Fort Knox Kentucky Medical Clinic Replacement - Industry Day Presentation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Industry_Day_-_Attendee_List_-_4_Feb._2016.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers
BUILDING STRONG®
Fort Knox Clinic Industry Forum
4 February 2016
Opening Remarks
Welcome to Louisville
Dewey W. Rissler, P.E., PMP Chief, Military Support Section
Administrative Announcements Please turn off all cell phones and pagers No recording Emergency information Posting of briefing www.lrl.usace.army.mil http://www.lrl.usace.army.mil/
Agenda Check-In Opening Remarks Administrative Announcements Project Specific Overview Two-Phase Procurement Process Construction Contract Administration Subcontracting Requirements Open Forum (Questions) Networking / Discussions
Project Specific Overview
Melody A. Thompson, PMP Project Manager
General Project Information
Purpose of Industry Forum
Project follows typical D/B MILCON concept but is medical
Project Scope
Project Schedule Milestones Synopsis in Fed Biz Ops Feb-16 Advertisement Period-Phase I Feb-16 Proposals Due Phase I Mar-16 Advertisement Period-Phase II Apr-16 through Jun-16 Proposals Due Phase II Jun-16 Contract Award Aug-16 NTP Sep-16 Clinic Construction Complete (820 days) Dec-18 Initial Outfitting and Transition - HFPA Dec-19 (max) Demolition (300 days) Oct- 20
Project Cost
Contract Cost Limit $70,000,000
Contract Award <= $70,000,000
Scope of Project
New Medical Clinic Replacement - 101,627 SF.
Supporting utilities and site improvements with connection to existing central utility plant.
Demolition of existing hospital Comply with Medical Design Instructions (MDI), UFC 4- 510-01, ATFP - UFC 4-010-01, ABA Architectural Barriers Act Accessibility Standards
Evidenced Based Design Principles MHS World Class Checklist Requirements High performance and sustainable bldg. principles LEED for New Construction silver certified rating Enhanced Commissioning requirements Building Information Modeling (BIM) requirements
Scope
Concept of Operations Program for Design Project Rooms Content Report Site information/constraints
►VA CBOC effort ►Nolin effort
Project Location
Project Site
Site Constraints
Clinic Dept. # Department Name
Dept. 01 Common Areas
Dept. 02 Primary Care Clinic
Dept. 03 PT/Chiro/Ortho Clinic
Dept. 04 Specialty Care Clinic
Dept. 05 Pharmacy
Dept. 06 Laboratory and Radiology Services
Dept. 07 Behavior Health Clinic
Dept. 08 Information Management Division
Dept. 09 Logistics
Dept. 10 General Administration Division
Dept. 11 Patient Administration Division
Dept. 12 Command Suite
Adjacency Diagram
Two-Phase Procurement Process
Jesse Scharlow Contract Specialist
502-315-6183
How to get to the Solicitation FedBizOpps - www.fbo.gov This project is W912QR-16-R-0014
►Synopsis and Modifications ►View interested vendors list ►Register as an interested vendor ►Register to receive notification
Download Technical Data Package ►Need to be registered in SAM (System for Award Management) ►Need to be registered in FBO http://www.fbo.gov/
The Procurement Process
This is a two-phase design/build request for proposal (D/B RFP).
Phase I Section 00116 Phase II Section 00118 Award a firm fixed price contract to one contractor to be responsible for the design and construction of this project.
Phase I Proposal Requirements Proposals for Phase I are tentatively scheduled to be due in March 2016 Phase I proposals do not include price proposals.
Phase I proposals include:
► Phase I –Factor 1 – Past Performance ► Phase I – Factor 2 – Technical ► Subfactor 1 – Management Plan ► Subfactor 2 – Individual Personnel Experience ► Phase I –Pro Forma Information
Phase I Evaluation Factors will be rated in the identified order of importance.
Past Performance will utilize a relevancy rating: Very
Relevant, Relevant, Somewhat Relevant, Not Relevant.
All technical factors will utilize adjectival ratings:
outstanding, good, acceptable, marginal, and unacceptable.
Up to 5 of the most highly qualified offerors will be invited to propose in Phase II.
Phase II Information
Phase II RFP technical information will be posted on the FedBizOpps website at:
www.fbo.gov.
Phase II proposals tentatively due June 2016.
http://www.fbo.gov/
Phase II Proposal Requirements Phase II –Factor 1 – Technical
► Subfactor 1 – Technical Approach Narrative ► Subfactor 2 – Structural Approach ► Subfactor 3 – Plans (Floor plans and site layout) ► Subfactor 4 – Building Rendering
Phase II –Factor 2 – Key Subcontractor Experience
Phase II –Factor 3 – Schedule Phase II –Factor 4 – Small Business
Participation Plan Phase II – Price and Pro Forma Information
(Sealed Envelope)
Phase II Evaluation
Phase I ratings will not be carried over.
Factors will be rated in the identified order of importance.
All technical factors will utilize adjectival ratings: outstanding, good, acceptable, marginal, and unacceptable.
Cost Technical Trade-Off Analysis
Using the technical evaluation ratings for Phase II and the proposed prices.
Award to the offeror that offers the best value to the Government considering their proposed price and technical proposal rating.
Construction Contract Administration
Roger K. Riddick, P.E.
Fort Knox Resident Engineer
Design-Build Construction Fast Track Design Design Reviews: turn around in 21 days Government approved shop drawing requirements are minimized Must have Designer of Record (DOR) approval
Majority of submittals are approved by the Contractor’s QC staff and DOR
Standard cut sheets or brochures – for information only (FIO)
Requests For Information (RFIs) during construction are answered by the DOR and approved/disapproved by USACE
Standards and tolerances established by industry/commercial standards as specified
Monthly progress payments will be made within 14 days of application
Materials payments can be made if properly stored with paid invoices
Government is committed to Partnering process at all levels
Government seeks to develop a high performing/profitable long lasting relationship
Government on-site project office
Monthly schedule update requirements
‘Win-Win’ outcome for all stakeholders
Must meet or beat contract time
Safety is
Priority #1!
Satisfy the
“CUSTOMER”
Subcontracting Requirements
Crystal May Deputy for Small Business
Louisville District 502-315-6111 crystal.m.may@usace.army.mil
Why a Subcontracting Plan?
Mandated by the Federal Acquisition
Regulations - FAR 19.702
► Over $700K or $1.5M for construction
► Offeror shall submit an acceptable plan in order to receive award
► Failure to comply in good faith is in material breach of the contract and subject to liquidated damages
Subcontracting Plan Requirements Eleven Elements in a Plan (FAR 19.704)
► (1) Separate Percentage Goals for each Small Business Category
► (2) Statement of TOTAL Dollars Planned to be Subcontracted to Large & Small Business
► (3) Description of Principal Types of Supplies/Services to be subcontracted along w/types planned for small business
► (9) All Large Business Subcontractors with subcontracts over $700K or $1.5M for construction must adopt a Subcontracting Plan that complies with
FAR 52.219-9
Summary Schedule and Cost Schedule
► Synopsis in Fed Biz Ops Feb-16 ► Proposals Due Phase I Mar-16 ► Proposals Due Phase II Jun-16 ► Contract Award Aug-16
Contract Cost Limit ► $70,000,000
Open Forum (Questions?)
BUILDING STRONG®37
Project Site
| Fort Knox Clinic�Industry Forum |
| Opening Remarks� |
| Administrative Announcements |
| Agenda |
| Slide Number 5 |
| General Project Information |
| Project Schedule Milestones |
| Project Cost |
| Scope of Project |
| Scope |
| Project Location |
| Project Site |
| Site Constraints |
| Clinic |
| Adjacency Diagram |
| Slide Number 16 |
| How to get to the Solicitation |
| The Procurement Process |
| Phase I Proposal Requirements |
| Phase I Evaluation |
| Phase II Information |
| Phase II Proposal Requirements |
| Phase II Evaluation |
| Cost Technical Trade-Off Analysis |
| Slide Number 25 |
| Construction Contract Administration� |
| Construction Contract Administration� |
| Construction Contract Administration� |
| Construction Contract Administration� |
| Construction Contract Administration� |
| Construction Contract Administration� |
| Slide Number 32 |
| Why a Subcontracting Plan? |
| Subcontracting Plan Requirements |
| Summary Schedule and Cost |
| Slide Number 36 |
| Slide Number 37 |