W912QR20B0022.pdf
PDF 1 MB Posted
- Attached to
- Green River Area Asphalt Sealing and Striping
- Solicitation number
- W912QR20B0022
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Results.pdf | ||
| W912QR20B0022 amd0002.pdf | ||
| W912QR20B0022 Amend 0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Asphalt Sealing and Striping, Green River Area
The estimated base and four option year value of this Indefinite Delivery/Indefinite Quantity Contract is Betw een $500,000 and $1,000,000.
NAICS Code: 237310, Size Determination $39.5M.
This is 100% Total Small Business Set-Aside.
The solicitation w ill be available on the w eb only. Faxed, telephone, or mailed requests for this solicitation w ill not be honored.
Central Contractor Registration and ORCA are now available through the System for Aw ard Management (SAM), available at w w w .sam.gov.
Offerors must comply w ith the requirements of 52.204-7, 52.232-33, and any other CCR/ORCA requirements in this solicitation through SAM.
PLEASE NOTE: SAM is completely free of charge for both registrants and users.
X
KARI A SMITH 502.315.7028
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
24-Jul-2020
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days af ter receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________21 Aug 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
10:00 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
502.315.6195 OR 6193FAX:TEL: 502.315.6172 TEL: FAX:
W912QR20B0022 66
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 10 00 - Solicitation
PRICE BREAKOUT SCHEDULE
BASE YEAR
Item
Est.
Quant.
Unit Price
Unit Total
0001 Mobilization/Demobilization-Barren River Lake 5 Day $
0002 Mobilization/Demobilization-Green River Lake 5 Day $
0003 Mobilization/Demobilization-Nolin River Lake 5 Day $
0004 Mobilization/Demobilization-Rough River Lake 5 Day $
0005 Asphalt Sealing 73,000 Sq. yd. $
0006 Crack Sealing 30,000 L. Ft. $
0007 Asphalt Striping 35,000 L. Ft. $
0008 Solid field asphalt painting 1,000 Sq Ft $
0009 Paint directional arrow 100 Each $
0010 Paint Handicap parking symbol 20 Each $
BASE YEAR TOTAL $
Option Year 1
Est.
Quant.
Unit Price
Unit Total
0011 Mobilization/Demobilization-Barren River Lake 5 Day $
0012 Mobilization/Demobilization-Green River Lake 5 Day $
0013 Mobilization/Demobilization-Nolin River Lake 5 Day $
0014 Mobilization/Demobilization-Rough River Lake 5 Day $
0015 Asphalt Sealing 73,000 Sq. yd. $
0016 Crack Sealing 30,000 L. Ft. $
0017 Asphalt Striping 35,000 L. Ft. $
0018 Solid field asphalt painting 1,000 Sq Ft $
0019 Paint directional arrow 100 Each $
0020 Paint handicap parking symbol 20 Each $
OPTION YEAR 1 TOTAL $
Option Year 2
Est.
Quant.
Unit Price
Unit Total
0021 Mobilization/Demobilization-Barren River Lake 5 Day $
0022 Mobilization/Demobilization-Green River Lake 5 Day $
0023 Mobilization/Demobilization-Nolin River Lake 5 Day $
0024 Mobilization/Demobilization-Rough River Lake 5 Day $
0025 Asphalt Sealing 73,000 Sq. yd. $
0026 Crack Sealing 30,000 L. Ft. $
0027 Asphalt Striping 35,000 L. Ft. $
0028 Solid field asphalt painting 1,000 Sq Ft $
0029 Paint directional arrow 100 Each $
0030 Paint Handicap parking symbol 20 Each $
OTPION YEAR 2 TOTAL $
Option Year 3
Est.
Quant.
Unit Price
Unit Total
0031 Mobilization/Demobilization-Barren River Lake 5 Day $
0032 Mobilization/Demobilization-Green River Lake 5 Day $
0033 Mobilization/Demobilization-Nolin River Lake 5 Day $
0034 Mobilization/Demobilization-Rough River Lake 5 Day $
0035 Asphalt Sealing 73,000 Sq. yd. $
0036 Crack Sealing 30,000 L. Ft. $
0037 Asphalt Striping 35,000 L. Ft. $
0038 Solid field asphalt painting 1,000 Sq Ft $
0039 Paint directional arrow 100 Each $
0040 Paint Handicap parking symbol 20 Each $
OPTION YEAR 3 TOTAL $
Option Year 4
Est.
Quant.
Unit Price
Unit Total
0041 Mobilization/Demobilization-Barren River Lake 5 Day $
0042 Mobilization/Demobilization-Green River Lake 5 Day $
0043 Mobilization/Demobilization-Nolin River Lake 5 Day $
0044 Mobilization/Demobilization-Rough River Lake 5 Day $
0045 Asphalt Sealing 73,000 Sq. yd. $
0046 Crack Sealing 30,000 L. Ft. $
0047 Asphalt Striping 35,000 L. Ft. $
0048 Solid field asphalt painting 1,000 Sq Ft $
0049 Paint directional arrow 100 Each $
0050 Paint Handicap parking symbol 20 Each $
OPTION YEAR 4 TOTAL $
BASE + OPTION YEARS TOTAL = $
W912QR20B0022
Price Breakout: Seed Task Order-Rough River Lake
Task One
Quant. Unit Price Unit Total
0001 Mobilization/Demobilization-Rough River Lake 3 Day
0005 Asphalt Sealing 25,918 Sq. Yd.
0006 Crack sealing 9,265 L. Ft.
0007 Asphalt striping 14,165 L. Ft.
0009 Paint directional arrow 12 Each
0010 Paint Handicap parking symbol 11 Each
Task One Total
Total Task 1
SPECIAL INSTRUCTIONS
This Invitation for Bid (IFB) is for an Indefinite Delivery/Indefinite Quantity Contract to provide asphalt sealing, crack sealing, and striping activities for US Army Corps of Engineers (USACE), Green River Area, South Central Kentucky, in accordance with the attached Scope of Work. The Base Period will be Date of Award through 14 August 2021. The Contractor’s services and responsibility shall include all planning, programming, administration, management, supervision, communications, and inspection necessary to assure that all services are conducted in accordance with the contract requirements and all applicable Federal, state and local laws and regulations.
Note 1: For the base year, the Government hereby obligates itself to obtain no less than $5,000.00 in services.
Note 2: This solicitation contains an option clause to extend the awarded contract for up to four (4) additional one-year periods. The one-year option periods are as follows:
Option Year 1: 15 August 2021 through 14 August 2022 Option Year 2: 15 August 2022 through 14 August 2023 Option Year 3: 15 August 2023 through 14 August 2024 Option Year 4: 15 August 2024 through 14 August 2025
One award will be made from this IFB. The contract type is a Firm Fixed Price, Indefinite Delivery Indefinite Quantity (IDIQ). An IDIQ contract provides for an indefinite quantity, within stated limits, of supplies or services during a fixed period. The Government places orders for individual requirements. The quantities listed within the price breakout schedule are the quantity limits serving as the max capacity for this contract per FAR 16.504.
This solicitation also contains a Seed Project which will be used to assist in price evaluations and will be awarded to the successful offeror as Task Order following award of the base IDIQ contract.
This procurement is 100% set-aside for Small Business, NAICS 237310 ($39.5 M).
Note 3: Page numbering in this document may not be accurate.
Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.
Bids will not be accepted for quantities less than the quantities specified in the bid schedule. Failure to submit a unit price for all items listed (base year and option years) will be considered as a material deviation from the requirements of the IFB and the bid will be rejected.
Note 4: The basis of award is Low Price. The price will be reviewed by the Government for reasonableness and realism through the use of price analysis. Price will also be checked for unbalancing of line items. Offerors are cautioned to distribute costs appropriately. Award will not be made to Offerors who do not provide reasonable and realistic prices for all line items listed in the price breakout schedule.
Submit Bids to: U.S. Army Corps of Engineers
Room 821, ATTN: Kari Smith 600 Dr. Martin Luther King, Jr. Place Louisville, KY 40202
Bids are due on 21 August 2020 at 10:00 AM Eastern Time. Please email offers to Kari Smith at Kari.A.Smith@usace.army.mil.
For contractual/technical questions, please contact ASSIGNED CT SPECIALIST by e-mail at kari.a.smith@usace.army.mil.
All contractors must be registered in the System for Award Management (www.SAM.gov) prior to award of a contract. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic
Funds Transfer – System for Award Management, which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by going to the website http://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a unique entity identifier for processing their registration. Refer to www.SAM.gov for information formerly found in CCR, EPLS, ORCA and FedReg.
Please begin the registration process immediately in order to avoid delay of the contract award should your firm be selected.
ALERT: You must submit a notarized letter appointing the authorized Entity Administrator before your registration will be activated. This requirement now applies to both new and existing entities. Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record. The notarized letter is mandatory and is required before the GSA Federal Service Desk (FSD) will activate the entity's registration.
Effective June 29, 2018 vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM.
Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier (known as DUNS). The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM. To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov).
PLEASE NOTE: SAM is completely free of charge for both registrants and users.
SCOPE OF WORK
GREEN RIVER AREA ASPHALT SEALING, CRACK SEALING, AND STRIPING CONTRACT
TABLE OF CONTENTS
SECTION C-1 GENERAL
SECTION C-1 GENERAL
C-1.1 PROJECT INFORMATION
C-1.2 SCOPE OF WORK
C-1.3 TASK ORDERS
C-1.4 NEGOTIATION
C-1.5 WORKING HOURS
C-1.6 CONTRACTOR SUBMITTALS
C-1.7 PERMITS AND LICENSES
C-1.8 IDENTIFICATION OF CONTRACTOR EMPLOYEES AND VEHICLES
C-1.9 SAFETY AND SECURITY REQUIREMENTS
C-1.10 ACCIDENT REPORTING
C-1.11 DAMAGE REPORTS
C-1.12 CONTRACTOR EMPLOYEES’ CONDUCT AND COMPETENTCY
C-1.13 DAMAGE OR LOSS OF CONTRACTORS SUPPLIES AND PROPERTY
C-1.14 SUPERVISION
C-1.15 ENVIRONMENTAL PROGRAM
C-1.16 CONTRACTOR DISCREPANCY REPORT (CDR)
C-1.17 MEETINGS
C-1.18 QUALITY CONTROL
C-1.19 QUALITY ASSURANCE
C-1.20 DEFICIENCIES
C-1.21 INTERRUPTIONS TO SYSTEMS
C-1.22 GOVERNMENT FURNISHED MATERIALS AND EQUIPMENT
C-1.23 CONTRACTOR FURNISHED ITEMS
C-1.24 SAFEGUARDING GOVERNMENT PROPERTY
C-1.25 NOTIFICATION OF WORK TO BE DONE
C-1.26 MINIMUM MANPOWER REQUIREMENTS
C-1.27 MINIMUM PERSONNEL QUALIFICATIONS
C-1.28 COOPERATION WITH OTHER CONTRACTORS, LESSEES, AND VOLUNTEERS
C-1.29 REPORTS
C-1.30 APPLICABLE PUBLICATIONS
C-1.31 DEFINITIONS
C-1.32 WAGE RATES COMMUNICATION
C-1.33 COMMUNICATION
SECTION C-2
ASPHALT SEALING, CRACK SEALING, AND STRIPING ACTIVITIES
SECTION C-2 ACTIVITIES
C-2.1 SCOPE OF WORK
C-2.2 GENERAL
C-2.3 GENERAL SPECIFICATIONS ASPHALT SEALING, CRACK SEALING, AND STRIPING
ACTIVITIES
C-2.4 INVENTORY OF SITES FOR ASPHALT SEALING, CRACK SEALING, AND STRIPING
ACTIVITIES
C-2.5 ITEMS TO BE FURNISHED BY THE GOVERNMENT
C-2.6 SUPPLIES TO BE FURNISHED BY THE CONTRACTOR
C-2.7 SERVICE EQUIPMENT
C-2.8 SPECIAL PROVISIONS
C-2.9 CONTRACTOR SUBMITTALS
DESCRIPTION/SPECIFICATIONS SECTION C-1
General
C-1.1 PROJECT INFORMATION. Asphalt sealing, crack sealing, and striping for US Army Corps of Engineers (USACE), Green River Area lakes (Barren River, Green River, Nolin River, and Rough River Lake), South Central Kentucky, in various operations areas and recreation areas.
C-1.2 SCOPE OF WORK. The Contractor shall furnish all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, except as otherwise provided herein, required to perform sealing, crack sealing, and striping activities at Barren River, Green River, Nolin River, and Rough River Lake Projects operations areas and Recreation areas, as specified and in strict accordance with all Terms, Conditions, General, Specific and Technical Provisions, Attachments, Exhibits, etc., contained herein or incorporated by reference. The Contractor’s work and responsibility shall include all planning, programming, administration, management, supervision, communications and inspection necessary to assure that all services are conducted in accordance with the contract requirements and all applicable Federal, State and local laws and regulations. The Contractor is required to attend a pre-work meeting to be scheduled by the Technical Point of Contact (TPOC).
The Contractor also acknowledges the Government’s right to perform any or all of the services described herein.
It is emphasized that the work described in this contract is a critical part of the Corps mission. The work described will be performed in public recreation and project operational areas. The Corps is committed to "Customer Care" and providing quality professional service. Each bidding Contractor is urged to visit the job sites to assess quantities, critical dimensions, work locations, and conditions. A Request for Quote (RFQ) will be issued for each contemplated Task Order. The RFQ will typically be structured in one of two ways:
1. By service type, quantity, and location. In this instance, the quantities listed in the RFQ and unit prices listed in the base contract are set values and the TPOC will direct the contractor where to specifically perform the work (i.e. which parking lots and/or roadways to seal, crack fill, and/or stripe). This is how the seed project is started.
2. By service type and specific location. In this instance the TPOC and Contractor must agree on the quantities for each service and specific location in order to apply the set unit prices per the base contract and agree on a task order price.
C-1.3 TASK ORDERS. All work under this contract will be ordered by issuance of individual Task Orders (DD Form 1155). No work shall be performed under this contract before an individual Task Order has been issued by the Contracting Officer (KO). Only the KO, by issuance of a modification, may make any change to a Task Order. The Task Order will list those items from the quote schedule that are to be performed or used to perform the work.
C-1.4. NEGOTIATION. NOT APPLICABLE.
C-1.5 WORKING HOURS.
a. Normal Working Hours. Normal working hours, except as otherwise specified herein, shall be Monday through Friday, 7:00 a.m. to 3:30 p.m. local time or as specified on the Task Order. Work inside Government buildings or other secured areas shall be performed during the above referenced work hours. Work that interferes with other ongoing functions at the project shall be scheduled around normal working hours, as specified by the TPOC. Refer to individual sections of this specification for specific schedules of work. No work shall be performed outside of these times, or on Saturday or Sunday or on federal Holidays, unless approved by the Park Manager. Initiation of work must be coordinated with the Park Manager.
b. Holiday Work. The ten Federal holidays observed are:
New Year's Day (January 1st) Martin Luther King Day (3rd Monday in January) President's Day (3rd Monday in February) Memorial Day (Last Monday in May) Independence Day (July 4th) Labor Day (1st Monday in September) Columbus Day (2nd Monday in October) Veterans Day (November 11th) Thanksgiving Day (4th Thursday in November) Christmas Day (December 25th)
When one of the above designated holidays falls on a Sunday, the following Monday is observed as a legal holiday.
When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday. Work shall be scheduled around the above listed Federal holidays except as specified herein or as approved by the TPOC.
c. Inclement Weather Work. The Contractor shall maintain the schedule of services regardless of inclement weather. Exceptions may be approved by the TPOC when severe conditions make it impractical or dangerous to perform the work. The KO will notify the Contractor, by modification to the Task Order, of any change that extends the performance period due to inclement weather.
d. Emergency and/or After Hours Work. Work may be required on holiday periods during heavy visitation, emergencies, or for other reasons as determined by the TPOC. Additional personnel may be required to handle the additional work load during holiday periods because of heavy visitation. The TPOC will notify the Contractor of actual work requirements.
e. Special Note. At certain portions of the areas, there are certain precautions that will need to be taken, as these areas cannot be completely closed while work is progressing. The areas will need to be partially barricaded/flagged by the contractor, the night before the sealing or painting application to prevent vehicles from parking in a portion of the lot the next calendar day. In addition, all services will need to be done at the first part of the week, allowing adequate dry time for weekend vehicle use (Fridays at 2:00 PM Eastern Time, 1:00 PM Central Time).
C-1.6 CONTRACTOR SUBMITTALS. Unless otherwise specified, the Contractor shall submit the following information to the TPOC prior to the pre-work conference for this contract:
a. Quality Control Plan. A suggested outline for the Contractor's Quality Control Plan.
b. Contractor Quality Control Inspector. List of Quality Control Inspectors.
c. Contractor Representatives. List of names of Contractor Representatives.
d. Accident Prevention Plan (APP). A suggested outline for the Contractor’s Accident Prevention Plan Appendix A of EM 385-1-1. See Section C-1.9 for APP requirements.
e. Emergency Contacts. A prioritized list, including phone numbers, of those persons (normally Contractor Representatives) to call in case of emergencies.
f. Operators. A list of names of qualified equipment/vehicle operators, including experience, training and qualification to operate specific equipment.
g. Certificate of Insurance
h. Performance Bond (where applicable)
i. Security Requirements – See Section C-1.9
j. Certification for Rollover Protective Structures (ROPS).
C-1.7 PERMITS AND LICENSES. The Contractor shall obtain, at own expense, any required licenses, permits or certifications necessary to perform the specified services. Required licenses, permits and certifications shall be kept current during the period the work is performed. The Contractor is also responsible for any and all costs associated with the training of Contractor personnel to acquire and maintain valid licenses, permits or certifications necessary to perform the contract services specified herein. The Contractor, Contractor personnel and any persons acting on behalf of the Contractor shall comply with all applicable Federal, State and local laws and regulations; including any subsequent changes to these laws and regulations. Minimum Personnel and Training Requirements. The Contractor shall provide an adequate number of fully trained and qualified personnel to perform the work specified herein.
Contractor personnel shall be properly trained to perform their assigned work in a safe and effective manner.
Training shall include, but is not limited to instruction on the proper and safe use and operation of Contractor equipment and any Contractor provided tools, supplies and materials required to perform the specified services.
Only properly trained and qualified employees shall be used in the performance of services specified herein. The Contractor shall also assume responsibility for training or orienting Contractor personnel to perform the services specified in the contract. In the event the Contracting Officer or his/her Authorized Representative determines that the Contractor does not have a qualified employee performing the specified work, the Contractor shall be required to provide qualified personnel, or subcontract the work to a person or persons who are trained and qualified to perform the work. The Contractor acknowledges that the employment of undocumented migrant workers to perform services under this contract will not be permitted.
C-1.8 IDENTIFICATION OF CONTRACT EMPLOYEES AND VEHICLES. All Contractor employees shall be in good appearance while performing services. Employees must wear long pants, shirt with no vulgar or obscene graphics with at least sleeves equivalent of a t-shirt, and durable work type shoes. Vehicles and any motorized equipment utilized for transportation shall be in good operating condition with no display of obscene or vulgar material such as stickers, flags, or etc.
Vehicles shall be maintained In Accordance With (IAW) federal, state, and local laws.
C-1.9 SAFETY AND SECURITY REQUIREMENTS.
a. General. Performance of all services shall assure complete safety to public visitors, Contractor employees, and all other persons in the area. The Contractor shall comply with any pertinent requirements contained in the Corps of Engineers Safety Manual EM 385-1-1, current at the time of award and any subsequent revisions to that document. Furthermore, the Contractor shall comply with pertinent occupational safety and health standards for general industry (29 CFR Part 1910) as required by the Occupational Safety and Health Administration (OSHA). If the Contractor fails or refuses to promptly comply with safety and security requirements as specified herein, the TPOC or any other project employee may stop all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such work stoppage shall be made subject to any claims for extension of time or for excess costs or damages sustained by the Contractor. Also, the Contractor will not be paid for work not performed as a result of the stop order.
-The Contractor shall comply with the Occupational Safety and Health Act (OSHA), the Corps of Engineers Manual, EM 385-1-1, https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385- 1- 1.pdf?ver=2015-04-09-142531-467 or latest version and as otherwise stated herein. Special attention shall be given to the requirements for safety meetings.
-The Contractor shall inform the TPOC a minimum of 7 calendar days prior to a Contractor monthly safety meeting, to permit a Government representative to attend.
b. Accident Prevention Plan (APP). The Contractor shall prepare an Accident Prevention Plan to assure that requirements of the safety program are provided as specified. This plan must be accepted by the Contracting Officer prior to commencement of any work. One copy of the Accident Prevention Plan shall be provided to the KO and the TPOC one week prior to the pre-work conference. The Accident Prevention Plan must be in the outline and form prescribed in Appendix A of Safety Manual EM 385-1-1.
c. Activity Hazard Analysis (AHA).
The Contractor shall use Activity Hazard Analyses (AHA’s) as one of many tools to insure safe performance of work. It is the Contractor’s responsibility to prepare the AHA. An approved AHA must be prepared by the Contractor for each Task Order issued by the Government. Sample AHA’s may be available at the project office for review and use by the Contractor to assist in the development of site specific Activity Hazard Analyses prior to the Contractor performing the job. The Contractor is encouraged to revise or add to these sample AHA’s as necessary to address changing conditions. Prior to performing jobs with inherent hazards, the Contractor shall review, at a “Tool Box” safety meeting, the approved AHA’s with those employees who shall perform that work each time the work is ordered. The Government may request advanced notification of the time and date of the above AHA Tool Box safety
1) Schedule meeting for Contractor employees so that the Government may attend such reviews.
2) The Government will require the Contractor to prepare an AHA for any jobs for which an adequate AHA does not already exist. A copy of this AHA shall be submitted to the TPOC and must be accepted before the Contractor starts the job. This copy of the AHA will become the property of the Government. Guidance is included, which shall be used by the Contractor as a guide for the preparation of required AHA's.
3) A copy of an approved AHA is required for each Task Order issued by the Government. A copy of the approved AHA’s shall be available at all times to workers at each associated job site and a copy shall be provided to the Government.
d. Public Safety. The Contractor shall ensure that reasonable precautions are taken to protect the public at all times where work is being performed. The Contractor shall immediately report to the TPOC any potential hazards found by his employees on the project. The Accident Prevention Plan shall include procedures to be taken to provide for public safety. Additionally, the Contractor shall not allow any persons, except employees, into work areas that are not otherwise open to the public; nor shall the Contractor transport in Contractor work vehicles any persons, except employees, during times the Contractor is on the project performing work under a Task Order.
e. Personal Protective Apparel and Equipment. Protective apparel and equipment, as identified in the AHA, shall be provided to eliminate or minimize hazards to personnel. As a minimum, each employee shall wear a short-sleeved shirt, long trousers, and appropriate footwear during all contract work. Face shields, spectacles with side-shields, or goggles, and hearing protection shall be worn by employees when required by Safety Manual EM 385-1-
1. Contractor personnel involved in handling or application of pesticides or herbicides shall use all protective apparel per manufacturer's recommendations. Fire extinguisher(s) and first aid kit(s) meeting the Safety Manual EM 385-1-1, standards shall also be provided and easily accessible to all employees.
f. Contractor Employees Certified in First Aid & CPR. The Contractor shall schedule employees so the appropriate numbers of certified personnel are on duty to administer First Aid and CPR as required by the Safety Manual EM 385-1-1. Copies of their certification shall be provided in accordance with regulations. Two people per crew shall be trained in First Aid and CPR. Individuals working alone shall be trained in First Aid.
g. Hazard Communication Program. The Contractor shall be responsible for implementing a hazard communication program for Contractor employees, as required by the Safety Manual. The Contractor shall provide Material Safety Data Sheets (MSDS) and/or Safety Data Sheets (SDS) for review by the TPOC prior to use of any hazardous substance on the project and provide a plan for the proper handling, transportation, storage and usage of hazardous substances on the project.
h. Required Security Training and Planning
1) All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
2) Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
3) The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the TPOC NLT 5 calendar days after the completion of the training.
4) The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the TPOC no later than 3 business days after the initial contract award.
5) The Contractor shall be responsible for closing and locking gates after entering and leaving areas controlled by the gates. Egress and ingress to controlled access areas or buildings for which no keys are provided will be under the supervision of Corps personnel.
C-1.10 ACCIDENT REPORTING. The Contractor is responsible for reporting all accidents to the TPOC immediately. Prompt action shall be taken to ensure immediate and appropriate medical treatment. The Contractor shall maintain an accurate record of any accidents in the manner and on the forms prescribed by the TPOC. For property damage accidents of $2,000 or more, the Contractor shall complete and submit to the TPOC a copy of ENG Form 3394. The Contractor shall maintain an OSHA 300 Log of On-The-Job injuries and first aid treatments. The Contractor shall also provide a monthly record of all exposure and accident experience incidental to the performance of services under the contract. This reporting requirement includes exposure and accident experience of both the Prime Contractor and any subcontractor(s). A Monthly Record of Work-Related Injuries/Illnesses & Exposure form will be available from the TPOC. The Monthly Record of Work-Related Injuries/Illnesses & Exposure report shall be provided to the TPOC by the 5th working day of the month for the previous month.
C-1.11 DAMAGE REPORTS. All instances where Government materials, supplies, property, and/or equipment are damaged shall be reported immediately to the COR/TPOC. When the damage was caused by contract employees, a written report of the incident and extent of such damage shall be submitted to the TPOC, within 2 work days (less weekends and holidays) of occurrence. For property damage accidents of $2,000 or more the Contractor will complete and submit to the TPOC a copy of ENG 3394.
C-1.12 CONTRACTOR EMPLOYEES' CONDUCT AND COMPETENCY. All contract employees shall conduct themselves in a proper and courteous manner at all times. Since the majority of work is performed in the presence of the general public, the conduct of all employees is critical and will be closely monitored. Contract employees shall comply with all provisions of Title 36, Chapter III, Part 327, CFR and obey all posted signs and regulations in the performance of the work under this contract. Being under the influence of or consuming alcoholic beverages or controlled substances by the Contractor or employees while on duty is prohibited.
a. Employee Dismissal. The Contractor expressly agrees to dismiss any employee or subcontractor employee whose continued employment is deemed by the TPOC to be inconsistent with the best interests of the public or the U.S. Army Corps of Engineers. The KO or the TPOC may require the Contractor to immediately remove from the work site any employee or subcontractor who is incompetent, endangers persons or property, or whose physical or mental condition would impair their ability to satisfactorily perform the work. Notification to the Contractor will be promptly made in writing if time and circumstances permit. Otherwise, notification will be verbal and confirmed in writing as soon as possible. No removal shall reduce the Contractor's obligation to perform all work required under this contract nor be the basis for time extension. Immediate replacement of the employee shall be made.
C-1.13 DAMAGE OR LOSS OF CONTRACTOR'S SUPPLIES AND PROPERTY. The Contractor is responsible for taking the action necessary to protect Contractor supplies, materials and equipment, and the personal property of Contractor employees from loss, damage or theft. The Government assumes no responsibility for theft, damage, etc., of the above. The Government is not responsible for providing storage areas or facilities for the storage of Contractor supplies, materials and equipment. With prior approval, the TPOC may provide a location for the temporary storage of large equipment to prevent the transportation of such equipment to/from the work site while a particular service is being performed. However, the Government assumes no liability for the loss or destruction of Contractor equipment while it is stored on Government property.
C-1.14 SUPERVISION.
The designated Technical Point of Contact (TPOC) for each respective site will be: Chris Boggs - Green River Area, Operations Manager Alan Ramey – Barren River Lake, Park Manager Lori Brewster – Green River Lake, Park Manager Deryck Rodgers – Nolin River Lake, Park Manager Diane Stratton – Rough River Lake, Park Manager
The resident Technical Point of Contact (TPOC) is: Chris Boggs – Green River Area Operations Manager. The Contractor is responsible for providing on-site supervision and quality control inspections of work performed under the contract. The level of supervision and inspections shall be sufficient to assure that services are performed in accordance with contractual requirements and all applicable Federal, state and local laws and regulations. The Contractor or a Contractor Representative shall personally supervise the work, or be readily available by phone or other means of communication to respond to any contract issue that may arise when work is in progress. The Contractor Representative(s) shall conduct overall management coordination and be the central point of contact with the Government for performance of all work under the contract.
Each Contractor Representative shall have full authority to contractually commit the Contractor for prompt action on all matters pertaining to administration of this contract, and shall be the on-site Contractor employee who is responsible for safety.
In addition to Contractor Representative(s), the Contractor shall also appoint Quality Control Inspectors (QCI) who shall perform the Contractor's Quality Control Program. QCI’s shall be responsible for implementing the Contractor’s Accident Prevention Plan. All QCI'S shall have the authority to determine for the Contractor when work is ready for Government inspection and to make decisions for the Contractor on re-performance when necessary. A QCI shall be appointed for each work crew. For work performed outside normal working hours, a Contractor Representative or QCI shall be present at the work site.
The TPOC and Government Inspectors will deal directly with the QCI’s or Contractor Representatives, for normal day-to-day administration of the contract provisions.
The names and telephone numbers of all individuals authorized to act on behalf of the Contractor as Contractor Representatives shall be submitted in writing to the TPOC before work is performed.
The Contractor shall maintain copies of contract work requirements, specifications, Activity Hazard Analysis, etc., at each work site which relate to each person's work responsibilities, and shall review them to insure employees comprehension of a job prior to initiating work.
C-1.15 ENVIRONMENTAL PROGRAM. The Contractor shall comply with Federal, State, and local laws, regulations and standards regarding environmental protection. All environmental protection matters shall be coordinated with the TPOC. Any of the facilities operated by the Contractor may be inspected by the TPOC, or other Federal, State and local officials without advance notice. Access for inspection shall be granted upon request.
Citations against Government facilities operated by the Contractor for non-compliance with environmental standards are a matter for resolution between the Government and the issuing office.
The Contractor shall conduct all operations and maintenance activities in a manner to prevent contamination of Government land and property. The Contractor shall ensure all lubricants, petroleum products, paints, cleaning materials, or any other hazardous substances are not spilled, leaked or disposed of on Government property and are disposed of in accordance with environmental regulations. If spills or contamination occur, the Contractor shall be responsible for cleanup and any associated costs in accordance with Federal, State and Local Law. Such spills shall be reported to the TPOC immediately.
C-1.16 CONTRACT DISCREPANCY REPORT (CDR). A CDR is a formal document used by the Government to process defects in services. As initially issued to the Contractor, the CDR describes the discrepancy or problem. The CDR will be discussed with the Contractor or his representative when it is issued. The Contractor shall provide his written response on the CDR form within 24 hours of issuance. The Contractor's response must:
a. Identify the cause and corrective action taken, and
b. Identify Contractor action to prevent recurrence.
Upon finalization of the CDR, the Contractor and the TPOC must sign the form. The Contractor will be given a copy of the completed form. Should the Contractor not concur with any decision, etc., the Contractor may so state, in writing, and request a final decision by the Contracting Officer. The Contracting Officer monitors all CDR's issued, and CDR's are the principle evidence used by the Contracting Officer in determining Government contract actions such as termination or decision not to exercise options.
C-1.17 MEETINGS. The Contractor is required to attend a pre-work meeting to be scheduled by the TPOC. The Contractor or his authorized representative shall report each month with the schedule and location determined by the TPOC to discuss contract work items. Specific topics of discussion at the monthly meetings may include issuing task orders, requests for estimates, negotiation, inspections, quality control, and upcoming work. If a CDR is issued, mutual effort will be made to resolve any and all problems identified to preclude their recurrence. The TPOC may alter this reporting schedule, or change the reporting method, time, or place if mutually agreeable between the TPOC and the Contractor. A tour of the work site will be conducted following the discussions. It is recommended that the Contractor’s on-site representative or superintendent also attend this meeting. During the pre-work conference, the Contractor shall also provide any required submittals not previously submitted.
C-1.18 QUALITY CONTROL. The Contractor shall have a Quality Control program to assure the requirements of the contract are provided as specified. The primary purpose of Quality Control is to identify and correct deficiencies in the quality of services performed before the level of performance is unacceptable.
The program shall include, but not be limited to the following:
a. An inspection system covering all the services stated in the contract specifications.
b. A method of identifying and correcting deficiencies in the quality of services performed before the level of performance is unacceptable.
c. A file of all inspections conducted by the Contractor and the corrective actions taken. These files shall be made available for inspection upon request by the TPOC.
d. A method of insuring that employees have full knowledge of work assignments and that appropriate technical expertise is utilized with each work assignment.
e. A method of coordinating each work crew’s activities with the TPOC and/or inspector.
The Contractor may use any or all portions of this plan to prepare a plan of his own. A signed plan, including Contractor specific information, shall be provided to the Contracting Officer and the TPOC, and accepted, prior to the Pre-Work Conference. If changes to this program occur, updated copies shall be provided to the Contracting Officer and TPOC.
Failure to provide appropriate Quality Control may result in issuance of a CDR, and/or termination of the contract.
C-1.19 QUALITY ASSURANCE. The Government will monitor the Contractor's performance in each functional area under this contract and reserves the rights to use whatever additional surveillance procedures are deemed appropriate. The Government will examine completed work to determine whether work is performed and completed in compliance with the specifications for each Task order and contained herein. The TPOC is responsible for the Government’s Quality Assurance Program under the purchase order. The TPOC and/or his designated Quality Assurance Inspector (QAI) will observe the work being performed and inspect completed work. The contractor and the COR/TPOC/QAI shall coordinated work schedules and inspections to best evaluate contractor performance. The Government will use a combination of random, planned, and 100% inspections to evaluate the work provided under this contract. If the completed work does not conform to the requirements under the contract, the Government may require the contractor remedy the work until it satisfactorily meets the requirements of the contract specifications.
When the deficiencies cannot be corrected by re-performance, the Government may reduce or deduct the purchase order price to reflect the reduced value of the work performed or pursue claims as detailed in the FAR clauses contain in the contract. Should the Government verification reveal a nonperformance by the Contractor, a CDR may be issued.
A Government employee shall not be considered an Inspector unless he identifies himself as such to the Contractor, the Contractor Representative, or Quality Control Inspector. No Inspector is authorized to change any provision of the specifications without written authorization of the Contracting Officer nor shall the presence or absence of an inspector relieve the Contractor from any requirements of the Contract.
C-1.20 DEFICIENCIES. If the Contractor fails to perform, or if performance in any area is judged unsatisfactory by the TPOC, the Government will take corrective action. If any of the services do not conform to contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no cost to the Government. When the defect in services cannot be corrected by re-performance, or cannot be corrected in the specified time frame, the Contractor is required to respond to a CDR (See Section C- 1.16), and deductions will be determined by the Contracting Officer.
C-1.21 INTERRUPTIONS TO SYSTEMS. All work that would necessitate an interruption of the use of the project or its support systems or otherwise disrupt building occupants and/or the visiting public shall be fully coordinated and approved in advance by the TPOC. Interruptions shall be kept to an absolute minimum, and all repairs or replacements of equipment or components shall be accomplished in an expeditious and efficient manner.
C-1.22 GOVERNMENT FURNISHED MATERIALS AND EQUIPMENT.
a. Government Furnished Facilities. The Government is not responsible for providing storage areas or facilities for the storage of Contractor supplies, materials and equipment. With prior approval, the TPOC may provide a location for the temporary storage of large equipment to prevent the transportation of such equipment to/from the work site while a particular service is being performed. However, the Government assumes no liability for the loss or destruction of Contractor equipment while it is stored on Government property.
b. Utilities. The Government will NOT furnish available utilities to perform the specified work, unless otherwise approved by the Park Manager. The Contractor shall supply his own utilities including water, electric, and toilets, etc. If the Park Manager approves use of government utilities, the Contractor shall make a dedicated effort to conserve utilities and shall comply with all Government regulations regarding energy conservation. Government furnished utilities shall be used only in the performance of work specified in this contract.
c. Forms. All Department of Defense forms, required by the Government to be used under this contract, will be provided by the Government during the contract period. The Government reserves the right to modify or supersede these forms during the contract period.
d. Control. The Contractor shall provide control to ensure Government…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .