PWS - JSCG-P Line Haul Services.pdf
PDF 456 KB Posted
- Attached to
- JSCG-P Line Haul Services
- Solicitation number
- W912QL-27-Q-A004
About this file
This is a Performance Work Statement (PWS) for line-haul transportation services supporting the Joint Security Cooperation Group–Panama (JSCG-P) operations across multiple sites in Panama. The contract is a Firm-Fixed Price (FFP) non-personal services contract with a 12-month base period (07 December 2026 to 06 December 2027) and four optional 12-month extension years through 06 December 2031.
The contractor shall provide one 20-foot flatbed truck with 10K forklift capability for palletized equipment and 463L pallet movements, and one 20-foot flatbed truck with crane capability (minimum 10,000-pound rated capacity) for tricon, quadcon, and 20-foot container movements. Services include qualified operators, drivers, riggers, fuel, Panama passes, rigging, loading/unloading support, material handling equipment, and the ability to transport hazardous materials and ammunition when operated by certified personnel. The contractor must maintain operational readiness during the 0800-2000 daily window, capable of conducting up to three trips within each 12-hour period, performing movements on an order basis initiated by the Contracting Officer's Representative (COR). The baseline requirement includes 50 movements using the forklift-equipped truck and 50 movements using the crane-equipped truck per year. Contractor responsibilities encompass all equipment maintenance, personnel training and certification, insurance (full coverage including collision, comprehensive, property damage, and cargo liability per Panamanian law), compliance with U.S. and Panamanian safety standards, background checks for all personnel conducted by Panamanian National Police, and surge capacity to support additional assets when mission demands increase. Key deliverables include a Quality Control Plan within 30 days of award, Anti-Terrorism Level I training certificates within 10 days of completion, proof of insurance prior to initial asset use, base access documentation at least seven days before movement, and monthly invoices with usage reports submitted by 1600 local time on the first Tuesday of each month.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
Version 1
October 2023
410th Ver 1 2023-10
[JSCG-P Line Haul Service]
Part 1
General Information
1. GENERAL: This is a non-personal services contract under which the personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. The United States (U.S.) Government shall not exercise any supervision or control over the Contractor’s employees performing the tasks herein. Such contract employees shall be accountable solely to the Contractor who, in turn shall be responsible to the U.S. Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Line Haul Service for JSCG-P as defined in this PWS except for those items specified as government furnished property (GFP) and government furnished services (GFS). The contractor shall perform to the standards in this contract.
1.2 Background: The Joint Security Cooperation Group–Panama (JSCG-P) requires reliable line-haul transportation services to support operations across multiple sites, including Fort Sherman, Panama Pacífico, Cocolí, Cerro Tigre, Rodman, Panama Pacífico International Airport (PPIA), and JSCG-P Headquarters. These services are critical for the safe and timely movement of containers (tricons, quadcons, and 20-ft containers), palletized equipment (including 463L pallets), hazardous materials, and ammunition in support of ongoing missions. To meet operational demands, the contractor shall provide qualified personnel, 20-foot flatbed trucks with crane capability, 10K forklifts, and material handling equipment (MHE) to ensure uninterrupted logistics support within the designated operational window. The complexity of the road network and the operational tempo necessitate contracted assets to guarantee safe, efficient, and continuous movement of mission-critical cargo.
1.3 Objectives: The Contractor shall provide line-haul transportation services to support JSCG-P operations across Panama for a 12-month base period with four (4) option years, conducting multiple trips (up to three [3]) within a 12-hour window from 0800 and 2000. All movements shall be performed on an order basis, as directed by the Government through the Contracting Officer’s Representative (COR), for either forklift-capable and/or crane-capable flatbed movements as required throughout the performance period.
The baseline requirement is:
• 50 movements using a 20-foot flatbed truck with 10K forklift capability for 463L pallet and other palletized equipment movements. This asset must include 10K forklift capability, transport to each operating site, qualified operator, PPE, driver, fuel, rigging, Panama pass, and loading/unloading support.
• 50 movements using a 20-foot flatbed truck with crane capability for tricon, quadcon, and 20-foot container movements. This asset must include crane capability, qualified operator, PPE, driver, fuel, rigging, Panama pass, and loading/unloading support.
Each movement shall include trucks capable of transporting tricons, quadcons, 20-foot containers, and 463L pallets, with the ability to move hazardous materials (HAZMAT) and ammunition when operated by certified personnel. All movements shall be supported by Material Handling Equipment (MHE), including forklifts.
The Contractor shall also provide surge capacity, certified HAZMAT and ammunition transportation, and qualified drivers, operators, and riggers to ensure compliance with U.S. Government and Panamanian safety standards. The objective is to maintain continuous, compliant, and mission-ready transportation support across all designated sites.
October 2023
1.4 Scope: The Contractor shall provide non-personal line-haul transportation services to support JSCG-P operations across Panama. Services shall include:
• One (1) 20-foot flatbed truck with 10K forklift capability — for 463L pallet and other palletized equipment movements. This asset shall include transport to operating sites, a qualified operator, PPE, driver, fuel, Panama pass, rigging, loading/unloading support, and the ability to conduct HAZMAT and ammunition movements when operated by certified personnel.
• One (1) 20-foot flatbed truck with crane capability — for tricon, quadcon, and 20-foot container movements. This asset shall include a qualified crane operator, PPE, driver, fuel, rigging, Panama pass, loading/unloading support, and the ability to conduct HAZMAT and ammunition movements when operated by certified personnel.
Each asset shall be operated by qualified personnel and equipped with the necessary support, including drivers, operators, riggers, PPE, fuel, Panama passes, and rigging or loading/unloading support as applicable.
All movements shall be supported by Material Handling Equipment (MHE), to ensure safe and efficient loading and unloading. The Contractor shall provide certified personnel for hazardous materials and ammunition movements, with Government-provided escort support by the host nation and Ministerio de Seguridad (MINSEG) documentation. Operational availability shall be maintained daily from 0800 to 2000, with the ability to conduct up to three (3) trips within each 12-hour window.
All transportation services shall be performed on an order basis, initiated by Government tasking through the Contracting Officer’s Representative (COR), and executed within the defined operational window. The Contractor shall maintain surge capacity to provide additional trucks, flatbeds, and forklift assets beyond the baseline requirement when mission demands increase. The Contractor shall provide all required supervision and perform all maintenance necessary to ensure that trucks, cranes, forklifts, and all other operational equipment remain fully functional and compliant with U.S. Government and host-nation safety standards. All services shall be accomplished in coordination with the COR, ensuring compliance with U.S.
Government standards, host-nation regulations, and mission timelines. The Contractor shall deliver containers and equipment across multiple sites, including Fort Sherman, Panama Pacífico, Cocolí, Cerro Tigre, Rodman, Panama Pacífico International Airport (PPIA), and JSCG-P Headquarters, and to any additional locations designated by the COR during the performance period.
1.5 Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and four (4) 12-month option years. The start date is 07 December 2026 to 06 December 2027, the option years are as follows:
OY1: 07 December 2027 – 06 December 2028 OY2: 07 December 2028 – 06 December 2029 OY3: 07 December 2029 – 06 December 2030 OY4: 07 December 2030 – 06 December 2031
1.6 General Information:
1.6.1 Quality Control Plan (QCP): The Contractor shall develop, implement, and maintain a QCP and program to ensure all work described in this contract is performed at or above the standard defined in the Performance Requirements Summary (PRS). The QCP is developed by the contractor for its internal use to ensure that it performs and delivers high-quality service. The Contractor’s QCP is the means by which the contractor ensures all work complies with the requirements of the contract. The QCP identifies and corrects potential and actual problem areas throughout the entire scope of the contract.
1.6.1.1 The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor shall submit the Quality Control Plan (QCP) within thirty
(30) calendar days after contract award. The QCP shall meet the minimum requirements in paragraph 1.6.1.
October 2023
The Contractor shall submit proposed QCP changes to the Contracting Officer (KO) at least five (5) calendar days before implementation. No QCP change may be implemented without written KO approval.
The Contractor shall provide a copy to the COR for inclusion in the COR contract file {Deliverable A001}.
1.6.1.2 The Quality Control Plan shall address as a minimum:
1.6.1.2.1 Inspection Program. Included shall be a quality control inspection program covering all general and specific tasks included in the contract scope of work. It shall specify tasks or areas to be inspected on a scheduled or unscheduled basis, the manner in which inspections are to be conducted, the titles of the individuals who will perform the inspections, and the percentage of the work that will be inspected on a recurring basis. In developing this inspection program, the Contractor shall identify the key activities and associated characteristics in each process that have a significant influence on specific services and provide for methods for evaluation of the selected characteristics.
1.6.1.2.2 Deficiency Identification. The QCP shall include a method of identifying deficiencies in the quality of services performed before the level of performance becomes unacceptable as defined in the PRS.
This shall contain processes for corrective action without dependence upon Government direction.
1.6.1.2.3 Deficiency Correction. The program shall contain process control and process performance measurement procedures that shall include how the Contractor shall implement preventive corrective actions. The Contractor shall demonstrate that it has designed quality into the delivery of services thereby mitigating the risk(s) associated with delivery of deficient or nonconforming services.
1.6.1.2.4 Documentation and Enforcement. The QCP shall include a method of documenting and enforcing quality control operations of both prime contractor and subcontractor work; including inspection and testing.
1.6.1.2.5 Trend Analysis. The QCP shall include a method of performing trend analysis and assessments through the use of metrics.
1.6.1.2.6 Surveillance Methods. The QCP shall contain specific surveillance techniques for all contract services. The surveillance methods shall be comprehensive and adaptable to the reporting system of the plan.
1.6.2 Quality Assurance (QA): The government shall evaluate the contractor’s performance under this contract in accordance with (IAW) the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed IAW the performance standards and contract quality requirements are met. Contract quality requirements” means the technical requirements in the contract relating to the quality of the product or service and those contract clauses prescribing inspection, and other quality controls incumbent on the contractor, to ensure the product or service conforms to the contractual requirements. It defines how the performance standards will be applied, the frequency of surveillance, the performance threshold, and deductions, if applicable.
1.6.3 Recognized Holidays: The Contractor shall perform services when required to include weekends and country holidays as requested by the contract.
1.6.4 Hours of Operation: The contractor is responsible for conducting business between the hours of 0800 to 2000 Monday through Sunday, except when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must, at all times, maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
1.6.5 Place of Performance: The work under this contract shall be performed across the Republic of Panama, including Fort Sherman, Panama Pacífico, Cocolí, Cerro Tigre, Rodman, Panama Pacífico International Airport (PPIA), JSCG-P Headquarters, and connecting road networks.
October 2023
1.6.6 Type of Contract: The Government anticipates the award of a Firm-Fixed Price (FFP) contract.
1.6.7 Access and General Protection Policy and Procedures:
1.6.7.1 FPCON: In addition to the changes otherwise authorized by the changes of clause of contract, should the US Government Force Protection Condition (FPCON) at any individual installation change, the Government may require changes in contractor security matters or process in accordance with DoDI 2000.16.
During FPCONs Charlie and Delta, only contract services that have been deemed “mission essential” by the Government will continue. Contract services will resume when the FPCON is reduced to Bravo or lower.
1.6.7.2 Physical Security: RESERVED.
1.6.7.3 Escorts: The Contractor and all associated sub-contractor employees shall always be escorted by host nation security personnel or by an individual designated by the Contracting Officer Representative (COR) while accessing U.S. facilities or activities, or controlled spaces. Uncleared contractors will allow sufficient time to announce the presence of any uncleared visitors prior to entering any controlled facility to allow staff sufficient time to safeguard sensitive, classified, or critical information against inadvertent disclosure.
1.6.7.4 Personnel Security Clearance Requirements: RESERVED.
1.6.7.5 Background Checks: The Contractor shall ensure all contractor and subcontractor employees performing services under this contract have passed a background check conducted by the Panamanian National Police (Policía Nacional de Panamá) or other Host Nation authority responsible for criminal history verification. Background checks previously completed as part of a personnel security clearance investigation or as a condition of employment may be accepted if they meet Host Nation standards.
Documentation of completed background checks must be made available to the KO, KS, and COR within ten (10) {Deliverable A002}.
The Government reserves the right to deny or revoke an employee’s access to the worksite if a background check indicates the individual poses a security risk. Removal of an employee for security reasons does not relieve the Contractor of its obligation to perform all required services under this contract.
If the Government determines additional background checks are required, the Contractor shall provide the following information for any contractor or subcontractor employee performing services under this contract, upon request from the KO and COR {Deliverable A003}:
• Full birth name
• Married name (if applicable)
• SSN or local equivalent (ID card number)
• Date of birth
• Place of birth (city, country)
• Home telephone number
• Cellular telephone number
• E-mail address
1.6.7.5.1 Background Check Notification Requirements: If a background check on any employee or subcontractor employee performing services under this contract, whether the check was conducted as a condition of employment or as part of the contract with the Government, reveals any information from any source (including host country law enforcement) of criminal activity by Contractor employees, subcontractors, or subcontractor employees, the Contractor shall notify the KO and COR of that information within 24 hours. The Contractor shall make notification of:
(1) Traffic violations, other than parking, will be reported to the KO or COR only if the contract is for drivers for the Government;
October 2023
(2) Any suspicious activity by Contractor employees, subcontractors, or subcontractor employees the Contractor believes may pose a risk to U.S. or host nation national security or imminent risk of deadly bodily harm to any person; and
(3) Any actions taken against Contractor employees, subcontractors, or subcontractor employees pursuant to this requirement.
1.6.7.5.2 Remedies. In addition to other remedies available to the Government, the Contractor’s failure to comply with the requirements of this paragraph may result in requiring the Contractor to remove a Contractor employee or employees from the performance of the contract.
1.6.7.5.3 Subcontracts. The Contractor shall include the substance of this paragraph and the preceding paragraph in all subcontracts.
1.6.7.6 Uncleared Contractor Common Access Card (CAC) Credentialing and Access Procedures:
RESERVED.
1.6.7.6.1 Contractor Common Access Card (CAC) Eligible Requirements: RESERVED.
1.6.7.6.1.1 Federal Installation/Facility Access: Contractor and all associated sub-contractor employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The employee performing services under this contract shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, Security Office or the host nation equivalent.
1.6.7.6.2. Contractor Non CAC Eligible Requirements for DOD Facility and Installation Access:
RESERVED
1.6.7.7 Employment Eligibility: The Contractor shall ensure that all Contractor employees and sub-contractor employees performing services under this contract are employed in accordance with Panamanian labor laws and regulations.
1.6.7.8 Access to Government Information Systems: RESERVED.
1.6.7.9 Key Control: RESERVED.
1.6.7.10 Lock Combinations: RESERVED.
1.6.8 Post Award Conference/Contract Periodic Progress Meetings: The Contractor shall attend the post award conference convened by the contracting activity or contract administration office IAW Federal Acquisition Regulation (FAR) Subpart 42.5. The KO, COR, with other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the KO will apprise the contractor of how the government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government. Knowledge of any items that impact on the unit’s ability to conduct its mission or support operations, as well as measures taken to resolve these shortcomings, must not be disseminated outside of need-to-know channels.
1.6.9 Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: ensure the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor
October 2023
Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinate availability of government furnished property; and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.10 Key Personnel: The following are considered key personnel: The Contract Manager and Alternate Contract Manager. The Contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate, who shall act for the Contractor when the manager is absent, shall be designated in writing to KO and COR within three (3) calendar days after contract award (and within 24 hours of any replacement) and submit {Deliverable A004}.Contract Manager and alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The Contract Manager or alternate shall be available between 0800 and 2000 Monday thru Sundays except when the government facility is closed for administrative reasons.
Qualifications for all key personnel are listed below:
Contract Manager and Alternate Contract Manager: The Contract Manager and/or Alternate Contract Manager shall be able to speak, read, write, and understand English.
1.6.11 Special Qualifications or Certifications: Contractor employees shall be certified crane operators, certified 10K forklift operators, certified riggers and certified HAZMAT/ammunition drivers.
1.6.11.1 IA/IT Training Certification: RESERVED.
1.6.12 Identification of Contractor Employees: Contractor employees shall identify themselves as Contractor personnel and shall avoid representing themselves as Government employees. This identification includes meeting attendance, answering Government telephones, email communications, and working in other situations where Contractor status is not obvious. Contractor personnel identification shall be easily identifiable through the display of badges, name tags, lanyards, etc.
1.6.12.1 Badging of Contractor Employees: If required by the Government, contract personnel and all associated subcontractors’ employees accessing U.S. facilities or activities, shall present a valid picture ID while accessing Government owned or contracted facilities and shall adhere to facility security policies and restrictions.
1.6.12.2 Uniform: The Contractor shall provide a standard uniform for all Contractor and subcontractor employees and ensure they wear the uniform while performing on-site services under this contract (e.g, delivery, retrieval and maintenance).
1.6.13 Contractor Travel: RESERVED.
1.6.14 Other Direct Costs (ODC): RESERVED.
1.6.15 Data Rights: RESERVED.
1.6.16. Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. Neither the Contractor, nor Contractor personnel, shall divulge, nor release data or information developed, or obtained under performance of this work statement, except to authorize Government personnel or upon written approval of the KO. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall apply, and shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.
October 2023
1.6.16.1 Non-Disclosure Statements: The Contractor shall provide signed non-disclosure agreements to the KO and COR at least 24 hours prior to commencement of work under the contract {Deliverable A016}.
1.6.16.2 Advertisement and Social Media: The Contractor shall NOT post information to public website or social media locations, personal or professional, that in any way disclose names, locations, hotel data, participants, discussions, pictures, etc. before, during or after the contract period of performance without the express consent of the Government. The use of propaganda violates DOD Commercial Use of Imagery Guidelines stated at (www.dimoc.mil/resourcess/limitations/). The Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any marketing tools to include its company website.
1.6.16.3 INFORMATION ASSURANCE: At no time will the Contractor or associated sub-contractor employees transmit government documents or information over using methods that do not meet the security requirements specified in the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, "Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations" such as personal electronic mail accounts, public digital data storage sites (cloud storage), social media platforms or instant messaging. Approved government sites such as U.S. Army Aviation and Missile Research Development and Engineering Center (ARMDEC) Safe Exchange at https://safe.amrdec.army.mil/SAFE/About.aspx, or All Partners Access Network (APAN) at https://community.apan.org/, or other transmission means determined by the government must be used.
1.6.17 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the KO immediately and per occurrence whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan within 24-hours to the KO to avoid or mitigate any such OCI {Deliverable A005}. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.18 Phase-in/Phase-Out (PIPO) Period: RESERVED.
1.6.19 General Training Requirements:
1.6.19.1 Anti-Terrorism (AT) Level I Training: The Contractor shall complete AT Level I Training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 30 calendar days after employment of new personnel, all Contractor employees, including subcontractor employees, who are employed under the contract shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR and KO within 10 calendar days after completion of training by all employees and subcontractor personnel {Deliverable A006}. For Common Access Card (CAC) holders, AT Level I awareness training is available at https://jkodirect.jten.mil, course number “JS-US007-14”. For non-CAC holders, AT Level I awareness training is available at http://jko.jten.mil/courses/atl1/launch.html (this standalone version is intended for non-CAC users without a JKO account only). Training must have been completed within the last 12 months and maintained yearly thereafter. If training cannot be conducted on the website, the Contractor will coordinate with the local AT Officer at their assigned location for classroom training by a Level 2 trained AT Officer and a copy of either the training certificate or the training attendance roster signed by the AT Officer will be maintained by the Contractor. Verification of the training will be provided to the COR or KO within 10 calendar days after completion of the training.
http://www.dimoc.mil/resourcess/limitations/
October 2023
1.6.19.2 OPSEC Awareness: If the contractor, or a subcontractor, or employees of either disclose any information identified on the unit’s Critical Information List that disrupts or harms the Government's operations or activities, then the Government retains the right to exclude any employee from performance of duties under this contract. The exclusion of an employee for security reasons will not relieve the contractor from performance of services required under this contract. By way of example, personnel shall not sketch or take photos of government facilities or activities, unless related to service to be provided. All government paper products and removable digital storage material that is received, generated, or stored during the contract will be destroyed completely when no longer needed to preclude recognition of information. Approved methods of destruction may include, when feasible and allowed, cross-cut shredding, burning, pulping pulverizing and degaussing. The contractor shall immediately report any incidents of anyone attempting to obtain sensitive or proprietary information by unauthorized individual(s) and remain alert to such attempts via social engineering, phishing, or online communication. A prepublication review is required by the COR/KO prior to releasing any information related to the activities, plans and operations associated with this support. Specific details and knowledge of the location, time and place of support activities associated with this US/Partner Nation(s) effort will be kept close hold and will only be shared with personnel who have a need-to-know.
1.6.19.3 Information Assurance (IA) Training: RESERVED.
1.6.19.4 Information Assurance (IA)/Information Technology (IT) Training: RESERVED.
1.6.19.5 Threat Awareness Reporting Program (TARP Training): RESERVED.
1.6.19.6 iWATCH Training: RESERVED.
1.6.19.7 OPSEC Training: RESERVED.
1.6.20 Overseas Training Requirements:
1.6.20.1 Antiterrorism (AT) Awareness Training for Contractor Personnel Traveling: RESERVED.
1.6.20.2 SERE Training: RESERVED.
1.6.21 Foreign (OCONUS) Requirements: RESERVED.
1.6.21.1 Theater and Country Clearance Requirements: RESERVED.
1.6.21.2 Vetting: The Contractor company and all associated sub-contractor companies must have been vetted by the US Embassy in the country which the contract will be performed. For the purposes of this contract, the company is considered vetted if the company is located in the country which the contract will be performed unless the company has been previously barred from performing services for the Government. If during a previous vetting process the company was barred from performing service for the Government, then that is grounds for termination of the contract. If the company is located outside of the country which the contract will be performed, the company must be vetted by the US Embassy in the country of performance. Vetting will coordinate through the US Embassy's DOD Security Cooperation Office (SCO) in the country of performance. If during any previous vetting process in other countries, the company is found to be barred from performing services for the Government; this finding is grounds for termination of the contract.
1.6.21.3 Installation Access to DOD Facility or Host Nation Installation: Contractor and all subcontractor employees performing services under this contract shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) (U.S. citizen and residents only), and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and areas commander installation/facility access and local security policies
October 2023 and procedures (provided by the COR or KO), and status of forces agreements or other diplomatic agreements. The employee performing services under this contract shall provide all information required for background checks to meet installation access requirements to the installation Provost Marshal Office, Director of Emergency Services, Security Office, or host nation equivalent.
1.6.21.4 Host Nation Installation Access with No DOD Facility: Contractor and all associated subcontractor employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures. The employee performing services under this contract shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, Security Office or the host nation equivalent.
1.6.21.5 Deoxyribonucleic Acid (DNA) Samples: RESERVED.
1.6.21.6 Medical Travel Requirement: RESERVED.
1.6.22 Synchronized Pre-deployment and Operational Tracker (SPOT): RESERVED.
1.6.23 Safety: The following provides information pertaining to Safety and Accident Prevention:
1.6.23.1 (OCONUS - Host Nation) Safety Laws and Regulations: The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991), the references contained therein (e.g. U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)), and applicable Host Nation Safety Laws and Regulations.
1.6.24 Environmental Compliance: The contract requires transportation of HAZMAT, ammo, and fuel across the Panama Canal. The Contractor shall comply with Panamanian Ministry of Environment (Ministerio de Ambiente - MiAMBIENTE) regulations, Panama Canal Authority (Autoridad del Canal de Panamá - ACP) watershed transport rules (if crossing the Canal/Cocolí/Rodman), and immediate spill containment/reporting procedures.
October 2023
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. Definitions:
2.1.1 Area of Responsibility. The U.S. Southern Command (USSOUTHCOM) area of responsibility (AOR) includes the geographic areas of Antigua and Barbuda, Argentina, Aruba, Barbados, Belize, Bolivia, Brazil, British Virgin Islands, Cayman Islands, Chile, Colombia, Costa Rica, Cuba, Curacao, Dominica, Dominican Republic, Ecuador, El Salvador, Falkland Islands, French Guiana, Grenada, Guadeloupe, Guatemala, Guyana, Haiti, Honduras, Jamaica, Martinique, Mayotte, Montserrat, Nicaragua, Panama, Paraguay, Peru, Saint Barthélemy, Saint Martin, Saint Kitts and Nevis, Saint Lucia, Saint Vincent and the Grenadines, Saint Maarten, Suriname, Trinidad and Tobago, Turks and Caicos Islands, Uruguay, and Venezuela.
2.1.2. Contractor. The total contractor organization or a separate entity of it; such as an affiliate, division, or plant that performs its own purchasing.
2.1.3. Contracting officer (KO). A person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings.
2.1.4. Contracting Officer’s Representative (COR). An individual designated and authorized in writing by the contracting officer to perform specific technical or administrative functions.
2.1.5. Defective Service. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.6. Deliverable. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.7. Foreign National. A foreign national is not a U.S. citizen. Green card holders are also identified as foreign nationals. A foreign national is further categorized as either a third country national or a local national based on the person’s citizenship and location of performance of duty.
2.1.8. Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.9. Local National. Local nationals are foreign nationals who are citizens of the country where the performance of duty will occur.
2.1.10. Performance Work Statement (PWS). A statement of work for performance-based acquisitions that describes the required results in clear, specific, and objective terms with measurable outcomes.
2.1.11. Physical Security. Protection of the perimeter area, government property, and assets that prevent the loss or damage of Government property.
2.1.12. Quality Assurance. The various functions, including inspection, performed by the government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.
2.1.13. Quality Assurance Surveillance Plan (QASP). A plan describing how the agency will survey, observe, test, sample, evaluate and document the Contractor’s performance in meeting critical performance standards identified in the contract.
October 2023
2.1.14. Quality Control (QC). Tasks performed by the Contractor to improve the quality of the organization’s output.
2.1.15. Shall. An imperative command; has a duty to or is required to. Denotes that a regulation must be followed unless the contracting officer has obtained a deviation.
2.1.16. Subcontractor. Any supplier, distributor, vendor, or firm that furnishes supplies or services to or for a prime contractor or another subcontractor.
2.1.17. Third Country National. Third country nationals are foreign nationals who are not citizens of the country where the performance of duty will occur.
2.1.18. Work Day. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.19. Work Week. Monday through Sunday, unless specified otherwise.
2.2 Acronyms:
AFFSSIR Armed Forces Repository of Specimen Samples ALMS Army Learning Management System ANSI American National Standards Institute AOR Area of Responsibility AR Army Regulation ATCTS Army Training Certification Tracking System AT Anti-Terrorism CAC Common Access Card CFR Code of Federal Regulations CI Counter Intelligence CLIN Contract Line Item Number CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative DBA Defense Base Act DD Form 254 Department of Defense Contract Security Requirement List DNA Deoxyribonucleic Acid (DNA) DOD Department of Defense DODD Department of Defense Directive DODI Department of Defense Instruction DOW Department of War FAR Federal Acquisition Regulation FHP Force Health Protection FCG Foreign Clearance Guide FN Foreign National FY Fiscal Year GFE Government Furnished Equipment GFP Government Furnished Property GFS Government Furnished Services HAZMAT Hazardous Material IA Information Assurance IAW In Accordance With IT Information Technology JSCG-P Joint Security Cooperation Group–Panama JPAS Joint Personnel Adjudication System JTR Joint Travel Regulation
October 2023
KO Contracting Officer LN Local National LOA Letter of Authorization MHE Material Handling Equipment MINSEG Ministerio de Seguridad NCIC-III National Crime Information Center Interstate Identification Index NIST National Institute of Standards and Technology ODC Other Direct Costs OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OSHA Occupational Safety and Health Administration OPSEC Operation Security PIPO Phase In/Phase Out PPIA Panama Pacífico International Airport PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QCP Quality Control Program RA Requiring Activity SCR Service Contract Reporting SOP Standard Operating Procedures SPOT Synchronized Predeployment and Operational Tracker TCN Third Country National TE Technical Exhibit TSDB Terrorist Screening Data Base U.S.C. United States Code USSOUTHCOM United States Southern Command
October 2023
THIS SECTION INTENTIONALLY LEFT BLANK
October 2023
PART 3
Government Furnished Equipment (GFE), Government Furnished Property (GFP), and Government
Furnished Services (GFS)
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services: US Government Escort of HAZMAT and Ammunition.
3.2 Facilities: RESERVED
3.3 Utilities: RESERVED
3.4 Equipment: RESERVED
3.5 Materials: RESERVED
3.6 Common Access Cards (CAC): RESERVED
October 2023
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Part 3 of this PWS.
4.2 Facility Security Clearance: RESERVED.
4.3. Materials: The Contractor shall furnish all materials required to support line-haul transportation operations under this PWS. Materials shall include rigging, strapping, blocking, chocking, and any other items necessary to safely secure and transport tricons, quadcons, 20-foot containers, 463L pallets, and other palletized equipment. The Contractor shall also provide all required PPE for drivers, operators, and riggers, as well as any consumable materials needed to support loading, unloading, and movement operations throughout the performance period.
4.4. Equipment: The Contractor shall furnish all equipment necessary to meet the requirements of this PWS. Required equipment includes 20-foot flatbed trucks with 10k forklift capability for 463L pallet and palletized equipment movements, and 20-foot flatbed trucks with crane capability for tricon, quadcon, and 20-foot container movements. The Contractor shall also provide MHE, and any additional equipment required to safely load, unload, lift, stage, or transport mission-critical cargo. All equipment shall be fully operational, compliant with U.S. Government and Panamanian safety standards, and available to perform movements ordered through the COR.
4.5. Insurance: All insurances required by the Government of Panama to operate within the country shall be obtained and maintained as required by the Government of Panama. Insurance requirements include but are not limited to: Third-Party Damage, Personal Injury/Fatality, coverage for additional passengers, and representation in criminal and civil court proceedings.
4.5.1. Worker’s Compensation and Employers Liability Insurance as required by law except that if the contract is to be performed in a country which does not require or permit private insurance, then compliance with the statutory or administrative requirements for the Country of Panama. The required Worker’s Compensation insurance shall extend to cover employer’s liability for accidental bodily injury or death and for occupational disease with a minimum liability limit as required by the Government of Panama.
4.5.2 Defense Base Act (DBA) Insurance: When the DBA applies, the Contractor shall comply with FAR
28.305 and the contract clause at FAR 52.228-3, Workers' Compensation Insurance (Defense Base Act).
Any DBA waiver and any alternate workers' compensation or war-hazard insurance requirement shall be established only by the KO in accordance with FAR 28.305 and 28.309.
October 2023
SPECIFIC TASKS
5. Specific Tasks: The Contractor shall provide non-personal line-haul transportation services to support JSCG-P operations across Panama. Services shall include:
• One (1) 20-foot flatbed truck with 10K forklift capability — for 463L pallet and other palletized equipment movements. This asset shall include transport to operating sites, a qualified operator, PPE, driver, fuel, Panama pass, rigging, loading/unloading support, and the ability to conduct HAZMAT and ammunition movements when operated by certified personnel.
• One (1) 20-foot flatbed truck with crane capability — for tricon, quadcon, and 20-foot container movements. This asset shall include a qualified crane operator, PPE, driver, fuel, rigging, Panama pass, loading/unloading support, and the ability to conduct HAZMAT and ammunition movements when operated by certified personnel.
Each asset shall be operated by qualified personnel and equipped with the necessary support, including drivers, operators, riggers, PPE, fuel, Panama passes, and rigging or loading/unloading support as applicable.
All movements shall be supported by Material Handling Equipment (MHE), to ensure safe and efficient loading and unloading. The Contractor shall provide certified personnel for hazardous materials and ammunition movements, with Government-provided escort support and Ministerio de Seguridad (MINSEG) documentation. Operational availability shall be maintained daily from 0800 to 2000, with the ability to conduct up to three (3) trips within each 12-hour window.
All transportation services shall be performed on an order basis, initiated by Government tasking through the Contracting Officer’s Representative (COR), and executed within the defined operational window. The Contractor shall maintain surge capacity to provide additional trucks, flatbeds, and forklift assets beyond the baseline requirement when mission demands increase. The Contractor shall provide all required supervision and perform all maintenance necessary to ensure that trucks, cranes, forklifts, and all other operational equipment remain fully functional and compliant with U.S. Government and host-nation safety standards. All services shall be accomplished in coordination with the COR, ensuring compliance with U.S.
Government standards, host-nation regulations, and mission timelines. The Contractor shall deliver containers and equipment across multiple sites, including Fort Sherman, Panama Pacífico, Cocolí, Cerro Tigre, Rodman, Panama Pacífico International Airport (PPIA), and JSCG-P Headquarters, and to any additional locations designated by the COR during the performance period.
Tasks consist of the following:
5.1 Basic Services: The Contractor shall provide the separate line-haul service objectives identified in paragraphs 5.2 through 5.10. Each written Government movement request shall identify the requested service, pickup and delivery locations, cargo type and quantity, required asset type, requested movement window, and any required access, escort, or inspection coordination. A movement request coordinates performance under the existing contract and does not change contract scope, price, terms, or conditions;
only the KO may authorize a contract change.
October 2023
5.2 Vehicle Specifications:
5.2.1 20-foot Flatbed Truck and 10K Forklift: The Contractor shall provide one (1) 20-foot flatbed truck and one (1) 10,000-pound-capacity forklift to support palletized cargo and 463L pallet movements. The written Government movement request shall identify whether the flatbed truck, forklift, or both assets are required for the movement.
(a) STD: The Contractor shall provide a 20-foot flatbed truck that is operational, maintained in accordance with the manufacturer's preventive-maintenance requirements, and suitable for the requested load and route.
AQL: 100% compliance
(b) STD: The Contractor shall provide one 10,000-pound-capacity forklift that is operational, maintained in accordance with the manufacturer's preventive-maintenance requirements, and equipped with manufacturer-approved forks and attachments appropriate for the requested palletized load.
AQL: 100% compliance
(c) STD: The Contractor shall configure forklift forks and attachments in accordance with the forklift manufacturer's load chart and the cargo manufacturer's handling instructions. The Contractor shall not use the forklift to handle a load that exceeds the rated capacity for the applicable load center and attachment configuration.
AQL: 100% compliance
(d) STD: Forklift operations shall be performed by trained and authorized operators in accordance with 29 CFR 1910.178, Panama Canal Authority (ACP) Standard 2600SEG111 when operating in ACP-controlled areas, and applicable Panamanian occupational-safety requirements.
AQL: 100% compliance
(e) STD: The Contractor shall complete and document a pre-use forklift inspection before each day of operation and shall remove from service any forklift with a safety deficiency until corrected.
AQL: 100% compliance
5.2.2 20-foot Flatbed Truck With Truck-Mounted Crane Capability: The Contractor shall provide one (1) 20-foot flatbed truck equipped with a truck-mounted crane to support tricon, quadcon, and 20-foot container movements. The written Government movement request shall identify the cargo type, quantity, lift requirement, and requested movement window.
(a) STD: The Contractor shall provide a crane-equipped flatbed truck that is operational, maintained in accordance with the manufacturer's preventive-maintenance requirements, and suitable for the requested load, lift radius, and route.
AQL: 100% compliance
(b) STD: The truck-mounted crane shall have a manufacturer-rated capacity of at least 10,000 pounds at the lift radius required for the requested movement and shall use rigging appropriate to the load and lift plan.
AQL: 100% compliance
(c) STD: Truck-mounted crane operations shall be performed by trained and qualified operators in accordance with 29 CFR 1910.180 or 29 CFR 1926 Subpart CC, as applicable to the work performed, applicable manufacturer requirements, and applicable Panamanian occupational-safety requirements.
AQL: 100% compliance
(d) STD: The Contractor shall inspect the crane and rigging before use, document the inspection, and remove from service any equipment with a safety deficiency until corrected.
October 2023
5.3 Delivery, Drop-Off, and Pickup:
5.3.1 Delivery and Drop-Off Task: The Contractor shall deliver cargo to the designated delivery location identified in the written Government movement request. Each request shall identify the cargo type and quantity, pickup and delivery locations, required asset type, requested movement window, and any required access, escort, or inspection coordination. The Contractor shall safely off-load and stage cargo at the designated location in accordance with the contract and the applicable cargo-handling instructions.
(a) (a) STD: The Contractor shall complete each delivery within the 0800-2000 operational window, with no more than three (3) trips in a 12-hour period, after receiving a written Government movement request at least seventy-two (72) hours before the requested movement and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .