W912QR20B0002Specs-0003.pdf

PDF 2 MB Posted

Attached to
Automated Infantry Platoon Battle Course (AIPBC) at Fort Campbell, KY
Solicitation number
W912QR20B0002
Issued by

About this file

This federal contract opportunity notice provides details for the Automated Infantry Platoon Battle Course (AIPBC) project at Fort Campbell, KY. The solicitation seeks design/build services for an estimated $5-10 million construction project. The NAICS code is 236220 and businesses must meet the size standard definition for that code as listed in SAM. The solicitation will be available electronically on beta.SAM.gov and faxed, emailed or mailed requests will not be accepted. The project requires application of the HUBZone 10% price preference. Responses are due per the solicitation schedule. The U.S. Army Corps of Engineers Engineering District Louisville is the contracting agency.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912QR20B0002 for the Ft. Campbell Automated Infantry Platoon Battle Course Project is hereby amended as follow s:

SEE ATTACHED AMDT 0003 SUMMARY OF CHANGES.

1. CONTRACT ID CODE PAGE OF PAGES

1 20

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20B0002

X 9B. DATED (SEE ITEM 11)

20-Feb-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Apr-2020

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912QR20B0002Specs-0003

W912QR20B0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMDT 0003 SUMMARY OF CHANGES

A. Electronic bid submission instructions have been incorporated herein and must be adhered to. Please refer to the instructions for all pertinent bid submission and bid opening information.

B. The second pre-bid site visit attendee roster has been attached.

C. The following PLANS have been revised and replaced in their entirety:

• CD101 – Unused sheet CD143 outline removed

• CS103A – Keynotes for fence and gate removed

• CS104 – Keynote 23 updated with correct structural reference

• CS104A – Wheelstop keynote removed and note added to clarify Option E

• CS511 – Wheelstop detail removed

• CG102 – Bar scale corrected

• CG103 – Bar scale corrected

• ES102 – Note updated to show utility tie in point

• ES503 – Bollards removed from detail

• ES506 – Edited detail callouts and notes

• ES606 – General sheet note added

D. The following SPECIFICATION Sections have been removed in their entirety:

• Specification Section 04 21 13.13

• Specification Section 07 11 13

• Specification Section 07 19 00

E. The following SPECIFICATION Sections have been revised and replaced in their entirety:

• Specification Section 08 33 13

• Specification Section 08 33 23

• Specification Section 10 28 13

• Specification Section 13 34 19

F. The following SHEETS have been revised and replaced in their entirety:

• A_ROC_A-201

• A_ROC_A-301

• A_BE_A-301

• A_BE_A-101

• A_LAT_A-201

• A_LAT_A-301

• A_OPS_A-201

• A_OPS_A-301

• A_ABB_A-201

• A_ABB_A-301

• A_ABB_A-501

• A_CRM_A-201

• A_CRM_A-301

G. All other terms and conditions remain unchagned.

H. The bid due date has been extended to 13 April 2020 at 2:00 PM Eastern Time (ET).

W912QR20B0002

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 06-Apr-2020 02:00 PM to 13-Apr-2020 02:00 PM.

SECTION 00 21 00 - INSTRUCTIONS

The following have been added by full text:

ELECTRONIC BID INSTRUCTIONS

Bid Opening

All sealed bids must be delivered electronically per the instructions contained within this solicitation. Please deliver bids electronically to Marcel Hull at Marcel.D.Hull@usace.army.mil. The bid opening will be conducted telephonically via the below conference call-in number. Bids must be received by the time specified in the solicitation, otherwise they will be deemed late and unacceptable. The bid opening teleconference will begin promptly thirty (30) minutes after the bid submission time. The conference call-in number is as follows:

Conference Call-In Number: (605) 313-5111 Access Code: 131632

The Contracting Officer with assistance from the assigned Contract Specialist will download all of the bid submissions and record all of the pertinent information prior to the conference call. The bid opening teleconference will begin promptly 30 minutes after the submission time and at that time the bid opening officer will 1) read the names of the submitting contractors and their bids, and 2) read the independent government estimate. Once the information has been disseminated, the call will come to an end. The bid abstract will be posted to the beta.sam website by close of business of the day bids are opened.

Immediately following the bid opening, and upon notice by the Contracting Officer, the apparent low offeror will be requested to mail in their original bid and original bid bonds, respectively.

NOTE: Due to the potential of no Government Personnel being available to inspect the original bonds, the Contracting Officer may contact the bonding company to verify the information in the bond is accurate and complete.

Automated Infantry Platoon Battle Course 456975

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 80 00.00 06 SPECIAL PROVISIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 32 01.00 06 PROJECT SCHEDULE

01 33 00.00 06 SUBMITTAL PROCEDURES

01 33 29.00 06 SUSTAINABILITY REPORTING

01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 04.10 06 CONTRACTOR QUALITY CONTROL

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 39 00.00 10 CONCRETE CURING

03 62 16 METALLIC NON-SHRINK GROUTING

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

04 21 13.13 ***AMDT 0003 - Spec Deleted***

DIVISION 05 - METALS

05 05 23.16 STRUCTURAL WELDING

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 10 METAL BLEACHER

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 11 13 ***AMDT 0003 - Spec Deleted*** 07 19 00 ***AMDT 0003 - Spec Deleted***

07 21 13 BOARD INSULATION (WALLS)

07 22 00 ROOF INSULATION & UNDERLAYMENT

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

PROJECT TABLE OF CONTENTS Page 1

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 27 36 SPRAY FOAM AIR BARRIERS

07 42 13 EXTERIOR METAL WALL PANELS

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING & SNOW GUARD

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 33 13 COILING COUNTER DOORS

08 33 23 OVERHEAD COILING DOORS (AMMO BREAKDOWN BUILDING)

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 11 00 VISUAL DISPLAY UNITS (FOR CLASSROOM BLDG ONLY)

10 14 00.10 EXTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 19 METAL BUILDING SYSTEMS

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 93.00 06 TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC

23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 82 46.00 40 ELECTRIC UNIT HEATERS

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 08 00 APPARATUS INSPECTION AND TESTING

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 31 - EARTHWORK

PROJECT TABLE OF CONTENTS Page 2

31 00 00.00 06 EARTHWORK

31 05 22.00 06 GEOTEXTILES USED AS FILTERS

31 11 00 CLEARING AND GRUBBING

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 15 00 AGGREGATE SURFACING

32 31 13 CHAIN LINK FENCES AND GATES

32 92 19 SEEDING

DIVISION 33 - UTILITIES

33 40 00 STORM DRAINAGE UTILITIES

33 46 16 SUBDRAINAGE PIPING

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 3

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 55 PAGES

Automated Infantry Platoon Battle Course

00 80 00.00 06 SD-01 Preconstruction Submittals

1.27 G ROLabor, Equipment, and Material

Report

1.27 G RODaily Equipment Report

1.13 G ROFingerprints of all persons

employed or to be employed SD-02 Shop Drawings

1.40 G ROMechanical/Electrical Room

Layout

SD-04 Samples

1.15 G ROEquipment Warranty

Identification Tags SD-05 Design Data

1.8.1 G ROEquipment-in-Place List

1.8.1 G ROMaintenance and Parts Data

G ROSF1413 Statement and Acknowledgement

1.13 G ROLocal Agency Check

1.44 G ROProgress Photographs

SD-07 Certificates

1.15 G ROWarranty of Construction

1.14 G RONO ASBESTOS - CONTAINING

MATERIAL (ACM)

CERTIFICATION

1.31 G ROInsurance

G RODA Form 3337

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 55 PAGES

00 80 00.00 06 1.29 G ROSales and Use Tax SD-11 Closeout Submittals

1.7.4 G ROPreliminary (Working) As-Built

Drawings

1.7.1 G ROFinal As-Built Drawings

1.7.1.2 G ROCAD Working As-Built Drawings

1.15 G ROWarranty Management Plan

1.7.3 G ROContour Map

01 32 01.00 06 SD-01 Preconstruction Submittals

3.4.1 G ROPreliminary Project Schedule

3.4 G ROProject Schedule

SD-05 Design Data 3.5.2Narrative Report 3.5.4Schedule Reports

3.4.4 GPeriodic Schedule Updates

01 33 00.00 06 SD-01 Preconstruction Submittals G ROSubmittal register

01 33 29.00 06 SD-01 Preconstruction Submittals

1.5.1.1 G ROSustainability Action Plan

1.4 G ROLEED AP BD+C

G RODesign Phase High Performance and Sustainable Building Checklist

1.5.1.4 G ROSustainability Progress Report

SD-11 Closeout Submittals

1.5.1.2 G ROFinal Sustainability eNotebook

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 55 PAGES

01 33 29.00 06 1.5.1.2 G ROAmended Final Sustainability eNotebook

1.5.1.2 G ROFinal High Performance and

Sustainable Building Checklist

01 35 26.00 06 SD-01 Preconstruction Submittals 1.7Accident Prevention Plan (APP) 1.7Fatigue Management Plan 1.7Bloodborne Pathogen Plan 1.7Exposure Control Plan 1.7Automatic External Defibrillator

(AED) Program 1.7Site Layout Plan 1.7Access/Haul Road Plan 1.7Hearing Conservation Program 1.7Respiratory Protection Plan 1.7Health Hazard Control Program 1.7Hazard Communication Program 1.7Process Safety Management

Plan 1.7Lead Compliance Plan &

Specifications 1.7Asbestos Abatement Plan &

Specifications 1.7Radiation Safety Program 1.7Abrasive Blasting Plan 1.7Heat Stress Monitoring Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 55 PAGES

01 35 26.00 06 1.7Cold Stress Monitoring Plan 1.7Indoor Air Quality Management

Plan 1.7Mold Remediation Plan 1.7Chromium (VI) Exposure

Evaluation 1.7Crystalline Silica Assessment 1.7Lighting Plan for Night

Operations 1.7Traffic Control Plan 1.7Fire Prevention Plan 1.7Wild Land Fire Management Plan 1.7Arc Flash Hazard Analysis 1.7Assured Equipment Grounding

Control Program (AEGCP) 1.7Hazardous Energy Control Plan 1.7Standard Pre-Lift Plan (LHE) 1.7Critical Lift Plan - LHE 1.7Fall Protection and Prevention

Plan 1.7Demolition/Renovation Plan (to include engineering survey) 1.7Rope Access Work Plan 1.7Excavation/Trenching Plan

Fire Prevention & Protection Plan for Underground Construction

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 55 PAGES

01 35 26.00 06 1.7Compressed Air Plan for Underground Construction

1.7Erection and Removal Plan for Formwork and Shoring

1.7PreCast Concrete Plan 1.7Lift-Slab Plans 1.7Masonry Bracing Plan 1.7Steel Erection Plan 1.7Explosives Safety Site Plan

(ESSP)

1.7Blasting Plan 1.7Tree Felling/Maintenance

Program 1.7Site Safety and Health Plan

(HTRW)

1.7Confined Space Entry

Procedures 1.7Confined Space Program

1.8 G ROActivity Hazard Analysis (AHA)

1.5.1.1 G ROSite Safety and Health Officer

Qualifications(SSHO) G ROCertified Safety

Professional/Certified Industrial Hygienist Qualifications

1.12.7 G ROProof of qualification for Crane

Operators

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 55 PAGES

01 35 26.00 06 1.12.7 G ROCritical Lift Plan G ROUxo Safety Course

SD-06 Test Reports 1.12Reports 1.12.1Accident Reports 1.12.3Monthly Exposure Reports 1.12.5Crane Reports 1.12.4Regulatory Citations and

Violations SD-07 Certificates

1.13Hot work permit 1.12.6Crane Certificate of Compliance

01 45 04.10 06 SD-01 Preconstruction Submittals

3.3 G ROConstruction Quality Control Plan

01 50 00 SD-01 Preconstruction Submittals

1.3 G ROConstruction Site Plan

2.2.1 G ROHaul Road Plan

SD-06 Test Reports Backflow Preventer Tests

SD-07 Certificates Backflow Tester Backflow Preventers

01 57 19.00 06 SD-01 Preconstruction Submittals 1.6.1Preconstruction Survey

1.11 GSolid Waste Management Permit

1.6.2 GRegulatory Notifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 55 PAGES

01 57 19.00 06 1.7 GEnvironmental Protection Plan

1.7.9.1 GDirt and Dust Control Plan

1.6.5 GEmployee Training Records

1.6.4 GEnvironmental Manager

Qualifications GNotice Of Soil Treatment

3.2.1 G ROStormwater Pollution Prevention

Plan (SWPPP)

SD-06 Test Reports 3.7.1.1.2Laboratory Analysis 3.2.2.2Inspection Reports

3.7.2.1 GSolid Waste Management Report

SD-07 Certificates

1.6.5 GEmployee Training Records

Certificate of Competency 1.6.5Erosion and Sediment Control

Inspector SD-11 Closeout Submittals

3.2.2.3Stormwater Pollution Prevention Plan Compliance Notebook

3.2.2.4 GStormwater Notice of Termination

3.7.1 GWaste Determination

Documentation

3.7.4.6 GDisposal Documentation for

Hazardous and Regulated Waste

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 55 PAGES

01 57 19.00 06 1.6.5 GAssembled Employee Training Records

1.11 GSolid Waste Management Permit

3.7.2.1 GSolid Waste Management Report

3.7.4.1 GHazardous Waste/Debris

Management

1.6.2 GRegulatory Notifications

3.7.2.1 GSales Documentation

Contractor Certification As-Built Topographic Survey

01 74 19 SD-01 Preconstruction Submittals

1.6 G ROConstruction Waste Management

Plan SD-06 Test Reports

1.8.2Quarterly Reports 1.8.3Annual Report

SD-11 Closeout Submittals

1.9 SFinal Construction Waste

Diversion Report 01 78 23 SD-10 Operation and Maintenance

Data

1.3 G ROO&M Database

3.1.1 G ROTraining Plan

3.1.3 G ROTraining Outline

3.1.2 G ROTraining Content

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 55 PAGES

01 78 23 3.1.4 G ROTraining Video Recording

3.1.6 G ROValidation of Training Completion

02 41 00 SD-01 Preconstruction Submittals 1.2.2Demolition Plan 1.9Existing Conditions

SD-07 Certificates 1.6Notification

SD-11 Closeout Submittals 3.3.3Receipts

03 11 13.00 10 SD-02 Shop Drawings

2.2.1 G ROFormwork

3.1.1 G ROFormwork

2.2.1 G ROForm Removal Schedule

SD-03 Product Data 2.2Form Materials

SD-04 Samples

1.3 G ROSample Panels

SD-05 Design Data 2.1Calculations

SD-06 Test Reports 3.2Inspection

03 15 00.00 10 SD-03 Product Data 2.2Preformed Expansion Joint Filler 2.3Sealant

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 55 PAGES

03 15 00.00 10 2.3.2Lubricant for Preformed Compression Seals

2.3.3Field-Molded Type SD-07 Certificates

2.2Preformed Expansion Joint Filler 2.3Sealant

03 20 00.00 10 SD-01 Preconstruction Submittals GButt-Splices

SD-02 Shop Drawings

3.1 G ROReinforcement

SD-07 Certificates 2.3Reinforcing Steel

Qualified Welders 1.3.1Qualification of Steel Bar

Butt-Splicers 03 30 00.00 10 SD-01 Preconstruction Submittals

1.4.2 G ROQuality Control Plan

1.4.1Laboratory Accreditation

3.8.5.4 G ROSampling Plan

SD-03 Product Data Part 2Recycled Content Products 2.2Cementitious Materials

Vapor Retarder 2.10Vapor Barrier

Floor Finish 2.8Floor Hardener

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 55 PAGES

03 30 00.00 10 2.4Chemical Admixtures HDPE Liner Product Data HDPE Liner Manufacturer's Installation Instructions

SD-04 Samples 2.4.5Surface Retarder

SD-05 Design Data

2.1.1 G ROMixture Proportions

SD-06 Test Reports

2.1.1 G ROMixture Proportions

3.8 G ROTesting and Inspection for CQC

2.2.2Fly Ash

2.3 G ROAggregates

Air Content; G Slump; G Compressive Strength; G

2.5Water SD-07 Certificates

1.4Contractor Quality Control personnel

3.2.1Ready-Mix Plant 03 35 00.00 10 SD-03 Product Data

Part 2Recycled Content Products SD-04 Samples Field Test Panels Sample Wall Panels

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 55 PAGES

03 35 00.00 10 Slab Panels 03 39 00.00 10 SD-03 Product Data

2.1Curing Materials SD-06 Test Reports

3.2Testing and Inspection for CQC SD-08 Manufacturer’s Instructions

2.1Curing Compound 03 62 16 SD-01 Preconstruction Submittals

1.3.1 GGrout Placement and Inspection

Reports

SD-04 Samples

2.1.2 GAggregates

2.1.4 GExpansive Admixtures

SD-06 Test Reports

3.3 GExpansion

3.3 GCompressive Strength

1.3.1 GGrout Placement and Inspection

Reports

2.1.5 GExpansive Grout

2.1.1 GPortland Cement

SD-07 Certificates

2.1.1 GPortland Cement

2.1.4 GExpansive Admixtures

2.1.5 GExpansive Grout

2.1.2 GAggregates

04 20 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 55 PAGES

04 20 00 GSplit-Face & Smooth CMU 3.4.1.1Detail Drawings

GAE

SD-03 Product Data

1.4.1 GHot Weather Procedures

1.4.2 GCold Weather Procedures

2.2.2.2.1 GCement

2.4.1.1 GCementitious Materials

GWater-Repellant Admixture SD-04 Samples

GSplit-face & Smooth CMU

2.4.1.4 GAdmixtures for Masonry Mortar

2.6.2 GAnchors, Ties, and Bar

Positioners

2.6.3 GJoint Reinforcement

SD-05 Design Data

2.1.2 GMasonry Compressive Strength

3.2.5 GBracing Calculations

SD-06 Test Reports 3.6.1.1Field Testing of Mortar 3.6.1.2Field Testing of Grout 3.6.1.3Single-Wythe Masonry Wall

Water Penetration Test SD-07 Certificates Special Masonry Inspector Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 55 PAGES

04 20 00 2.2.2.2Concrete Masonry Units (CMU) 3.3.3.1Split-Faced & Smooth CMU 2.2.3Precast Concrete Units 2.4.1.1Cementitious Materials 2.4.1.4Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout 2.6.2Anchors, Ties, and Bar

Positioners 2.6.3Joint Reinforcement

SD-08 Manufacturer’s Instructions 2.4.1.4Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance Data Take-Back Program

04 21 13.13

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

***AMDT 0003 - Spec Deleted***

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 55 PAGES

05 05 23.16 SD-01 Preconstruction Submittals 3.2Welding Quality Assurance Plan

SD-03 Product Data

1.3 G ROWelding Procedure Qualifications

1.3.5Welder, Welding Operator, and

Tacker Qualification 1.3.6Inspector Qualification 1.3.2Previous Qualifications 1.3.3Pre-Qualified Procedures 2.2Welding Electrodes and Rods

SD-06 Test Reports 3.3Nondestructive Testing

SD-07 Certificates 1.3.1Certified Welding Procedure

Specifications (WPS) 1.3.1Certified Brazing Procedure

Specifications (BPS) 1.3.1Certified Procedure Qualification

Records (PQR)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 55 PAGES

05 05 23.16 1.3.1Certified Welder Performance Qualifications (WPQ)

1.3.1Certified Brazer Performance Qualifications (BPQ)

05 12 00 SD-01 Preconstruction Submittals

1.5.1.1 G AEErection Drawings

SD-02 Shop Drawings

1.5.2 G AEFabrication Drawings

SD-03 Product Data 2.6.2Shop Primer 2.4.1Welding Electrodes and Rods

Direct Tension Indicator Washers Non-Shrink Grout; G, AE

2.3.3Tension Control Bolts SD-06 Test Reports

2.6.2Class B Coating Bolts, Nuts, and Washers; G, AE

3.7.1.2Weld Inspection Reports Direct Tension Indicator Washer Inspection Reports; G, AE

3.7.2.1Bolt Testing Reports 3.7.3Embrittlement Test Reports

SD-07 Certificates 2.2Steel 2.3Bolts, Nuts, and Washers 2.5Galvanizing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 55 PAGES

05 12 00 Pins and Rollers 1.3AISC Fabrication Plant Quality

Certification 1.3AISC Erector Quality Certification 1.5.3.1Welding Procedures and

Qualifications 2.4.1Welding Electrodes and Rods

05 30 00 SD-02 Shop Drawings

1.3.4 G AEFabrication Drawings

SD-03 Product Data 2.2Accessories 2.1Deck Units

Galvanizing Repair Paint Mechanical Fasteners

2.1.4Touch-Up Paint Sound Absorbing Materials

1.3.2Welding Equipment 1.3.2Welding Rods and Accessories

SD-04 Samples 2.1.1Metal Roof Deck Units

Cellular Metal Floor Deck Units 2.2.4Flexible Closure Strips

Acoustical Material SD-05 Design Data

2.1 G AEDeck Units

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 55 PAGES

05 30 00 Powder-Actuated Tool Operator 1.3.2Welder Qualifications 1.3.2Welding Procedures 1.3.3.1Fire Safety 1.3.3.2Wind Storm Resistance 1.3.1Manufacturer's Certificate

Stud Manufacture's Certification Stud Manufacture's Test Reports

SD-11 Closeout Submittals

2.1 SRecycled Content of Steel

Products 05 40 00 SD-02 Shop Drawings

1.6.1 GFraming Components

SD-03 Product Data

2.1Studs, Joists SD-05 Design Data

GMetal Framing and Truss Calculations

SD-07 Certificates 1.4Load-Bearing Cold-Formed Metal

Framing 3.2.1Welds

05 50 10 SD-02 Shop Drawings G ROBeacher Unit

SD-03 Product Data

2.2 G ROBleacher Unit

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 55 PAGES

05 50 10 2.2 G ROBleacher Unit 2.1Access Doors and Panels

06 10 00 SD-02 Shop Drawings

1.8.1 G DOFabricated Structural Members

2.2.1 G RONailing Strips

SD-05 Design Data

1.8.2 G DOModifications of Structural

Members SD-06 Test Reports

1.4.5Preservative-treated SD-07 Certificates Certificates of Grade

SD-10 Operation and Maintenance Data

3.3Take-back Program 06 61 16 SD-02 Shop Drawings

GDetail Drawings

3.1 GInstallation

SD-03 Product Data 2.1Solid polymer material 1.4.1Qualifications 2.3Fabrications

SD-04 Samples

2.1 GMaterial

SD-06 Test Reports 2.1Solid polymer material

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 55 PAGES

06 61 16 SD-07 Certificates 2.3Fabrications 1.4.1Qualifications

SD-10 Operation and Maintenance Data Clean-up

07 11 13

07 19 00

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

***AMDT 0003 - Spec Deleted***

***AMDT 0003 - Spec Deleted***

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 55 PAGES

07 21 13 SD-03 Product Data 1.3Manufacturer's Standard Details

2.2 G ROBoard Insulation

2.4Accessories

SD-07 Certificates

2.2 GBoard Insulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 55 PAGES

07 21 13 1.7 GSpecial Warranties

1.7 GSpecial Warranties

SD-08 Manufacturer’s Instructions 2.2Board Insulation 2.4.1Adhesive

SD-11 Closeout Submittals SULE Greenguard

2.1.1 SVolatile Organic Compound

(VOC) Content

2.1.2 SRecycled Content

07 22 00 SD-02 Shop Drawings

1.3 GInsulation Board Layout

SD-03 Product Data

2.2 GInsulation

2.4 GFasteners

2.3 GSelf-Adhering Underlayment

SD-07 Certificates

1.8 GVolatile Organic Compounds

(VOC) Content

1.6 GInstaller Qualifications

SD-08 Manufacturer’s Instructions

2.4 GFasteners

2.2 GInsulation

SD-11 Closeout Submittals

1.8 SVolatile Organic Compounds

(VOC) Content

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 55 PAGES

07 27 10.00 10 SD-06 Test Reports

3.1.2 G ROTesting and Inspection

SD-07 Certificates G ROAir Barrier Inspector

07 27 26 SD-01 Preconstruction Submittals

1.9.1 G ROQualifications of Manufacturer

1.9.2 G ROQualifications of Installer

SD-02 Shop Drawings

1.4 G ROFluid-Applied Membrane Air

Barrier SD-03 Product Data

1.4 G ROFluid-Applied Membrane Air

Barrier

2.2 G ROPrimers, Adhesives, and Mastics

2.6Reinforcement 1.4.2Safety Data Sheets

SD-04 Samples

1.4.3 G ROMockup

SD-06 Test Reports

1.6 G ROCapillary Moisture Test

1.4.4 G ROField Peel Adhesion Test

3.4.1 G ROSite Inspections

SD-07 Certificates 1.4Fluid-Applied Membrane Air

Barrier 1.9.1Qualifications of Manufacturer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 55 PAGES

07 27 26 1.9.2Qualifications of Installer SD-08 Manufacturer’s Instructions

1.4 G ROFluid-Applied Membrane Air

Barrier

2.2 G ROPrimers, Adhesives, and Mastics

07 27 36 SD-01 Preconstruction Submittals

1.10.1 G ROQualification of Manufacturer

1.10.2 G ROQualification of Installer

1.11 G ROQuality Control Plan

1.11 G ROSafety Plan

1.9.1 G ROFire Prevention Plan

1.9.2 G RORespirator Plan

SD-02 Shop Drawings 1.5Spray Foam Air Barrier

G ROFoam Air Barrier System SD-03 Product Data

2.1.2 G ROClosed Cell

2.3 G ROPrimers, Adhesives, and Mastics

1.5.2Safety Data Sheets

2.1.1 G ROIgnition Barrier Coatings

SD-04 Samples

1.5 G ROSpray Foam Air Barrier

SD-06 Test Reports

1.5.4 G ROField Peel Adhesion Test

1.5.3Primers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 55 PAGES

07 27 36 1.5.4 G ROFlame Spread And Smoke Developed Index Ratings Of SPF Products

3.4.1 G ROSite Inspections

SD-07 Certificates

2.1.2 G ROClosed cell

1.10.1 G ROQualification of Manufacturer

1.10.2 G ROQualification of Installer

SD-08 Manufacturer’s Instructions 1.6.1SPF Handling, Storage, and

Spray Procedures 3.2.1Substrate Preparation 1.5.1Ignition Barrier 2.3Primers, Adhesives, and Mastics

SD-09 Manufacturer’s Field Reports

1.11Core Samples 3.3.2Daily Work Record

07 42 13 SD-01 Preconstruction Submittals

1.5.3 G AEQualification of Manufacturer

1.5.4 G AEQualification of Installation

Contractor

1.8 G AEWarranty

SD-02 Shop Drawings

1.5.1.1 G AEInstallation Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 55 PAGES

07 42 13 2.2.1 G AEWall Panels 2.2.2Factory Color Finish 1.5.5Closure Materials 2.5.4.4Pressure Sensitive Tape 2.5.4.1Sealants and Caulking 1.5.3.1Galvanizing Repair Paint 1.5.3.1Enamel Repair Paint

Aluminized Steel Repair Paint 1.5.5Accessories 2.5Accessories

SD-04 Samples

2.2.1 GWall Panels

1.5.3.1 GFasteners

2.5.3 GMetal Closure Strips

GColor chart SD-05 Design Data

1.5.1.2 G AEWind load design analysis

SD-06 Test Reports

3.7.2 G ROLeakage Tests

1.3.2 G AEWind Load Tests

2.2.2.6 G AECoating

2.2.2.6 G AEChalking

SD-07 Certificates

1.5.3.1 GCoil Stock

1.5.3.1 GFasteners

1.5.3.1 GGalvanizing Repair Paint

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 55 PAGES

07 42 13 1.5.3.1 GEnamel Repair Paint SD-08 Manufacturer’s Instructions

3.3 GInstallation

SD-09 Manufacturer’s Field Reports

3.8.1 GManufacturer's Field Reports

SD-11 Closeout Submittals

1.8 GWarranty

1.5.6 GMaintenance Instructions

1.8.120 year 'No Dollar Limit' warranty for labor and material 07 60 00 SD-02 Shop Drawings

2.1.1 G ROExposed Sheet Metal

3.1.12 G ROGutters

3.1.13 G RODownspouts

2.1.1 G ROFascia

3.1.10 G ROFascia

3.1.16 G ROFlashing at Roof Penetrations

and Equipment Supports

3.1.11 G RODrip Edges

3.1.14 G ROEave Flashing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 55 PAGES

07 60 00 Indicate thicknesses, dimensions, fastenings, anchoring methods, expansion joints, and other provisions necessary for thermal expansion and contraction.

Scaled manufacturer's catalog data may be submitted for factory fabricated items.

SD-11 Closeout Submittals 3.5Quality Control Plan

Submit for sheet metal work in accordance with paragraph entitled 'Field Quality Control'.

07 61 14.00 20 SD-02 Shop Drawings

1.2.5 G AERoofing

2.5 G ROSnow Retention System

SD-03 Product Data

2.1 G AERoofing Panels

2.2Attachment Clips 2.3.1Closures 2.3Accessories 2.3.2Fasteners 2.3.3Sealants

2.5 G ROSnow Retention System

2.4Insulation

1.7 G ROWarranty

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 55 PAGES

07 61 14.00 20 SD-04 Samples

2.1 G ROPanel

SD-05 Design Data

1.5 G AEDesign Calculations

G ROSnow Retention System Calculations

SD-06 Test Reports 3.6Field Inspection 1.3.3Structural Performance 1.6.6Finish

SD-07 Certificates

1.6.3 G ROManufacturer's Technical

Representative Installer's Qualifications; G, RO

2.1Coil Stock SD-08 Manufacturer’s Instructions

3.3 GInstallation

SD-11 Closeout Submittals

3.8Information Card

1.7 G ROWarranty

07 84 00 SD-02 Shop Drawings

2.1 GFirestopping System

SD-03 Product Data

2.2 GFirestopping Materials

SD-06 Test Reports

3.3 GInspection

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 55 PAGES

07 84 00 SD-07 Certificates 2.2Firestopping Materials

1.5.1 GInstaller Qualifications

07 92 00 SD-03 Product Data

2.2 GSealants

2.3 GPrimers

2.4 GBond Breakers

2.5 GBackstops

3.1Field Adhesion

SD-07 Certificates Indoor Air Quality

08 11 13 SD-02 Shop Drawings

2.1 G RODoors

2.1 G RODoors

2.6 G ROFrames

2.6 G ROFrames

2.4Accessories

SD-03 Product Data

2.1 G RODoors

2.6 G ROFrames

2.4Accessories 2.7Weatherstripping

08 33 13 SD-02 Shop Drawings

1.3 GDetail Drawings

SD-03 Product Data 1.5Warranty

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 55 PAGES

08 33 13 2.1Rolling Counter Doors 3.1Installation 3.5Cleaning

SD-06 Test Reports 3.3Drop-test

SD-11 Closeout Submittals 2.3Rolling Counter Door

(Non-Rated) 2.4Fire-Rated Rolling Counter Door

08 33 23 SD-02 Shop Drawings G ROInsulated Overhead Coiling

Doors SD-03 Product Data

G ROInsulated Overhead Coiling Doors

2.2.2 GHardware

2.2.3Counterbalancing Mechanism

2.2.4 G ROElectric Door Operators

SD-05 Design Data G ROInsulated Overhead Coiling

Doors

2.2.2 G ROHardware

2.2.3Counterbalancing Mechanism

2.2.4 G ROElectric Door Operators

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 55 PAGES

08 33 23 3.3.2Operation and Maintenance Manuals

3.3.2Materials 3.3.2Devices 3.3.2Procedures 3.3.2Manufacture's Brochures 3.3.2Parts Lists

SD-11 Closeout Submittals

3.3.1 G ROWarranty

08 51 13 SD-02 Shop Drawings

2.1 G ROWindows

1.10Fabrication Drawings

SD-03 Product Data

2.1 G ROWindows

2.2.7.1 G ROHardware

2.2.3 G ROFasteners

1.11 G ROWindow Performance

2.3 G ROThermal-Barrier Windows

2.2.9 G ROScreens

2.2.2 G ROWeatherstripping

2.2.7 G ROAccessories

1.11.4 G ROThermal Performance

SD-04 Samples 1.4.2.1Finish Sample

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 55 PAGES

08 51 13 1.4.3Minimum Condensation Resistance Factor

08 71 00 SD-02 Shop Drawings

1.3 GManufacturer's Detail Drawings

1.3 GVerification of Existing Conditions

1.5 G ROHardware Schedule

2.3.3 GKeying System

SD-03 Product Data

2.3 G ROHardware Items

SD-08 Manufacturer’s Instructions 3.1Installation

SD-10 Operation and Maintenance Data

1.5 G ROHardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting 08 81 00 SD-02 Shop Drawings

Installation SD-03 Product Data

1.6.1Insulating Glass 1.3Glazing Accessories

SD-07 Certificates 1.6.1Insulating Glass

SD-08 Manufacturer’s Instructions 2.3Setting and Sealing Materials 3.2Glass Setting

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 55 PAGES

08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers

SD-03 Product Data 2.2Metal Wall Louvers

09 22 00 SD-02 Shop Drawings

2.1 GMetal support systems

09 29 00 SD-03 Product Data 2.1.5Accessories 2.1.1Gypsum Board

SRecycled Content for Gypsum Board

SRecycled Content for Paper Facing and Gypsum Cores

2.1.2 SVOC Content of Joint Compound

SD-07 Certificates

2.1Asbestos Free Materials

2.1.1 SIndoor Air Quality for Gypsum

Board SIndoor Air Quality for Non-aerosol

Adhesives SIndoor Air Quality for Aerosol

Adhesives SD-08 Manufacturer’s Instructions Safety Data Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 55 PAGES

09 29 00 SD-10 Operation and Maintenance Data Manufacturer Maintenance Instructions

09 51 00 SD-03 Product Data Acoustical Ceiling Systems

09 65 00 SD-02 Shop…

This is the start of the file's text. The full file is on GovTribe.