W912QR-31720390_NRP15-0000.pdf
PDF 11 MB Posted
- Solicitation number
- W912QR-31720390
About this file
This solicitation is for construction services for the FY23 National Roofing Program (NRP) Project #15 located at Fort Eustis - Hangar in Newport News, Virginia and USARC & OMS buildings in Charlottesville, Virginia. The solicitation number is W912QR-31720390 and was issued by the Department of the Army Corps of Engineers Engineering District Louisville. Services required include roof replacement and repairs at the specified locations, with a response deadline of August 15, 2022. The anticipated award date is September 30, 2022. Pricing is to be provided using fixed unit pricing for labor and materials.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912QR-31720390_NRP15-0003.pdf | ||
| W912QR-31720390_NRP15-0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Army Reserve National Roofing Program FY23 Task Order 15
P2: 507756 Design-Bid-Build & Design-Build
Volume A – VA070 - Newport News, VA (DBB)
Volume B – VA006 - Charlottesville, VA (DB)
Certified Final
21 August 2023
W912QR-31720390
MATOC
W912QR20D0014 thru 20D0016 W912QR20D0018 thru 20D0020 All requirements of the base MATOC Volume 1 of 2 shall apply to this Task Order unless noted otherwise.
ARIMS: 200A Disposition: Maintain for 15yrs after construction
W912QR-31720390_NRP15-0000
DEPARTMENT OF THE ARMY
LOUISVILLE DISTRICT, CORPS OF ENGINEERS
P.O. BOX 59
LOUISVILLE,KENTUCKY 40201-0059
REPLY TO
ATTENTION OF
Contracting Division 1 August 2023
AR6-Cram/REI Brazos/REI Curtis-McKinley/REI Legacy/Terracon Pacific/Conley/REI/AMTECH Tabcon/MECA
Dear MATOC Contractors:
This action is a 100% set-aside for IDIQ contract holders under the USACE, Louisville District's MATOC pool (IDIQ Contract Numbers W912QR20D0014 - W912QR20D0016 and W912QR20D0018-W912QR20D0020, Design Build Multiple Award Task Order Contract (MATOC) for Building Envelope, Roof Repair and Replacement Construction in Support of U.S.
Army Reserve National Roofing Program (NRP), Army, and Air Force Reserves Sections.
The project is restricted to the six (6) contract holders listed above only. Proposals submitted from other vendors will not be considered.
This notice is provided for informational purposes only. Therefore, FAR 5.203 does not apply.
We request you submit a price proposal for design and construction services required to repair roofs at Newport News, VA; FAC ID VA070 and Charlottesville, VA; FAC ID VA006 as detailed in the scope of work, drawings, and specifications posted at the System for Award Management (www.SAM.gov). The documents are available for download at www.SAM.gov only. All vendors must be registered in the SAM database at SAM.gov. The RFP can be found by logging into the website as a vendor and searching for the solicitation number (W912QR-31720390). The cost range is between $1,000,000 and $5,000,000.
The basis for award of this task order is lowest evaluated price (base plus all options). Your proposal should include a price breakdown and/or labor category table demonstrating the use of the binding rates included in your MATOC contract. The submitted price breakdown should include sufficient detail to allow the Government to verify that your proposed price incorporates the binding rates from your base contract. Any level of effort shown in the submitted information will not be used for evaluation purposes and will be used only to ensure that the proposal is in compliance with the binding rates from the base contract. Proposals that fail to submit a price breakdown or fail to use the binding rates from your MATOC will not be considered. Proposals submitted in response to this RFP shall be good for no less than 90 calendar days.
Award of this project is Subject to the Availability of Funds. Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available.
Proposals are due no later than 2:00 PM ET on Monday, 11 September 2023. Submit your proposal by email to Rachael.L.McClellan@usace.army.mil. Proposals not received by the stated date/time will not be considered. Please acknowledge receipt of this RFP by signing below in the space provided and returning to Rachael McClellan via email at Rachael.L.McClellan@usace.army.mil.
Payment and Performance Bonds will be required for this project. The Notice to Proceed will be issued after receipt and approval of the bonds.
All questions regarding this Request for Proposal (RFP) must be submitted via ProjNet. The website to access this system is www.projnet.org and the bidder inquiry key for this specific project is:
(3WWMJ9-9HR7BN). Please see ProjNet instructions included in this RFP.
System for Award Management (SAM): Your SAM registration is required to be active prior to any award. You must submit a notarized letter appointing the authorized Entity Administrator before your registration will be activated. This requirement now applies to both new and existing entities.
Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record. The notarized letter is mandatory and is required before the GSA Federal Service Desk (FSD) will activate the entity's registration.
All contractors must be registered in the System for Award Management (www.SAM.gov) prior to award of a contract. All proposed contractors are highly encouraged to review FAR Clause 52.232- 33 Payments by Electronic Funds Transfer – System for Award Management, which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).”
Those not currently registered can obtain registration by going to the website www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier (formerly DUNS number) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from www. SAM.gov. Refer to www.SAM.gov for information formerly found in CCR, EPLS, ORCA and FedReg.
If you have contractual questions, please contact Rachael McClellan at Rachael.L.McClellan@usace.army.mil. If an Offeror believes that the requirements in the RFP contain an error, omission, or are otherwise unsound, the offeror shall immediately notify the Contract Specialist in writing with supporting rationale. All Offerors are reminded that the Government reserves the right to award this RFP based on the initial proposals, as received, without discussion.
Sincerely, Jesse E. Scharlow Contracting Officer
(Signature) (Date) (Printed Name)
(Firm Name)
SCHARLOW.JESS
E.E.1298182471
Digitally signed by
SCHARLOW.JESSE.E.129818247
Date: 2023.08.21 09:29:43 -04'00'
RELEASE OF CLAIMS – FINAL PAYMENT
FOR
Contract No.: Task Order:
Pursuant to the terms of Contract No. , dated _, (hereinafter called the Contract) the undersigned Contractor (hereinafter called the Contractor) hereby acknowledges that it has requested final payment in the sum certain amount of (Dollars) $ for Task Order under the Contract. The Contractor further understands and agrees that final payment of the above stated sum to the Contractor, or its assignees, if any, constitutes compensation in full on behalf of the Contractor, and its subcontractors and suppliers, for all costs and markups directly or indirectly attributable to work performed under Task Order , including any modifications or changes thereto, except for the following claims:
If NONE, the undersigned Contractor shall initial here:
In consideration of final payment of the above-stated sum, which has been or is to be paid under the Contract for Task Order to the Contractor or its assignees, if any, the Contractor, upon payment of said sum by the UNITED STATES OF AMERICA (hereinafter called the Government) does hereby release the Government, its officers, agents, and employees from any and all liabilities, obligations, claims, and demands of any kind arising out of or under Task Order , except for those expressly reserved above.
Executed this day of , .
By
(Signature)
(Printed Name)
WITNESSES:
(Title)
(Signature) (Signature)
(Printed Name) (Printed Name)
Address Address
OFFEROR'S QUESTIONS AND COMMENTS
Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet. Offerors shall submit their proposals in accordance with the provisions stated in the solicitation.
To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system.
The Solicitation Number is: W22W9K-31720390
The Bidder Inquiry Key is: FE2T8Z-Q7RHAV
Specific Instructions for ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret
Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Select Continue. A page will then open asking you to enter the answer to your Secret
Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
From this page you may view all bidder inquiries or add an inquiry.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
NOTES:
1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.
2. Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary.
3. The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled five (5) calendar days prior to the closing date stated in the solicitation. No Government responses will be entered into the ProjNet system within two (2) calendar days prior to the closing date stated in the solicitation.
SECTION 00010 – PRICE BREAKOUT SCHEDULE
PROJECT: The Scope of Work (SOW) is for the design and construction services required to repair failed or failing roofs in the United States Army Reserve Command (USARC) roofing inventory under the NRP FY23 Project 15
LOCATIONS:
PROPOSER’S NAME:
ITEM
NUMBER Description UNIT AMOUNT
BASE Work For VA070 0001 Construction: All work, materials, and labor JOB $___________ required to replace the roof at VA070 Building Hangar Section 1
0002 Construction: All work, materials, and labor JOB $___________ required to replace the roof at VA070 Building Hangar Section 2
0003 Construction: All work, materials, and labor JOB $_ required to replace the translucent fiberglass sandwich panel wall system at VA070
0004 Construction: All work, materials, and labor JOB $_ required to provide new rooftop mounted equipment platforms at VA070
0005 Construction: All work, materials, and labor JOB $___________ required to replace the roof hatch at VA070 Building Hangar Section 1
TOTAL PROJECT BASE PROPOSAL $
FACILITY LOCATION
VA070 Newport News, VA VA006 Charlottesville, VA
OPTIONS: Options may be exercised up to 150 days from Notice to Proceed
OPTION 1 Work For VA006
0006 Construction: All work, materials, and labor JOB $___________ required to replace the roof at VA006 Building USARC Section 1A
0007 Design: All work and labor required to JOB $___________ design the roof at VA006 Building USARC Section 1A
0008 Construction: All work, materials, and labor JOB $___________
Building USARC Section 1A
0009 Design: All work and labor required to JOB $_
Building USARC Section 1A __________
Total Option 1 $___________
OPTION 2 Work For VA006 0010 Construction: All work, materials, and labor JOB $___________ required to replace the roof at VA006 Building USARC Section 1C
0011 Design: All work and labor required to JOB $___________ design the roof at VA006 Building USARC Section 1C
0012 Construction: All work, materials, and labor JOB $___________
Building USARC Section 1D
0013 Design: All work and labor required to JOB $
Building USARC Section 1D ___________
Total Option 2 $___________
OPTION 3 Work For VA006 0014 Construction: All work, materials, and labor JOB $___________
Building OMS Section 2A
0015 Design: All work and labor required to JOB $___________
Building OMS Section 2A Total Option 3 $___________
TOTAL ALL OPTIONS PROPOSAL $
TOTAL PROJECT BASE PLUS OPTIONS PROPOSAL $
Provide the binding contract rates and hours included in job prices above for all base and option tasks.
Project Manager _______ hours x _______ = $___________
Superintendent _______ hours x _______ = $___________
CQC Manager _______ hours x _______ = $___________
Site Safety Health Officer _______ hours x _______ = $___________
NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE
NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
NOTE NO. 2. Offerors must insert a price on all numbered items including options of the CLIN Schedule. Failure to do so may result in the offer being unacceptable.
NOTE NO. 3.
The Offeror’s Base Bid and all Options will be evaluated and awarded based on the lowest evaluated price. In accordance with 52.217-5, Evaluation of Options, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement.
Evaluation of options will not obligate the Government to exercise the options.]
--END OF CLIN SCHEDULE—
52.204-27 Prohibition on a ByteDance Covered Application.
As prescribed in 4.2203(c), insert the following clause:
Prohibition on a ByteDance Covered Application (Jun 2023)
(a) Definitions. As used in this clause-
Covered application means the social networking service TikTok or any successor application or service developed or provided by ByteDance Limited or an entity owned by ByteDance Limited.
Information technology, as defined in 40 U.S.C. 11101(6)-
(1) Means any equipment or interconnected system or subsystem of equipment, used in the automatic acquisition, storage, analysis, evaluation, manipulation, management, movement, control, display, switching, interchange, transmission, or reception of data or information by the executive agency, if the equipment is used by the executive agency directly or is used by a contractor under a contract with the executive agency that requires the use-
(i) Of that equipment; or
(ii) Of that equipment to a significant extent in the performance of a service or the furnishing of a product;
(2) Includes computers, ancillary equipment (including imaging peripherals, input, output, and storage devices necessary for security and surveillance), peripheral equipment designed to be controlled by the central processing unit of a computer, software, firmware and similar procedures, services (including support services), and related resources; but
(3) Does not include any equipment acquired by a Federal contractor incidental to a Federal contract.
(b) Prohibition. Section 102 of Division R of the Consolidated Appropriations Act, 2023 (Pub.
L. 117-328), the No TikTok on Government Devices Act, and its implementing guidance under Office of Management and Budget (0MB) Memorandum M-23-13, dated February 27, 2023, "No TikTok on Government Devices" Implementation Guidance, collectively prohibit the presence or use of a covered application on executive agency information technology, including certain equipment used by Federal contractors. The Contractor is prohibited from having or using a covered application on any information technology owned or managed by the Government, or on any information technology used or provided by the Contractor under this contract, including equipment provided by the Contractor's employees; however, this prohibition does not apply if the Contracting Officer provides written notification to the Contractor that an exception has been granted in accordance with 0MB Memorandum M-23-13.
(c) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (c), in all subcontracts, including subcontracts for the acquisition of commercial products or commercial services.
(End of clause)
Section 00 70 00
52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)
The Contractor shall be required to
(a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than 400 calendar days from Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
(End of Clause)
52.211-12 Liquidated Damages -- Construction (Sept 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,275 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
52.211-13 Time Extensions -- (Sept 2000)
Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The change order also may provide an equitable readjustment of liquidated damages under the new completion schedule.
52.217-5 -- Evaluation of Options.
As prescribed in 17.208(c), insert a provision substantially the same as the following:
Evaluation of Options (Jul 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(End of Provision)
52.217-7 -- Option for Increased Quantity -- Separately Priced Line Item.
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option Reference Price Breakout Schedule. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (Feb 1999)
(a) The offeror’s attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor’s aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for Minority Participation for Each Trade
Goals for Female Participation for Each Trade
27.1% (Warwick County, VA) 6.9% 27.9% (Albemarle County, VA) 6.9%
These goals are applicable to all the Contractor’s construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor’s compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on
(1) its implementation of the Equal Opportunity clause,
(2) specific affirmative action obligations required by the clause entitled “Affirmative Action Compliance Requirements for Construction,’’ and
(3) its efforts to meet the goals.
The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor’s goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the –
(1) Name, address, and telephone number of the subcontractor;
(2) Employer’s identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the “covered area” is the state of VA, Warwick County and city of Newport News, and the state of VA, Albemarle County and city of Charlottesville.
(End of Provision)
52.232-18 Availability of Funds
Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
52.236-1 Performance of Work by the Contractor (Apr 1984)
The Contractor shall perform on the site, and with its own organization, work equivalent to at least 20% of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction, and the Contracting Officer determines that the reduction would be to the advantage of the Government.
52.236-4 Physical Data (Apr 1984)
Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations.
(b) Weather conditions: The Contractor shall make his own investigations as to weather conditions at the site. Data may be obtained from various National Weather Service offices located generally at airports of principal cities, the nearest to this project being Des Moines, IA.
(c) Transportation facilities: Roads and railroads in the general area are shown on the drawings.
Access ways shall be investigated by the Contractor to satisfy himself as to their existence and allowable use.
(d) Historical data for all areas may be obtained from:
US Dept of Commerce National Oceanic and Atmospheric Administration National Weather Service Wakefield VA 10009 General Mahone Highway Wakefield VA 23888
(757) 899-4200
US Dept of Commerce National Oceanic and Atmospheric Administration National Weather Service Baltimore/Washington Weather Forecast Office Baltimore/Washington 43858 Weather Service Rd.
Sterling, VA 20166
(571) 888-3500
52.236-27 Site Visit (Construction) (Feb 1995) Alternate I
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
USACE Contact: Andrew McCauley Email: robert.a.mccauley@usace.army.mil Phone: 502-315-7048 *Pre-Visit questions can be directed to Mr. Andrew McCauley via phone or email.
VA070 site visit info:
POC: Chris Renew WK Phone: 757.878.0613 x240 CELL Phone: 757-817-9045 Date/Time: 8/28/2023 @0900 ET
VA0006 site visit info:
POC: Donald Huson Phone: 540-266-4003 Email: donald.l.huson.ctr@army.mil Date/Time: 8/29/2023 @0900 ET
52.246-21 Warranty of Construction (Mar 1994)
(a) In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph (i) of this clause, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.
(b) This warranty shall continue for a period of 1 year from the date of final acceptance of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date the Government takes possession.
(c) The Contractor shall remedy at the Contractor’s expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor’s expense any damage to Government-owned or controlled real or personal property, when that damage is the result of-
(1) The Contractor’s failure to conform to contract requirements; or
(2) Any defect of equipment, material, workmanship, or design furnished.
(d) The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. The Contractor’s warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement.
(e) The Contracting Officer shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage.
(f) If the Contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor’s expense.
(g) With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall-
(1) Obtain all warranties that would be given in normal commercial practice;
(2) Require all warranties to be executed, in writing, for the benefit of the Government, if directed by the Contracting Officer; and
(3) Enforce all warranties for the benefit of the Government, if directed by the Contracting Officer.
(h) In the event the Contractor’s warranty under paragraph (b) of this clause has expired, the Government may bring suit at its expense to enforce a subcontractor’s, manufacturer’s, or supplier’s warranty.
(i) Unless a defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material or design furnished by the Government nor for the repair of any damage that results from any defect in Government-furnished material or design.
(j) This warranty shall not limit the Government’s rights under the Inspection and Acceptance clause of this contract with respect to latent defects, gross mistakes, or fraud.
252.236-7001 Contract Drawings and Specifications (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall—
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
N/A file:///O/...070%20&%20VA006/Wage%20Rates/VA20230159%20dtd%2013%20JAN%202023%20Newport%20News,%20VA-BLDG.txt[8/16/2023 10:03:51 PM]
"General Decision Number: VA20230159 01/13/2023
Superseded General Decision Number: VA20220159
State: Virginia
Construction Type: Building
County: Newport News* County in Virginia.
*INDEPENDENT CIY OF NEWPORT NEWS
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the file:///O/...070%20&%20VA006/Wage%20Rates/VA20230159%20dtd%2013%20JAN%202023%20Newport%20News,%20VA-BLDG.txt[8/16/2023 10:03:51 PM]
Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2023 1 01/13/2023
ASBE0024-006 04/01/2021
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 39.27 18.67+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.
BOIL0045-003 01/01/2021
Rates Fringes
BOILERMAKER......................$ 42.62 24.81
BRVA0008-001 05/01/2022
Rates Fringes
BRICKLAYER.......................$ 22.44 10.23
ELEC1340-001 12/01/2022
Rates Fringes
ELECTRICIAN (Includes Low Voltage Wiring and Alarm Installation)....................$ 31.30 8.5%+6.35
* ELEV0052-005 01/01/2023
Rates Fringes file:///O/...070%20&%20VA006/Wage%20Rates/VA20230159%20dtd%2013%20JAN%202023%20Newport%20News,%20VA-BLDG.txt[8/16/2023 10:03:51 PM]
ELEVATOR MECHANIC................$ 47.72 37.335+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.
b. VACATIONS: 6% men under 5 years based on regular hourly rate and 8% men over 5 years based on regular hourly rate for all hours worked.
ENGI0147-019 05/01/2022
Rates Fringes
POWER EQUIPMENT OPERATOR
Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100
ft. above ground............$ 34.17 15.21 Cranes under 90 tons........$ 33.26 15.12
IRON0079-012 05/01/2022
Rates Fringes
IRONWORKER, STRUCTURAL AND
ORNAMENTAL.......................$ 28.87 11%+14.24
IRON0079-013 05/01/2022
Rates Fringes
IRONWORKER, RIGGER...............$ 28.87 11%+14.24
PLUM0110-008 11/01/2022
Rates Fringes
PIPEFITTER (Includes HVAC Pipe, Unit and Temperature Controls Installations)..........$ 31.77 17.40
PLUMBER..........................$ 31.77 17.40
* SUVA2013-042 01/11/2016
Rates Fringes
CARPENTER, Includes Acoustical Ceiling Installation, Drywall Hanging, and Form Work...........$ 20.26 2.77
CAULKER..........................$ 18.49 1.33
file:///O/...070%20&%20VA006/Wage%20Rates/VA20230159%20dtd%2013%20JAN%202023%20Newport%20News,%20VA-BLDG.txt[8/16/2023 10:03:51 PM]
CEMENT MASON/CONCRETE FINISHER...$ 17.23 0.72
GLAZIER..........................$ 19.36 4.68
IRONWORKER, REINFORCING..........$ 27.18 4.13
LABORER: Mason Tender - Brick...$ 13.48 ** 3.27
LABORER: Mason Tender - Cement/Concrete..................$ 12.96 ** 3.12
LABORER: Pipelayer..............$ 12.40 ** 1.96
LABORER: Common or General, Including Demolition.............$ 12.00 ** 1.61
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 17.75 3.40
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.95 4.03
OPERATOR: Bulldozer.............$ 18.07 3.50
OPERATOR: Forklift..............$ 19.40 7.00
OPERATOR: Loader................$ 21.28 3.17
OPERATOR: Roller................$ 16.25 4.88
PAINTER (Brush and Roller).......$ 14.28 ** 0.00
PAINTER: Spray..................$ 18.10 5.43
ROOFER...........................$ 18.40 2.31
SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 19.71 2.76
SPRINKLER FITTER (Fire Sprinklers)......................$ 18.91 4.67
TILE FINISHER....................$ 23.40 0.00
TILE SETTER......................$ 27.80 10.25
TRUCK DRIVER: Dump Truck........$ 15.50 ** 0.75
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
file:///O/...070%20&%20VA006/Wage%20Rates/VA20230159%20dtd%2013%20JAN%202023%20Newport%20News,%20VA-BLDG.txt[8/16/2023 10:03:51 PM]
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658 ($12.15). Please see the Note at the top of the wage determination for more information.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, file:///O/...070%20&%20VA006/Wage%20Rates/VA20230159%20dtd%2013%20JAN%202023%20Newport%20News,%20VA-BLDG.txt[8/16/2023 10:03:51 PM]
005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
file:///O/...070%20&%20VA006/Wage%20Rates/VA20230159%20dtd%2013%20JAN%202023%20Newport%20News,%20VA-BLDG.txt[8/16/2023 10:03:51 PM]
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISIO"
file:///O/...006/Wage%20Rates/VA20230011%20dtd%2002%20JUN%202023%20Albemarle%20Co.,%20Charlottsville%20VA-BLDG.txt[8/16/2023 10:04:48 PM]
"General Decision Number: VA20230011 06/02/2023
Superseded General Decision Number: VA20220011
State: Virginia
Construction Type: Building
County: Albemarle County in Virginia.
Includes the independent city of Charlottesville*
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for file:///O/...006/Wage%20Rates/VA20230011%20dtd%2002%20JUN%202023%20Albemarle%20Co.,%20Charlottsville%20VA-BLDG.txt[8/16/2023 10:04:48 PM] performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2023 1 01/13/2023 2 06/02/2023
ASBE0024-006 04/01/2021
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 39.27 18.67+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.
BOIL0045-003 01/01/2021
Rates Fringes
BOILERMAKER......................$ 42.62 24.81
ELEV0051-007 01/01/2023
Rates Fringes
ELEVATOR MECHANIC................$ 47.09 37.335+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving and Christmas Day.
b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
ENGI0147-019 05/01/2022
Rates Fringes file:///O/...006/Wage%20Rates/VA20230011%20dtd%2002%20JUN%202023%20Albemarle%20Co.,%20Charlottsville%20VA-BLDG.txt[8/16/2023 10:04:48 PM]
POWER EQUIPMENT OPERATOR
Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100
ft. above ground............$ 34.17 15.21 Cranes under 90 tons........$ 33.26 15.12
* IRON0005-010 06/01/2023
Rates Fringes
IRONWORKER.......................$ 36.10 25.19
PAIN0051-033 06/01/2021
Rates Fringes
PAINTER: Spray Only..............$ 25.50 11.27
* SUVA2013-023 01/11/2016
Rates Fringes
BRICKLAYER.......................$ 23.54 6.73
CARPENTER........................$ 14.81 ** 2.19
ELECTRICIAN......................$ 24.01 8.28
IRONWORKER, REINFORCING..........$ 25.36 6.68
LABORER: Common or General......$ 10.00 ** 1.15
LABORER: Mason Tender - Brick...$ 13.41 ** 3.15
LABORER: Mason Tender - Cement/Concrete..................$ 15.32 ** 0.00
LABORER: Pipelayer..............$ 12.00 ** 1.17
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 16.24 0.87
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.95 4.03
OPERATOR: Bulldozer.............$ 16.00 ** 0.00
OPERATOR: Forklift..............$ 19.40 7.00
OPERATOR: Loader................$ 21.28 3.17
OPERATOR: Roller................$ 16.25 4.88 file:///O/...006/Wage%20Rates/VA20230011%20dtd%2002%20JUN%202023%20Albemarle%20Co.,%20Charlottsville%20VA-BLDG.txt[8/16/2023 10:04:48 PM]
PAINTER (Brush and Roller).......$ 20.01 0.00
PIPEFITTER, Includes HVAC Pipe and Unit Installation.......$ 23.32 6.04
PLUMBER..........................$ 21.32 2.31
ROOFER...........................$ 16.17 ** 3.73
SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 23.00 1.40
TILE FINISHER....................$ 23.40 0.00
TILE SETTER......................$ 27.80 10.25
TRUCK DRIVER: Dump Truck........$ 16.58 1.73
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658 ($12.15). Please see the Note at the top of the wage determination for more information.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the…
This is the start of the file's text. The full file is on GovTribe.