This federal contract opportunity notice provides details for the Automated Infantry Platoon Battle Course (AIPBC) project at Fort Campbell, KY. The solicitation seeks design/build services for an estimated $5-10 million construction project. The NAICS code is 236220 and businesses must meet the size standard definition for that code as listed in SAM. The solicitation will be available electronically on beta.SAM.gov and faxed, emailed or mailed requests will not be accepted. The project requires application of the HUBZone 10% price preference. Responses are due per the solicitation schedule. The U.S. Army Corps of Engineers Engineering District Louisville is the contracting agency.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR20B0002 for the Ft. Campbell Automated Infantry Platoon Battle Course Project is hereby amended as follow s:
SEE ATTACHED AMDT 0003 SUMMARY OF CHANGES.
1. CONTRACT ID CODE PAGE OF PAGES
1 20
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20B0002
X 9B. DATED (SEE ITEM 11)
20-Feb-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Apr-2020
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QR20B0002Specs-0003
W912QR20B0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMDT 0003 SUMMARY OF CHANGES
A. Electronic bid submission instructions have been incorporated herein and must be adhered to. Please refer to the instructions for all pertinent bid submission and bid opening information.
B. The second pre-bid site visit attendee roster has been attached.
C. The following PLANS have been revised and replaced in their entirety:
• CD101 – Unused sheet CD143 outline removed
• CS103A – Keynotes for fence and gate removed
• CS104 – Keynote 23 updated with correct structural reference
• CS104A – Wheelstop keynote removed and note added to clarify Option E
• CS511 – Wheelstop detail removed
• CG102 – Bar scale corrected
• CG103 – Bar scale corrected
• ES102 – Note updated to show utility tie in point
• ES503 – Bollards removed from detail
• ES506 – Edited detail callouts and notes
• ES606 – General sheet note added
D. The following SPECIFICATION Sections have been removed in their entirety:
• Specification Section 04 21 13.13
• Specification Section 07 11 13
• Specification Section 07 19 00
E. The following SPECIFICATION Sections have been revised and replaced in their entirety:
• Specification Section 08 33 13
• Specification Section 08 33 23
• Specification Section 10 28 13
• Specification Section 13 34 19
F. The following SHEETS have been revised and replaced in their entirety:
• A_ROC_A-201
• A_ROC_A-301
• A_BE_A-301
• A_BE_A-101
• A_LAT_A-201
• A_LAT_A-301
• A_OPS_A-201
• A_OPS_A-301
• A_ABB_A-201
• A_ABB_A-301
• A_ABB_A-501
• A_CRM_A-201
• A_CRM_A-301
G. All other terms and conditions remain unchagned.
H. The bid due date has been extended to 13 April 2020 at 2:00 PM Eastern Time (ET).
W912QR20B0002
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 06-Apr-2020 02:00 PM to 13-Apr-2020 02:00 PM.
SECTION 00 21 00 - INSTRUCTIONS
The following have been added by full text:
ELECTRONIC BID INSTRUCTIONS
Bid Opening
All sealed bids must be delivered electronically per the instructions contained within this solicitation. Please deliver bids electronically to Marcel Hull at Marcel.D.Hull@usace.army.mil. The bid opening will be conducted telephonically via the below conference call-in number. Bids must be received by the time specified in the solicitation, otherwise they will be deemed late and unacceptable. The bid opening teleconference will begin promptly thirty (30) minutes after the bid submission time. The conference call-in number is as follows:
Conference Call-In Number: (605) 313-5111 Access Code: 131632
The Contracting Officer with assistance from the assigned Contract Specialist will download all of the bid submissions and record all of the pertinent information prior to the conference call. The bid opening teleconference will begin promptly 30 minutes after the submission time and at that time the bid opening officer will 1) read the names of the submitting contractors and their bids, and 2) read the independent government estimate. Once the information has been disseminated, the call will come to an end. The bid abstract will be posted to the beta.sam website by close of business of the day bids are opened.
Immediately following the bid opening, and upon notice by the Contracting Officer, the apparent low offeror will be requested to mail in their original bid and original bid bonds, respectively.
NOTE: Due to the potential of no Government Personnel being available to inspect the original bonds, the Contracting Officer may contact the bonding company to verify the information in the bond is accurate and complete.
Automated Infantry Platoon Battle Course 456975
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 00.00 06 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 32 01.00 06 PROJECT SCHEDULE
01 33 00.00 06 SUBMITTAL PROCEDURES
01 33 29.00 06 SUSTAINABILITY REPORTING
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 39 00.00 10 CONCRETE CURING
03 62 16 METALLIC NON-SHRINK GROUTING
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
04 21 13.13 ***AMDT 0003 - Spec Deleted***
DIVISION 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 10 METAL BLEACHER
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 ***AMDT 0003 - Spec Deleted*** 07 19 00 ***AMDT 0003 - Spec Deleted***
07 21 13 BOARD INSULATION (WALLS)
07 22 00 ROOF INSULATION & UNDERLAYMENT
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
PROJECT TABLE OF CONTENTS Page 1
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 SPRAY FOAM AIR BARRIERS
07 42 13 EXTERIOR METAL WALL PANELS
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING & SNOW GUARD
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 33 13 COILING COUNTER DOORS
08 33 23 OVERHEAD COILING DOORS (AMMO BREAKDOWN BUILDING)
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS (FOR CLASSROOM BLDG ONLY)
10 14 00.10 EXTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93.00 06 TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 82 46.00 40 ELECTRIC UNIT HEATERS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 31 - EARTHWORK
PROJECT TABLE OF CONTENTS Page 2
31 00 00.00 06 EARTHWORK
31 05 22.00 06 GEOTEXTILES USED AS FILTERS
31 11 00 CLEARING AND GRUBBING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 15 00 AGGREGATE SURFACING
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 40 00 STORM DRAINAGE UTILITIES
33 46 16 SUBDRAINAGE PIPING
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 3
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 55 PAGES
Automated Infantry Platoon Battle Course
00 80 00.00 06 SD-01 Preconstruction Submittals
1.27 G ROLabor, Equipment, and Material
Report
1.27 G RODaily Equipment Report
1.13 G ROFingerprints of all persons
employed or to be employed SD-02 Shop Drawings
1.40 G ROMechanical/Electrical Room
Layout
SD-04 Samples
1.15 G ROEquipment Warranty
Identification Tags SD-05 Design Data
1.8.1 G ROEquipment-in-Place List
1.8.1 G ROMaintenance and Parts Data
G ROSF1413 Statement and Acknowledgement
1.13 G ROLocal Agency Check
1.44 G ROProgress Photographs
SD-07 Certificates
1.15 G ROWarranty of Construction
1.14 G RONO ASBESTOS - CONTAINING
MATERIAL (ACM)
CERTIFICATION
1.31 G ROInsurance
G RODA Form 3337
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 55 PAGES
00 80 00.00 06 1.29 G ROSales and Use Tax SD-11 Closeout Submittals
1.7.4 G ROPreliminary (Working) As-Built
Drawings
1.7.1 G ROFinal As-Built Drawings
1.7.1.2 G ROCAD Working As-Built Drawings
1.15 G ROWarranty Management Plan
1.7.3 G ROContour Map
01 32 01.00 06 SD-01 Preconstruction Submittals
3.4.1 G ROPreliminary Project Schedule
3.4 G ROProject Schedule
SD-05 Design Data 3.5.2Narrative Report 3.5.4Schedule Reports
3.4.4 GPeriodic Schedule Updates
01 33 00.00 06 SD-01 Preconstruction Submittals G ROSubmittal register
01 33 29.00 06 SD-01 Preconstruction Submittals
1.5.1.1 G ROSustainability Action Plan
1.4 G ROLEED AP BD+C
G RODesign Phase High Performance and Sustainable Building Checklist
1.5.1.4 G ROSustainability Progress Report
SD-11 Closeout Submittals
1.5.1.2 G ROFinal Sustainability eNotebook
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 55 PAGES
01 33 29.00 06 1.5.1.2 G ROAmended Final Sustainability eNotebook
1.5.1.2 G ROFinal High Performance and
Sustainable Building Checklist
01 35 26.00 06 SD-01 Preconstruction Submittals 1.7Accident Prevention Plan (APP) 1.7Fatigue Management Plan 1.7Bloodborne Pathogen Plan 1.7Exposure Control Plan 1.7Automatic External Defibrillator
(AED) Program 1.7Site Layout Plan 1.7Access/Haul Road Plan 1.7Hearing Conservation Program 1.7Respiratory Protection Plan 1.7Health Hazard Control Program 1.7Hazard Communication Program 1.7Process Safety Management
Plan 1.7Lead Compliance Plan &
Specifications 1.7Asbestos Abatement Plan &
Specifications 1.7Radiation Safety Program 1.7Abrasive Blasting Plan 1.7Heat Stress Monitoring Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 55 PAGES
01 35 26.00 06 1.7Cold Stress Monitoring Plan 1.7Indoor Air Quality Management
Plan 1.7Mold Remediation Plan 1.7Chromium (VI) Exposure
Evaluation 1.7Crystalline Silica Assessment 1.7Lighting Plan for Night
Operations 1.7Traffic Control Plan 1.7Fire Prevention Plan 1.7Wild Land Fire Management Plan 1.7Arc Flash Hazard Analysis 1.7Assured Equipment Grounding
Control Program (AEGCP) 1.7Hazardous Energy Control Plan 1.7Standard Pre-Lift Plan (LHE) 1.7Critical Lift Plan - LHE 1.7Fall Protection and Prevention
Plan 1.7Demolition/Renovation Plan (to include engineering survey) 1.7Rope Access Work Plan 1.7Excavation/Trenching Plan
Fire Prevention & Protection Plan for Underground Construction
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 55 PAGES
01 35 26.00 06 1.7Compressed Air Plan for Underground Construction
1.7Erection and Removal Plan for Formwork and Shoring
1.7PreCast Concrete Plan 1.7Lift-Slab Plans 1.7Masonry Bracing Plan 1.7Steel Erection Plan 1.7Explosives Safety Site Plan
(ESSP)
1.7Blasting Plan 1.7Tree Felling/Maintenance
Program 1.7Site Safety and Health Plan
(HTRW)
1.7Confined Space Entry
Procedures 1.7Confined Space Program
1.8 G ROActivity Hazard Analysis (AHA)
1.5.1.1 G ROSite Safety and Health Officer
Qualifications(SSHO) G ROCertified Safety
Professional/Certified Industrial Hygienist Qualifications
1.12.7 G ROProof of qualification for Crane
Operators
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 55 PAGES
01 35 26.00 06 1.12.7 G ROCritical Lift Plan G ROUxo Safety Course
SD-06 Test Reports 1.12Reports 1.12.1Accident Reports 1.12.3Monthly Exposure Reports 1.12.5Crane Reports 1.12.4Regulatory Citations and
Violations SD-07 Certificates
1.13Hot work permit 1.12.6Crane Certificate of Compliance
01 45 04.10 06 SD-01 Preconstruction Submittals
3.3 G ROConstruction Quality Control Plan
01 50 00 SD-01 Preconstruction Submittals
1.3 G ROConstruction Site Plan
2.2.1 G ROHaul Road Plan
SD-06 Test Reports Backflow Preventer Tests
SD-07 Certificates Backflow Tester Backflow Preventers
01 57 19.00 06 SD-01 Preconstruction Submittals 1.6.1Preconstruction Survey
1.11 GSolid Waste Management Permit
1.6.2 GRegulatory Notifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 55 PAGES
01 57 19.00 06 1.7 GEnvironmental Protection Plan
1.7.9.1 GDirt and Dust Control Plan
1.6.5 GEmployee Training Records
1.6.4 GEnvironmental Manager
Qualifications GNotice Of Soil Treatment
3.2.1 G ROStormwater Pollution Prevention
Plan (SWPPP)
SD-06 Test Reports 3.7.1.1.2Laboratory Analysis 3.2.2.2Inspection Reports
3.7.2.1 GSolid Waste Management Report
SD-07 Certificates
1.6.5 GEmployee Training Records
Certificate of Competency 1.6.5Erosion and Sediment Control
Inspector SD-11 Closeout Submittals
3.2.2.3Stormwater Pollution Prevention Plan Compliance Notebook
3.2.2.4 GStormwater Notice of Termination
3.7.1 GWaste Determination
Documentation
3.7.4.6 GDisposal Documentation for
Hazardous and Regulated Waste
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 55 PAGES
01 57 19.00 06 1.6.5 GAssembled Employee Training Records
1.11 GSolid Waste Management Permit
3.7.2.1 GSolid Waste Management Report
3.7.4.1 GHazardous Waste/Debris
Management
1.6.2 GRegulatory Notifications
3.7.2.1 GSales Documentation
Contractor Certification As-Built Topographic Survey
01 74 19 SD-01 Preconstruction Submittals
1.6 G ROConstruction Waste Management
Plan SD-06 Test Reports
1.8.2Quarterly Reports 1.8.3Annual Report
SD-11 Closeout Submittals
1.9 SFinal Construction Waste
Diversion Report 01 78 23 SD-10 Operation and Maintenance
Data
1.3 G ROO&M Database
3.1.1 G ROTraining Plan
3.1.3 G ROTraining Outline
3.1.2 G ROTraining Content
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 55 PAGES
01 78 23 3.1.4 G ROTraining Video Recording
3.1.6 G ROValidation of Training Completion
02 41 00 SD-01 Preconstruction Submittals 1.2.2Demolition Plan 1.9Existing Conditions
SD-07 Certificates 1.6Notification
SD-11 Closeout Submittals 3.3.3Receipts
03 11 13.00 10 SD-02 Shop Drawings
2.2.1 G ROFormwork
3.1.1 G ROFormwork
2.2.1 G ROForm Removal Schedule
SD-03 Product Data 2.2Form Materials
SD-04 Samples
1.3 G ROSample Panels
SD-05 Design Data 2.1Calculations
SD-06 Test Reports 3.2Inspection
03 15 00.00 10 SD-03 Product Data 2.2Preformed Expansion Joint Filler 2.3Sealant
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 55 PAGES
03 15 00.00 10 2.3.2Lubricant for Preformed Compression Seals
2.3.3Field-Molded Type SD-07 Certificates
2.2Preformed Expansion Joint Filler 2.3Sealant
03 20 00.00 10 SD-01 Preconstruction Submittals GButt-Splices
SD-02 Shop Drawings
3.1 G ROReinforcement
SD-07 Certificates 2.3Reinforcing Steel
Qualified Welders 1.3.1Qualification of Steel Bar
Butt-Splicers 03 30 00.00 10 SD-01 Preconstruction Submittals
1.4.2 G ROQuality Control Plan
1.4.1Laboratory Accreditation
3.8.5.4 G ROSampling Plan
SD-03 Product Data Part 2Recycled Content Products 2.2Cementitious Materials
Vapor Retarder 2.10Vapor Barrier
Floor Finish 2.8Floor Hardener
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 55 PAGES
03 30 00.00 10 2.4Chemical Admixtures HDPE Liner Product Data HDPE Liner Manufacturer's Installation Instructions
SD-04 Samples 2.4.5Surface Retarder
SD-05 Design Data
2.1.1 G ROMixture Proportions
SD-06 Test Reports
2.1.1 G ROMixture Proportions
3.8 G ROTesting and Inspection for CQC
2.2.2Fly Ash
2.3 G ROAggregates
Air Content; G Slump; G Compressive Strength; G
2.5Water SD-07 Certificates
1.4Contractor Quality Control personnel
3.2.1Ready-Mix Plant 03 35 00.00 10 SD-03 Product Data
Part 2Recycled Content Products SD-04 Samples Field Test Panels Sample Wall Panels
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 55 PAGES
03 35 00.00 10 Slab Panels 03 39 00.00 10 SD-03 Product Data
2.1Curing Materials SD-06 Test Reports
3.2Testing and Inspection for CQC SD-08 Manufacturer’s Instructions
2.1Curing Compound 03 62 16 SD-01 Preconstruction Submittals
1.3.1 GGrout Placement and Inspection
Reports
SD-04 Samples
2.1.2 GAggregates
2.1.4 GExpansive Admixtures
SD-06 Test Reports
3.3 GExpansion
3.3 GCompressive Strength
1.3.1 GGrout Placement and Inspection
Reports
2.1.5 GExpansive Grout
2.1.1 GPortland Cement
SD-07 Certificates
2.1.1 GPortland Cement
2.1.4 GExpansive Admixtures
2.1.5 GExpansive Grout
2.1.2 GAggregates
04 20 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 55 PAGES
04 20 00 GSplit-Face & Smooth CMU 3.4.1.1Detail Drawings
GAE
SD-03 Product Data
1.4.1 GHot Weather Procedures
1.4.2 GCold Weather Procedures
2.2.2.2.1 GCement
2.4.1.1 GCementitious Materials
GWater-Repellant Admixture SD-04 Samples
GSplit-face & Smooth CMU
2.4.1.4 GAdmixtures for Masonry Mortar
2.6.2 GAnchors, Ties, and Bar
Positioners
2.6.3 GJoint Reinforcement
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
3.2.5 GBracing Calculations
SD-06 Test Reports 3.6.1.1Field Testing of Mortar 3.6.1.2Field Testing of Grout 3.6.1.3Single-Wythe Masonry Wall
Water Penetration Test SD-07 Certificates Special Masonry Inspector Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 55 PAGES
04 20 00 2.2.2.2Concrete Masonry Units (CMU) 3.3.3.1Split-Faced & Smooth CMU 2.2.3Precast Concrete Units 2.4.1.1Cementitious Materials 2.4.1.4Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout 2.6.2Anchors, Ties, and Bar
Positioners 2.6.3Joint Reinforcement
SD-08 Manufacturer’s Instructions 2.4.1.4Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance Data Take-Back Program
04 21 13.13
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
***AMDT 0003 - Spec Deleted***
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 55 PAGES
05 05 23.16 SD-01 Preconstruction Submittals 3.2Welding Quality Assurance Plan
SD-03 Product Data
1.3 G ROWelding Procedure Qualifications
1.3.5Welder, Welding Operator, and
Tacker Qualification 1.3.6Inspector Qualification 1.3.2Previous Qualifications 1.3.3Pre-Qualified Procedures 2.2Welding Electrodes and Rods
SD-06 Test Reports 3.3Nondestructive Testing
SD-07 Certificates 1.3.1Certified Welding Procedure
Specifications (WPS) 1.3.1Certified Brazing Procedure
Specifications (BPS) 1.3.1Certified Procedure Qualification
Records (PQR)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 55 PAGES
05 05 23.16 1.3.1Certified Welder Performance Qualifications (WPQ)
1.3.1Certified Brazer Performance Qualifications (BPQ)
05 12 00 SD-01 Preconstruction Submittals
1.5.1.1 G AEErection Drawings
SD-02 Shop Drawings
1.5.2 G AEFabrication Drawings
SD-03 Product Data 2.6.2Shop Primer 2.4.1Welding Electrodes and Rods
Direct Tension Indicator Washers Non-Shrink Grout; G, AE
2.3.3Tension Control Bolts SD-06 Test Reports
2.6.2Class B Coating Bolts, Nuts, and Washers; G, AE
3.7.1.2Weld Inspection Reports Direct Tension Indicator Washer Inspection Reports; G, AE
3.7.2.1Bolt Testing Reports 3.7.3Embrittlement Test Reports
SD-07 Certificates 2.2Steel 2.3Bolts, Nuts, and Washers 2.5Galvanizing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 55 PAGES
05 12 00 Pins and Rollers 1.3AISC Fabrication Plant Quality
Certification 1.3AISC Erector Quality Certification 1.5.3.1Welding Procedures and
Qualifications 2.4.1Welding Electrodes and Rods
05 30 00 SD-02 Shop Drawings
1.3.4 G AEFabrication Drawings
SD-03 Product Data 2.2Accessories 2.1Deck Units
Galvanizing Repair Paint Mechanical Fasteners
2.1.4Touch-Up Paint Sound Absorbing Materials
1.3.2Welding Equipment 1.3.2Welding Rods and Accessories
SD-04 Samples 2.1.1Metal Roof Deck Units
Cellular Metal Floor Deck Units 2.2.4Flexible Closure Strips
Acoustical Material SD-05 Design Data
2.1 G AEDeck Units
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 55 PAGES
05 30 00 Powder-Actuated Tool Operator 1.3.2Welder Qualifications 1.3.2Welding Procedures 1.3.3.1Fire Safety 1.3.3.2Wind Storm Resistance 1.3.1Manufacturer's Certificate
Stud Manufacture's Certification Stud Manufacture's Test Reports
SD-11 Closeout Submittals
2.1 SRecycled Content of Steel
Products 05 40 00 SD-02 Shop Drawings
1.6.1 GFraming Components
SD-03 Product Data
2.1Studs, Joists SD-05 Design Data
GMetal Framing and Truss Calculations
SD-07 Certificates 1.4Load-Bearing Cold-Formed Metal
Framing 3.2.1Welds
05 50 10 SD-02 Shop Drawings G ROBeacher Unit
SD-03 Product Data
2.2 G ROBleacher Unit
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 55 PAGES
05 50 10 2.2 G ROBleacher Unit 2.1Access Doors and Panels
06 10 00 SD-02 Shop Drawings
1.8.1 G DOFabricated Structural Members
2.2.1 G RONailing Strips
SD-05 Design Data
1.8.2 G DOModifications of Structural
Members SD-06 Test Reports
1.4.5Preservative-treated SD-07 Certificates Certificates of Grade
SD-10 Operation and Maintenance Data
3.3Take-back Program 06 61 16 SD-02 Shop Drawings
GDetail Drawings
3.1 GInstallation
SD-03 Product Data 2.1Solid polymer material 1.4.1Qualifications 2.3Fabrications
SD-04 Samples
2.1 GMaterial
SD-06 Test Reports 2.1Solid polymer material
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 55 PAGES
06 61 16 SD-07 Certificates 2.3Fabrications 1.4.1Qualifications
SD-10 Operation and Maintenance Data Clean-up
07 11 13
07 19 00
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
***AMDT 0003 - Spec Deleted***
***AMDT 0003 - Spec Deleted***
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 55 PAGES
07 21 13 SD-03 Product Data 1.3Manufacturer's Standard Details
2.2 G ROBoard Insulation
2.4Accessories
SD-07 Certificates
2.2 GBoard Insulation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 55 PAGES
07 21 13 1.7 GSpecial Warranties
1.7 GSpecial Warranties
SD-08 Manufacturer’s Instructions 2.2Board Insulation 2.4.1Adhesive
SD-11 Closeout Submittals SULE Greenguard
2.1.1 SVolatile Organic Compound
(VOC) Content
2.1.2 SRecycled Content
07 22 00 SD-02 Shop Drawings
1.3 GInsulation Board Layout
SD-03 Product Data
2.2 GInsulation
2.4 GFasteners
2.3 GSelf-Adhering Underlayment
SD-07 Certificates
1.8 GVolatile Organic Compounds
(VOC) Content
1.6 GInstaller Qualifications
SD-08 Manufacturer’s Instructions
2.4 GFasteners
2.2 GInsulation
SD-11 Closeout Submittals
1.8 SVolatile Organic Compounds
(VOC) Content
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 55 PAGES
07 27 10.00 10 SD-06 Test Reports
3.1.2 G ROTesting and Inspection
SD-07 Certificates G ROAir Barrier Inspector
07 27 26 SD-01 Preconstruction Submittals
1.9.1 G ROQualifications of Manufacturer
1.9.2 G ROQualifications of Installer
SD-02 Shop Drawings
1.4 G ROFluid-Applied Membrane Air
Barrier SD-03 Product Data
1.4 G ROFluid-Applied Membrane Air
Barrier
2.2 G ROPrimers, Adhesives, and Mastics
2.6Reinforcement 1.4.2Safety Data Sheets
SD-04 Samples
1.4.3 G ROMockup
SD-06 Test Reports
1.6 G ROCapillary Moisture Test
1.4.4 G ROField Peel Adhesion Test
3.4.1 G ROSite Inspections
SD-07 Certificates 1.4Fluid-Applied Membrane Air
Barrier 1.9.1Qualifications of Manufacturer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 55 PAGES
07 27 26 1.9.2Qualifications of Installer SD-08 Manufacturer’s Instructions
1.4 G ROFluid-Applied Membrane Air
Barrier
2.2 G ROPrimers, Adhesives, and Mastics
07 27 36 SD-01 Preconstruction Submittals
1.10.1 G ROQualification of Manufacturer
1.10.2 G ROQualification of Installer
1.11 G ROQuality Control Plan
1.11 G ROSafety Plan
1.9.1 G ROFire Prevention Plan
1.9.2 G RORespirator Plan
SD-02 Shop Drawings 1.5Spray Foam Air Barrier
G ROFoam Air Barrier System SD-03 Product Data
2.1.2 G ROClosed Cell
2.3 G ROPrimers, Adhesives, and Mastics
1.5.2Safety Data Sheets
2.1.1 G ROIgnition Barrier Coatings
SD-04 Samples
1.5 G ROSpray Foam Air Barrier
SD-06 Test Reports
1.5.4 G ROField Peel Adhesion Test
1.5.3Primers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 55 PAGES
07 27 36 1.5.4 G ROFlame Spread And Smoke Developed Index Ratings Of SPF Products
3.4.1 G ROSite Inspections
SD-07 Certificates
2.1.2 G ROClosed cell
1.10.1 G ROQualification of Manufacturer
1.10.2 G ROQualification of Installer
SD-08 Manufacturer’s Instructions 1.6.1SPF Handling, Storage, and
Spray Procedures 3.2.1Substrate Preparation 1.5.1Ignition Barrier 2.3Primers, Adhesives, and Mastics
SD-09 Manufacturer’s Field Reports
1.11Core Samples 3.3.2Daily Work Record
07 42 13 SD-01 Preconstruction Submittals
1.5.3 G AEQualification of Manufacturer
1.5.4 G AEQualification of Installation
Contractor
1.8 G AEWarranty
SD-02 Shop Drawings
1.5.1.1 G AEInstallation Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 55 PAGES
07 42 13 2.2.1 G AEWall Panels 2.2.2Factory Color Finish 1.5.5Closure Materials 2.5.4.4Pressure Sensitive Tape 2.5.4.1Sealants and Caulking 1.5.3.1Galvanizing Repair Paint 1.5.3.1Enamel Repair Paint
Aluminized Steel Repair Paint 1.5.5Accessories 2.5Accessories
SD-04 Samples
2.2.1 GWall Panels
1.5.3.1 GFasteners
2.5.3 GMetal Closure Strips
GColor chart SD-05 Design Data
1.5.1.2 G AEWind load design analysis
SD-06 Test Reports
3.7.2 G ROLeakage Tests
1.3.2 G AEWind Load Tests
2.2.2.6 G AECoating
2.2.2.6 G AEChalking
SD-07 Certificates
1.5.3.1 GCoil Stock
1.5.3.1 GFasteners
1.5.3.1 GGalvanizing Repair Paint
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 55 PAGES
07 42 13 1.5.3.1 GEnamel Repair Paint SD-08 Manufacturer’s Instructions
3.3 GInstallation
SD-09 Manufacturer’s Field Reports
3.8.1 GManufacturer's Field Reports
SD-11 Closeout Submittals
1.8 GWarranty
1.5.6 GMaintenance Instructions
1.8.120 year 'No Dollar Limit' warranty for labor and material 07 60 00 SD-02 Shop Drawings
2.1.1 G ROExposed Sheet Metal
3.1.12 G ROGutters
3.1.13 G RODownspouts
2.1.1 G ROFascia
3.1.10 G ROFascia
3.1.16 G ROFlashing at Roof Penetrations
and Equipment Supports
3.1.11 G RODrip Edges
3.1.14 G ROEave Flashing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 55 PAGES
07 60 00 Indicate thicknesses, dimensions, fastenings, anchoring methods, expansion joints, and other provisions necessary for thermal expansion and contraction.
Scaled manufacturer's catalog data may be submitted for factory fabricated items.
SD-11 Closeout Submittals 3.5Quality Control Plan
Submit for sheet metal work in accordance with paragraph entitled 'Field Quality Control'.
07 61 14.00 20 SD-02 Shop Drawings
1.2.5 G AERoofing
2.5 G ROSnow Retention System
SD-03 Product Data
2.1 G AERoofing Panels
2.2Attachment Clips 2.3.1Closures 2.3Accessories 2.3.2Fasteners 2.3.3Sealants
2.5 G ROSnow Retention System
2.4Insulation
1.7 G ROWarranty
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 55 PAGES
07 61 14.00 20 SD-04 Samples
2.1 G ROPanel
SD-05 Design Data
1.5 G AEDesign Calculations
G ROSnow Retention System Calculations
SD-06 Test Reports 3.6Field Inspection 1.3.3Structural Performance 1.6.6Finish
SD-07 Certificates
1.6.3 G ROManufacturer's Technical
Representative Installer's Qualifications; G, RO
2.1Coil Stock SD-08 Manufacturer’s Instructions
3.3 GInstallation
SD-11 Closeout Submittals
3.8Information Card
1.7 G ROWarranty
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping System
SD-03 Product Data
2.2 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 55 PAGES
07 84 00 SD-07 Certificates 2.2Firestopping Materials
1.5.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.2 GSealants
2.3 GPrimers
2.4 GBond Breakers
2.5 GBackstops
3.1Field Adhesion
SD-07 Certificates Indoor Air Quality
08 11 13 SD-02 Shop Drawings
2.1 G RODoors
2.1 G RODoors
2.6 G ROFrames
2.6 G ROFrames
2.4Accessories
SD-03 Product Data
2.1 G RODoors
2.6 G ROFrames
2.4Accessories 2.7Weatherstripping
08 33 13 SD-02 Shop Drawings
1.3 GDetail Drawings
SD-03 Product Data 1.5Warranty
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 55 PAGES
08 33 13 2.1Rolling Counter Doors 3.1Installation 3.5Cleaning
SD-06 Test Reports 3.3Drop-test
SD-11 Closeout Submittals 2.3Rolling Counter Door
(Non-Rated) 2.4Fire-Rated Rolling Counter Door
08 33 23 SD-02 Shop Drawings G ROInsulated Overhead Coiling
Doors SD-03 Product Data
G ROInsulated Overhead Coiling Doors
2.2.2 GHardware
2.2.3Counterbalancing Mechanism
2.2.4 G ROElectric Door Operators
SD-05 Design Data G ROInsulated Overhead Coiling
Doors
2.2.2 G ROHardware
2.2.3Counterbalancing Mechanism
2.2.4 G ROElectric Door Operators
SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 55 PAGES
08 33 23 3.3.2Operation and Maintenance Manuals
3.3.2Materials 3.3.2Devices 3.3.2Procedures 3.3.2Manufacture's Brochures 3.3.2Parts Lists
SD-11 Closeout Submittals
3.3.1 G ROWarranty
08 51 13 SD-02 Shop Drawings
2.1 G ROWindows
1.10Fabrication Drawings
SD-03 Product Data
2.1 G ROWindows
2.2.7.1 G ROHardware
2.2.3 G ROFasteners
1.11 G ROWindow Performance
2.3 G ROThermal-Barrier Windows
2.2.9 G ROScreens
2.2.2 G ROWeatherstripping
2.2.7 G ROAccessories
1.11.4 G ROThermal Performance
SD-04 Samples 1.4.2.1Finish Sample
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 55 PAGES
08 51 13 1.4.3Minimum Condensation Resistance Factor
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 G ROHardware Schedule
2.3.3 GKeying System
SD-03 Product Data
2.3 G ROHardware Items
SD-08 Manufacturer’s Instructions 3.1Installation
SD-10 Operation and Maintenance Data
1.5 G ROHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting 08 81 00 SD-02 Shop Drawings
Installation SD-03 Product Data
1.6.1Insulating Glass 1.3Glazing Accessories
SD-07 Certificates 1.6.1Insulating Glass
SD-08 Manufacturer’s Instructions 2.3Setting and Sealing Materials 3.2Glass Setting
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 55 PAGES
08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers
SD-03 Product Data 2.2Metal Wall Louvers
09 22 00 SD-02 Shop Drawings
2.1 GMetal support systems
09 29 00 SD-03 Product Data 2.1.5Accessories 2.1.1Gypsum Board
SRecycled Content for Gypsum Board
SRecycled Content for Paper Facing and Gypsum Cores
2.1.2 SVOC Content of Joint Compound
SD-07 Certificates
2.1Asbestos Free Materials
2.1.1 SIndoor Air Quality for Gypsum
Board SIndoor Air Quality for Non-aerosol
Adhesives SIndoor Air Quality for Aerosol
Adhesives SD-08 Manufacturer’s Instructions Safety Data Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 55 PAGES
09 29 00 SD-10 Operation and Maintenance Data Manufacturer Maintenance Instructions
09 51 00 SD-03 Product Data Acoustical Ceiling Systems