W912QR20B0023Specs-0002.pdf

PDF 2 MB Posted

Attached to
Panama City ARC Addition
Solicitation number
W912QR20B0023
Issued by

About this file

This federal solicitation is for the Panama City ARC Addition project with an estimated construction cost range between $1,000,000 to $5,000,000. The project scope involves construction of a 5,032 square foot one-story ARC Training Building Addition to the existing 100-member Panama City Army Reserve Center and a new Organizational Storage Building. The solicitation is 100% set aside for small business and funds are not presently available, with no contract award until appropriated funds are made available. Bidders must comply with CCR/ORCA requirements through SAM and technical inquiries are to be submitted via Bidder Inquiry in ProjNet.

View the file

Other files

File Type Posted
Bid Abstract.docx DOCX document
W912QR20B0023Plans-0002.pdf PDF
W912QR20B0023Plans-0001.pdf PDF
Sign In Reserves.pdf PDF
W912QR20B0023Specs-0001.pdf PDF
W912QR20B0023Plans-0000.pdf PDF
W912QR20B0023Specs_Vol2-0000.pdf PDF
W912QR20B0023Specs_Vol1-0000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912QR20B0032 for Panama City ARC Addition at Panama City, Florida is hereby amended as follow s:

See Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20B0023

X 9B. DATED (SEE ITEM 11)

31-Jul-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0002

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3.EFFECTIVE DATE

26-Aug-2020

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912QR20B0023-0002

W912QR20B0023

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0002

1. Revisions to Drawings

1) CG100 – GRADING SITE PLAN (BASE BID)

a. Removed keynote 2. Removed Bid Option 1 items in drawing.

2) CS100 – CIVIL SITE PLAN (BASE BID)

a. Added keynote 19 to reference Detail C6/C-501.

3) S-001 – STRUCTURAL GENERAL NOTES

a. Added note “F” under “Foundations” to specify the minimum thickness of gravel layer to be placed under the slab on grade at various locations.

4) S-303 – STRUCTURAL SECTIONS

a. Detail E8: updated grouted area and steel lintel length to match Detail D4/S-303

5) A-102 – FLOOR PLANS

a. Detail B7: Revised wall type P23 to P23A in UHS Building

b. Detail B7: Added metal shelving layout in UHS Building

c. Floor Plan Keynote 110.12 added

6) A-501 – PARTITION AND DETAILS

a. Added new partition type P23A

7) A-503 – DETAILS

a. Detail A4: Added 24” dimension.

8) A-504 – DOOR DETAILS

a. Added new PEMB Metal Jamb and Header details A9 and F9.

9) A-601 – DOOR SCHEDULE

a. Note #5 added to identify sound control doors.

b. Door Schedule revised for PEMB Metal Jamb and Headers at doors 140B and 141B to identify new details on A-301

c. Door Schedule revised for detail call-outs at PEMB exterior doors 140A and 141A.

10) I-101 – FINISH FLOOR PLAN

a. Revised window treatment tag to RS and legend to reflect RS – Roller Shade.

11) I-601 – FINISH SCHEDULE AND LEGEND

a. Revised finish legend from MB-100 to RS-100 matching Spec Section 12 24 13 ROLLER

WINDOW SHADES

12) ED101 – EXISTING ARC – DEMOLITION PLAN

a. Revised note to turn over salvaged access control keypad to owner.

13) 1T103 – ARC ADDITION – SECURITY AND ACCESS CONTROL PLAN

a. Revised general note 1: To clarify scope of contractor

2. Revisions to Specifications

1) TABLE OF CONTENTS (TOC)

a. Removed Section 07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS

b. Added Section 08 14 00 WOOD DOORS

c. Removed Section 08 34 59 VAULT DOORS & DAY GATES

d. Removed Section 08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

e. Added Section 10 56 13 STEEL SHELVING

2) Section 00 10 00 PRICE BREAKOUT SCHEDULE

a. Removed pallet racks from Bid Item No. 0007 “Option 5”

3) Submittal Register

a. Updated to remove and add requirements from sections listed below.

4) Section 01 46 00.00 06 TOTAL BUILDING COMMISSIONING

a. Removed references to Building Envelope Specialist.

5) Section 05 50 13 MISCELLANEOUS METAL FABRICATIONS

a. Revised to add insulated roof hatch specification

6) Section 07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS

a. Removed section in its entirety.

7) Section 08 14 00 WOOD DOORS

a. Added section in its entirety.

8) Section 08 34 59 VAULT DOORS & DAY GATES

a. Removed section in its entirety.

9) Section 08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

a. Removed section in its entirety.

10) Section 08 81 00 GLAZING

a. Revised for fire-rated glass & framing.

11) Section 09 96 00 HIGH PERFORMANCE COATINGS

a. Revised to remove Epoxy Coatings and only include Concrete Sealer information.

12) Section 10 56 13 STEEL SHELVING Added section in its entirety.

3. The proposal due date is hereby extended from 31 August 2020 by 12:00 pm to Wednesday, 2 September 2020 at 12:00 PM Eastern Time.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 31-Aug-2020 12:00 PM to 02-Sep-2020 12:00 PM.

The following have been modified:

PRICE BREAKOUT SCHEDULE

PROJECT: EMERGENCY (HURRICANE DAMAGE) RELOCATION

PANAMA CITY ARMY RESERVE CENTER

LOCATION: PANAMA CITY, FLORIDA

PROPOSER’S NAME:

Item Description Unit Amount

BASE BID

0001 Primary Facilities

Job $ -

0002 Supporting Facilities

Total Base Bid $ -

OPTIONS

0003 Option 1 – Roof Drains (Addition)

0004 Option 2 – Roof Drains (Exisisting)

0005 Option 3 - ACFT Track and Pull-up Bars

0006 Option 4 – CFCI OMAR Funded Items

0007 Option 5 – CFCI “Bona Fide Need” OMAR Funded Items

Total All Options

Total Base Bid with All Options $ -

GENERAL:

This section comprises an explanation of the line items identified in the Price Breakout Schedule. This section is a general scope of work for the line items described in the Price Breakout Schedule and is not intended to be all encompassing in the description. All work specified herein shall be accomplished in accordance with the procedures prescribed in the technical provisions of the specifications and the plans/details as shown on the contract drawings. The contractor shall propose for each type of work under the applicable line item. Any item of work described in the contract but not listed in the bid schedule shall be included in the item of work to which it is made subsidiary.

BASE PROPOSAL ITEM DESCRIPTIONS

Item No. 0001 “Primary Facilities” includes the demolition and new work to construct a 5,032 square foot one-story ARC Training Building Addition to the existing 100-member Panama City Army Reserve Center (ARC) and new Organizational Storage Building, in Panama City, FL. This includes all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the work required for the superstructure, exterior, roof, interior construction, finishes, plumbing, HVAC, fire protection, and electrical work shown on the approved design drawings and specifications.

Item No. 0002 “Supporting Facilities” includes the demolition and new work to provide and modify electrical service, water, sewer, gas, land clearing, general site improvements, utility connections, paving, walks, curbs, gutters, storm drainage, and site improvements to support the ARC Training Building Addition, new Organizational Storage Building, and future Arms Vault Container concrete slab and utilities, and non-organizational vehicle parking This includes all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the work required for the superstructure, exterior, roof, interior construction, finishes, plumbing, HVAC, fire protection, and electrical work shown on the approved design drawings and specifications.

OPTION PROPOSAL ITEM DESCRIPTIONS

Item No. 0003 “Option 1 - Roof Drains (Addition)” includes the installation of gutters and downspouts for a complete stormwater collection system at the ARC Addition as shown on the approved design drawings and specifications.

This includes all materials, plant, tools, labor costs, and other associated incidentals necessary to complete installation of roof drain system and restoration of the grade and gravel.

***Price for this Option shall be good for 90 days from Notice to Proceed.

Item No. 0004 “Option 2 - Roof Drains (Existing)” includes the installation of gutters and downspouts for a complete stormwater collection system at the existing ARC building as shown on the approved design drawings and specifications. This includes all materials, plant, tools, labor costs, and other associated incidentals necessary to complete installation of roof drain system and restoration of the grade and gravel, and roof leader and yard drain.

***Price for this Option shall be good for 90 days from Notice to Proceed.

Item No. 0005 “Option 3 - ACFT Track and Pull-up Bars” includes the installation of a running path and pull-up bars as shown on the approved design drawings and specifications. This includes all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the entire ACFT Track and Pull-Up Bar area.

***Price for this Option shall be good for 90 days from Notice to Proceed.

Item No. 0006 “Option 4 – CFCI Operation and Maintenance – Army Reserve (OMAR) Funded Items” includes all work required to furnish and install “OMAR Funded Items” for the ARC Addition. OMAR Funded Items is to be contractor provided and installed, unless otherwise noted. Contractor to review drawings and specifications to locate all OMAR Funded Items. OMAR Funded Items for this facility addition includes, but is not limited to the following:

Caging for unit storage in ARC Addition and new Organizational Storage Building ***Price for this Option shall be good for 90 days from Notice to Proceed.

Item No. 0007 “Option 5 – CFCI Bona Fide Need Operation and Maintenance – Army Reserve (OMAR) Funded Items” includes all work required to furnish and install “Bona Fide Need OMAR Funded Items” for the ARC Addition and new Organizational Storage Building. Bona Fide Need Equipment is to be contractor provided and installed, unless otherwise noted. Contractor to review drawings and specifications to locate all Bona Fide Need Equipment.

Bona Fide Need Equipment for this facility addition includes, but is not limited to the following:

Free Standing Metal Shelving in caged storage areas in ARC Addition Amendment 0002*************************************************************** Free Standing Shelving in caged storage areas of new Organizational Storage Building ***************************************************************Amendment 0002 Fire Extinguishers and Window Blinds ***Price for this Option shall be good for 360 days from Notice to Proceed.

(End of Summary of Changes)

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 00 PRICE BREAKOUT SCHEDULE

00 80 00.00 06 SPECIAL PROVISIONS

ATTACHMENT - SIGN

ATTACHMENT - SUBMITTAL REGISTER

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 32 01.00 06 PROJECT SCHEDULE

01 33 00.00 06 SUBMITTAL PROCEDURES

01 33 29.00 06 SUSTAINABILITY REPORTING

ATTACHMENT A - ENERGY & SUSTAINABILITY RECORD CARD

01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 04.10 06 CONTRACTOR QUALITY CONTROL

01 45 35 SPECIAL INSPECTIONS

01 46 00.00 06 TOTAL BUILDING COMMISSIONING

ATTACHMENT A - OWNER PROJECT REQUIREMENT

ATTACHMENT A - OWNER PROJECT REQUIREMENT TABLE

ATTACHMENT B - BASIS OF DESIGN

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 23 OPERATION AND MAINTENANCE DATA

ATTACHMENT - BLANK DD FORM 1354

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 83 13.00 06 LEAD IN CONSTRUCTION

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 21 00 STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 50 14 STRUCTURAL METAL FABRICATIONS

05 51 33 METAL LADDERS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 19 00 WATER REPELLENTS

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 BUILDING INSULATION

AMENDMENT 0002**********************************************************

07 22 00 ROOF AND DECK INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

***********************************************************AMENDENT 0002

07 27 19.01 SELF-ADHERING AIR BARRIERS

07 54 19 POLYVINYL-CHLORIDE ROOFING

07 60 00 FLASHING AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

AMENDMENT 0002**********************************************************

08 14 00 WOOD DOORS

08 33 23 OVERHEAD COILING DOORS

08 34 73 SOUND CONTROL DOOR ASSEMBLIES

08 71 00 DOOR HARDWARE

***********************************************************AMENDMENT 0002

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 68 00 CARPETING

09 90 00 PAINTS AND COATINGS

09 96 00 HIGH-PERFORMANCE COATINGS

DIVISION 10 - SPECIALTIES

Amendment 0001************************************************************

10 11 00 VISUAL DISPLAY UNITS

************************************************************Amendment 0001

10 14 00.20 INTERIOR SIGNAGE

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

AMENDMENT 0002************************************************************

10 56 13 STEEL SHELVING

************************************************************AMENDMENT 0002

DIVISION 12 - FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

12 36 00 COUNTERTOPS

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 19 METAL BUILDING SYSTEMS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93.00 06 TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 23 00 REFRIGERANT PIPING

23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT

23 82 19.00 40 FAN COIL UNITS

23 82 46.00 40 ELECTRIC UNIT HEATERS

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00.00 06 EARTHWORK

ATTACHMENT - GEOTECH REPORT

31 11 00 CLEARING AND GRUBBING

31 31 16.13 CHEMICAL TERMITE CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 23 AGGREGATE BASE COURSES

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 PAVEMENT MARKINGS

32 92 19 SEEDING

32 92 23 SODDING

DIVISION 33 - UTILITIES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 30 00 SANITARY SEWERAGE

-- End of Project Table of Contents --

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 72 PAGES

Panama City FL Army Reserve Center

00 80 00.00 06 SD-01 Preconstruction Submittals

1.28 GLabor, Equipment, and Material

Report

1.28 GDaily Equipment Report

1.37 GRadioactive Material/Equipment

SD-02 Shop Drawings

1.41 GMechanical/Electrical Room

Layout

SD-04 Samples

1.16 GEquipment Warranty Identification

Tags

SD-05 Design Data

1.9.1Equipment-in-Place List

1.9.1Maintenance and Parts Data

1.12SF1413 Statement and

Acknowledgement

1.14Local Agency Check

SD-07 Certificates

1.16Warranty of Construction

1.15NO ASBESTOS - CONTAINING

MATERIAL (ACM)

CERTIFICATION

1.32Insurance

1.30Sales and Use Tax

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 72 PAGES

00 80 00.00 06 1.7.4Preliminary (Working) As-Built

Drawings

1.7.1 GFinal As-Built Drawings

1.16 GWarranty Management Plan

01 11 00 SD-01 Preconstruction Submittals

1.7.1Utility Outage Requests

1.7.1Utility Connection Requests

1.7.2Borrow Permits

1.7.2Excavation Permits

1.7.2Welding Permits

GSalvage Plan

01 32 01.00 06 SD-01 Preconstruction Submittals

3.4.1 GPreliminary Project Schedule

3.4 GProject Schedule

SD-05 Design Data

3.5.2Narrative Report

3.5.4Schedule Reports

3.4.4 GPeriodic Schedule Updates

01 33 00.00 06 SD-01 Preconstruction Submittals

1.4.2 G ROSubmittal register

01 33 29.00 06 SD-01 Preconstruction Submittals

1.5.2.1 GSustainability Action Plan

LEED Final Design Review

Results

1.7.2USGBC GPA Final Design

Review Results

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 72 PAGES

01 33 29.00 06 1.7.1.7 GLEED Implementation Plan

1.5.1 G AEDesign Phase High Performance

and Sustainable Building Checklist

1.5.2.4 GSustainability Progress Report

SD-05 Design Data

1.7.1.4 GLEED Correction Plan

SD-11 Closeout Submittals

1.5.2.2 G AEFinal Sustainability eNotebook

1.5.2.2 G AEAmended Final Sustainability

eNotebook

1.5.2.2 GFinal High Performance and

Sustainable Building Checklist

1.7.1.9 GLEED Plaque and Certificate

1.7.2.2 GUSGBC GPA Certificates

01 35 26.00 06 SD-01 Preconstruction Submittals

1.7Accident Prevention Plan (APP)

1.7Fatigue Management Plan

1.7Bloodborne Pathogen Plan

1.7Exposure Control Plan

1.7Automatic External Defibrillator

(AED) Program

1.7Site Layout Plan

1.7Access/Haul Road Plan

1.7Hearing Conservation Program

1.7Respiratory Protection Plan

1.7Health Hazard Control Program

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 72 PAGES

01 35 26.00 06 1.7Hazard Communication Program

1.7Process Safety Management

Plan

1.7Lead Compliance Plan &

Specifications

1.7Asbestos Abatement Plan &

Specifications

1.7Radiation Safety Program

1.7Abrasive Blasting Plan

1.7Heat Stress Monitoring Plan

1.7Cold Stress Monitoring Plan

1.7Indoor Air Quality Management

Plan

1.7Mold Remediation Plan

1.7Chromium (VI) Exposure

Evaluation

1.7Crystalline Silica Assessment

1.7Lighting Plan for Night Operations

1.7Traffic Control Plan

1.7Fire Prevention Plan

1.7Wild Land Fire Management Plan

1.7Arc Flash Hazard Analysis

1.7Assured Equipment Grounding

Control Program (AEGCP)

1.7Hazardous Energy Control Plan

1.7Standard Pre-Lift Plan (LHE)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 72 PAGES

01 35 26.00 06 1.7Critical Lift Plan - LHE

1.7Naval Architectural Analysis-LHE

(Floating)

1.7Floating Plant Inspection and

Certification

1.7Severe Weather Plan for Marine

Activities

1.7Emergency Plan for Marine

Activities

1.7Man Overboard/Abandon Ship

Procedures

1.7Float Plan for Launches, Motorboats, Skiffs

1.7Fall Protection and Prevention

Plan

1.7Demolition/Renovation Plan (to include engineering survey)

1.7Rope Access Work Plan

1.7Excavation/Trenching Plan

1.7Fire Prevention and Protection

Plan for Underground Construction

1.7Compressed Air Plan for

Underground Construction

1.7Erection and Removal Plan for

Formwork and Shoring

1.7PreCast Concrete Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 72 PAGES

01 35 26.00 06 1.7Lift-Slab Plans

1.7Masonry Bracing Plan

1.7Steel Erection Plan

1.7Explosives Safety Site Plan

(ESSP)

1.7Blasting Plan

1.7Dive Operations Plan

1.7Safe Practices Manual for Diving

Activities

1.7Emergency Management Plan for

Diving

1.7Tree Felling/Maintenance

Program

1.7Aircraft/Airfield Construction

Safety & Phasing Plan (CSPP)

1.7Aircraft/Airfield Safety Plan

Compliance Document (SPCD)

1.7Site Safety and Health Plan

(HTRW)

1.7Confined Space Entry

Procedures

1.7Confined Space Program

1.8 G ROActivity Hazard Analysis (AHA)

1.5.1.1 G ROSite Safety and Health Officer

Qualifications(SSHO)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 72 PAGES

01 35 26.00 06 1.12.7 G ROProof of qualification for Crane

Operators

1.12.7 G ROCritical Lift Plan

SD-06 Test Reports

1.12Reports

1.12.1Accident Reports

1.12.3Monthly Exposure Reports

1.12.5Crane Reports

1.12.4Regulatory Citations and

Violations

SD-07 Certificates

1.12.8Confined Space Entry Permit

1.13Hot work permit

1.12.6Crane Certificate of Compliance

01 45 04.10 06 SD-01 Preconstruction Submittals

3.3Construction Quality Control Plan

01 45 35 SD-01 Preconstruction Submittals

GProject Manual

Written Practices

NDT Procedures and Equipment

Calibration Records

SD-06 Test Reports

3.1.3Daily Reports

3.1.2Biweekly Reports

SD-07 Certificates

2.1Fabrication Plant

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 72 PAGES

01 45 35 Steel Truss Plant

Wood Truss Plant

AC472 Accreditation

Steel Joist Institute Membership

Certified Plant

2.1Certificate of Compliance

1.5.17 GSpecial Inspector of Record

1.5 GSpecial Inspector

Qualification Records

SD-11 Closeout Submittals

3.1.3Interim Final Report

3.1.3 GComprehensive Final Report

01 46 00.00 06 SD-01 Preconstruction Submittals

1.4 GCommissioning Specialists

1.4.3 GCommissioning Specialists

1.8 GProject Schedule

SD-05 Design Data

3.1.4 GDesign Review Report

SD-06 Test Reports

3.1.3 GConstruction Phase

Commissioning Plan

3.1.6.3 GPre-Functional Checklists

GPVT Procedures

G DOPVT Report

1.6Issues Log

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 72 PAGES

01 46 00.00 06 3.7.1Post-Construction Trend Log

Report

3.6 GCommissioning Report

3.7 GPost-Construction

Commissioning Report

GMonthly Monitoring Based

Commissioning Update

GMonitoring Based Commissioning

Report

SD-07 Certificates

1.7 GCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.2 GSystems Training

3.3 GTraining Plan

3.3 G ROTraining Attendance Rosters

3.4 GSystems Manual

3.7 G DOPost-Construction Systems

Manual

3.5 G DOMaintenance and Service Life

Plans

SD-11 Closeout Submittals

S DOFinal Commissioning Report

SFinal Construction Phase

Commissioning Plan

01 50 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 72 PAGES

01 50 00 1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

01 57 19.00 06 SD-01 Preconstruction Submittals

1.5.1Preconstruction Survey

1.10 GSolid Waste Management Permit

1.5.2 GRegulatory Notifications

1.6 GEnvironmental Protection Plan

1.6.9.1 GDirt and Dust Control Plan

1.5.5 GEmployee Training Records

1.5.4 GEnvironmental Manager

Qualifications

3.12 GNotice Of Soil Treatment

3.2.1 GStormwater Pollution Prevention

Plan (Swppp)

SD-06 Test Reports

Inspection Reports

3.7.2.1 GSolid Waste Management Report

SD-07 Certificates

1.5.5 GEmployee Training Records

SD-11 Closeout Submittals

3.7.1 GWaste Determination

Documentation

3.7.4.3 GDisposal Documentation for

Hazardous and Regulated Waste

1.5.5 GAssembled Employee Training

Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 72 PAGES

01 57 19.00 06 1.10 GSolid Waste Management Permit

3.7.2.1 GSolid Waste Management Report

1.5.2 GRegulatory Notifications

3.7.2.1 GSales Documentation

3.7.2.1Contractor Certification

As-Built Topographic Survey

01 74 19 SD-01 Preconstruction Submittals

1.7 GConstruction Waste Management

Plan

SD-06 Test Reports

1.9.2Quarterly Reports

1.9.3Annual Report

SD-11 Closeout Submittals

1.10 SFinal Construction Waste

Diversion Report

01 78 23 SD-10 Operation and Maintenance

Data

1.4 GO&M Database

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 72 PAGES

02 41 00 1.11Existing Conditions

SD-07 Certificates

1.7 GNotification

Notification of Demolition and

Renovation Form

SD-11 Closeout Submittals

Receipts

02 83 13.00 06 SD-01 Preconstruction Submittals

1.5.2.2 G POLead Compliance Plan

1.5.1.1 G POCompetent Person

1.5.1.2 G POTraining Certification

1.5.2.8 G POLead waste management plan

03 30 00 SD-01 Preconstruction Submittals

1.6.3.1Concrete Curing Plan

1.6.5 GQuality Control Plan

1.6.6 GQuality Control Personnel

Certifications

1.6.6Quality Control Organizational

Chart

1.6.8 GLaboratory Accreditation

3.3.9Maturity Method Data

SD-02 Shop Drawings

1.6.2.1 G AEReinforcing Steel

SD-03 Product Data

2.4.5 GJoint Sealants

2.4.4 GJoint Filler

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 72 PAGES

03 30 00 2.1 GFormwork Materials

2.3.3.2 GRecycled Aggregate Materials

2.3.1Cementitious Materials

2.4.1 GConcrete Curing Materials

2.6 GReinforcement

2.4.3.1 GLiquid Chemical Floor Hardeners

and Sealers

2.3.4 GAdmixtures

2.2.2 GWaterstops

2.2.3 GBiodegradable Form Release

Agent

2.4.2 G AENonshrink Grout

2.4.6 GVapor Barrier

SD-05 Design Data

1.6.1.1 G AEConcrete Mix Design

SD-06 Test Reports

1.6.1.1 G AEConcrete Mix Design

1.6.4.1Fly Ash

1.6.4.1Pozzolan

1.6.4.2Aggregates

3.13.2.3Compressive Strength Tests

G; AE

Air Content; G AE

Slump Tests; G AE

2.3.2Water

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 72 PAGES

03 30 00 2.6.1Reinforcing Bars

1.6.3.2Safety Data Sheets

1.6.6.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.4.5Joint Sealants

2.4.1Curing Compound

04 20 00 SD-02 Shop Drawings

3.3.4.1 GCut CMU

3.4.1.1 G AEDetail Drawings

SD-03 Product Data

1.5.1 GHot Weather Procedures

1.5.2 GCold Weather Procedures

2.2.2.2.1 GCement

2.4.1.1 GCementitious Materials

SD-04 Samples

1.3.1.1 GMock-Up Panel

2.2.2.2 GConcrete Masonry Units (CMU)

2.6.2 GAnchors, Ties, and Bar

Positioners

2.6.3 GJoint Reinforcement

2.6.6 GClay Masonry Expansion-Joint

Materials

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 72 PAGES

04 20 00 2.1.2 GMasonry Compressive Strength

2.2.2.3Fire-Rated Concrete Masonry

Units

3.2.5 GBracing Calculations

SD-07 Certificates

2.2.2.2Concrete Masonry Units (CMU)

Precast Concrete Units

2.4.1.1Cementitious Materials

2.6.2Anchors, Ties, and Bar

Positioners

2.6.3Joint Reinforcement

Protective Water Repellent

SD-08 Manufacturer’s Instructions

Protective Water Repellent

SD-11 Closeout Submittals

SClay Units

2.2.2.2.2 SRecycled Content

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 G AEErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.4.2 G AEFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.4.2Non-Shrink Grout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 72 PAGES

05 12 00 2.2.1 SRecycled Content for Structural

Steel

2.2.2 SRecycled Content for Structural

Steel Tubing

SD-06 Test Reports

2.6.2Class B Coating

2.3Bolts, Nuts, and Washers

3.7.1.2Weld Inspection Reports

3.7.2.1 GBolt Testing Reports

3.7.3Embrittlement Test Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

2.5Galvanizing

1.3 GAISC Structural Steel Fabricator

Quality Certification

1.3AISC Structural Steel Erector

Quality Certification

1.4.3.1 GWelding Procedures and

Qualifications

2.4.1 GWelding Electrodes and Rods

3.7.1.1 GCertified Welding Inspector

3.7.1.2NDT Technician

3.4Welding Procedure Specifications

(WPS)

05 21 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 72 PAGES

05 21 00 1.3.2Welder Qualification

SD-02 Shop Drawings

1.3.1 G AESteel Joist Framing

SD-05 Design Data

2.2 G AEDesign Calculations and joist

profiles

SD-06 Test Reports

3.4Erection Inspection

3.4Welding Inspections

SD-07 Certificates

1.3.2Certification of Compliance

SD-11 Closeout Submittals

2.3 SRecycled Content of Steel

Products

05 30 00 SD-02 Shop Drawings

1.3.5 G AEFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1Deck Units

2.1.3Galvanizing Repair Paint

2.1.3Touch-Up Paint

1.3.3Welding Equipment

1.3.3Welding Rods and Accessories

SD-04 Samples

2.1.1Metal Roof Deck Units

2.2.4Flexible Closure Strips

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 72 PAGES

05 30 00 SD-05 Design Data

2.1 GDeck Units

SD-07 Certificates

1.3.2Powder-Actuated Tool Operator

1.3.3Welder Qualifications

1.3.3Welding Procedures

1.3.4.1Wind Storm Resistance

1.3.1Manufacturer's Certificate

SD-11 Closeout Submittals

2.1 SRecycled Content of Steel

Products

05 40 00 SD-02 Shop Drawings

1.5.1 GFraming Components

SD-03 Product Data

2.1Studs, Joists

SD-05 Design Data

1.5.2 GMetal Framing Calculations

SD-07 Certificates

3.1.1Welds

SD-11 Closeout Submittals

2.1 SRecycled Content of Steel

Products

05 50 13 SD-02 Shop Drawings

2.4 G AEFloor Gratings

2.5 GBollards/Pipe Guards

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 72 PAGES

05 50 13 2.7 GRoof Hatch Safety Railing

System

2.6 GAngles and Plates

2.8 GRoof Hatches

SD-03 Product Data

2.4 GFloor Gratings

2.7Roof Hatch Safety Railing

System

2.8 GRoof Hatches

2.1 GCertificates of Compliance

2.1 SRecycled Content

05 50 14 SD-02 Shop Drawings

1.3.1 GDetail Drawings

2.1.2.1.1 GWelding Procedures

2.2.4Welding Repair Plan

2.1.6Castings

SD-03 Product Data

2.1.2.1.3.1Filler Metal

2.1.8.3Lubricant

SD-06 Test Reports

2.2Tests, Inspections, and

Verifications

SD-07 Certificates

1.3.2Welding Qualifications

2.1.2.3.1 GApplication Qualification for Steel

Studs

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 72 PAGES

05 50 14 2.1.2.4Welding of Aluminum

2.2.3.1Weld Inspection Log

2.2.3.1Certified Welding Inspector

2.2.3.2.1Nondestructive Testing Personnel

05 51 33 SD-02 Shop Drawings

2.3Ladders

SD-03 Product Data

2.3Ladders

2.3.1Ladder Safety Devices

SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

06 10 00 SD-07 Certificates

1.9.1Certificates of Grade

1.7Preservative Treatment

06 41 16.00 10 SD-02 Shop Drawings

2.6Shop Drawings

3.1Installation

SD-03 Product Data

2.1Wood Materials

Wood Finishes

2.6.3.3Finish Schedule

1.4.2Certification

SD-04 Samples

2.3Plastic Laminates

Cabinet Hardware

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 72 PAGES

06 41 16.00 10 SD-07 Certificates

1.4Quality Assurance

3.1Laminate Clad Casework

SD-11 Closeout Submittals

LEED Documentation

06 61 16 SD-02 Shop Drawings

3.1 GInstallation

SD-03 Product Data

2.1Solid Polymer Material

1.5.1Qualifications

2.3Fabrications

2.2.4 SIndoor air quality for solid surface

seam and sealant products

SD-04 Samples

2.1 GMaterial

2.3.5 GCounter and Vanity Tops

SD-06 Test Reports

2.1Solid Polymer Material

SD-07 Certificates

2.3Fabrications

1.5.1Qualifications

2.1 SIndoor Air Quality for solid

surface fabrication products

SD-10 Operation and Maintenance

Data

3.2Clean-up

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 72 PAGES

07 05 23 SD-01 Preconstruction Submittals

1.4Work Plan

GS

SD-03 Product Data

2.2Thermal Imaging Camera

GS

SD-05 Design Data

3.2Envelope Surface Area

Calculations

GS

SD-07 Certificates

1.6.2.1Pressure Test Agency

1.6.2.2Thermographer Qualifications

1.6.3Test Instruments

1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5Pressure Test Procedures

GS

1.6.4Air Leakage Test Report

3.5.7Air Leakage Test Report

1.6.4Diagnostic Test Report

3.6.5Diagnostic Test Report

07 19 00 SD-03 Product Data

2.2Water Repellents

SD-06 Test Reports

1.3.2Water Absorption

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 72 PAGES

07 19 00 2.3.1Water Absorption

2.3.2Water Absorption

2.3.3Water Absorption

2.3.1Accelerated Weathering

2.3.2Accelerated Weathering

2.3.3Accelerated Weathering

2.3.4Accelerated Weathering

2.3.1Resistance to Chloride Ion

Penetration

2.3.2Resistance to Chloride Ion

Penetration

2.3.3Resistance to Chloride Ion

Penetration

2.3.4Resistance to Chloride Ion

Penetration

1.3.2Moisture Vapor Transmission

2.3.1Moisture Vapor Transmission

2.3.2Moisture Vapor Transmission

2.3.3Moisture Vapor Transmission

2.3.4Moisture Vapor Transmission

2.3.1Scaling Resistance

2.3.2Scaling Resistance

2.3.3Scaling Resistance

2.3.4Scaling Resistance

1.3.2Water Penetration and Leakage

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 72 PAGES

07 19 00 1.3.1Manufacturer's Qualifications

1.3.1Applicator's Qualifications

1.3.3Evidence of Acceptable Variation

1.12Warranty

SD-08 Manufacturer’s Instructions

3.4Application

1.7.1Safety Data Sheets

07 21 13 SD-03 Product Data

1.3 GManufacturer's Standard Details

2.1 GBlock or Board Insulation

2.2 GVapor Retarder

2.3 GPressure Sensitive Tape

1.4 GProtection Board or Coatings

2.5 GAccessories

2.1.5 SRecycled Content for Block or

Board Insulation

SD-07 Certificates

2.1 GBlock or Board Insulation

2.2 GVapor Retarder

2.4 GProtection Board or Coating

3.4.2 GProtection Board or Coating

1.7 GSpecial Warranties

1.7 GSpecial Warranties

2.1.6 SIndoor Air Quality For Block Or

Board Insulation

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 72 PAGES

07 21 13 2.1Block or Board Insulation

2.5.1Adhesive

07 21 16 SD-03 Product Data

2.1Sound Attenuation Batt Insulation

2.1.2 SRecycled Content for Insulation

Materials

2.4.3Spray Polyurethane Foam

Insulation - Thermal SPF

2.3Vapor Retarder

2.4Accessories

SD-07 Certificates

2.1.4Indoor Air Quality for Insulation

Materials

2.4.1Indoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.3.1Insulation

07 22 00 SD-02 Shop Drawings

1.3 GInsulation Board Layout

1.3 GVerification of Existing Conditions

SD-03 Product Data

2.1 GInsulation

1.4 GCover Board

2.2 GFasteners

2.1.3 SRecycled Content For Insulation

SD-06 Test Reports

GFlame Spread Rating

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 72 PAGES

07 22 00 SD-07 Certificates

1.6 GInstaller Qualifications

2.1.4 SIndoor Air Quality For Insulation

SD-08 Manufacturer’s Instructions

2.2 GFasteners

2.1 GInsulation

07 27 10.00 10 SD-06 Test Reports

1.7 G AEDesign Review Report

SD-07 Certificates

1.6 GAir Barrier Inspector

07 27 19.01 SD-01 Preconstruction Submittals

1.8.1 GQualifications of Manufacturer

1.8.2 GQualifications of Installer

SD-02 Shop Drawings

1.4 GSelf-adhering Air Barrier

SD-03 Product Data

1.4 GSelf-adhering Air Barrier

2.2 GPrimers, Adhesives, and Mastics

1.4.2 GSafety Data Sheets

SD-04 Samples

1.4 GSelf-adhering Air Barrier

SD-06 Test Reports

1.6 GField Peel Adhesion Test

1.4.4 GFlame Propagation of Wall

Assemblies

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 72 PAGES

07 27 19.01 1.4.4 GFlame Spread and Smoke

Developed Index Ratings

3.4.1 GSite Inspections and Testing

SD-07 Certificates

1.4 GSelf-adhering Air Barrier

1.8.1 GQualifications of Manufacturer

1.8.2 GQualifications of Installer

SD-08 Manufacturer’s Instructions

1.4 GSelf-adhering Air Barrier

2.2 GPrimers, Adhesives, and Mastics

07 54 19 SD-02 Shop Drawings

1.6 GDetail Drawings

1.6 GRoof Plan

SD-03 Product Data

3.2.2 GPVC Roofing Membrane

2.1.2 SEnergy Star Label for roof

membrane

2.1.4Bonding Adhesive

1.5.3Flashing

3.2.2.2Flashing

2.1.7Membrane Fasteners and Plates

2.1.10Roof Insulation

2.1.8Pre-Manufactured Accessories

2.1.1Information Card

SD-05 Design Data

1.3.2 GWind Uplift Resistance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 72 PAGES

07 54 19 SD-07 Certificates

1.5.1Qualification of Manufacturer

1.5.2Qualifications of Applicator

1.3.2Wind Uplift Resistance

1.3.1Fire Resistance

2.1.1Minimum Polymer Thickness

2.1.6Minimum Polymer Thickness

1.10 GSample

SD-08 Manufacturer’s Instructions

3.2 GApplication Method

2.1.6 GMembrane Flashing

3.3.2 GMembrane Flashing

3.2.4Perimeter Attachment

2.1.7.2Auxiliary Fasteners

2.1.8Pre-Manufactured Accessories

1.8 GCold Weather

SD-11…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .