W912QR-02130378 _NRP27-VolA-0000.pdf
PDF 1 MB Posted
- Attached to
- FY20 NRP Roofing Project 27
- Solicitation number
- W912QR-02130378
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Army Reserve National Roofing Program FY20 Task Order 27
P2: 484076
Design-Bid-Build Volume A of A-E
Volume A – Task Order Requirements Volume B – MD003, Baltimore, MD Volume C – MD021, Rockville, MD Volume D – WV014, Grafton, WV Volume E – WV022, Kingwood, WV
14 August 2020
W912QR-02130378
MATOC
W912QR20D0014 thru 0020
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR-02130378-0000
DEPARTMENT OF THE ARMY
LOUISVILLE DISTRICT, CORPS OF ENGINEERS
P.O. BOX 59
LOUISVILLE,KENTUCKY 40201-0059
REPLY TO
ATTENTION OF
Contracting Division 14 August 2020
AR6-Cram/REI Brazos/REI Curtis-McKinley/REI Pacific/Conley/REI/AMTECH Tabcon/MECA
CYE/MECA
Legacy/Terracon
Dear MATOC Contractors:
Reference is made to your Indefinite Delivery Contracts, Numbers W912QR20D0014 - W912QR20D0020, Design Build Multiple Award Task Order Contract (MATOC) for Building Envelope, Roof Repair and Replacement Construction in Support of U.S. Army Reserve National Roofing Program (NRP), Army, and Air Force Reserves Sections.
We request you submit a price proposal for construction services required to repair roofs at Baltimore, MD (FAC ID MD003), Rockville, MD (FAC ID MD0021), Grafton, WV (FAC ID WV014), and Kingwood, WV (FAC ID WV022), as detailed in the scope of work, drawings, and specifications posted at www.Beta.SAM.gov. The documents are available for download at www.Beta.SAM.gov only. All vendors must be registered in the SAM database at Beta.SAM.gov.
The RFP can be found by logging into the website as a vendor and searching for the solicitation number (W912QR-02130378). The cost range is between $1,000,000 and $5,000,000. PLEASE
NOTE: THIS IS FOR CONSTRUCTION SERVICES ONLY.
The basis for award of this task order is lowest evaluated price (base plus all options). Your proposal should include a price breakdown and/or labor category table demonstrating the use of the binding rates included in your MATOC contract. The submitted price breakdown should include sufficient detail to allow the Government to verify that your proposed price incorporates the binding rates from your base contract. Any level of effort shown in the submitted information will not be used for evaluation purposes and will be used only to ensure that the proposal is in compliance with the binding rates from the base contract. Proposals that fail to submit a price breakdown or fail to use the binding rates from your MATOC will not be considered. Proposals submitted in response to this RFP shall be good for no less than 90 calendar days.
Proposals are due no later than 10:00 AM ET on 4 September 2020. Submit your proposal by email to Joshua.A.Gitchel@usace.army.mil. Proposals not received by the stated date/time will not be considered. Please acknowledge receipt of this RFP by signing below in the space provided and returning to Josh Gitchel via email at Joshua.A.Gitchel@usace.army.mil.
Payment and Performance Bonds will be required for this project. The Notice to Proceed will be issued after receipt and approval of the bonds.
All questions regarding this Request for Proposal (RFP) must be submitted via ProjNet. The website to access this system is www.projnet.org. Please see ProjNet instructions included in this RFP.
System for Award Management (SAM): Your SAM registration is required to be active prior to any award. You must submit a notarized letter appointing the authorized Entity Administrator before your registration will be activated. This requirement now applies to both new and existing entities.
Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record. The notarized letter is mandatory and is required before the GSA Federal Service Desk (FSD) will activate the entity's registration.
All contractors must be registered in the System for Award Management (www.Beta.SAM.gov) prior to award of a contract. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer – System for Award Management, which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by going to the website www.Beta.SAM.gov. The process can usually be completed from 24 to 48 hours after submission.
Contractors will need to obtain a Unique Entity Identifier (formerly DUNS number) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from www.Beta.SAM.gov. Refer to www.Beta.SAM.gov for information formerly found in CCR, EPLS, ORCA and FedReg.
If you have contractual questions, please contact Josh Gitchel at Joshua.A.Gitchel@usace.army.mil.
If an Offeror believes that the requirements in the RFP contain an error, omission, or are otherwise unsound; the offeror shall immediately notify the Contract Specialist in writing with supporting rationale. All Offerors is reminded that the Government reserves the right to award this RFP based on the initial proposals, as received, without discussion.
Sincerely, Misty Bock Contracting Officer
(Signature) (Date)
(Printed Name)
(Firm Name)
PROJNET INSTRUCTIONS: OFFEROR'S QUESTIONS AND COMMENTS
Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet. Offerors shall submit their proposals in accordance with the provisions stated in the solicitation.
To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system.
The Solicitation Number is: W912QR-02130378
The Bidder Inquiry Key is:
MD003 - 6652U8-2V6N8T
MD021 - WF8EPV-TBK34M
WV014 - G7YEDT-FFYCSJ
WV022 - GTNTIT-DS5H4I
Specific Instructions for ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret
Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Select Continue. A page will then open asking you to enter the answer to your Secret Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
From this page you may view all bidder inquiries or add an inquiry.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
NOTES:
1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.
2. Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary.
3. The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled five (5) calendar days prior to the closing date stated in the solicitation. No Government responses will be entered into the ProjNet system within two (2) calendar days prior to the closing date stated in the solicitation.
SECTION 00010 – PRICE BREAKOUT SCHEDULE
PROJECT: The Scope of Work (SOW) is for the construction services required to repair failed or failing roofs in the United States Army Reserve Command (USARC) roofing inventory under the NRP FY20 Project #27
LOCATIONS:
PROPOSER’S NAME:
ITEM
NUMBER Description UNIT AMOUNT
BASE Work For MD003 0001 Construction: All work, materials, and labor JOB $___________ required to replace the roof at MD003 Building OMS
0002 Construction: All work, materials, and labor JOB $___________ required to replace the roof at MD003 Building USARC
TOTAL PROJECT BASE PROPOSAL $
OPTIONS: Options may be exercised up to 120 days from Notice to Proceed OPTION 1 Work For MD021 0003 Construction: All work, materials, and labor JOB $___________ required to replace the roof at MD021 Building USARC
0004 Construction: All work, materials, and labor JOB $___________ required to replace the roof at MD021 Building OMS
Total Option 1 $___________
OPTION 2 Work For WV014 0005 Construction: All work, materials, and labor JOB $___________ required to replace the roof at WV014 Building USARC
FACILITY LOCATION
MD003 Baltimore, MD MD021 Rockville, MD WV014 Grafton, WV WV022 Kingwood, WV
Total Option 2 $___________ OPTION 3 Work For WV022 0006 Construction: All work, materials, and labor JOB $___________ required to replace the roof at WV022 Building USARC
0007 Construction: All work, materials, and labor JOB $___________ required to replace the roof at WV022 Building USARC
Total Option 3 $___________
TOTAL ALL OPTIONS PROPOSAL $
TOTAL PROJECT BASE PLUS OPTIONS PROPOSAL $
Provide the binding contract rates and hours included in job prices above for all base and option tasks.
Project Manager _______ hours x _______ = $___________ Superintendent _______ hours x _______ = $___________ CQC Manager _______ hours x _______ = $___________ Site Safety Health Officer _______ hours x _______ = $___________
NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE
NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
NOTE NO. 2. Offerors must insert a price on all numbered items of the CLIN Schedule.
Failure to do so may result in the offer being unacceptable.
NOTE NO. 3. The Offeror’s Base and Options will be evaluated on price only.
--END OF CLIN SCHEDULE—
Section 00 70 00
52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) The Contractor shall be required to
(a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than 270 days from Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
(End of Clause)
52.211-12 Liquidated Damages -- Construction (Sept 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1279.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
52.217-5 -- Evaluation of Options.
As prescribed in 17.208(c), insert a provision substantially the same as the following:
Evaluation of Options (Jul 1990) Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(End of Provision)
52.217-7 -- Option for Increased Quantity -- Separately Priced Line Item.
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option Reference Price Breakout Schedule. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (Feb 1999)
(a) The offeror’s attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor’s aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for Minority Participation for Each Trade
Goals for Female Participation for Each Trade
Baltimore, MD – 23% 6.9%
Rockville, MD – 15.5% 6.9%
Grafton, WV – 2.1% 6.9%
Kingwood, WV – 2.1% 6.9%
These goals are applicable to all the Contractor’s construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor’s compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on
(1) its implementation of the Equal Opportunity clause,
(2) specific affirmative action obligations required by the clause entitled “Affirmative Action Compliance Requirements for Construction,’’ and
(3) its efforts to meet the goals.
The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor’s goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer’s identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the “covered area” is the state of Baltimore, MD, Rockville, MD, Grafton, WV and Kingwood, WV.
(End of Provision)
52.236-4 Physical Data (Apr 1984)
Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by Surveys.
(b) Weather conditions: The Contractor shall make his own investigations as to weather conditions at the site. Data may be obtained from various National Weather Service offices located generally at airports of principal cities, the nearest to this project being Dayton, OH.
(c) Transportation facilities: Roads and railroads in the general area are shown on the drawings.
Access ways shall be investigated by the Contractor to satisfy himself as to their existence and allowable use.
(d) Historical data for all areas may be obtained from:
U. S. Department of Commerce National Climatic Center Federal Building Asheville, NC 28801
252.236-7001 Contract Drawings and Specifications (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall—
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File
Drawing No.
G001
(End of clause)
WAGE DECISIONS
"General Decision Number: MD20200030 06/26/2020
Superseded General Decision Number: MD20190030
State: Maryland
Construction Type: Building
County: Baltimore County in Maryland.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020 1 03/13/2020 2 04/17/2020 3 05/15/2020 4 05/29/2020 5 06/05/2020 6 06/26/2020
ASBE0024-007 04/01/2020
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 38.01 17.37+a
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.
BRMD0001-011 05/03/2020
Rates Fringes
BRICKLAYER (Excluding Pointing, Caulking and Cleaning)........................$ 33.00 12.09
CARP0197-003 04/01/2019
Rates Fringes
CARPENTER (Including Drywall Hanging, Drywall Finishing, Form Work, Metal Stud Installation and Scaffold Building)........................$ 26.66 14.83
CARP0219-002 05/01/2019
Rates Fringes
MILLWRIGHT.......................$ 33.56 14.93
CARP0441-002 05/01/2018
Rates Fringes
PILEDRIVERMAN....................$ 30.18 15.03
* ELEC0024-012 05/31/2020
Rates Fringes
ELECTRICIAN (Including low voltage wiring for and installation of alarms; HVAC controls)........................$ 39.25 5.25%+16.44
ELEC0024-013 05/31/2020
Rates Fringes
ELECTRICIAN (Communication and Sound Equipment).............$ 28.63 4.75%+14.12
PAID HOLIDAYS: New Year's Day, Memorial Day, Fourth of July, Labor Day, Veterans Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day
* ENGI0037-026 04/01/2020
Rates Fringes
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 29.08 13.05+a OPERATOR: Bulldozer.............$ 31.03 13.05+a OPERATOR: Excavator.............$ 31.03 13.05+a OPERATOR: Forklift..............$ 31.03 13.05+a OPERATOR: Gradall...............$ 31.03 13.05+a OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 31.03 13.05+a OPERATOR: Roller excluding Asphalt..........................$ 25.45 13.05+a
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and Christmas Day.
IRON0016-012 04/01/2016
Rates Fringes
GLAZIER..........................$ 28.48 19.45
IRONWORKER (Fence Erection-Chain Link/Cyclone).....$ 28.23 19.45
IRONWORKER, ORNAMENTAL,
REINFORCING AND STRUCTURAL.......$ 28.48 19.45
IRONWORKER, SHEETING.............$ 28.73 19.45
LABO0710-007 04/01/2019
Rates Fringes
LABORER: Mason Tender - Brick...$ 19.41 6.06 LABORER: Mason Tender - Cement/Concrete..................$ 19.41 6.06
PAIN0051-022 06/01/2018
Rates Fringes
PAINTER
Industrial..................$ 31.10 11.48 Spray and Paperhanger.......$ 25.06 9.76
PLAS0891-005 07/01/2018
Rates Fringes
PLASTERER........................$ 29.53 6.80
PLAS0891-008 08/01/2016
Rates Fringes
PLASTERER (Fireproofing Including Sprayer, Mixer, and Handler) Handler.....................$ 16.50 4.89 Mixer/Pump..................$ 18.50 4.89 Sprayer.....................$ 23.00 4.89
PLUM0486-012 12/16/2019
Rates Fringes
PIPEFITTER (Including HVAC Pipe and System Installation)....$ 40.97 20.82
ROOF0030-033 07/01/2019
Rates Fringes
ROOFER, Excludes Installation of Metal Roofs...................$ 26.44 12.24
SFMD0669-001 04/01/2020
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 35.70 23.60
SHEE0100-026 11/01/2019
Rates Fringes
SHEET METAL WORKER, Includes HVAC Duct Installation (Excludes Metal Roof Installation)....................$ 33.81 21.13
SUMD2010-078 04/30/2010
Rates Fringes
ABATEMENT WORKER: ASBESTOS
(Removal from Mechanical Systems).........................$ 12.60 3.91
CARPENTER (Acoustical Ceiling Installation Only)...............$ 16.00 2.60
CEMENT MASON/CONCRETE FINISHER...$ 19.52 5.96
ELEVATOR MECHANIC................$ 29.66 9.34
LABORER: Common or General......$ 11.85 2.40
LABORER: Grade Checker..........$ 16.00 2.90
LABORER: Landscape..............$ 10.00 0.00
LABORER: Mason Tender - Stone...$ 14.03 0.00
LABORER: Mortar Mixer...........$ 16.61 9.08
LABORER: Pipelayer..............$ 14.78 3.96
LABORER: Mason Tender (for Pointing, Caulking and Cleaning)........................$ 12.93 0.00
MASON - STONE....................$ 29.82 10.05
OPERATOR: Asphalt Roller........$ 21.35 5.38
OPERATOR: Backhoe...............$ 22.78 5.94
OPERATOR: Boom..................$ 21.44 8.29
OPERATOR: Crane.................$ 20.17 4.64
OPERATOR: Grader/Blade..........$ 16.75 5.79
OPERATOR: Loader................$ 20.01 6.38
PAINTER: Brush and Roller.......$ 19.28 5.04
PLUMBER..........................$ 27.88 10.97
POINTER, CAULKER, CLEANER,
Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 19.75 0.00
SHEET METAL WORKER (Metal Roofs Installation)..............$ 20.71 6.23
TILE FINISHER....................$ 17.32 0.00
TILE SETTER......................$ 21.38 4.65
TRUCK DRIVER: Dump Truck........$ 15.40 1.96
TRUCK DRIVER: Tractor Haul
Truck............................$ 17.87 9.98
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
"General Decision Number: WV20200027 04/24/2020
Superseded General Decision Number: WV20190027
State: West Virginia
Construction Type: Building
County: Taylor County in West Virginia.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor
1 01/24/2020 2 03/13/2020 3 03/27/2020 4 04/17/2020 5 04/24/2020
ASBE0002-002 08/01/2019
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 41.26 25.67
BOIL0667-005 03/01/2018
BOILERMAKER......................$ 39.38 23.77
BRWV0015-004 06/01/2018
Rates Fringes
BRICKLAYER
Bricklayer & Brick Pointer/Caulker/Cleaner.....$ 29.59 21.88
BRWV0015-010 06/01/2018
Rates Fringes
MASON - STONE....................$ 29.59 21.88
CARP0436-001 12/01/2019
Rates Fringes
CARPENTER (Including Drywall Hanging and Form Work)...........$ 28.40 22.75
CARP0443-009 12/01/2019
Rates Fringes
MILLWRIGHT.......................$ 34.75 24.05
ELEC0596-006 06/01/2019
Rates Fringes
ELECTRICIAN......................$ 36.10 24.23
ENGI0132-006 12/01/2018
Rates Fringes
POWER EQUIPMENT OPERATOR:
GROUP 1.....................$ 39.56 19.95
GROUP 2.....................$ 39.21 19.95
GROUP 3.....................$ 38.21 19.95
GROUP 4.....................$ 27.71 19.95
GROUP 1: All Friction Cranes, Tower Cranes and all Cranes with 180 ft. or more of boom including mast and jibs or lifting capacity of 100 tons or more and hoists with 30,000 pound line pull or more
GROUP 2: Operating Cranes and Tower Cranes with a lifting capacity of 15 tons and over
GROUP 3: Backhoe, Excavator, Bulldozer, all other Cranes
GROUP 4: Bobcat/Skid Steer/Skid Loader, Oiler
IRON0549-008 12/01/2018
Rates Fringes
IRONWORKER (Ornamental, Reinforcing, and Structural).....$ 33.34 20.81
LABO0379-007 12/01/2017
Rates Fringes
LABORER
Mason Tender - Cement/Concrete.............$ 21.94 15.75
LABO0984-009 12/01/2017
Rates Fringes
LABORER
Group 1.....................$ 21.58 15.75 Group 2.....................$ 21.94 15.75
LABORER CLASSIFICATIONS
GROUP 1: Carpenter Tender, Common or General, Water Boy
GROUP 2: Concrete Worker, Dewatering, Grade Checker, Mason Tender-Brick, Mortar Mixer, Rigging and Signaling, Scaffold Builder (Brick and Masonry), Skytrak Forklift Operator
LABO1149-004 12/01/2017
Rates Fringes
LABORER
Asphalt Raker...............$ 21.72 16.25
PAIN0091-012 12/01/2019
Rates Fringes
PAINTER (Brush, Roller and Spray)...........................$ 26.37 16.87
PAIN1195-002 12/01/2018
Rates Fringes
GLAZIER..........................$ 30.75 12.24
PLAS0926-007 06/01/2018
CEMENT MASON/CONCRETE FINISHER...$ 31.63 21.26
PLUM0152-009 11/01/2018
Rates Fringes
PLUMBER..........................$ 31.94 33.68
SFWV0669-003 04/01/2020
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 35.37 24.37
SHEE0033-003 06/01/2018
Rates Fringes
SHEET METAL WORKER (Includes HVAC Duct Installation)..........$ 30.65 24.91
* UAVG-WV-0004 01/01/2019
Rates Fringes
LABORER (Pipelayer)..............$ 24.06 16.34
* UAVG-WV-0011 01/01/2019
Rates Fringes
PAINTER (Drywall Finishing/Taping)................$ 26.36 17.68
* UAVG-WV-0018 01/01/2019
Rates Fringes
PIPEFITTER (Includes HVAC Pipe Installation)...............$ 32.21 29.06
SUWV2012-025 08/13/2012
Rates Fringes
OPERATOR: Forklift..............$ 33.09 3.00
ROOFER...........................$ 24.28 9.32
Truck Driver: Single and Double Axle Dump Trucks..........$ 28.52 3.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
"General Decision Number: WV20200046 07/10/2020
Superseded General Decision Number: WV20190046
State: West Virginia
Construction Type: Building
County: Preston County in West Virginia.
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor
1 01/24/2020 2 04/03/2020 3 07/10/2020
ASBE0002-002 08/01/2019
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 41.26 25.67
BOIL0667-005 03/01/2018
Rates Fringes
BOILERMAKER......................$ 39.38 23.77
BRWV0009-007 12/01/2019
TILE SETTER......................$ 29.93 24.38
BRWV0015-004 06/01/2018
Rates Fringes
BRICKLAYER
Bricklayer & Brick Pointer/Caulker/Cleaner.....$ 29.59 21.88
BRWV0015-009 06/01/2018
Rates Fringes
BRICKLAYER
Brick Refractory/Brick Placement Worker............$ 31.92 21.89
BRWV0015-010 06/01/2018
Rates Fringes
MASON - STONE....................$ 29.59 21.88
BRWV0015-014 06/01/2018
Rates Fringes
TILE FINISHER....................$ 23.59 19.95
CARP0003-022 12/01/2016
Rates Fringes
CARPENTER (Including Batt Insulation and Scaffold Builder).........................$ 24.76 18.39
CARP0443-009 12/01/2019
Rates Fringes
MILLWRIGHT.......................$ 34.75 24.05
CARP0604-008 12/01/2016
Rates Fringes
CARPENTER (Form Work Only).......$ 28.70 19.08
ELEC0596-006 06/01/2019
Rates Fringes
ELECTRICIAN......................$ 36.10 24.23
ENGI0132-012 12/01/2018
Rates Fringes
POWER EQUIPMENT OPERATOR:
GROUP 1.....................$ 39.56 19.20
GROUP 2.....................$ 39.21 19.20
GROUP 3.....................$ 38.21 19.20
GROUP 4.....................$ 27.71 19.20
GROUP 1: All Friction Cranes, Tower Cranes and all Cranes with 180 ft. or more of boom including mast and jibs or lifting capacity of 100 tons or more and hoists with 30,000 pound line pull or more, Mechanics with tools with 3/4 inch drive and below
GROUP 2: Operating Cranes and Tower Cranes with a lifting capacity of 15 tons and over
GROUP 3: Bulldozer, Excavator, Forklift, Non-Farm Type Tractor, all other Cranes, all other Mechanics
GROUP 4: Bobcat/Skid Steer/Skid Loader, Farm Type Tractor, Loader
IRON0549-010 12/01/2018
Rates Fringes
IRONWORKER (Ornamental, Reinforcing and Sheeting)........$ 33.34 20.81
IRON0568-019 05/01/2018
Rates Fringes
IRONWORKER (Structural)..........$ 28.56 20.61
LABO0379-014 12/01/2017
Rates Fringes
LABORER
Group 1.....................$ 21.58 15.75 Group 2.....................$ 21.94 15.75 Group 3.....................$ 22.37 15.75 Group 4.....................$ 19.23 15.75
LABORER CLASSIFICATIONS
GROUP 1: Carpenter Tender, Common or General, Landscape
GROUP 2: Bobcat Operator (Clean up/Demolition), Chain Saw, Concrete Saw (Hand Held/Walk Behind), Dewatering, Fence Erection, Grouting, Mason Tender-Brick, Mason
Tender-Cement/Concrete, Rodman, Scaffold Builder (Brick and Masonry), Skytrak Forklift Operator
GROUP 3: Pipelayer
Group 4: Flagger
LABO0379-039 12/01/2017
Rates Fringes
LABORER:
Concrete Worker.............$ 26.17 16.50
LABO1149-009 12/01/2017
Rates Fringes
LABORER..........................$ 21.72 16.25
LABORER CLASSIFICATIONS
Asphalt Raker, Demolition, Grade Checker, Jack Hammer, Mortar Mixer, Plaster Tender, Tamper (Hand Held), Water Boy
PAIN0091-012 12/01/2019
Rates Fringes
PAINTER (Brush, Roller and Spray)...........................$ 26.37 16.87
PAIN0970-007 12/01/2019
Rates Fringes
PAINTER (Drywall Finishing/Taping)................$ 28.85 16.50
PAIN1195-002 12/01/2018
Rates Fringes
GLAZIER..........................$ 30.75 12.24
PLAS0926-002 06/01/2018
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 31.63 21.26
PLAS0926-005 06/01/2018
CEMENT MASON/CONCRETE FINISHER...$ 31.63 21.26
PLASTERER (EIFS and Fireproofing)....................$ 30.06 20.36
PLUM0083-006 07/01/2019
Rates Fringes
PLUMBER..........................$ 32.62 33.53
* ROOF0188-003 07/01/2020
Rates Fringes
ROOFER...........................$ 28.45 17.24
SHEE0033-003 06/01/2018
Rates Fringes
SHEET METAL WORKER (Includes HVAC Duct Installation)..........$ 30.65 24.91
TEAM0175-005 10/01/2019
Rates Fringes
Truck drivers:
GROUP 2.....................$ 29.30 17.81
GROUP 3.....................$ 29.45 17.81
TRUCK DRIVER CLASSIFICATIONS
GROUP 2 - Dump Truck (Up to 5 cu. yds.), Water Tank Truck (Straight)
GROUP 3 - Dump Truck (5 cu. yds. & over), Tractor Haul Truck, Water Tank Truck (Semi)
* UAVG-WV-0025 01/01/2019
Rates Fringes
LABORER (Motorized Buggy Operator)........................$ 21.83 16.00 LABORER (Power Tool Operator)....$ 22.81 16.50
SUWV2012-044 08/13/2012
Rates Fringes
CARPENTER (Drywall Hanging Only)............................$ 23.23 12.13
LABORER (Wacker Roller Operator)........................$ 23.07 11.07
OPERATOR: Backhoe...............$ 21.51 7.36
OPERATOR: Roller................$ 25.24 16.15
PIPEFITTER, Includes HVAC Pipe Installation................$ 25.32 19.97
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .