SEE ADDENDUM

(No Collect Calls)

W912QR19T0032 12-Feb-2019

b. TELEPHONE NUMBER

502.315.7406

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 05 Mar 2019

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912QR9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

TRAVIS I DUNN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W22W9K90102063

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

502.315.6195 OR 6193FAX:

TEL: 502.315.6172 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$18,000,000

NAICS:

561720

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912QR19T0032

Section SF 1449 - CONTINUATION SHEET

SPECIAL INSTRUCTIONS

This Request for Quote (RFQ) is for an Indefinite Delivery/Indefinite Quantity (IDIQ) Contract to provide Cleaning Services for Nolin River Lake in accordance with the Performance Work Statement. Nolin River Lake is located in South Central Kentucky, in Edmonson, Hart, and Grayson counties, approximately 20 miles south of Leitchfield, Kentucky. Principal cities in the area are Leitchfield and Brownsville, Kentucky. The Base Year will be from 01 April 2019 through 31 March 2020. The Contractor's work and responsibility shall include all planning, programming, administration, management, supervision, communications, and inspection necessary to assure that all services are conducted in accordance with the contract requirements and all applicable Federal, state and local laws and regulations.

Note: This solicitation contains an option clause to extend the awarded contract for up to three (3) additional one-year periods. The one-year option periods are as follows:

Option Year 1: 01 April 2020 through 31 March 2021 Option Year 2: 01 April 2021 through 31 March 2022 Option Year 3: 01 April 2022 through 31 March 2023

One award will be made from this RFQ. The contract type will be a Firm-Fixed Price IDIQ. The minimum guarantee for the Base Year is $5,514.00 in services. There is no guaranteed minimum for the option periods, if exercised.

This procurement is 100% set-aside for Small Business, NAICS 561720 ($18.0 million).

Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.

Note: The terms offer and Quote are used interchangeably in this RFQ.

Site Visit:

A Site Visit may be scheduled by contacting Jon Fillingham at Jon.P.Fillingham@usace.army.mil or (270) 286-4511

In accordance with FAR 52.237-1, Offerors are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

Note: For contractual/technical questions, please contact Travis Dunn at travis.i.dunn@usace.army.mil.

Basis of Award:

The basis of award is the Best Value Trade-Off process. Factors to be considered are Past Experience, Past Performance, and Price. The Quote Requirements and Evaluation Process are detailed in the Evaluation Criteria section of this RFQ.

Quotes will not be accepted for quantities less than the quantities specified in the Price Breakout Schedule. Failure to submit a unit price for all items listed (Base Year and Option Years) will be considered as a material deviation from the requirements of the RFQ and the Quote will be rejected.

Quotes are due on Tuesday 05 March 2019 at 2:00 PM Eastern Time. Quotes shall remain valid for 60 calendar days. Email submissions will be accepted; email Travis Dunn at travis.i.dunn@usace.army.mil. Fax submissions will NOT be accepted. Submit mailed Quotes to:

mailto:Jon.P.Fillingham@usace.army.mil mailto:travis.i.dunn@usace.army.mil mailto:travis.i.dunn@usace.army.mil

U.S. Army Corps of Engineers Room 821, ATTN: Travis Dunn 600 Dr. Martin Luther King, Jr. Place Louisville, KY 40202

All contractors must be registered in the System for Award Management (www.SAM.gov) prior to award of a contract. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer – System for Award Management, which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by going to the website http://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier (formerly DUNS number) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from http://www.SAM.gov.

Refer to www.SAM.gov for information formerly found in CCR, EPLS, ORCA, and FedReg.

Please begin the registration process immediately in order to avoid delay of the contract award should your firm be selected.

ALERT: You must submit a notarized letter appointing the authorized Entity Administrator before your registration will be activated. This requirement now applies to both new and existing entities. Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record. The notarized letter is mandatory and is required before the GSA Federal Service Desk (FSD) will activate the entity's registration.

Effective 29 June 2018, vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM.

Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier (known as DUNS). The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM.

To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov).

Note: Page numbering in this document may not be accurate.

http://www.sam.gov/ http://www.sam.gov/ http://www.sam.gov/ http://www.sam.gov/ http://www.sam.gov/

EVALUATION CRITERIA

Quote Requirements

Each offer must include the following items:

(1) A completed Price Breakout Schedule and Representations and Certifications.

(2) Descriptions of at least one (1) and up to five (5) projects substantially complete or completed by the prime contractor within the last five (5) years that are similar to this project in scope. Projects similar in scope involve furnishing the supplies, tools, and equipment necessary to clean and maintain showers, restrooms, pit toilets, dump stations, refuse receptacles, recreational facility grounds (i.e., boat ramps, playgrounds, beaches, picnic shelters) and campsites, and cleaning and maintaining those showers, restrooms, toilets, grounds, and campsites, etc. Projects considered similar to this project include Cleaning and Janitorial Service contracts that involve both indoor and outdoor cleaning and maintenance work at public recreation areas. Templates for project descriptions (see Form A: Project Detail Sheet) are included for your use. If you elect not to use this format, all information identified on the template is still required for evaluation of the experience factor.

(3) At least one (1) reference for each project identified for project experience. Reference information must include project name, location, point of contact, telephone number, and email address. Also include any ratings, letters, awards, etc. that support past performance on these projects. A Past Performance Questionnaire Template is attached for your convenience. If used, the Past Performance Questionnaire must be submitted by the offeror with the Quote submission and not sent directly to the agency from the reference.

Evaluation Process

A Source Selection Evaluation Board (SSEB) comprised of representatives of the Corps of Engineers, User/Customer, and other required personnel will evaluate the Quotes. Offerors are advised that the evaluation and rating of Quotes will be conducted in strict confidence. Reviews of non-price factors will be conducted without knowledge of the price offered. The number and identities of offerors will not be revealed to anyone who is not involved in the evaluation and award process or to other offerors.

The evaluation process will consist of the following four parts:

(1) Quote Compliance Review

a. This is an initial review to ensure that all required forms and certifications are complete.

(2) Past-Performance and Experience Evaluation

a. The SSEB will evaluate and rate the Quotes against the RFQ requirements.

i. Using the relevancy ratings and confidence assessments defined in the tables below, these non-price factors will be evaluated based on the extent of recent and relevant past experience, and the quality of the offeror’s performance during that experience. Evaluators will apply the adjectival rating for the definition that most closely matches the evaluation.

Past Performance Relevancy Ratings Rating Definition Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

Performance Confidence Assessments Rating Definition Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Neutral Confidence No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.

Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will successfully perform the required effort.

(3) Price Evaluation

a. The SSEB will evaluate price Quotes independent of the evaluation of the non-price factors.

(4) Source Selection Process

a. After evaluations are complete, the Contracting Officer will compare the relative advantages and disadvantages of the Quotes and prices. Award will be made using a trade- off analysis to determine the best value offer. Selection criteria include: Prime Contractor Experience, Prime Contractor Past Performance, and Price. All non-price evaluation factors, when combined, are considered approximately equal to price.

FORM A: Project Detail Sheet (p. 1 of 1)

Your company’s name:

Name of Project/Location/Acreage:

General Scope of Project:

Your role (prime, joint venture, subcontractor) and work your company selfperformed:

Percentage of Work completed by Prime Contractor Personnel:

Award Date: ____________

Extent and type of work you subcontracted out:

Project Point of Contact (POC) for reference (name and organization and phone number)

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name: CAGE Code:

Address: Unique Entity Identifier Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR.

THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL

INFORMATION ON THIS FORM.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable

No information or did not apply to your contract

Rating will be neither positive nor negative.

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication)

E VG S M U N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

E VG S M U N

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance

E VG S M U N

with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U N

b) Contractor complied with all security requirements for the project and personnel security requirements. E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this contractor.

E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

PRICE BREAKOUT SCHEDULE

Base Year: Period of Performance April 1, 2019 - March 31, 2020

Item No.

Description Est.

Quantity

Unit Unit Price Extended Price

0001 Clean Showerhouse 720 each 0002 Clean Pit Toilet 500 each 0003 Clean Flush Restroom 850 each 0004 Clean Dump Station 200 each 0005 Clean Picnic Shelter 500 each 0006 Clean Campsite 3000 each 0007 Litter Pick-Up-Administrative Area 70 each 0008 Litter Pick-Up-Moutardier - Campground 40 each 0009 Litter Pick-UP - Moutardier Day Use 70 each 0010 Litter Pick-Up - Iberia 65 each 0011 Litter Pick-UP - Wax Campground 20 each 0012 Litter Pick-UP - Wax Day Use 70 each 0013 Litter Pick-UP- Dog Creek Day Use 65 each 0014 Litter Pick-UP- Dog Creek - Campground 40 each 0015 Refuse Receptacles (Trash Cans) 14,400 each 0016 Centralized Refuse Collection (Trash Bins) 430 each 0017 Playgrounds, Beaches, and Equipment 600 each 0018 Picnic Sites 600 each 0019 Boat Ramps 70 each 0020 Special Facility Cleaning 30 each

Total:

Option 1: Period of Performance April 1, 2020 - March 31, 2021

Description Est.

Quantity

Unit Unit Price Extended Price

0001 Clean Showerhouse 720 each 0002 Clean Pit Toilet 500 each 0003 Clean Flush Restroom 850 each 0004 Clean Dump Station 200 each 0005 Clean Picnic Shelter 500 each 0006 Clean Campsite 3000 each 0007 Litter Pick-Up-Administrative Area 70 each 0008 Litter Pick-Up-Moutardier - Campground 40 each 0009 Litter Pick-UP - Moutardier Day Use 70 each 0010 Litter Pick-Up - Iberia 65 each 0011 Litter Pick-UP - Wax Campground 20 each 0012 Litter Pick-UP - Wax Day Use 70 each 0013 Litter Pick-UP- Dog Creek Day Use 65 each 0014 Litter Pick-UP- Dog Creek - Campground 40 each 0015 Refuse Receptacles (Trash Cans) 14,400 each 0016 Centralized Refuse Collection (Trash Bins) 430 each 0017 Playgrounds, Beaches, and Equipment 600 each 0018 Picnic Sites 600 each 0019 Boat Ramps 70 each

Option 2: Period of Performance April 1, 2021 - March 31, 2022

Description Est.

Quantity

Unit Unit Price Extended Price

0001 Clean Showerhouse 720 each 0002 Clean Pit Toilet 500 each 0003 Clean Flush Restroom 850 each 0004 Clean Dump Station 200 each 0005 Clean Picnic Shelter 500 each 0006 Clean Campsite 3000 each 0007 Litter Pick-Up-Administrative Area 70 each 0008 Litter Pick-Up-Moutardier - Campground 40 each 0009 Litter Pick-UP - Moutardier Day Use 70 each 0010 Litter Pick-Up - Iberia 65 each 0011 Litter Pick-UP - Wax Campground 20 each 0012 Litter Pick-UP - Wax Day Use 70 each 0013 Litter Pick-UP- Dog Creek Day Use 65 each 0014 Litter Pick-UP- Dog Creek - Campground 40 each 0015 Refuse Receptacles (Trash Cans) 14,400 each 0016 Centralized Refuse Collection (Trash Bins) 430 each 0017 Playgrounds, Beaches, and Equipment 600 each 0018 Picnic Sites 600 each 0019 Boat Ramps 70 each

Option 3: Period of Performance April 1, 2022 - March 31, 2023

Description Est.

Quantity

Unit Unit Price Extended Price

0001 Clean Showerhouse 720 each 0002 Clean Pit Toilet 500 each 0003 Clean Flush Restroom 850 each 0004 Clean Dump Station 200 each 0005 Clean Picnic Shelter 500 each 0006 Clean Campsite 3000 each 0007 Litter Pick-Up-Administrative Area 70 each 0008 Litter Pick-Up-Moutardier - Campground 40 each 0009 Litter Pick-UP - Moutardier Day Use 70 each 0010 Litter Pick-Up - Iberia 65 each 0011 Litter Pick-UP - Wax Campground 20 each 0012 Litter Pick-UP - Wax Day Use 70 each 0013 Litter Pick-UP- Dog Creek Day Use 65 each 0014 Litter Pick-UP- Dog Creek - Campground 40 each 0015 Refuse Receptacles (Trash Cans) 14,400 each 0016 Centralized Refuse Collection (Trash Bins) 430 each 0017 Playgrounds, Beaches, and Equipment 600 each 0018 Picnic Sites 600 each 0019 Boat Ramps 70 each

TOTAL (BASE + ALL OPTIONS):

This is a contract to furnish all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, required to perform cleaning services at the Nolin River Lake project, with options to extend the term of the contract.

REPS AND CERTS

COMPANY NAME AND ADDRESS: _______________________________________

PHONE NUMBER ________________ FAX NUMBER ________________

EMAIL ADDRESS ______________________________________________________

BUSINESS SIZE (select one)

Large Business _____ Small Business_____ HUBZone Business_____ 8A _____ Woman-Owned ____ Service-Disabled Veteran-Owned ____

Contractor is registered with SAM: _____ YES _____ NO (See FAR 52.204-7)

TAX ID # ______________________

INDICATE Unique Entity Identifier (previously DUNS NUMBER) ____________ CAGE NO. _________ (Note: See FAR 52.204-7. Unique Entity Identifier (FAR 52.204-7) is a 9 digit numeric code.)

PERFORMANCE WORK STATEMENT

DESCRIPTION/SPECIFICATIONS

SECTION C-1

General

C-1.1 PROJECT INFORMATION. Nolin River Lake is in South Central Kentucky, in Edmonson, Hart, and Grayson counties, approximately 20 miles south of Leitchfield, Kentucky. Principal cities in the area are Leitchfield and Brownsville, Kentucky.

C-1.2 SCOPE OF WORK. The Contractor shall furnish all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, except as otherwise provided herein, required to perform cleaning services at the Nolin Lake project, as specified and in strict accordance with all Terms, Conditions, General, Specific and Technical Provisions, Drawings, Attachments, Exhibits, etc., contained herein or incorporated by reference.

The quantities listed in the Price Breakout Schedule are approximate and are provided as information only to assist in preparation of proposed pricing. They are not guaranteed and the actual quantities may be more or less than shown. Variation in these estimated quantities shall not be justification for modification of the contract or request for additional payment.

It is emphasized that the work described in this contract is a critical part of the Corps mission. The majority of work described will be performed in public recreation areas. The Corps is committed to "Customer Care" and providing quality professional service.

C-1.3 TASK ORDERS. All work under this contract will be ordered by issuance of task orders (SF1449 or DD1155) and call orders. The task order will list those items from the price breakout schedule to be used to perform the work. No work shall be performed under this contract before an individual task order has been issued by the Contracting officer (KO). Only the KO, by issuance of a modification, may make any change to a task order. The call order is the Contractors' notification to actually perform the work, at the time(s) specified by the Technical Point of Contact (TPOC), or if the time is not specified, according to the time schedules contained in the technical provisions of the contract. There may be several call orders issued, at different times, for work contained in the contract. All work under this contract will proceed by the issuance of a call order.

C-1.4 NEGOTIATION. No negotiated work is included in this contract.

C-1.5 WORKING HOURS.

a. Normal Working Hours. Normal working hours, except as otherwise specified herein, shall be Monday through Friday, 7:00 a.m. to 4:00 p.m. local time or as specified on the task order. Work inside Government buildings or other secured areas shall be performed during the above referenced work hours.

Work that interferes with other ongoing functions at the project shall be scheduled around normal working hours, as specified by the TPOC. Refer to individual sections of this specification for specific schedules of work.

The following are listed as the technical points of contact for this contract:

Jon Fillingham, Lead Park Ranger, Nolin River Lake, TPOC Deryck Rodgers, Park Manager, Nolin River Lake, Alternate TPOC

b. Holiday Work. The ten Federal holidays observed are:

New Year's Day (January 1st) Martin Luther King Day (3rd Monday in January) President's Day (3rd Monday in February) Memorial Day (Last Monday in May) Independence Day (July 4th)

Labor Day (1st Monday in September) Columbus Day (2nd Monday in October) Veterans Day (November 11th) Thanksgiving Day (4th Thursday in November) Christmas Day (December 25th)

When one of the above designated holidays falls on a Sunday, the following Monday is observed as a legal holiday. When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday. Work shall be scheduled around the above listed Federal holidays except as specified herein or as approved by the

TPOC.

c. Inclement Weather Work. The Contractor shall maintain the schedule of services regardless of inclement weather. Exceptions may be approved by the TPOC when severe conditions make it impractical or dangerous to perform the work. The TPOC will notify the Contractor, by modification to the task order, of any change that extends the performance period due to inclement weather.

d. Emergency and/or After Hours Work. Work may be required on holiday periods during heavy visitation, emergencies, or for other reasons as determined by the TPOC. Additional personnel may be required to handle the additional work load during holiday periods because of heavy visitation. The TPOC will notify the Contractor of actual work requirements.

C-1.6 CONTRACTOR SUBMITTALS. Unless otherwise specified, the Contractor shall submit the following information to the TPOC prior to the pre-work conference for this contract:

a. Quality Control Plan. A suggested outline for the Contractor's Quality Control Plan is in Exhibit A.

b. Contractor Quality Control Inspector. List of Quality Control Inspectors.

c. Contractor Representatives. List of names of Contractor Representatives.

d. Accident Prevention Plan (APP). A suggested outline for the Contractor’s Accident Prevention Plan is in Exhibit B. See Section C-1.9 for APP requirements.

e. Emergency Contacts. A prioritized list, including phone numbers, of those persons (normally Contractor Representatives) to call in case of emergencies.

f. Operators. A list of names of qualified equipment/vehicle operators, including experience, training and qualification to operate specific equipment.

g. Certificate of Insurance.

h. Security Requirements – See Section C, Paragraph 1.9, Part H

C-1.7 PERMITS AND LICENSES. The Contractor shall, at his own expense, obtain any licenses or permits required to perform all aspects, requirements, and work under this contract. The Contractor shall comply with all current Federal, State, and local laws and regulations and shall comply with any subsequent changes.

C-1.8 IDENTIFICATION OF CONTRACT EMPLOYEES AND VEHICLES. The Contractor shall furnish his employees, other than office and clerical personnel, standardized uniforms (shirt-pants/shirt-skirt) with a company patch or embroidered identification on the breast pocket or on the sleeve at the top of the arm, within 30 calendar days after notice of award of the contract. Any employee hired 30 calendar days after award of the Contract shall be in the required uniform within 14 calendar days of the date of hire. Contractor uniforms shall not resemble U.S. Army Corps of Engineers uniforms. Contractor employees and subcontractors shall wear these uniforms at all times they are performing work under this contract. Exceptions may be granted by the TPOC for short term workers, or during disasters, emergencies, wildfire suppression, or special circumstances specified by the

TPOC. Stained or faded uniforms shall not be worn. All vehicles used by the Contractor to perform work under this contract shall be identified with the company name prominently displayed on the outside of both front doors of each vehicle in a professional manner to provide an attractive and readily visible means of identification.

The Contractor may require his employees to report in their own vehicles to the project, but these personal vehicles must be parked at a site designated by the TPOC. All vehicles used in performance of work must be marked.

Vehicles used by the Contractor to perform administrative functions such as morning meetings or crew supervision must also be marked.

C-1.9 SAFETY AND SECURITY REQUIREMENTS.

a. General. If the Contractor fails or refuses to promptly comply with safety and security requirements as specified herein, the TPOC or any other project employee may stop all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such work stoppage shall be made subject to any claims for extension of time or for excess costs or damages sustained by the Contractor.

Also, the Contractor will not be paid for work not performed as a result of the stop order.

The Contractor shall comply with the Occupational Safety and Health Act (OSHA), the Corps of Engineers Manual, EM 385-1-1 (https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf), and as otherwise stated herein. Special attention shall be given to the requirements for safety meetings. The Contractor shall inform the TPOC a minimum of 7 days prior to a Contractor monthly safety meeting, to permit a Government representative to attend.

b. Accident Prevention Plan (APP). The Contractor shall prepare an Accident Prevention Plan to assure that requirements of the safety program are provided as specified. This plan must be accepted by the Contracting Officer prior to commencement of any work. One copy of the Accident Prevention Plan shall be provided to the Contracting Officer and the TPOC one week prior to the pre-work conference. The Accident Prevention Plan must be in the outline and form prescribed in Appendix A of EM 385-1-1.

c. Activity Hazard Analysis.

1) The Contractor shall use Activity Hazard Analyses (AHA’s) as one of many tools to insure safe performance of work. It is the Contractor’s responsibility to prepare the AHA. An approved AHA must be prepared by the Contractor for each task order issued by the Government. Sample AHA’s may be available at the project office for review and use by the Contractor to assist in the development of site specific Activity Hazard Analyses prior to the Contractor performing the job. The Contractor is encouraged to revise or add to these sample AHA’s as necessary to address changing conditions. Prior to performing jobs with inherent hazards, the Contractor shall review, at a “Tool Box” safety meeting, the approved AHA’s with those employees who shall perform that work each time the work is ordered. The Government may request advanced notification of the time and date of the above AHA Tool Box safety meeting for Contractor employees so that the Government may attend such reviews.

2) The Government will require the Contractor to prepare an AHA for any jobs for which an adequate

AHA does not already exist. A copy of this AHA shall be submitted to the TPOC and must be accepted before the Contractor starts the job. This copy of the AHA will become the property of the Government. Guidance is included in Exhibit C, which shall be used by the Contractor as a guide for the preparation of required AHA's.

3) A copy of an approved AHA is required for each task order issued by the Government. A copy of the approved AHA’s shall be available at all times to workers at each associated job site and a copy shall be provided to the Government.

d. Public Safety. The Contractor shall ensure that reasonable precautions are taken to protect the public at all times where work is being performed. The Contractor shall immediately report to the TPOC any potential hazards found by his employees on the project. The Accident Prevention Plan shall include procedures to be taken to provide for public safety. Additionally, the Contractor shall not allow any persons, except employees, into work areas that are not otherwise open to the public; nor shall the Contractor transport in Contractor work vehicles any persons, except employees, during times the Contractor is on the project performing work under a task order.

e. Personal Protective Apparel and Equipment. Protective apparel and equipment, as identified in the AHA, shall be provided to eliminate or minimize hazards to personnel. As a minimum, each employee shall wear a short-sleeved shirt (as detailed in C-1.8), long trousers, and appropriate footwear during all contract work.

Face shields, spectacles with side-shields, or goggles, and hearing protection shall be worn by employees when required by safety manual. Contractor personnel involved in handling or application of pesticides or herbicides shall use all protective apparel per manufacturer's recommendations. Fire extinguisher(s) and first aid kit(s) meeting the Safety Manual standards shall also be provided and easily accessible to all employees.

f. Contractor Employees Certified in First Aid & CPR. The Contractor shall schedule employees so the appropriate numbers of certified personnel are on duty to administer First Aid and CPR as required by the Safety Manual. Copies of their certification shall be provided to the TPOC within 7 business days of contract award. Two people per crew shall be trained in First Aid and CPR. Individuals working alone shall be trained in First Aid.

g. Hazard Communication Program. The Contractor shall be responsible for implementing a hazard communication program for Contractor employees, as required by the Safety Manual. The Contractor shall provide Material Safety Data Sheets (MSDS) and/or Safety Data Sheets (SDS) for review by the TPOC prior to use of any hazardous substance on the project and provide a plan for the proper handling, transportation, storage and usage of hazardous substances on the project.

h. Antiterrorism/Operations Security – Required Security Training and Planning.

1. Access and General Protection/Security Policy and Procedures: All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

2. Suspicious Activity Reporting Training: The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the TPOC NLT 5 calendar days after the completion of the training.

3. Pre-screen candidates using E-Verify Program: The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the TPOC no later than 3 business days after the initial contract award.

http://www.uscis.gov/e-verify

C-1.10 ACCIDENT REPORTING. The Contractor is responsible for reporting all accidents to the TPOC immediately. Prompt action shall be taken to ensure immediate and appropriate medical treatment. The Contractor shall maintain an accurate record of any accidents in the manner and on the forms prescribed by the TPOC. For property damage accidents of $2,000 or more, the Contractor shall complete and submit to the TPOC a copy of ENG Form 3394 (provided by the TPOC at the time the accident is reported). The Contractor shall maintain an OSHA 300 Log (see Exhibit D) of On – The – Job injuries and first aid treatments.

C-1.11 DAMAGE REPORTS. All instances where Government materials, supplies, property, and/or equipment are damaged shall be reported immediately to the TPOC. When the damage was caused by contract employees, a written report of the incident and extent of such damage shall be submitted to the TPOC, within 2 work days (less weekends and holidays) of occurrence. For property damage accidents of $2,000 or more the Contractor will complete and submit to the TPOC a copy of ENG 3394.

C-1.12 CONTRACT EMPLOYEES' CONDUCT AND COMPETENCY. All contract employees shall conduct themselves in a proper and courteous manner at all times. Since the majority of work is performed in the presence of the general public, the conduct of all employees is critical and will be closely monitored. Contract employees shall comply with all provisions of Title 36, Chapter III, Part 327, CFR and obey all posted signs and regulations in the performance of the work under this contract. Being under the influence of or consuming alcoholic beverages or controlled substances by the Contractor or employees while on duty is prohibited.

a. Employee Dismissal. The Contractor expressly agrees to dismiss any employee or subcontractor employee whose continued employment is deemed by the TPOC to be inconsistent with the best interests of the public or the U.S. Army Corps of Engineers. The KO or the TPOC may require the Contractor to immediately remove from the work site any employee or subcontractor who is incompetent, endangers persons or property, or whose physical or mental condition would impair their ability to satisfactorily perform the work. Notification to the Contractor will be promptly made in writing if time and circumstances permit. Otherwise, notification will be verbal and confirmed in writing as soon as possible.

No removal shall reduce the Contractor's obligation to perform all work required under this contract nor be the basis for time extension. Immediate replacement of the employee shall be made.

C-1.13 DAMAGE OR LOSS OF CONTRACTOR'S SUPPLIES AND PROPERTY. The Contractor is responsible for taking the action necessary to protect Contractor supplies, materials and equipment, and the personal property of Contractor employees from loss, damage or theft. The Government assumes no responsibility for theft, damage, etc., of the above.

C-1.14 SUPERVISION. The Contractor or a Contractor Representative shall personally supervise the work, or be readily available by phone or other means of communication to respond to any contract issue that may arise when work is in progress. The Contractor Representative(s) shall conduct overall management coordination and be the central point of contact with the Government for performance of all work under the contract.

Each Contractor Representative shall have full authority to contractually commit the Contractor for prompt action on all matters pertaining to administration of this contract, and shall be the on-site Contractor employee who is responsible for safety.

In addition to Contractor Representative(s), the Contractor shall also appoint Quality Control Inspectors (QCI) who shall perform the Contractor's Quality Control Program. QCI’s shall be responsible for implementing the Contractor’s Accident Prevention Plan. All QCI'S shall have the authority to determine for the Contractor when work is ready for Government inspection and to make decisions for the Contractor on re-performance when necessary. A QCI shall be appointed for each work crew. For work performed outside normal working hours, a Contractor Representative or QCI shall be present at the work site.

The TPOC and Government Inspectors will deal directly with the QCI’s or Contractor Representatives, for normal day-to-day administration of the contract provisions.

The names and telephone numbers of all individuals authorized to act on behalf of the Contractor as Contractor

Representatives shall be submitted in writing to the TPOC before work is performed.

The Contractor shall maintain copies of contract work requirements, specifications, Activity Hazard Analysis, etc., at each work site which relate to each person's work responsibilities, and shall review them to ensure employees comprehension of a job prior to initiating work.

C-1.15 ENVIRONMENTAL PROGRAM. The Contractor shall comply with Federal, State, and local laws, regulations and standards regarding environmental protection. All environmental protection matters shall be coordinated with the TPOC. Any of the facilities operated by the Contractor may be inspected by the TPOC, or other Federal, State and local officials without advance notice. Access for inspection shall be granted upon request.

Citations against Government facilities operated by the Contractor for non-compliance with environmental standards are a matter for resolution between the Government and the issuing office. Payment of fines or penalty charges associated with citations issued by Federal, State or local officials will be paid by the Government.