added Section 10 56 13 STEEL SHELVING
2) Section 00 10 00 PRICE BREAKOUT SCHEDULE
a. Removed pallet racks from Bid Item No. 0007 “Option 5”
3) Submittal Register
a. Updated to remove and add requirements from sections listed below.
4) Section 01 46 00.00 06 TOTAL BUILDING COMMISSIONING
a. Removed references to Building Envelope Specialist.
5) Section 05 50 13 MISCELLANEOUS METAL FABRICATIONS
a. Revised to add insulated roof hatch specification
6) Section 07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
a. Removed section in its entirety.
7) Section 08 14 00 WOOD DOORS
a. Added section in its entirety.
8) Section 08 34 59 VAULT DOORS & DAY GATES
a. Removed section in its entirety.
9) Section 08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
a. Removed section in its entirety.
10) Section 08 81 00 GLAZING
a. Revised for fire-rated glass & framing.
11) Section 09 96 00 HIGH PERFORMANCE COATINGS
a. Revised to remove Epoxy Coatings and only include Concrete Sealer information.
12) Section 10 56 13 STEEL SHELVING Added section in its entirety.
3. The proposal due date is hereby extended from 31 August 2020 by 12:00 pm to Wednesday, 2 September 2020 at 12:00 PM Eastern Time.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 31-Aug-2020 12:00 PM to 02-Sep-2020 12:00 PM.
The following have been modified:
PRICE BREAKOUT SCHEDULE
PROJECT: EMERGENCY (HURRICANE DAMAGE) RELOCATION
PANAMA CITY ARMY RESERVE CENTER
LOCATION: PANAMA CITY, FLORIDA
PROPOSER’S NAME:
Item Description Unit Amount
BASE BID
0001 Primary Facilities
Job $ -
0002 Supporting Facilities
Total Base Bid $ -
OPTIONS
0003 Option 1 – Roof Drains (Addition)
0004 Option 2 – Roof Drains (Exisisting)
0005 Option 3 - ACFT Track and Pull-up Bars
0006 Option 4 – CFCI OMAR Funded Items
0007 Option 5 – CFCI “Bona Fide Need” OMAR Funded Items
Total All Options
Total Base Bid with All Options $ -
GENERAL:
This section comprises an explanation of the line items identified in the Price Breakout Schedule. This section is a general scope of work for the line items described in the Price Breakout Schedule and is not intended to be all encompassing in the description. All work specified herein shall be accomplished in accordance with the procedures prescribed in the technical provisions of the specifications and the plans/details as shown on the contract drawings. The contractor shall propose for each type of work under the applicable line item. Any item of work described in the contract but not listed in the bid schedule shall be included in the item of work to which it is made subsidiary.
BASE PROPOSAL ITEM DESCRIPTIONS
Item No. 0001 “Primary Facilities” includes the demolition and new work to construct a 5,032 square foot one-story ARC Training Building Addition to the existing 100-member Panama City Army Reserve Center (ARC) and new Organizational Storage Building, in Panama City, FL. This includes all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the work required for the superstructure, exterior, roof, interior construction, finishes, plumbing, HVAC, fire protection, and electrical work shown on the approved design drawings and specifications.
Item No. 0002 “Supporting Facilities” includes the demolition and new work to provide and modify electrical service, water, sewer, gas, land clearing, general site improvements, utility connections, paving, walks, curbs, gutters, storm drainage, and site improvements to support the ARC Training Building Addition, new Organizational Storage Building, and future Arms Vault Container concrete slab and utilities, and non-organizational vehicle parking This includes all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the work required for the superstructure, exterior, roof, interior construction, finishes, plumbing, HVAC, fire protection, and electrical work shown on the approved design drawings and specifications.
OPTION PROPOSAL ITEM DESCRIPTIONS
Item No. 0003 “Option 1 - Roof Drains (Addition)” includes the installation of gutters and downspouts for a complete stormwater collection system at the ARC Addition as shown on the approved design drawings and specifications.
This includes all materials, plant, tools, labor costs, and other associated incidentals necessary to complete installation of roof drain system and restoration of the grade and gravel.
***Price for this Option shall be good for 90 days from Notice to Proceed.
Item No. 0004 “Option 2 - Roof Drains (Existing)” includes the installation of gutters and downspouts for a complete stormwater collection system at the existing ARC building as shown on the approved design drawings and specifications. This includes all materials, plant, tools, labor costs, and other associated incidentals necessary to complete installation of roof drain system and restoration of the grade and gravel, and roof leader and yard drain.
***Price for this Option shall be good for 90 days from Notice to Proceed.
Item No. 0005 “Option 3 - ACFT Track and Pull-up Bars” includes the installation of a running path and pull-up bars as shown on the approved design drawings and specifications. This includes all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the entire ACFT Track and Pull-Up Bar area.
***Price for this Option shall be good for 90 days from Notice to Proceed.
Item No. 0006 “Option 4 – CFCI Operation and Maintenance – Army Reserve (OMAR) Funded Items” includes all work required to furnish and install “OMAR Funded Items” for the ARC Addition. OMAR Funded Items is to be contractor provided and installed, unless otherwise noted. Contractor to review drawings and specifications to locate all OMAR Funded Items. OMAR Funded Items for this facility addition includes, but is not limited to the following:
Caging for unit storage in ARC Addition and new Organizational Storage Building ***Price for this Option shall be good for 90 days from Notice to Proceed.
Item No. 0007 “Option 5 – CFCI Bona Fide Need Operation and Maintenance – Army Reserve (OMAR) Funded Items” includes all work required to furnish and install “Bona Fide Need OMAR Funded Items” for the ARC Addition and new Organizational Storage Building. Bona Fide Need Equipment is to be contractor provided and installed, unless otherwise noted. Contractor to review drawings and specifications to locate all Bona Fide Need Equipment.
Bona Fide Need Equipment for this facility addition includes, but is not limited to the following:
Free Standing Metal Shelving in caged storage areas in ARC Addition Amendment 0002*************************************************************** Free Standing Shelving in caged storage areas of new Organizational Storage Building ***************************************************************Amendment 0002 Fire Extinguishers and Window Blinds ***Price for this Option shall be good for 360 days from Notice to Proceed.
(End of Summary of Changes)
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 00 PRICE BREAKOUT SCHEDULE
00 80 00.00 06 SPECIAL PROVISIONS
ATTACHMENT - SIGN
ATTACHMENT - SUBMITTAL REGISTER
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 32 01.00 06 PROJECT SCHEDULE
01 33 00.00 06 SUBMITTAL PROCEDURES
01 33 29.00 06 SUSTAINABILITY REPORTING
ATTACHMENT A - ENERGY & SUSTAINABILITY RECORD CARD
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 46 00.00 06 TOTAL BUILDING COMMISSIONING
ATTACHMENT A - OWNER PROJECT REQUIREMENT
ATTACHMENT A - OWNER PROJECT REQUIREMENT TABLE
ATTACHMENT B - BASIS OF DESIGN
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 23 OPERATION AND MAINTENANCE DATA
ATTACHMENT - BLANK DD FORM 1354
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 83 13.00 06 LEAD IN CONSTRUCTION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 50 14 STRUCTURAL METAL FABRICATIONS
05 51 33 METAL LADDERS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 19 00 WATER REPELLENTS
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 BUILDING INSULATION
AMENDMENT 0002**********************************************************
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
***********************************************************AMENDENT 0002
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 54 19 POLYVINYL-CHLORIDE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
AMENDMENT 0002**********************************************************
08 14 00 WOOD DOORS
08 33 23 OVERHEAD COILING DOORS
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 71 00 DOOR HARDWARE
***********************************************************AMENDMENT 0002
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
09 96 00 HIGH-PERFORMANCE COATINGS
DIVISION 10 - SPECIALTIES
Amendment 0001************************************************************
10 11 00 VISUAL DISPLAY UNITS
************************************************************Amendment 0001
10 14 00.20 INTERIOR SIGNAGE
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
AMENDMENT 0002************************************************************
10 56 13 STEEL SHELVING
************************************************************AMENDMENT 0002
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 36 00 COUNTERTOPS
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93.00 06 TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 23 00 REFRIGERANT PIPING
23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT
23 82 19.00 40 FAN COIL UNITS
23 82 46.00 40 ELECTRIC UNIT HEATERS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00.00 06 EARTHWORK
ATTACHMENT - GEOTECH REPORT
31 11 00 CLEARING AND GRUBBING
31 31 16.13 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23 AGGREGATE BASE COURSES
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 92 19 SEEDING
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
-- End of Project Table of Contents --
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 72 PAGES
Panama City FL Army Reserve Center
00 80 00.00 06 SD-01 Preconstruction Submittals
1.28 GLabor, Equipment, and Material
Report
1.28 GDaily Equipment Report
1.37 GRadioactive Material/Equipment
SD-02 Shop Drawings
1.41 GMechanical/Electrical Room
Layout
SD-04 Samples
1.16 GEquipment Warranty Identification
Tags
SD-05 Design Data
1.9.1Equipment-in-Place List
1.9.1Maintenance and Parts Data
1.12SF1413 Statement and
Acknowledgement
1.14Local Agency Check
SD-07 Certificates
1.16Warranty of Construction
1.15NO ASBESTOS - CONTAINING
MATERIAL (ACM)
CERTIFICATION
1.32Insurance
1.30Sales and Use Tax
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 72 PAGES
00 80 00.00 06 1.7.4Preliminary (Working) As-Built
Drawings
1.7.1 GFinal As-Built Drawings
1.16 GWarranty Management Plan
01 11 00 SD-01 Preconstruction Submittals
1.7.1Utility Outage Requests
1.7.1Utility Connection Requests
1.7.2Borrow Permits
1.7.2Excavation Permits
1.7.2Welding Permits
GSalvage Plan
01 32 01.00 06 SD-01 Preconstruction Submittals
3.4.1 GPreliminary Project Schedule
3.4 GProject Schedule
SD-05 Design Data
3.5.2Narrative Report
3.5.4Schedule Reports
3.4.4 GPeriodic Schedule Updates
01 33 00.00 06 SD-01 Preconstruction Submittals
1.4.2 G ROSubmittal register
01 33 29.00 06 SD-01 Preconstruction Submittals
1.5.2.1 GSustainability Action Plan
LEED Final Design Review
Results
1.7.2USGBC GPA Final Design
Review Results
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 72 PAGES
01 33 29.00 06 1.7.1.7 GLEED Implementation Plan
1.5.1 G AEDesign Phase High Performance
and Sustainable Building Checklist
1.5.2.4 GSustainability Progress Report
SD-05 Design Data
1.7.1.4 GLEED Correction Plan
SD-11 Closeout Submittals
1.5.2.2 G AEFinal Sustainability eNotebook
1.5.2.2 G AEAmended Final Sustainability
eNotebook
1.5.2.2 GFinal High Performance and
Sustainable Building Checklist
1.7.1.9 GLEED Plaque and Certificate
1.7.2.2 GUSGBC GPA Certificates
01 35 26.00 06 SD-01 Preconstruction Submittals
1.7Accident Prevention Plan (APP)
1.7Fatigue Management Plan
1.7Bloodborne Pathogen Plan
1.7Exposure Control Plan
1.7Automatic External Defibrillator
(AED) Program
1.7Site Layout Plan
1.7Access/Haul Road Plan
1.7Hearing Conservation Program
1.7Respiratory Protection Plan
1.7Health Hazard Control Program
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 72 PAGES
01 35 26.00 06 1.7Hazard Communication Program
1.7Process Safety Management
Plan
1.7Lead Compliance Plan &
Specifications
1.7Asbestos Abatement Plan &
Specifications
1.7Radiation Safety Program
1.7Abrasive Blasting Plan
1.7Heat Stress Monitoring Plan
1.7Cold Stress Monitoring Plan
1.7Indoor Air Quality Management
Plan
1.7Mold Remediation Plan
1.7Chromium (VI) Exposure
Evaluation
1.7Crystalline Silica Assessment
1.7Lighting Plan for Night Operations
1.7Traffic Control Plan
1.7Fire Prevention Plan
1.7Wild Land Fire Management Plan
1.7Arc Flash Hazard Analysis
1.7Assured Equipment Grounding
Control Program (AEGCP)
1.7Hazardous Energy Control Plan
1.7Standard Pre-Lift Plan (LHE)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 72 PAGES
01 35 26.00 06 1.7Critical Lift Plan - LHE
1.7Naval Architectural Analysis-LHE
(Floating)
1.7Floating Plant Inspection and
Certification
1.7Severe Weather Plan for Marine
Activities
1.7Emergency Plan for Marine
Activities
1.7Man Overboard/Abandon Ship
Procedures
1.7Float Plan for Launches, Motorboats, Skiffs
1.7Fall Protection and Prevention
Plan
1.7Demolition/Renovation Plan (to include engineering survey)
1.7Rope Access Work Plan
1.7Excavation/Trenching Plan
1.7Fire Prevention and Protection
Plan for Underground Construction
1.7Compressed Air Plan for
Underground Construction
1.7Erection and Removal Plan for
Formwork and Shoring
1.7PreCast Concrete Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 72 PAGES
01 35 26.00 06 1.7Lift-Slab Plans
1.7Masonry Bracing Plan
1.7Steel Erection Plan
1.7Explosives Safety Site Plan
(ESSP)
1.7Blasting Plan
1.7Dive Operations Plan
1.7Safe Practices Manual for Diving
Activities
1.7Emergency Management Plan for
Diving
1.7Tree Felling/Maintenance
Program
1.7Aircraft/Airfield Construction
Safety & Phasing Plan (CSPP)
1.7Aircraft/Airfield Safety Plan
Compliance Document (SPCD)
1.7Site Safety and Health Plan
(HTRW)
1.7Confined Space Entry
Procedures
1.7Confined Space Program
1.8 G ROActivity Hazard Analysis (AHA)
1.5.1.1 G ROSite Safety and Health Officer
Qualifications(SSHO)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 72 PAGES
01 35 26.00 06 1.12.7 G ROProof of qualification for Crane
Operators
1.12.7 G ROCritical Lift Plan
SD-06 Test Reports
1.12Reports
1.12.1Accident Reports
1.12.3Monthly Exposure Reports
1.12.5Crane Reports
1.12.4Regulatory Citations and
Violations
SD-07 Certificates
1.12.8Confined Space Entry Permit
1.13Hot work permit
1.12.6Crane Certificate of Compliance
01 45 04.10 06 SD-01 Preconstruction Submittals
3.3Construction Quality Control Plan
01 45 35 SD-01 Preconstruction Submittals
GProject Manual
Written Practices
NDT Procedures and Equipment
Calibration Records
SD-06 Test Reports
3.1.3Daily Reports
3.1.2Biweekly Reports
SD-07 Certificates
2.1Fabrication Plant
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 72 PAGES
01 45 35 Steel Truss Plant
Wood Truss Plant
AC472 Accreditation
Steel Joist Institute Membership
Certified Plant
2.1Certificate of Compliance
1.5.17 GSpecial Inspector of Record
1.5 GSpecial Inspector
Qualification Records
SD-11 Closeout Submittals
3.1.3Interim Final Report
3.1.3 GComprehensive Final Report
01 46 00.00 06 SD-01 Preconstruction Submittals
1.4 GCommissioning Specialists
1.4.3 GCommissioning Specialists
1.8 GProject Schedule
SD-05 Design Data
3.1.4 GDesign Review Report
SD-06 Test Reports
3.1.3 GConstruction Phase
Commissioning Plan
3.1.6.3 GPre-Functional Checklists
GPVT Procedures
G DOPVT Report
1.6Issues Log
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 72 PAGES
01 46 00.00 06 3.7.1Post-Construction Trend Log
Report
3.6 GCommissioning Report
3.7 GPost-Construction
Commissioning Report
GMonthly Monitoring Based
Commissioning Update
GMonitoring Based Commissioning
Report
SD-07 Certificates
1.7 GCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.2 GSystems Training
3.3 GTraining Plan
3.3 G ROTraining Attendance Rosters
3.4 GSystems Manual
3.7 G DOPost-Construction Systems
Manual
3.5 G DOMaintenance and Service Life
Plans
SD-11 Closeout Submittals
S DOFinal Commissioning Report
SFinal Construction Phase
Commissioning Plan
01 50 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 72 PAGES
01 50 00 1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
01 57 19.00 06 SD-01 Preconstruction Submittals
1.5.1Preconstruction Survey
1.10 GSolid Waste Management Permit
1.5.2 GRegulatory Notifications
1.6 GEnvironmental Protection Plan
1.6.9.1 GDirt and Dust Control Plan
1.5.5 GEmployee Training Records
1.5.4 GEnvironmental Manager
Qualifications
3.12 GNotice Of Soil Treatment
3.2.1 GStormwater Pollution Prevention
Plan (Swppp)
SD-06 Test Reports
Inspection Reports
3.7.2.1 GSolid Waste Management Report
SD-07 Certificates
1.5.5 GEmployee Training Records
SD-11 Closeout Submittals
3.7.1 GWaste Determination
Documentation
3.7.4.3 GDisposal Documentation for
Hazardous and Regulated Waste
1.5.5 GAssembled Employee Training
Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 72 PAGES
01 57 19.00 06 1.10 GSolid Waste Management Permit
3.7.2.1 GSolid Waste Management Report
1.5.2 GRegulatory Notifications
3.7.2.1 GSales Documentation
3.7.2.1Contractor Certification
As-Built Topographic Survey
01 74 19 SD-01 Preconstruction Submittals
1.7 GConstruction Waste Management
Plan
SD-06 Test Reports
1.9.2Quarterly Reports
1.9.3Annual Report
SD-11 Closeout Submittals
1.10 SFinal Construction Waste
Diversion Report
01 78 23 SD-10 Operation and Maintenance
Data
1.4 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 72 PAGES
02 41 00 1.11Existing Conditions
SD-07 Certificates
1.7 GNotification
Notification of Demolition and
Renovation Form
SD-11 Closeout Submittals
Receipts
02 83 13.00 06 SD-01 Preconstruction Submittals
1.5.2.2 G POLead Compliance Plan
1.5.1.1 G POCompetent Person
1.5.1.2 G POTraining Certification
1.5.2.8 G POLead waste management plan
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.5 GQuality Control Plan
1.6.6 GQuality Control Personnel
Certifications
1.6.6Quality Control Organizational
Chart
1.6.8 GLaboratory Accreditation
3.3.9Maturity Method Data
SD-02 Shop Drawings
1.6.2.1 G AEReinforcing Steel
SD-03 Product Data
2.4.5 GJoint Sealants
2.4.4 GJoint Filler
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 72 PAGES
03 30 00 2.1 GFormwork Materials
2.3.3.2 GRecycled Aggregate Materials
2.3.1Cementitious Materials
2.4.1 GConcrete Curing Materials
2.6 GReinforcement
2.4.3.1 GLiquid Chemical Floor Hardeners
and Sealers
2.3.4 GAdmixtures
2.2.2 GWaterstops
2.2.3 GBiodegradable Form Release
Agent
2.4.2 G AENonshrink Grout
2.4.6 GVapor Barrier
SD-05 Design Data
1.6.1.1 G AEConcrete Mix Design
SD-06 Test Reports
1.6.1.1 G AEConcrete Mix Design
1.6.4.1Fly Ash
1.6.4.1Pozzolan
1.6.4.2Aggregates
3.13.2.3Compressive Strength Tests
G; AE
Air Content; G AE
Slump Tests; G AE
2.3.2Water
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 72 PAGES
03 30 00 2.6.1Reinforcing Bars
1.6.3.2Safety Data Sheets
1.6.6.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.4.5Joint Sealants
2.4.1Curing Compound
04 20 00 SD-02 Shop Drawings
3.3.4.1 GCut CMU
3.4.1.1 G AEDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
2.2.2.2.1 GCement
2.4.1.1 GCementitious Materials
SD-04 Samples
1.3.1.1 GMock-Up Panel
2.2.2.2 GConcrete Masonry Units (CMU)
2.6.2 GAnchors, Ties, and Bar
Positioners
2.6.3 GJoint Reinforcement
2.6.6 GClay Masonry Expansion-Joint
Materials
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 72 PAGES
04 20 00 2.1.2 GMasonry Compressive Strength
2.2.2.3Fire-Rated Concrete Masonry
Units
3.2.5 GBracing Calculations
SD-07 Certificates
2.2.2.2Concrete Masonry Units (CMU)
Precast Concrete Units
2.4.1.1Cementitious Materials
2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
Protective Water Repellent
SD-08 Manufacturer’s Instructions
Protective Water Repellent
SD-11 Closeout Submittals
SClay Units
2.2.2.2.2 SRecycled Content
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 G AEErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.4.2 G AEFabrication Drawings
SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
2.4.2Non-Shrink Grout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 72 PAGES
05 12 00 2.2.1 SRecycled Content for Structural
Steel
2.2.2 SRecycled Content for Structural
Steel Tubing
SD-06 Test Reports
2.6.2Class B Coating
2.3Bolts, Nuts, and Washers
3.7.1.2Weld Inspection Reports
3.7.2.1 GBolt Testing Reports
3.7.3Embrittlement Test Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
2.5Galvanizing
1.3 GAISC Structural Steel Fabricator
Quality Certification
1.3AISC Structural Steel Erector
Quality Certification
1.4.3.1 GWelding Procedures and
Qualifications
2.4.1 GWelding Electrodes and Rods
3.7.1.1 GCertified Welding Inspector
3.7.1.2NDT Technician
3.4Welding Procedure Specifications
(WPS)
05 21 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 72 PAGES
05 21 00 1.3.2Welder Qualification
SD-02 Shop Drawings
1.3.1 G AESteel Joist Framing
SD-05 Design Data
2.2 G AEDesign Calculations and joist
profiles
SD-06 Test Reports
3.4Erection Inspection
3.4Welding Inspections
SD-07 Certificates
1.3.2Certification of Compliance
SD-11 Closeout Submittals
2.3 SRecycled Content of Steel
Products
05 30 00 SD-02 Shop Drawings
1.3.5 G AEFabrication Drawings
SD-03 Product Data
2.2Accessories
2.1Deck Units
2.1.3Galvanizing Repair Paint
2.1.3Touch-Up Paint
1.3.3Welding Equipment
1.3.3Welding Rods and Accessories
SD-04 Samples
2.1.1Metal Roof Deck Units
2.2.4Flexible Closure Strips
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 72 PAGES
05 30 00 SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates
1.3.2Powder-Actuated Tool Operator
1.3.3Welder Qualifications
1.3.3Welding Procedures
1.3.4.1Wind Storm Resistance
1.3.1Manufacturer's Certificate
SD-11 Closeout Submittals
2.1 SRecycled Content of Steel
Products
05 40 00 SD-02 Shop Drawings
1.5.1 GFraming Components
SD-03 Product Data
2.1Studs, Joists
SD-05 Design Data
1.5.2 GMetal Framing Calculations
SD-07 Certificates
3.1.1Welds
SD-11 Closeout Submittals
2.1 SRecycled Content of Steel
Products
05 50 13 SD-02 Shop Drawings
2.4 G AEFloor Gratings
2.5 GBollards/Pipe Guards
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 72 PAGES
05 50 13 2.7 GRoof Hatch Safety Railing
System
2.6 GAngles and Plates
2.8 GRoof Hatches
SD-03 Product Data
2.4 GFloor Gratings
2.7Roof Hatch Safety Railing
System
2.8 GRoof Hatches
2.1 GCertificates of Compliance
2.1 SRecycled Content
05 50 14 SD-02 Shop Drawings
1.3.1 GDetail Drawings
2.1.2.1.1 GWelding Procedures
2.2.4Welding Repair Plan
2.1.6Castings
SD-03 Product Data
2.1.2.1.3.1Filler Metal
2.1.8.3Lubricant
SD-06 Test Reports
2.2Tests, Inspections, and
Verifications
SD-07 Certificates
1.3.2Welding Qualifications
2.1.2.3.1 GApplication Qualification for Steel
Studs
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 72 PAGES
05 50 14 2.1.2.4Welding of Aluminum
2.2.3.1Weld Inspection Log
2.2.3.1Certified Welding Inspector
2.2.3.2.1Nondestructive Testing Personnel
05 51 33 SD-02 Shop Drawings
2.3Ladders
SD-03 Product Data
2.3Ladders
2.3.1Ladder Safety Devices
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
06 10 00 SD-07 Certificates
1.9.1Certificates of Grade
1.7Preservative Treatment
06 41 16.00 10 SD-02 Shop Drawings
2.6Shop Drawings
3.1Installation
SD-03 Product Data
2.1Wood Materials
Wood Finishes
2.6.3.3Finish Schedule
1.4.2Certification
SD-04 Samples
2.3Plastic Laminates
Cabinet Hardware
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 72 PAGES
06 41 16.00 10 SD-07 Certificates
1.4Quality Assurance
3.1Laminate Clad Casework
SD-11 Closeout Submittals
LEED Documentation
06 61 16 SD-02 Shop Drawings
3.1 GInstallation
SD-03 Product Data
2.1Solid Polymer Material
1.5.1Qualifications
2.3Fabrications
2.2.4 SIndoor air quality for solid surface
seam and sealant products
SD-04 Samples
2.1 GMaterial
2.3.5 GCounter and Vanity Tops
SD-06 Test Reports
2.1Solid Polymer Material
SD-07 Certificates
2.3Fabrications
1.5.1Qualifications
2.1 SIndoor Air Quality for solid
surface fabrication products
SD-10 Operation and Maintenance
Data
3.2Clean-up
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 72 PAGES
07 05 23 SD-01 Preconstruction Submittals
1.4Work Plan
GS
SD-03 Product Data
2.2Thermal Imaging Camera
GS
SD-05 Design Data
3.2Envelope Surface Area
Calculations
GS
SD-07 Certificates
1.6.2.1Pressure Test Agency
1.6.2.2Thermographer Qualifications
1.6.3Test Instruments
1.6.3Date Of Last Calibration
SD-06 Test Reports
3.5Pressure Test Procedures
GS
1.6.4Air Leakage Test Report
3.5.7Air Leakage Test Report
1.6.4Diagnostic Test Report
3.6.5Diagnostic Test Report
07 19 00 SD-03 Product Data
2.2Water Repellents
SD-06 Test Reports
1.3.2Water Absorption
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 72 PAGES
07 19 00 2.3.1Water Absorption
2.3.2Water Absorption
2.3.3Water Absorption
2.3.1Accelerated Weathering
2.3.2Accelerated Weathering
2.3.3Accelerated Weathering
2.3.4Accelerated Weathering
2.3.1Resistance to Chloride Ion
Penetration
2.3.2Resistance to Chloride Ion
Penetration
2.3.3Resistance to Chloride Ion
Penetration
2.3.4Resistance to Chloride Ion
Penetration
1.3.2Moisture Vapor Transmission
2.3.1Moisture Vapor Transmission
2.3.2Moisture Vapor Transmission
2.3.3Moisture Vapor Transmission
2.3.4Moisture Vapor Transmission
2.3.1Scaling Resistance
2.3.2Scaling Resistance
2.3.3Scaling Resistance
2.3.4Scaling Resistance
1.3.2Water Penetration and Leakage
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 72 PAGES
07 19 00 1.3.1Manufacturer's Qualifications
1.3.1Applicator's Qualifications
1.3.3Evidence of Acceptable Variation
1.12Warranty
SD-08 Manufacturer’s Instructions
3.4Application
1.7.1Safety Data Sheets
07 21 13 SD-03 Product Data
1.3 GManufacturer's Standard Details
2.1 GBlock or Board Insulation
2.2 GVapor Retarder
2.3 GPressure Sensitive Tape
1.4 GProtection Board or Coatings
2.5 GAccessories
2.1.5 SRecycled Content for Block or
Board Insulation
SD-07 Certificates
2.1 GBlock or Board Insulation
2.2 GVapor Retarder
2.4 GProtection Board or Coating
3.4.2 GProtection Board or Coating
1.7 GSpecial Warranties
1.7 GSpecial Warranties
2.1.6 SIndoor Air Quality For Block Or
Board Insulation
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 72 PAGES
07 21 13 2.1Block or Board Insulation
2.5.1Adhesive
07 21 16 SD-03 Product Data
2.1Sound Attenuation Batt Insulation
2.1.2 SRecycled Content for Insulation
Materials
2.4.3Spray Polyurethane Foam
Insulation - Thermal SPF
2.3Vapor Retarder
2.4Accessories
SD-07 Certificates
2.1.4Indoor Air Quality for Insulation
Materials
2.4.1Indoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.3.1Insulation
07 22 00 SD-02 Shop Drawings
1.3 GInsulation Board Layout
1.3 GVerification of Existing Conditions
SD-03 Product Data
2.1 GInsulation
1.4 GCover Board
2.2 GFasteners
2.1.3 SRecycled Content For Insulation
SD-06 Test Reports
GFlame Spread Rating
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 72 PAGES
07 22 00 SD-07 Certificates
1.6 GInstaller Qualifications
2.1.4 SIndoor Air Quality For Insulation
SD-08 Manufacturer’s Instructions
2.2 GFasteners
2.1 GInsulation
07 27 10.00 10 SD-06 Test Reports
1.7 G AEDesign Review Report
SD-07 Certificates
1.6 GAir Barrier Inspector
07 27 19.01 SD-01 Preconstruction Submittals
1.8.1 GQualifications of Manufacturer
1.8.2 GQualifications of Installer
SD-02 Shop Drawings
1.4 GSelf-adhering Air Barrier
SD-03 Product Data
1.4 GSelf-adhering Air Barrier
2.2 GPrimers, Adhesives, and Mastics
1.4.2 GSafety Data Sheets
SD-04 Samples
1.4 GSelf-adhering Air Barrier
SD-06 Test Reports
1.6 GField Peel Adhesion Test
1.4.4 GFlame Propagation of Wall
Assemblies
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 72 PAGES
07 27 19.01 1.4.4 GFlame Spread and Smoke
Developed Index Ratings
3.4.1 GSite Inspections and Testing
SD-07 Certificates
1.4 GSelf-adhering Air Barrier
1.8.1 GQualifications of Manufacturer
1.8.2 GQualifications of Installer
SD-08 Manufacturer’s Instructions
1.4 GSelf-adhering Air Barrier
2.2 GPrimers, Adhesives, and Mastics
07 54 19 SD-02 Shop Drawings
1.6 GDetail Drawings
1.6 GRoof Plan
SD-03 Product Data
3.2.2 GPVC Roofing Membrane
2.1.2 SEnergy Star Label for roof
membrane
2.1.4Bonding Adhesive
1.5.3Flashing
3.2.2.2Flashing
2.1.7Membrane Fasteners and Plates
2.1.10Roof Insulation
2.1.8Pre-Manufactured Accessories
2.1.1Information Card
SD-05 Design Data
1.3.2 GWind Uplift Resistance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 72 PAGES
07 54 19 SD-07 Certificates
1.5.1Qualification of Manufacturer
1.5.2Qualifications of Applicator
1.3.2Wind Uplift Resistance
1.3.1Fire Resistance
2.1.1Minimum Polymer Thickness
2.1.6Minimum Polymer Thickness
1.10 GSample
SD-08 Manufacturer’s Instructions
3.2 GApplication Method
2.1.6 GMembrane Flashing
3.3.2 GMembrane Flashing
3.2.4Perimeter Attachment
2.1.7.2Auxiliary Fasteners
2.1.8Pre-Manufactured Accessories
1.8 GCold Weather
SD-11…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .